电力建设工程劳务分包安全协议

范文类型:合同协议,适用行业岗位:电力,工程,全文共 2824 字

+ 加入清单

编号: ______________

发包人:_______________________________________________________________________

承包人:_______________________________________________________________________

分包工程名称:_________________________________________________________________

施工地址:______________________________________________________________ 区(县)

北京市建设委员会

发包人(全称):_____________________________________________________________

承包人(全称):_____________________________________________________________

根据《中华人民共和国民法典》、《中华人民共和国建筑法》及其他有关法律法规,遵循平等自愿、公正和诚实信用的原则,双方就建设工程劳务合作事项协商一致,订立本合同。

第一条 工程概况及承包工作内容

1?1工程名称:__________________________________________________________________

1?2工程概况:_________________________________________________________________

1?3分包工作内容:____________________________________________________________

范围包括:_____________________________________________________________________

1?4 工程监理单位 (全称):_____________________________________________________

_______________________________________________________________________________

第二条 作业人员

承包人根据工程需要向发包人提供作业人员共_______名。

第三条 合同工期

开工日期_____年____月_____日,完工日期_____年____月_____日,工期为______天。

第四条 合同价款

4?1合同价款为:_________元(人民币) 大 写:_________元

4?2合同价款的确定原则(在确认的方式前划"√"):

经过招投标确定或虽未经招投标程序,由承、发包双方协商一致,确认:

( )4?2?1本合同价款为固定价格,在约定的风险范围内合同价款不再调整。

( )4?2?2以( )年施工预算或( )年施工概算定额为依据:

①定额工资单价为:

瓦 工_____元/工日;结构木工______元/工日;装修木工_____元/工日;钢 筋 工_____元/工日;

砼 工_____元/工日;油 工_______元/工日;抹 灰 工_____元/工日;架 子 工_____元/工日;

水 暖 工_____元/工日;电 工______元/工日;壮 工_____元/工日;_______;_______;_______ ;

② 按建筑面积确定承包价_____元/平方米;其中, 地上结构:_____元/M2;地下结构:_____元/M2;初 装 修:_____元/M2;水 电:______元/M2;________; _________;

③分项工程承包:

外墙面砖:_______元/M2;屋面防水:_______元/M2;

水磨石地面:_______元/M2;水泥砂浆:_______元/M2;

内墙普通抹灰:_______元/M2;________;________;________。

( )4?2?3定额工以外发生的零星用工单价_______元/工日;(以实际发生,书面签证资料为准)

( )4?2?4因不可抗力、一周内非承包人原因停水、停电、停气或安排任务不及时等原因造成的停工、窝工累计超过八小时的按________________标准补偿。

4?3对合同价款内容的明确:_______________________________________________________________

第五条 合同价款的结算和支付

5?1 结算、决算资料:

5?1?1发包人向承包人提供工程施工图或工程量清单,承包人依据上述书面资料按本合同条款编制的施工预算书。

5?1?2承包人根据发包人下达的施工任务书或现场负责人的指令,安排作业人员完成作业内容,并取得有效的书面签证单据编制人工结算书。

5?1?3有效的月度工作量结算资料及书面洽商变更、现场签认资料等。

5?2合同价款的结算和决算:

5?2?1发包人应于每月____日对承包人完成的工程量给予核实、 确认并共同履行书面结算手续。

5?2?2工程交工后28日内,承包人向发包人递交完整的决算资料,发包人在收到决算资料后28日内进行核实,给予确认并办理分包工程决算手续。

5?3合同价款的支付:

5?3?1合同价款分期支付:在_____年______月______日付款_______元,在______年_______月_______日付款_______元,

5?3?2分期支付劳务费的,每期支付的劳务费数额不得少于己办理结算额的80%,余款在发包人对决算资料予以确认后28日内付清。

5?3?3合同价款的支付必须以银行转帐的形式办理,付款时发包人不得以现金方式向承包人支付劳务费。

5?3?4办理支付的手续为:承包人为外地进京施工企业的,应向发包人出据“北京市外地进京施工企业专用发票”作为收款凭证,发包人须将填写齐全的、票据收款人为承包人全称的支票或汇票交付给承包人指定的人员。

第六条 安全施工、重大伤亡及其他安全事故处理

6?1安全施工:发包人、承包人必须贯彻、执行国家和政府、行业主管部门颁布实施的有关安全生产的法律法规及各项规定,严格按安全标准组织施工。

6?2重大伤亡及其他安全事故处理:

6?2?1发生重大伤亡及其他安全事故,承发包双方应采取紧急措施防止事态扩大并全力组织抢救伤者,保护事故现场,如因抢救伤者必须移动现场设备,须作出书面记录或拍照。

6?2?2按照有关规定,发包人承包人应分清责任,由事故责任方承担相应的责任。发包人承包人对事故责任有争议时,应按政府有关部门的认定处理。

6?3对本工程的安全生产标准,双方约定如下:________________________________________________

展开阅读全文

更多相似范文

篇1:工程劳务合同范本2024_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 2046 字

+ 加入清单

工程劳务合同范本2018

接受劳务方(甲方):____________________________

提供劳务方(乙方):____________________________

依照《中华人民共和国合同法》和其他相关法律、法规的有关规定,经双方协商一致,签订本合同,并严肃履行。

第一条 工程项目

一、工程名称:

二、工程地点:

三、劳务承包工程范围及工作内容(见附表1)

四、工期________年____月____日开工,________年____月____日竣工。

五、承包劳务费用________元。(见附表1)

六、乙方投入工种及人数________人。

第二条 工程结算

第一个月预支生活费,按当月实际进场人数每人100元计算,下月结算时扣回,在工程施工进行中按当月完成的经甲方和监理验收合格工程量结算,按比例扣除保修金(结款额度不超过已完成量的80%)。工程竣工验收合格后,予以结算。

第三条 工程质量

甲方根据《建筑给水排水及采暖工程施工质量验收规范》gb50242-和相关文件组织验收,乙方按照《建筑给水排水及采暖工程施工质量验收规范》gb50242-、施工图纸、进度计划、技术交底、安全交底要求,精心组织施工,保证工程质量,如因乙方施工原因造成质量不合标准,必须返工修理,其工料费损失,由乙方承担;如工程质量低劣又无法挽救的,由乙方负责赔偿全部工料损失和甲方由此造成的其它损失。

第四条 安全生产

一、甲方对乙方承担的工作要做安全交底,提出明确的安全要求,并进行监督检查,检查发现问题,甲方有权停止其工作并进行经济处罚。乙方必须认真贯彻有关安全施工的规章制度,严格遵守安全操作规程,对甲方提供的安全生产用品,乙方经检查方可使用,施工中如因违反上述规定而发生伤亡事故,由乙方负全部责任。

二、劳动保护用品及施工中属个人使用的带电操作具如绝缘手套、胶靴等由乙方自行解决。甲方提供安全帽、工作服和电焊手套。

三、在施工过程中,乙方因违反消防条例和法规造成的火灾事故,由乙方负全部责任。

第五条 生活管理

一、乙方工人进场后,由甲方提供住宿,生活用品乙方自备,生活用液化气由甲方按定量提供。

二、生活需用之食物,由乙方自理。乙方工人如有疾病,医疗费用由乙方负责。

第六条 材料供应管理

乙方应根据甲方的进度要求编制自己的施工进度计划并据此提出相关材料计划,材料计划经甲方工程师和项目负责人审核后方可采购。乙方应及时提供材料计划并设专人向甲方办理用料的限额领料手续。乙方应严格按照甲方提供的质量要求和材料配合以施工。乙方施工中用料浪费及不合理的超出限额部分,由乙方负担。乙方在施工中做到日用日清,活完料净,保持现场整洁。

第七条 施工机具及耗材

一、乙方自备所有用到的工具和设备,保证使用需要。

二、甲方提供电线并提供焊条、电锤头、锯片等消耗品。

三、对甲方负责供应的用具,乙方应认真保管爱护,如有丢失损坏,乙方负责赔偿。

四、施工需用的中、小型机械,一台机械应配备一名操作工持有相关上岗证)。

五、乙方自备所有水钻钻头,保证使用需要。

第八条 现场管理

一、甲、乙方人员要严格遵守现场各项管理制度,在甲方现场负责人统一领导下组织施工,有关计划、进度、材料供应等工作双方应密切配合,保证施工顺利进行。

二、乙方应对施工人员进行遵纪守法和安全生产、爱护财产的教育,并指定专人负责现场保卫工作,严禁偷拿现场用料,如有违反现场管理制度的行为,甲方有权采取必要措施。

三、承包劳务人员要保持相对稳定,出入施工现场要穿戴甲方提供的工作服,戴安全帽,不准合同外人员出入现场和住宿。

第九条 违约责任

一、乙方承包的劳务项目,不得再行分包。在施工过程中经检验达不到以上约定验收标准,不能保证工程质量,甲方有权终止合同,造成返工的损失,乙方应予赔偿。

二、合同签订后,不经双方协商同意,任何一方不得随意变更或解除。如乙方不经甲方同意,单方解除合同时,应由乙方赔偿甲方因影响施工计划造成的经济损失;如甲方中途解除合同,应赔偿乙方因此造成的经济损失。

三、乙方必须按期保质保量完成工程内容,否则每逾期一天,应偿付给甲方按承包工程劳务费1%的逾期违约金。

四、甲乙双方不得借故拖欠各种应付款项,如拖欠不付,按银行短期贷款利率,偿付给对方逾期付款违约金。

五、由于本合同为包总量合同,除甲方原因外的各种原因造成的怠工和一些不可预见的5个工日以下的怠工,由乙方承担其费用。

第十条 附则

一、本合同发生纠纷时,当事人双方应及时协商,协商不成时。可向建筑物所在地经济合同仲裁委员会申请仲裁或向人民法院起诉。

二、本合同一式 两 份,甲乙双方各执一份。

三、双方商定的其他条款:

第十一条 合同附件及有效期

一、合同附件:

1.附表1;

2.安全协议

二、本合同自双方盖章(签字)之日起生效,至工程全部竣工并结算完毕后失效。

接受劳务方:________________________

____年____月____日

提供劳务方:________________________

____年____月____日

展开阅读全文

篇2:建设工程施工专业分包合同示范文本

范文类型:合同协议,适用行业岗位:工程,全文共 15295 字

+ 加入清单

承包人(全称):

分包人(全称):

依照《中华人民共和国民法典》、《中华人民共和国建筑法》及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,鉴于 (以下简称为“发包人”)与承包人已经签订施上总承包合同 (以下称为“总包合同”),承包人和分包人双方就分包工程施工事宜经协商达成一致,订立本合同。

一、分包工程概况

分包工程名称:

分包工程地点:

分包工程承包范围:

二、分包合同价款

金额(人民币):大写:

小写:

三、合同工期

开工日期:本分包工程定于 年 月 日开工

竣工日期:本分包工程定于 年 月 日竣工

合同工期总日历天数为: 天

四、工程质量标准

本分包工程质量标准双方约定为:

五、组成分包合同的文件包括:

1、本合同协议书;

2、中标通知书(如有时);

3、分包人的报价书;

4、除总包合同工程价款之外的总包合同文件;

5、本合同专用条款;

6、本合同通用条款;

7、本合同工程建设标准、图纸及有关技术文件;

8、合同履行过程中,承包人和分包人协商一致的其他书面文件。

六、本协议书有关词语的含义与本合同第二部分《通用条款》中分别赋予它们的定义相同。

七、分包人向承包人承诺,按照合同约定的工期和质量标准,完成本协议书第一条约定的工程(以下简称为“分包工程”),并在质量保修期内承担保修责任。

八、承包人向分包人承诺,按照合同约定的期限和方式,支付本协议书第二条约定的合同价款(以下简称“分包合同价”),以及其他应当支付的款项。

九、分包人向承包人承诺,履行总包合同中与分包工程有关的承包人的所有义务,并与承包人承担履行分包工程合同以及确保分包工程质量的连带责任。

十、合同的生效

合同订立时间: 年 月 日

合同订立地点:

本合同双方约定 后生效。

承包人:(公章) 分包人:(公章)

住所: 住所:

法定代表人: 法定代表人:

委托代理人: 委托代理人:

电话: 电话:

传真: 传真:

开户银行: 开户银行:

账号: 账号:

邮政编码: 邮政编码:

第二部分 通用条款

一、词语定义及合同文件

1、词语定义

下列词语除专用条款另有约定外,应具有本条款所赋予的定义:

1.1通用条款:是根据法律、行政法规规定及建设工程施工的需要订立,通用于分包工程施工的条款。

1.2专用条款:是承包人与分包人根据法律、行政法规规定,结合具体工程实际,经协商达成一致意见的条款,是对通用条款的具体化、补充或修改。

1.3发包人:指在总包合同协议书中约定的具有工程发包主体资格和支付工程价款能力的当事人,以及取得该当事人资格的合法继承人。

1.4承包人:指在总包合同协议书中约定的,被发包人接受的具有工程施工总承包主体资格的当事人,以及取得该当事人资格的合法继承人。

1.5分包人:指在本分包合同协议书中约定的,被承包人接受的具有分包该工程资格的当事人,以及取得该当事人资格的合法继承人。

1.6总包工程:指由发包人和承包人在总包合同协议书中约定的承包范围内的工程。

1.7分包工程:指由承包人和分包人在本合同协议书中约定的分包范围内的工程。

1.8工程师:指在总包合同中约定的由工程监理单位委派的工程师或发包人指定的履行总包合同的代表,其具体身份和职权由发包人和承包人在总包合同专用条款中约定。

1.9项目经理:指承包人在总包合同专用条款和本合同专用条款中指定的负责施工管理、履行总包合同及本合同的代表。

1.10分包项目经理:指由分包人在分包合同专用条款中指定的负责施工管理和履行分包合同的代表。

1.11总包合同:指发包人与承包人之间签订的施工总承包合同,由协议书、通用条款和专用条款组成。

1.12总包合同条款:指中华人民共和国建设部和国家工商行政管理局于1999年修订印发的《建设工程施工合同文本》(建建[1999]313号)中的施工合同通用条款,以及经发包人和承包人协商一致的专用条款。

1.13分包合同:指承包人和分包人之间签订的施工专业分包合同,由协议书、通用条款和专用条款组成。

1.14工程建设标准:指与分包工程相关的工程建设标准,以及经承包人确认的,对工程建设标准进行任何修改或增补。

1.15图纸:指由承包人提供的符合总包合同要求及分包合同需要的所有图纸、计算书、配套说明以及相关的技术资料。

1.16报价书:指由分包人根据分包合同的规定,为完成分包工程,向承包人提出的分包合同报价。在承包人采用招标方式确定分包人时,该报价书应与中标通知书中的中标价格一致。

1.17中标通知书:指由承包人发出的确定分包人中标的通知。

1.18开工日期:指承包人和分包人在本合同协议书中约定的,分包人开始施工的绝对或相对的日期。

1.19竣工日期:指承包人和分包人在本合同协议书中约定的,分包人完成分包工程的绝对或相对日期。

1.20合同价款:指承包人与分包人在本合同协议书中约定,承包人用以支付分包人按照分包合同完成分包范围内全部工程并承担质量保修责任的款项。

1.21追加合同价款:指在分包合同履行过程中发生需要增加合同款项的情况,经承包人确认后,按双方约定的计算合同价款的方法增加的合同价款。

1.22施工场地:指由承包人提供的用于分包工程施工的场所,以及承包人在现场总平面图中具体指定的供分包人施工使用的任何其他场所。

1.23书面形式:指分包合同、信件和数据电文(包括电报、电传、传真、电子数据交换和电子邮件)等可以有形地表现所载内容的形式。

1.24违约责任:指合同一方不履行合同义务或履行合同不符合约定内容,所应承担的责任。

1.25索陪:指在合同履行过程中,对于并非自己的过错,而是应由对方承担责任的情况造成的实际损失,向对方提出经济补偿和(或)工期顺延的要求。

1.26不可抗力:指不能预见、不能避免并不能克服的客观情况。

1.27小时或天:本合同中规定按小时计算时间的,从事件有效开始时计算(不扣除休息时间);规定按天计算时间的,开始当天不计人,从次日开始计算。时限的最后一天是休息日或者其他法定节假日的,以休息日或节假日次日为时限的最后一天,但竣工日期除外。时限的最后一天的截止时间为当日24时。

2、合同文件及解释顺序

2.1合同文件应能互相解释,互为说明。除本合同专用条款另有约定外,组成本合同的文件及优先解释顺序如下:

(1)本合同协议书;

(2)中标通知书(如有时);

(3)分包人的投标函及报价书;

(4)除总包合同工程价款之外的总包合同文件;

(5)本合同专用条款;

(6)本合同通用条款;

(7)本合同工程建设标准、图纸;

(8)合同履行过程中,承包人和分包人协商一致的其他书面文件。

2.2当合同文件内容出现含糊不清或不一致时,应在不影响工程正常进行的情况下,由分包人和承包人协商解决。双方协商不成时,按本合同通用条款第28条关于争议的约定处理。

3、语言文字和适用法律、行政法规及工程建设标准

3.1语言文字

除本合同专用条款中另有约定,本合同文件使用的语言文字应与总包文件使用的语言文字相同。

3.2适用法律和行政法规

除本合同专用条款中另有约定,本合同适用的法律、法规应与总包合同中规定适用的法律、法规相同。需要明示的法律、行政法规在专用条款内约定。

3.3适用工程建设标准

双方在本合同专用条款内约定适用的工程建设标准的名称;本合同专用条款没有具体约定的,应使用总包合同中所规定的与分包工程有关的工程建设标准。承包人应按本合同专用条款约定的时间向分包人提供一式两份约定的工程建设标准。

本合同中没有相应工程建设标准的,应由承包人按照本合同专用条款约定的时间向分包人提出施工 技术要求,分包人按约定的时间和要求提出施工工艺,经承包人确认后执行。

4、图纸

4.1承包人应按照本合同专用条款约定的日期和套数,向分包人提供图纸。分包人需要增加约定以外图纸套数的,承包人应代为复制,复制费用由分包人承担;如根据总包合同,承包人对工程图纸负有保密义务的,分包人应负责分包工程范围内图纸的保密工作,分包人的保密义务在分包合同终止后,应当继续履行。

4.2如分包工程的图纸不能完全满足施工需要,并且承包人委托分包人进行深化施工图设计的,分包人应在其设计资质等级和业务允许的范围内,在J序、分包工程图纸的基础上,根据国家有关工程建设标准进行深化设计,分包人的深化设计须经过承包人确认后方可进行施工。如分包人不具备相应的设计资质,应由承包人委托具有相应资质的单位进行深化设计。分包人应对自行设计的图纸负有全部的法律责任。

关于承包人委托分包人进行深化施工图设计的范围及发生的费用,双方应在专用条款中约定。

4.3承包人提供的图纸不能满足分包工程施工需要时,双方在专用条款内约定复制、重新绘制、翻译、购买标准图纸等的责任和费用承担。

二、双方一般权利和义务

5、总包合同

5.1分包人对总包合同的了解

承包人应提供总包合同

5.2分包人对有关分包工程的责任

除本合同条款另有约定,分包人应履行并承担总包合同中与分包工程有关的承包人的所有义务与责任,同时应避免因分包人自身行为或疏漏造成承包人违反总包合同中约定的承包人义务的情况发生。

5.3分包人与发包人的关系

分包人须服从承包人转发的发包人或工程师与分包工程有关的指令。未经承包人允许,,分包人不得以任何理由与发包人或工程师发生直接工作联系,分包人不得直接致函发包人或工程师,也不得直接接受发包人或工程师的指令。如分包人与发包人或工程师发生直接工作联系,将被视为违约,并承担违约责任。

6、指令和决定

6.1承包人指令

就分包工程范围内的有关工作,承包人随时可以向分包人发出指令,分包人应执行承包人根据分包合同所发出的所有指令。分包人拒不执行指令,承包人可委托其他施工单位完成该指令事项,发生的费用从应付给分包人的相应款项中扣除。

6.2分包人或工程师指令

就分包工程范围内的有关工作,分包人应执行经承包人确认和转发的发包人或工程师发出的所有指令和决定。

7、项目经理

7.1项目经理的姓名、职称在合同专用条款内写明。

7.2项目经理可授权具体的管理人员行使自己的部分权利,并在认为有必要时可撤回授权,授权和撤回均应提前7天以书面形式通知分包人,委派书及撤回通知作为分包合同的附件。

7.3承包人所发出的指令、通知由项目经理(或其授权人)签字后,以书面形式交给分包人,分包项目经理在回执上签署自己的姓名及收到时间后生效。确有必要时,项目经理可发出口头指令,并在48小时内给予书面确认。项目经理在48小时后未予书面确认的,分包人应于承包人发出口头指令后7天内提出书面确认要求,项目经理在分包人提出确认要求后7天内不予答复,应视为分包人要求已被确认。分包人认为承包人指令不合理,应在收到指令后24小时内提出书面申告,承包人在收到分包人申告后24小时内作出修改指令或继续执行原指令的决定,并以书面形式通知分包人。紧急情况下,项目经理可发出要求分包人立即执行的指令,分包人如有异议也应执行。如承包人发出错误的指令,并给分包人造成经济损失的,则承包人应给予分包人相应的补偿,但因分包人违反分包合同引起的损失除外。

7.4项目经理应按分包合同的约定,及时向分包人提供所需的指令、批准、图纸并履行其他约定的义务,否则分包人应在约定时间后24小时内将具体要求、需要的理由及延误的后果通知承包人,项目经理在收到通知后48小时内不予答复,应承担因延误造成的损失。

7.5承包人如需更换项目经理,应提前7天以书面形式通知分包人,后任继续行使前任的职权,履行前任的义务。

8、分包项目经理

8.1分包项目经理的姓名、职称在本合同专用条款内写明。

8.2分包人依据合同发出的请求和通知,以书面形式由分包项目经理签字后送交项目经理,项目经理在回执上签署姓名和收到的时间后生效。

8.3分包项目经理按项目经理批准的施工组织设计(或施工方案)和依据分包合同发出的指令组织施工。在情况紧急且无法与项目经理取得联系时,分包项目经理应采取保证人员生命和工程、财产安全的紧急措施,并在采取措施后48小时内向项目经理送交报告。责任在承包人或第三人,由承包人承担由此发生的追加合同价款,相应顺延工期;责任在分包人,由分包人承担费用,不顺延工期。

8.4分包人如需更换分包项目经理,应至少提前7天以书面形式通知承包人,并征得承包人同意,后任继续行使前任的职权,履行前任的义务。

8.5承包人可与分包人协商,建设更换其认为不称职的分包项目经理。

9、承包人的工作

9.1承包人应按本合同专用条款约定的内容和时间,一次或分阶段完成下列工作:

(1)向分包人提供根据总包合同由发包人办理的与分包工程相关的各种证件、批件、各种相关资料,向分包人提供具备施工条件的施工场地。

(2)按本合同专用条款约定的时间,组织分包人参加发包人组织的图纸会审,向分包人进行设计图纸交底。

(3)提供本合同专用条款中约定的设备和设施,并承担因此发生的费用。

(4)随时为分包人提供确保分包工程的施工所要求的施工场地和通道等,满足施322输的需要,保证施工期间的畅通。

(5)负责整个施工场地的管理工作,协调分包人与同一施工场地的其他分包人之间的交叉配合,确保分包人按照经批准的施工组织设计进行施工。

(6)承包人应做的其他工作,双方在本合同专用条款内约定。

9.2承包人未履行前款各项义务,导致工期延误或给分包人造成损失的,承包人赔偿分包人的相应损失,顺延延误的工期。

10、分包人的工作

10.1分包人应按本合同专用条款约定的内容和时间,完成下列工作:

(1)分包人应按照分包合同的约定,对分包工程进行设计(分包合同有约定时)、施工、竣工和保修。分包人在审阅分包合同和(或)总包合同时,或在分包合同的施工中,如发现分包工程的设计或工程建设标准、技术要求存在错误、遗漏、失误或其他缺陷,应立即通知承包人。

(2)按照本合同专用条款约定的时间,完成规定的设计内容,报承包人确认后在分包工程中使用。承包人承担由此发生的费用。

(3)在本合同专用条款约定的时间内,向承包人提供年、季、月度工程进度计划及相应进度统计报表。分包人不能按承包人批准的进度计划施工时,应根据承包人的要求提交一份修订的进度计划,以保证分包工程如期竣工。

(4)分包人应在专用条款约定的时间内,向承包人提交一份详细施工组织设计,承包人应在专用条款约定的时间内批准,分包人方可执行。

(5)遵守政府有关主管部门对施工场地交通、施工噪音以及环境保护和安全文明生产等的管理规定,按规定办理有关手续,并以书面形式通知承包人,承包人承担由此发生的费用,因分包人责任造成的罚款除外。

(6)分包人应允许承包人、发包人、工程师及其三方中任何一方授权的人员在工作时间内,合理进入分包工程施工场地或材料存放的地点,以及施工场地以外与分包合同有关的分包人的任何工作或准备的地点,分包人应提供方便。

(7)已竣工工程未交付承包人之前,分包人应负责已完分包工程的成品保护工作,保护期间发生损坏,分包人自费予以修复;承包人要求分包人采取特殊措施保护的工程部位和相应的追加合同价款,双方在本合同专用条款内约定。

(8)分包人应做的其他工作,双方在本合同专用条款内约定。

10.2分包人未履行前款各项义务,造成承包人损失的,分包人赔偿承包人有关损失。

11、总包合同解除

11.1如在分包人没有全面履行分包合同义务之前,总包合同解除,则承包人应及时通知分包人解除分包合同,分包人接到通知后应尽快撤离现场。

11.2因本合同第11.1款原因终止分包合同,分包人可以得到:已完工程价款、分包人员工的遣散费、二次搬运费等补偿。如本合同第11.1款约定的总包合同终止是因为分包人的严重违约,则只能得到已完工程价款补偿。

11.3在本合同第11.1款解除分包合同的情况下,分包人经承包人同意为分包工程已采购或已运至施工场地的材料设备,应全部移交给承包人,由承包人按本合同专用条款约定的价格支付给分包人。

12、转包与再分包

12.1除12.2款规定的情况外,分包人不得将其承包的分包工程转包给他人,也不得将其承包的分包工程的全部或部分再分包给他人。如分包人将其承包的分包工程转包或再分包,将被视为违约,并承担违约责任。

12.2分包人经承包人同意可以将劳务作业再分包给具有相应劳务分包资质的劳务分包企业。

12.3分包人应对再分包的劳务作业的质量等相关事宜进行督促和检查,并承担相关连带责任。

三、工期

13、开工与延期开工

13.1分包人应当按照本合同协议书约定的开工日期开工。分包人不能按时开工,应当不迟于本合同协议书约定的开工日期前5天,以书面形式向承包人提出延期开工的理由。承包人应当在接到延期开工申请后的48小时内以书面形式答复分包人。承包人在接到延期开工申请后48小时内不答复,视为同意分包人要求,工期相应顺延。承包人不同意延期要求或分包人未在规定时间内提出延期开工要求,工期不予顺延。

13.2因承包人原因不能按照本合同协议书约定的开工日期开工,项目经理应以书面形式通知分包人,推迟开工日期。承包人赔偿分包人因延期开工造成的损失,并相应顺延工期。

14、工期延误

14.1因下列原因之一造成分包工程工期延误,经项目经理确认,工期相应顺延:

(1)承包人根据总包合同从工程师处获得与分包合同相关的竣工时间延长;

(2)承包人未按本合同专用条款的约定提供图纸、开工条件、设备设施、施工场地;

(3)承包人未按约定日期支付工程款、进度款,致使分包工程施工不能正常进行;

(4)项目经理未按分包合同约定提供所需的指令、批准或所发出的指令错误,致使分包工程施工不能正常进行;

(5)非分包人原因的分包工程范围内的工程变更及工程量增加;

(6)不可抗力的原因;

(7)本合同专用条款中约定或项目经理同意工期顺延的其他情况。

14.2分包人应在14.1款约定情况发生后14天内,就延误的工期以书面形式向承包人提出报告。承包人在收到报告后14天内予以确认,逾期不予确认也不提出修改意见,视为同意顺延工期。

15、暂停施工

15.1发包人或工程师认为确有必要暂停施工时,应以书面形式通过承包人向分包人发出暂停施工指令,并在提出要求后48小时内提出书面处理意见。分包人停工和复工程序以及暂停施工所发生的费用,按总包合同相应条款履行。

16、工程竣工

16.1分包人应按照合同协议书约定的竣工日期或承包人同意顺延的工期竣工。

16.2因分包人原因不能按照本合同协议书约定的竣工日期或承包人同意顺延的工期竣工的,分包人承担违约责任。

16.3提前竣工程序按总包合同相应条款履行。

四、质量与安全

17、质量检查与验收

17.1分包工程质量应达到本合同协议书和本合同专用条款约定的工程质量标准,质量评定标准按照总包合同相应条款履行。因分包人原因工程质量达不到约定的质量标准,分包人应承担违约责任,违约金计算方法或额度在本合同专用条款内约定。

17.2双方对工程质量的争议,按照总包合同的条款履行。

17.3分包工程的检查、验收及工程试车等,按照总包合同相应的条款履行。分包人应就分包工程向承包人承担总包合同约定的承包人应承担的义务,但并不免除承包人根据总包合同应承担的总包质量管理的责任。

17.4分包人应允许并配合承包人或工程师进入分包人施工场地检查工程质量。

18、安全施工

18.1分包人应遵守工程建设安全生产有关管理规定,严格按照安全标准组织施工,承担由于自身安全措施不力造成事故的责任和因此发生的费用。

18.2在施工场地涉及危险地区或需要安全防护措施施工时,分包人应提出安全防护措施,经承包人批准后实施,发生的相应费用由承包人承担。

18.3发生安全事故,按照总包合同相应条款处理。

五、合同价款与支付

19、合同价款及调整

19.1招标工程的合同价款由承包人与分包人依据中标通知书中的中标价格在本合同协议书内约定;非招标工程的合同价款由承包人与分包人依据工程报价书在本合同协议书内约定。

19.2分包工程合同价款在本合同协议书内约定后,任何一方不得擅自改变。下列三种确定合同价款的方式,双方可在本合同专用条款内约定采用其中一种(应与总包合同约定的方式一致):

(1)固定价格。双方在本合同专用条款内约定合同价款包含的风险范围和风险费用的计算方法,在约定的风险范围内合同价款不再调整。风险范围以外的合同价款调整方法,应当在专用条款内约定。

(2)可调价格。合同价款可根据双方的约定而调整,双方在本合同专用条款内约定合同价款调整方法。

(3)成本加酬金。合同价款包括成本和酬金两部分,双方在本合同专用条款内约定成本构成和酬金的计算方法。

19.3可调价格计价方式中合同价款的调整因素包括:

(1)法律、行政法规和国家有关政策变化影响合同价款;

(2)工程造价管理部门公布的价格调整;

(3)一周内非分包人原因停水、停电、停气造成停工累计超过8小时;

(4)双方约定的其他因素。

19.4分包人应当在19.3款情况发生后10天内,将调整原因、金额以书面形式通知承包人,承包人确认调整金额后作为追加合同价款,与工程价款同期支付。承包人收到通知后10天内不予确认也不提出修改意见,视为已经同意该项调整。

19.5分包合同价款与总包合同相应部分价款无任何连带关系。

20、工程量的确认

20.1分包人应按本合同专用条款约定的时间向承包人提交已完工程量报告,承包人接到报告后7天内自行按设计图纸计量或经工程师计量。承包人在自行计量或由工程师计量前24小时应通知分包人,分包人为计量提供便利条件并派人参加。分包人收到通知后不参加计量,计量结果有效,作为工程价款支付的依据;承包人不按约定时间通知分包人,致使分包人未能参加计量,计量结果无效。

20.2承包人在收到分包人报告后7天内未进行计量或因工程师的原因未计量的,从第8天起,分包人报告中开列的工程量即视为被确认,作为工程价款支付的依据。

20.3分包人未按本合同专用条款约定的时间向承包人提交已完工程量报告,或其所提交的报告不符合承包人要求且未做整改的,承包人不予计量。

20.4对分包人自行超出设计图纸范围和因分包人原因造成返工的工程量,承包人不予计量。

21、合同价款的支付

21.1实行工程预付款的,双方应在本合同专用条款内约定承包人向分包人预付工程款的时间和数额,开工后按约定的时间和比例逐次扣回。

21.2在确认计量结果后1e天内,承包人应按专用条款约定的时间和方式,向分包人支付工程款(进度款)。按约定时间承包人应扣回的预付款,与工程款(进度款)同期结算。

21.3分包合同约定的工程变更调整的合同价款、合同价款的调整、索赔的价款或费用以及其他约定的追加合同价款,应与工程进度款同期调整支付。

21.4承包人超过约定的支付时间不支付工程款(预付款、进度款),分包人可向承包人发出要求付款的通知。

21.5承包人不按分包合同约定支付工程款(预付款、进度款),导致施工无法进行,分包人可停止施工,由承包人承担违约责任。

六、工程变更

22、工程变更

22.1分包人应根据以下指令,以更改、增补或省略的方式对分包工程进行变更:

(1)工程师根据总包合同作出的变更指令。该变更指令由工程师作出并经承包人确认后通知分包人;

(2)除上述(1)项以外的承包人作出的变更指令。

22.2分包人不执行从发包人或工程师处直接收到的未经承包人确认的分包工程变更的指令。如分包人直接收到此类变更指令,应立即通知项目经理并向项目经理提供一份该直接指令的复印件。项目经理应在24小时内提出关于对该指令的处理意见。

22.3分包工程变更价款的确定应按照总包合同的相应条款履行。分包人应在工程变更确定后11天内向承包人提出变更分包工程价款的报告,经承包人确认后调整合同价款。

22.4分包人在双方确定变更后11天内不向承包人提出变更分包工程价款的报告,视为该项变更不涉及合同价款的变更。

22.5承包人在收到变更分包工程价款之日起17天内予以确认,无正当理由逾期未予确认时,视为该报告已被确认。

七、竣工验收及结算

23、竣工验收

23.1分包工程具备竣工验收条件的,分包人应向承包人提供完整的竣工资料及竣工验收报告。双方约定由分包人提供竣工图的,应在专用条歇内约定提交日期和份数。

23.2承包人应在收到分包大提供的竣工验收报告之日起3日内通知发包人进行验收,分包人应配合承包人进行验收。根据总包合同无需由发包人验收的部分,承包人应按照总包合同约定的验收程序自行验收。发包人未能按照总包合同及时组织验收的,承包人应按照总包合同规定的发包人验收的期限及程序自行组织验收,并视为分包工程竣工验收通过。

23.3分包工程竣工验收未能通过且属于分包人原因的,分包人负责修复相应缺陷并承担相应的质量责任。

23.4分包工程竣工日期为分包人提供竣工验收报告之日。需要修复的,为提供修复后竣工报告之日。

24、竣工结算及移交

24.1分包工程竣工验收报告经承包人认可后14天内,分包人向承包人递交分包工程竣工结算报告及完整的结算资料,双方按照本合同协议书约定的合同价款及本合同专用条款约定的合同价款调整内容,进行工程竣工结算。

24.2承包人收到分包人递交的分包工程竣工结算报告及结算资料后28天内进行核实,给予确认或者 提出明确的修改意见。承包人确认竣工结算报告后7天内向分包人支付分包工程竣工结算价款。分包人收到竣工结算价款之日7天内,将竣35212程交付承包人。

24.3承包人收到分包工程竣工结算报告及结算资料后28天内无正当理由不支付工程竣工结算价款,从第29天起按分包人同期向银行贷款利率支付拖欠工程价款的利息,并承担违约责任。

25、质量保修

25.1在包括分包工程的总包工程竣工交付使用后,分包人应按国家有关规定对分包工程出现的缺陷进行保修,具体保修责任按照分包人与承包人在工程竣工验收之前签订的质量保修书执行。

八、违约、索赔及争议

26、违约

26.1当发生下列情况之一时,视为承包人违约:

(1)本合同通用条款第21.5款提到的承包人不按分包合同的约定支付预付款、工程款,导致施工无法进行;

(2)本合同通用条款第24.3款提到的承包人不按分包合同的约定支付工程竣工结算价款;

(3)承包人不履行分包合同义务或不按分包人合同约定履行义务的其他情况。

承包人承担违约责任,赔偿因其违约给分包人造成的经济损失顺延延误的工期。双方在本合同专用条款内约定承包人赔偿分包人损失的计算方法或承包人应当支付违约金的数额。

26.2当发生下列情况之一时,视为分包人违约:

(1)本合同通用条款第5.3款提到的如分包人与发包人或工程师发生直接工作联系;

(2)本合同通用条款第12.1款提到的分包人将其承包的分包工程转包或再分包;

(3)本合同通用条款第16.2款提到的因分包人原因不能按照本合同协议书约定的竣工日期或承包人同意顺延的工期竣工的;

(4)本合同通用条款第17.1款提到的因分包人原因工程质量达不到约定的质量标准;

(5)分包人不履行分包合同义务或不按分包人合同约定履行义务的其他情况。

分包人承担违约责任,赔偿因其违约给承包人造成的经济损失。双方在本合同专用条款内约定分包人赔偿承包人损失的计算方法或分包人应当支付违约金的数额。

26.3分包人违反本合同可能产生的后果

如分包人有违反分包合同的行为,分包人应保障承包人免于承担因此违约造成的工期延误、经济损失及根据总包合同承包人将负责的任何赔偿费,在此情况下,承包人可从本应支付分包人的任何价款中扣除此笔经济损失及赔偿费,并且不排除采用其他补救方法的可能。

27、索赔

27.1当一方向另一方提出索赔时,要有正当的索赔理由,且有索赔事件发生时的有效证据。

27.2承包人未能按分包合同的约定履行自己的各项义务或发生错误以及应由承包人承担责任的其他情况,造成工期延误和(或)分包人不能及时得到合同价款或分包人的其他经济损失,分包人可按总包合同约定的程序以书面形式向承包人索赔。

27.3在分包工程施工过程中,如分包人遇到不利外部条件等根据总包合同可以索赔的情况,分包人可以按照总包合同约定的索赔程序通过承包人提出索赔要求。在承包人收到分包人索赔报告后21天内给予分包人明确的答复,或要求进一步补充索赔理由和证据。索赔成功后,承包人应将相应部分转交分包人。

分包人应按照总包合同的规定及时向承包人提交分包工程的索赔报告,以保证承包人可以及时向发 包人进行索赔。承包人在35天内未能对分包人的索赔报告给予答复,视为分包人的索赔报告已经得到批准。

27.4承包人根据总包合同的约定向工程师递交任何索赔意向通知或其他资料,要求分包人协助时,分包人应就分包工程方面的情况,以书面形式向承包人发出相关通知或其他资料以及保持并出示同期施工记录,以便承包人能遵守总包合同有关索赔的约定。

分包人未予积极配合,使得承包人涉及分包工程的索赔未获成功,则承包人可在按分包合同约定应支付给分包人的金额中扣除上述本应获得的索陪项中适当比例的部分。

28、争议

28.1承包人分包人在履行合同发生争议,可以和解或者要求有关部门调解。当事人不愿和解、调解或者和解、调解不成的,双方可以在本合同专用条款内约定以下一种方式解决争议:

(1)双方达成仲裁协议,向约定的件裁委员会申请仲裁;

(2)向有管辖权的人民法院起诉。

28.2发生争议后,除非出现下列情况,双方应继续履行合同,保持分包工程施工连续,保护好已完工程:

(1)单方违约导致合同确已无法履行,双方协议停止施工;

(2)调解要求停止施工,且为双方接受;

(3)仲裁机构要求停止施工;

(4)法院要求停止施工。

九、保障、保险及担保

29、保障

29.1除应由承包人承担的风险外,分包人应保障承包人免于承受在分包工程施工过程中及修补缺陷引起的下列损失、索赔及与此有关的索赔、诉讼、损害赔偿:

(1)人员的伤亡;

(2)分包工程以外的任何财产的损失或损害。

上列撮失虚由造成损失的责任方承担。

29.2承包人应保障分包人免于承担与下列事宜有关的索赔、诉讼、损害赔偿费、诉讼费、指控费和其他开支:

(1)按分包合同约定,实施和完成分包合同以及保修过程当中所导致的无法避免的对财产的损害;

(2)由于发包人、承包人或其他分包商的行为或疏忽造成的人员伤亡或财产损失或损害,或与此相关的索赔、诉讼等。

上列损失应由造成损失的责任方承担。

30、保险

30.1承包人应为运至施工场地内用于分包工程的材料和待安装设备办理保险。发包人已经办理的保险视为承包人办理的保险。

30.2分包人必须为从事危险作业的职工办理意外伤害保险,并为施工场地内自有人员生命财产和施工机械设备办理保险,支付保险费用。

30.3保险事故发生时,承包人分包人均有责任尽力采取必要的措施,防止或者减少损失。

30.4具体投保内容和相关责任,承包人分包人在本合同专用条款内约定。

31、担保

31.1如分包合同要求承包人向分包人提供支付担保时,承包人应与分包人协商担保方式和担保额度,在本合同专用条款内约定。

31.2如分包合同要求分包人向承包人提供履约担保时,分包人应与承包人协商担保方式和担保额度,在本合同专用条款内约定。

31.3分包人提供的履约担保,不应超过总包合同中承包人向发包人提供的履约担保的额度。

十、其他

32、材料设备供应

32.1有关材料设备供应的数量、程序及责任均按总包合同中发包人与承包人的有关约定履行。

32.2总包合同约定就分包工程部分由发包人供应的材料设备,视为承包人供应的材料设备。

32.3除32.2款外的材料设备应由分包人按照本合同专用条款的约定采购,并提供产品合格证明,承包人不得指定生产厂或供应商。

33、文物

33.1承包人根据总包合同,应将涉及分包人施工场地以内需要保护的文物或古树名木通知分包人,分包人在施工中应认真保护,需要采取保护措施时,由承包人承担所需费用。

33.2分包人在其施工场地内发现文物,应采取保护措施,并按照总包合同约定的时间和程序报告承包人。

34、不可抗力

34.1不可抗力包括的范围以及事件处理同总包合同相应条款。

34.2不可抗力事件发生涉及分包人施工场地的,分包人应立即通知承包人,在力所能及的条件下,迅速采取措施,尽力减少损失。

34.3分包人承担自身的人员和财产的损失。

34.4因合同一方延迟履行合同后发生不可抗力的,不能免除延迟履行方的相应责任。

35、分包合同解除

35.1承包人和分包人协商一致,可以解除分包合同。

35.2发生本合同通用条款21.5款情况,停止施工超过28天,承包人仍不支付工程款(预付款、进度款),分包人有权解除合同。

35.3如分包人再分包或转包其承包的工程,承包人有权解除合同。

35.4有下列情形之一的,承包人分包人可以解除合同:

(1)因不可抗力导致合同无法履行;

(2)因一方违约(包括因发包人原因造成工程停建或缓建)导致合同无法履行。

35.5分包合同解除程序以及善后处理均按总包合同相应条款履行。

35.6分包合同解除后,不影响双方在合同中约定结算条款的效力。

36、合同生效与终止

36.1承包人分包人在本合同协议书中约定合同生效方式。

36.2承包人分包人履行合同全部义务,竣工结算价款支付完毕,分包人向承包人交付竣工的分包工程后,本合同即告终止。

36.3分包合同的权利义务终止后,承包人分包人应遵循诚实信用原则,履行通知、协助、保密等义务。

37、合同份数

37.1本合同正本两份,具有同等效力,由承包人分包人分别保存一份。

37.2本合同副本份数,由双方根据需要在本合同专用条款内约定。

38、补充条款

双方根据有关条款、行政法规规定,结合工程实际,经协商一致后,可对本合同通用条款内容具体化、补充或修改,在本合同专用条款内约定。

第三部分 专用条款

一、词语定义及合同文件

2.合同文件及解释顺序

合同文件及解释顺序:

3.语言文字和适用法律、行政法规及工程建设标准

3.1除总包合同文件规定的语言文字外,本合同还使用 语言文字。

3.2本合同需要明示的法律、行政法规和规章:

3.3本分包工程适用的工程建设标准: ,除以上工程建设标准以外,总包合同中约定的与分包工程相关的工程建设标准均适用于本分包工程。

承包人向分包人提出施工技术要求的内容和时间 年 月 日。分包人向承包人提出相应的施工工艺的时间 年 月 日。

4.图纸

4.1承包人向分包人提供图纸的日期: 年 月 日;

承包人向分包人提供图纸的套数: 。

4.2承包人委托分包人进行深化施工图设计的委托范围及费用承担:

4.3复制、重新绘制、翻译、购买标准图纸的责任和费用承担:

4.4关于使用国外图纸的要求及费用承担:

二、双方一般权利和义务

7.项目经理

姓名: 职称: (任命书作为分包合同附件)。

8.分包项目经理

姓名:职称:(任命书作为分包合同附件)。

9.承包人的工作

9.1承包人应完成下列工作:

(1)向分包人提供施工场地和施工所需的证件、批件的名称和完成时间:

(2)组织分包人参加发包人会审图纸的时间: 年 月 日;

向分包人进行设计图纸交底的时间: 年 月 日。

(3)承包人为本分包工程实施提供的机械设备和(或)其他设施(如有时),及费用承担:

(4)双方约定承包人应做的其他工作:

10.分包人的工作

10.1分包人应完成下列工作:

(2)需完成的设计内容和提交时间:

(3)分包人应在本合同签定生效后 天内向项目经理提交分包工程总体进度计划。分包人向承担人提交年、季度、月度、周工程进度计划及相应的进度统计报表时间为:

承包人批准工程进度计划的时间: 年 月 日。

(4)向承包人提交施工组织设计的时间: 年 月 日。

承包人批准施工组织设计的时间: 年 月 日。

(7)已完工程成品保护的特殊要求及费用承担:

(8)双方约定分包人应做的其他工作:

三、工期

14.工期延误

14.1双方约定工期顺延的其他情况:

四、质量与安全

17.质量检查与验收

17.1双方关于分包工程质量标准的约定:

五、合同价款与支付

19.合同价款及其调整

19.2本合同价款采用 种方式确定。

(1)采用固定价格的,合同价款包括的风险范围:

风险费用的计算方法:

风险范围以外合同价款调整方法为:

(2)采用可调价格的,合同价款的调整方法:

(3)采用成本加酬金的,有关成本加酬金的约定为:

19.3双方约定合同价款的其他调整因素:

20、工程量确认

20.1分包人向承包人提交已完工程量报告的时间:

21、合同价款的支付

21.1承包人向分包人预付工程款的时间和数量: 扣回时间和比: 。

21.2承包向分包人支付工程款(进度款)的时间和方式: 。

七、竣工验收及结算

23、竣工验收

23.1分包人提供竣工图的日期 年 月 日。

分包人提供竣工图的份数 份。

八、违约、索赔及争议

26、违约

26.1本合同关于承包人违约的具体责任:

(1)本合同通用条款第21.5款约定的承包人违约应承担的违约责任:

(2)本合同通用条款第24.3款约定的承包人违约应承担的违约责任:

(3)双方约定的承包人的其他违约责任:

26.2本合同关于分包人违约的具体责任:

(1)本合同通用条款第5.3款约定的分包人违约应承担的违约责任:

(2)本合同通用条款第12.1款约定的分包人违约应承担的违约责任:

(3)本合同通用条款第16.2款约定的分包人违约应承担的违约责任:

(4)本合同通用条款第17.1款约定的分包人违约应承担的违约责任:

(5)双方约定的分包人的其他违约责任:

28、争议

28.1双方约定,在履行分包合同过程中发生争议,双方协商解决或者调解不成时,按下列第 种方式解决争议:

(1)将争议提交 仲裁委员会申请仲裁;

(2)依法向有管辖权的人民法院提起诉讼。

九、保障、保险及担保

30、保险

30.1承包人投保内容和责任:

30.2分包人投保内容和责任:

31、担保

31.1承包人提供支付担保金额为:

担保方式为:

31.2分包人提供履约担保金额为:

担保方式为:

31.3其他提保事项约定:

十、其他

32、材料设备供应

32.3由分包人采购材料设备的约定:

37、合同份数

37.2双方约定本合同副本 份,其中,承包人 份,分包人 份。

38、补充条款:

展开阅读全文

篇3:国际工程施工合同一般条款[页17]_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 1311 字

+ 加入清单

国际工程施工合同(一般条款

通知

68.1 业主或工程师按合同条款给予承包人的所有证书、通知或书面命令均应邮寄或送交至承包人的主要营业地,或承包人指定的其他通讯地址。

68.2 所有按本合同条款给予业主或工程通知均应邮寄或送交至第二部分有关通知条款所指的其各自的地址。

68.3 任何一方均可把一指定地址改为在施工地国的另外一个地址,但事先应书面通知另一方,工程师在改变地址前需书面通知双方当事人。

业主违约

69.1 如果业主:

(1)在工程师证书所认定的应付款项按合同条款到期_________天内未向承包人支付,业主按合同有权所作的扣除部分除外,或

(2)干涉或阻碍或拒绝同意颁发任何此种证书,或

(3)破产或、如为公司,即将被清算,而此种清算不是为了重组或合并,或

(4)正式通知承包人,因不可预见的原因,鉴于经济混乱,其无法再履行其合同义务。

承包人应有权在提前_________天书面通知业主,并将副本呈交工程师后,终止其合同雇佣关系。

69.2 本条第1款规定的_________天通知期限到期后,尽管本合同第53条第1款作有规定,承包人仍然应尽量迅速地从工地撤走他所带来的所有建筑设备。

69.3 如果合同如此终止,业主必须向承包人承担本合同按第65条规定终止时一样的支付义务,但除了第65条第8款所规定的款项外,业主还必须向承包人支付因合同由此终止而造成的或有关的或导致损失费或损害费。

费用与法规的变更

70.1 合同价格的调整应与劳工或/和材料成本的增减,或其他任何影响施工费用的事项相关,应按第二部分第70条规定执行。

70.2 在提交工程标书最后期限前的_________天之后,如施工或即将施工工程所在地国的任何国家或州的法律、法令、政令或其它任何地方和其他权力机构的法律或条例或规章发生变化,或适用了使承包人的施工费用发生增减(非本条第1款所述的增减)的任何州的法规、法令、政令、法律、条例或规章,此种费用增减应经工程师证明,且由业主支付或记入贷方,合同价格也应作相应调整。

货币和汇率

71.1 在提交标书最后期限前的_________天之后,如施工或即将施工工程所在地国的政府或政府授权机构对合同价格计价货币实行货币管制和/或货币兑换管制,业主应补偿由此对承包人造成的一切损失或损害,这种补偿不得影响承包人在此种情况下行使其它任何权利或补救措施的权利。

72.1 如果合同规定,承包人的支付应全部或部分使用一种或多种外币,此种支付不得受特定外币与施工工程所在地国的货币之间的汇率变化的影响。

72.2 如业主要求标书计价只用一种货币,而支付却用多种货币,且承包人已说明他要求用其他货币支付的比例或数额,用于计算此种比例或数额支付的货币兑换率应为现行汇率,即由施工所在地国的中央银行在提交标书最后期限前的_________天当日所决定的汇率,就此,业主必须在标书提交前告知承包人,或在投标文件中予以写明。

72.3 如合同规定使用多种货币支付,凡涉及按本合同第58和第59条规定使用暂列款的项目,其用外汇支付的比例或数额安本条第1和第2款制定的原则予以确定。

共17页,当前第17页1234567891011121314151617

展开阅读全文

篇4:建设工程分包合同

范文类型:合同协议,适用行业岗位:工程,全文共 2922 字

+ 加入清单

发包方:(以下简称甲方)

承包人: (以下简称乙方)

根据《中华人民共和国民法典》、《中华人民共和国建筑法》及其相关的法律法规,遵循平等、自愿、诚信的原则,甲方将该工程泥水工、木工、外架工、钢筋工制安工程承包给乙方,双方达成如下协议:

第一条 工程承包的工作内容

(一)泥工工程内容

1、乙方须按设计施工图、设计变更通知、施工图纸会审等涉及的全部泥水施工内容(不含室内装修)。

2、以该工程滴水面为参照物,滴水面以内从桩基开始,该工程一切混凝土砂浆搅拌、浇注、养护由乙方负责。

3、以该工程的滴水面为参照物,滴水面以内砌砖、内外墙抹灰、贴外墙砖、水泥、砂、砖二次搬运、施工脚手架的安拆,由乙方负责。

4、乙方自己提供泥水工种所需要的塔吊、搅拌机、振动棒及泥水工一切的操作工具和机械设备,乙方自行负责设备的安拆、操作、维修保养。

5、乙方在修建中须清理完每层楼的建筑垃圾,再进入下道工序。

6、甲方提供该工种所需主材(沙石、水泥、砖、瓷砖)。

(二)木工工程内容

1、乙方须按设计施工图、设计变更通知、施工图纸会审等涉及的全部木工工程施工内容。

2、以该工程滴水面为参照物,滴水面以内的现浇混凝土的木模制作、安装、加固、拆模由乙方负责,回库材料必须按甲方指定位置堆放。

3、该工程木工工种所涉及的主材(模板、杉杆、方条)、耗材(钉子、铁丝)、二次搬运由乙方负责。

(三)外架工工程内容

1、乙方须按设计施工图、设计变更通知、施工图纸会审等涉及的全部外架工程施工内容。

2、乙方只负责外架的安拆和立网、平网的安拆、二次转运。

3、甲方负责外架工程所涉的主材(钢管、扣件、安全网、跳板)。

(四)钢筋工工程内容

1、乙方须按设计施工图、设计变更通知、施工图纸会审等涉及的全部钢筋工工程施工内容。

2、该工程以滴水面为参照物,滴水面以内该工程所涉及钢筋制作、安装工作由乙方负责。

3、乙方负责钢筋工程所要的设备(焊机、弯曲机、切割机、对焊机)、耗材(电焊条、切割片、轧丝)。

4、甲方负责钢筋工程的主材(钢筋、对接头、焊渣)。

第二条 合同工期

开工日期年月

第三条 合同价款

本工程的建筑面积约为43000m2,四大班组按房屋建筑面积每平方米 贰佰玖拾捌 元整)计价,结算时按施工图纸建筑面积为准。该价格包含工人工资、塔吊、搅拌机等设备的机械费用和安全费、因工残废(5000元以内)、劳*福利、赶工费。

第四条 付款方式

两幢每层主体完成现浇板结束后,甲方按每层总工程款(元/m2每层总建筑面积)70%支付给乙方,依此类推;贴外墙砖和室内抹灰完工后,拨付总工程款的25%,现场清理完毕拨付工程款的4%,剩余1%待工程完工验收后,一年内无质量问题付清。本工程所涉及的税费,乙方不出据发票,由甲方负责。

第五条 安全施工、重大事故处理

1、甲、乙双方必须贯彻执行国家和政府、行业主管部门颁布实施的有关安全生产的法律、法规及各项规定,严格按安全标准组织施工。

2、乙方在安全施工中必须做到安全生产、文明施工,严格遵守安全技术规程,乙方领头人、班组长随时对工人进行安全教育;必须安全作业,严禁酒后上岗、老弱病残上岗。

3、搭建施工电线必须使用电工搭接。

4、乙方在施工中,若发生安全事故,造成了伤、残亡等安全事故,总费用在5000元以下由乙方负责经济和法律责任,总费用5000元以上的由甲方负经济和法律责任。

5、乙方人员进入施工现场过程中,要求人人佩戴安全帽,凡是违反此条的,工人每次罚款10元,班组长罚款50元。

第六条 工程质量及标准

乙方在施工过程中必须按照图纸设计要求和指定的图集施工,不得粗制滥造,严格按照验收规范施工,对不合格的制作产品返工费用及材料损失皆由乙方承担,每道工序经有关部门技术人员验收合格后方可进行下道工序施工。在施工中-保质保量,若发生质量问题造成的经济损失全部由乙方承担。

对框架和现浇结构的现浇构件、制模作如下规定:

1、所有独立柱的轴线位移、垂直度在一层内的误差均应控制在规范范围内。

2、现浇梁的轴线位移不得超过规范要求,垂直度误差不得超过规范要求,需起弧的大梁,按规范要求起弧。

3、现浇板、梁的水平误差不得超过规范要求(除起弧现浇外)。

以上1、2、3条的规定的误差值严格控制,在施工过程中要随时检查及早发现,发现后马上进行补救措施,如不及时处理,一旦浇注成后无法补救,严重造成的损失概由乙方负责。在浇注成型后检查若突破上述规定值,不合格超过三处和跟不上施工进度,乙方无条件退场,工资按完成验收合格工程量的50%结算。在支撑时一定要牢固可靠,因加固不牢的混凝土突爆,在撤模后立即自觉将部分打掉达到合格标准,若乙方不打,事后甲方安排人打,工资从乙方工程款中扣除。

第七条 双方的责任和义务

(一)甲方责任和义务

1、负责提供场地、道路、水电等具备施工条件的工程施工现场及维护维修,负责工程施工的组织与协调及技术质量、安全等方面的交底。

2、负责基础的开挖、地梁开挖(含塔吊基础)。

3、负责工程用水电安装至分幢楼层处。

4、负责于术资料和办理施工洽商。

5、负责解决施工中存在和发生争议的技术问题。

6、负责本工程中各工程、工序间的协调与配合,若发现问题应向乙方提出书面整改意见。

7、本工程甲方的施工代表为理协调工作,乙方施工代表为组织协调。

(二)乙方的责任和义务

1、乙方对与其确定劳动关系的作业工人必须认真审查,保证人员的政治素质、身体素质和技术水平,工人年龄不得低于18周岁,不得超过60周岁。

2、乙方需将其作业人员登记造册(须写明姓名、性别、年龄、籍贯、工种、级别、工作证号及身份证号码),作为本合同附件。

3、在施工生产过程中,乙方必须保证人员相对稳定,不能随意变更备案人员,人员变动率小于,服从发包人的统筹安排,统一调动。

4、当乙方因故不能保证连续生产时,乙方在不影响甲方生产任务的前提下,可将队伍进行临时调整,对所调整人员应向甲方出具书面通知,并办理变更手续。

5、乙方必须按施工图纸及说明施工,如有合理化建议应征得甲方同意,并办理书面洽商变更手续后方可改动施工。在施工中应注意保护成品、半成品、爱护使用甲方提供的机械设备及其工具。

6、乙方应对作业工人进行安全生产、食品卫生、交通安,负责日常施工管负责现场安排工作、全及参防煤气中毒等方面的教育,自觉遵守甲方现场管理规定,服从甲方有关人员的指导、教育、监督和检查,并及时向甲方提供有关情况和资料。

第八条 保证金协议

1、在甲、乙双方签订合同时,乙方须向甲方缴纳保证金,乙方先预付定金元(大写:,乙方进场时再付余下的保证金。

2、保证金退订协议:完成两幢工程进度的第一层,退付,以此类推,到主体工程结束,无息退还全额保证金。

第九条 违约责任

甲、乙双方都必须遵守以上合同条款,不得违约,若一方违约,由违约方赔偿守约方人民币 壹万 元。

第十条 本合同一式三份,甲乙双方各执一份,备案一份,双方签字后生效,未尽事宜,双方协商解决。

甲方(公章):_________ 乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇5:建设工程劳务分包合同文本

范文类型:合同协议,适用行业岗位:工程,全文共 1808 字

+ 加入清单

签订合同双方:

建设单位:

施工单位:

为明确甲、乙双方在施工过程中的权利义务,促使双方互相创造条件,搞好配合协作,按时、按质、按建筑工程项目完成任务,经甲、乙双方充分协商,特签订本合同,以便共同遵守。

第一条:总则

一、工程名称:大酒店建设工程大酒店劳务分包

二、工程地点:昭阳区海楼路下段水文站旁。

三、工程范围:模板安装、拆除,泥工,钢筋加工安装。

四、工程造价:模板安装每平方米53.00元,泥工每平米75.00元,钢筋加工安装每平米32.00元预算造价,建筑面积21600平方米,合计单价160.00元/平方米。合计工程总价3456000.00元对该工程劳务包干。工程管理人员由甲方按月支付工资,乙方只负责完成该工程主体结构劳务施工。所有建筑所需材料由甲方自行采购。

第二条:工程期限

本合同全部工程自__年__月__日开工至__年__月__日竣工。在组织施工过程中,如遇下列情况,得顺延工期,双方应及时进行协商,并通过书面形式确定顺延期限:

一、因天灾或人力不能抗拒的原因被迫停工者;

二、因甲方提出更变计划或更变施工图而不能继续施工者;

第三条:物资供应

一、本合同全部所需材料按下列供应方式办理:

1、所用材料由加方自行采购。

2、所采购材料必须按照国家有关标准、规范验收合格,方可使用。

二、工程所需材料如因供应部门的规格品种或材质不能满足工程所需要求,必须以其他规格品种代替或加工处理时,应事先取得甲乙双方的同意,在办理有关手续后实行,由于代用或加工而发生的量差、价差及加工费,由负责供应的甲方负担。

三、凡应附有合格证明的材料,在进入施工现场时,必须验证。如无证明,须经试验合格方准使用,其试验费应由负责供应甲方负担。

第四条:工程款结算

一、本合同全部工程造价的结算方式,按下列规定办理:

模板安装每平方米53.00元,泥工每平米75.00元,钢筋加工安装每平米32.00元预算造价,建筑面积21600平方米,合计单价160.00元/平方米。合计工程总价3456000.00元包干。

二、本合同自签订生效之日后,甲方应每完成三层主体拨付一次劳务费,拨付比例为完成建筑面积的75%。

第五条:施工与设计变更

一、甲方管理人员及时有效的组织乙方劳务人员严格按照百年大计、质量第一的方针。要求全部工序达到合格标准。

二、在组织施工中,要坚持按图施工,任何一方不得随意变更设计,如遇下列情况造成乙方窝工,返工和材料,构件的积压倒运,劳动力、机械调迁等损失,应由甲方负担。

1、施工中发现设计有错误或有严重不合理的地方,乙方应及时通知甲方,由甲方与原设计单位商定提出修改或更变设计文件,经甲乙双方办理有关手续后方准继续施工;

2、施工中如遇设计变更后超出原设计标准或规模时,须经原批准单位审批同意,甲乙双方办理有关手续后方可施工。在设计变更未批准前,任何一方不得强行施工;

3、在施工中如遇中途停建、缓建,甲乙双方对在建工程应商定做到安全部位。

4、所需材料的垂直运输机械由甲方负责,不得影响乙方施工。

三、在施工中由于乙方本身原因造成的停工、返工,材料倒运等损失。均由乙方自行负担。

第六条:竣工验收、结算与保修

一、乙方在单项工程竣工15日内,应将验收日期通知甲方,届时验收,甲方无理推迟验收,期间所发生的各项损失,应由甲方负担。

二、工程验收合格,从验收之日起10天内,乙方向甲方移交完毕,如甲方不能按期接管,致使已验收工程发生损失,应由甲方负担。

三、在进行竣工工程验收中,如发现不合格需返工或修理补做的部分,双方在验收时应议定修补措施和期限,乙方在规定期限内完成,完成后经验收合格再行移交,因此而发生的各项费用由乙方承担。

四、竣工工程验收以后,乙方对施工的泥工工程质量保修一年。

第七条:奖励、惩罚

第八条:工程负责人和工伤事故

一、甲方派黄忠明同志为驻现场负责人、乙方派刘天贵同志为现场施工负责人。

二、甲方有责任教育工人严格执行操作规程,安全施工,在施工中发生的伤亡事故和乙方管理不善,造成的其他损失,均由乙方负责,并不得因此影响工程进度。

第九条:本合同自双方签订之日生效。在本合同全部工程竣工验收并结清尾款后失效,本合同一式四份,其中正本两份、副本两份,甲乙双方各执两份。

甲方:_________乙方:_________

法定代表人:_________法定代表人:_________

_________年____月____日_________年____月____日

展开阅读全文

篇6:安装工程施工合同_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 2447 字

+ 加入清单

安装工程施工合同

发包方(甲方): 广州大学 合同编号:gdht-

承包方(乙方): 签订地点:广州大学

按照《中华人民共和国合同法》和《建筑安装工程承包合同条例》的规定以及甲方招标文件和乙方投标文件,结合本工程具体情况,双方达成如下协议。

第一条 工程概况

1.1工程名称:

1.2工程地点:广州大学新校区 。

1.3承包范围: 按甲方招标文件、设计图纸、说明资料等。

1.4承包方式: 。

1.5工期:本工程自200 年 月 日开工,于2XX年 月 日竣工。

1.6工程质量:按国家和广东省建筑安装工程及甲方招标文件规定的质量标准验收 。

1. 7合同价款:人民币¥ 元(大写) ,

第二条 甲方工作

2.1开工前 天,向乙方提供经确认的施工图纸或做法说明 1 份,并向乙方进行施工现场交底。全部腾空或部分腾空房屋,清除影响施工的障碍物。对只能部分腾空的房屋所滞留的家具、陈设等采取保护措施。向乙方提供施工所需的水、电、气及电讯等设备,并说明使用注意事项。办理施工所涉及的各种申请、批件等手续。

2.2指派 为甲方代表,负责合同履行并对工程质量、进度进行监督检查,联系协同办理验收、变更、登记及其他有关事项的手续。

2.3如确实需要拆改原建筑物结构或设备管线,负责到有关部门办理相应审批手续。

2.4协调有关部门做好现场保卫、消防、垃圾处理等工作,并承担相应费用。

第三条 乙方工作

3.1指派 为乙方驻工地代表,负责合同履行。按要求组织施工,保质、保量、按期完成施工任务,解决由乙方负责的各项事宜。

3.2严格执行施工规范、安全操作规程、防火安全规定、环境保护规定。严格按照图纸或作法说明进行施工,做好各项质量检查记录。参加竣工验收,编制工程结算。

3.3遵守国家或地方政府及有关部门对施工现场管理的规定,妥善保护好施工现场周围建筑、设备管线、古树名木不受损坏。做好施工现场保卫和垃圾清运等工作,处理好由于施工带来的扰民问题及周围单位(住户)的关系。

3.4施工中未经甲方同意或有关部门批准,不得随意拆改原建筑物结构及各种设备管线。

3.5工程竣工未移交甲方之前,负责对现场的一切设施和工程成品进行保护。

第四条 关于工期的约定

4.1甲方若要求乙方工期提前竣工时,应征得乙方同意,并向乙方支付因提前完工采取措施的费用。

4.2因甲方原因造成乙方不能按期完成工程,则工期顺延。

4.3因乙方责任,不能按期开工或中途无故停工,影响工期的,工期不顺延。

4.4因设计变更或非乙方原因造成的停电、停水、停气及不可抗力因素影响,导致停工8小时以上(一周内累计计算),工期相应顺延。

第五条 关于工程质量及验收的约定

5.1本工程以《建筑装饰装修工程质量及验收规范》(gb50210-)等国家制订的施以及验收规范和甲方招标文件与设计要求为质量评定验收标准,甲乙双方如遇对质量要求和技术指标标准有相互抵触或异议的事项,由甲方在招标与投标文件中有关质量要求和技术指标比较优胜的原则选择确定该项的约定标准。

5.2本工程质量应达到国家质量评定合格(优良)标准。

5.3甲、乙双方应及时办理隐蔽工程和中间工程的检查与验收手续。乙方应提前3天书面通知甲方验收,如甲方不按时参加隐蔽工程和中间工程验收,乙方可自行验收,甲方应予承认。若甲方要求复验时,乙方应按要求办理复验。若复验合格,甲方应承担复验费用,由此造成停工的,则工期顺延;若复验不合格,其复验及返工费用由乙方承担,工期也予顺延。如乙方未通知甲方即自行验收,甲方不予承认,此事项如甲方要求复验时,乙方应承担因此引起的所有损失费用和贻误工期的责任。

5.4由于乙方原因造成质量事故,其返工费用由乙方承担,工期不顺延。

5.5 工程竣工后,乙方应通知甲方验收,甲方自接到验收通知 10 日内组织验收,并办理验收、移交手续。如甲方在规定时间内未能组织验收,需及时通知乙方,另定验收日期。但甲方应承认竣工日期,并承担乙方的看管费用和相关费用。

第六条 关于工程价款及结算的约定

6.1双方商定本合同价款采用下列第 种方式:

(1)固定价格。

(2)固定价格加 空白 %包干风险系数计算。包干风险包括 空白 内容。

(3)可调价格:详见本合同第十一条。

6.2本合同生效后,甲方分3次,按下表支付总额为¥ 元的工程价款。

拨款分 3次进行

拨款 100 %

金 额 (元)

工程完成30%时(乙方应在提交此项发票和支付凭据资料的同时,向甲方交付按本合同价款5%计款的履约保证金)

30%

工程完成50%

20%

验收合格后支付竣工结算余款

50%

6.3 工程竣工验收合格一年后,乙方提出工程结算并将验收结算有关资料送交甲方;甲方自接到上述资料的 天内审查完毕,到期未提出异议,视为同意;并在 天内,结清尾款并退还履约保证金。

第七条 关于材料供应的约定

7.1凡由乙方采购的材料、设备,如不符合质量要求或规格有差异,应禁止使用。若已使用,对工程造成的损失由乙方负责。

7.2由乙方负责采购工程所需材料并供应至施工场地。

7.3 材料设备应附有出厂合格证,如一方对材料设备有异议应进行检验。如检验合格,检验费用由持有异议一方承担,否则由采购方承担。

第八条 有关安全生产和防火的约定

8.1乙方在施工期间应严格遵守《建筑安装工程安全技术规程》、《建筑安装工人安全操作规程》、《中华人民共和国消防条例》和其他相关的法规、规范。

8.2由于乙方在施工生产过程中违反有关安全操作规程、消防条例,导致发生安全或火灾事故,乙方应承担由此引发的一切经济损失及其后果责任。

第九条 奖励和违约责任

9.1由于甲方原因导致延期开工或中途停工,甲方应补偿乙方因停工、窝工所造成的损失。每停工或窝工一天,甲方支付乙方 / 元。甲方不按合同的约定拨付款,每拖期一天,按付款额的 / %支付滞纳金。

9.2由于乙方原因,逾期竣工,每逾期一天,乙方支付甲方 元违约金;逾期三十天后,甲方有权终止本合同,乙方应按合同价款的30%向甲方支付违约金外,并全额退还甲方已经预付的款项及其利息。

共2页,当前第1页12

展开阅读全文

篇7:工程劳务承包合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 2639 字

+ 加入清单

甲方:

乙方:

根据《中华人民共和国合同法》及相关国家相关法律、法规和公司文件相关规定,遵循平等、自愿、公平和诚信的原则,甲、乙双就 (工程)劳务施工承包事宜协商达成一致。订立本合同。

第一条 工程概况

第二条 工程承包范围

室内消火栓系统、喷淋系统、室外消火栓系统、报警系统、应急照明系统、气体灭火系统的劳务施工。

第三条 工程工期

一、按项目部规定合理时间完成;

二、在施工过程中,如遇下列情况,工期相应顺延:

(一)因甲方设计变更或工程量增加而影响正常工期的;

(二)因甲方不能按期提供施工图、材料、设备的;所供材料、设备不符合施工需要的;所供材料、设备在交验时发现缺陷需要修、配、代、换而影响进度的;

(三)因甲方未具备进入条件,不能供施工场地水、电源、场地道路未能畅通、障碍物未能清除等影响进场施工的;

(四)在施工中因连续停水、停电影响正常施工的;

(五)非因乙方原因造成的前道工序没有完成,影响工程进度的;

(六)隐蔽工程在隐蔽之前,乙方通知甲方验收,甲方没有验收的。

第四条 工程价款

1、室内消火栓系统280元/套;喷淋系统75元/个;室外消防管道20元/米;自动报警系统75元/点位;应急照明65元/点位;室外栓260元/套;水泵接合器280元/套;气体灭火系统1200元/套;

2、以上价格的工程内容以20xx年7月2为界线,7月2日以前的应该完成的由甲方保质保量的移交给乙方进入下道工序的施工,若因前期工程不到位而造成工作量增加的总价在3000元以内,由乙方自行解决,超过3000元则由甲方负责;

3、主材由甲方提供,辅材由乙方提供,详见附表;

4、室外管网安装开孔开洞、挖沟、回填补洞均由甲方负责;

5、整个工程甲方一次性给乙方远程施工费5万元整;

6、以上价格不包括任何配合费、机械费、垂直运输费、管道防腐内容,如要防腐另行计价。

第五条 工程结算方式

1、每月的25日前乙方向甲方申报当月的工程进度量,甲方收到乙方进度量应急时对其进行核实,甲方按乙方的进度量按双方约定的价格的80%在次月的5日之前足额支付给乙方;

2、本工程经消防检测验收或消防备案后三日内,甲方应对乙方的整个工程量进行结算,除去3%的质保金外,甲方应在消防检测验收后10日内付清乙方的所有工程余款;

3、3%的质保金在工程验收备案之日起满一年后,15日之内付给乙方。

第六条 工程质量

1、甲方应向乙方提供安装施工图纸2套,并向乙方进行技术交底;

2、涉及隐蔽工程的,在工程隐蔽前,乙方应通知甲方到场验收,验收不合格,乙方进行整改另行验收到合格,甲方没有及时到场验收的,视为合格;

3、乙方在保证工程符合国家工程建设消防设计要求,满足使用要求的前提可适当的调整,同时也满足使用要求;

4、保修一年。

第七条 调试及验收

1、工程完工后,乙方通知甲方验收,甲方自接到验收通知2日内组织自行验收;

2、自行验收合格后,双方办理移交手续;

3、甲、乙双方应积极配合消防检测验收;

4、因特殊情况要求提前使用消防设施,甲、乙双方的移交就以提前之日算起,维修期也以当日算起。

第八条 甲方的权利与义务

1、负责统一制定各项管理目标,组织编制施工计划、物资需用量计划表,实施对工程质量、工期、安全生产、文明施工、计量检测、实验化验的控制、监督、检查和验收;

2、负责与业主、监理、设计及有关部门工作联系,协调现场工作关系;

3、根据工程情况要求乙方增减施工人数,满足施工生产需要。对施工质量低劣、技术差、不服从指挥、有违法乱纪行为的人员予以清退;

4、及时提供由甲方供应的施工机械设备、周转材料;

5、按本合同约定,向乙方支付足量劳动报酬;

6、统筹安排、协调解决乙方施工临时设施、用水、用电;

7、为乙方办理现场施工人员出入证件;

8、甲方应为乙方施工人员买够足够的保险金;

9、现在施工的加工材料甲方应派专人看管。

第九条 乙方的权利和义务

1、遵守国家政策和法律法规,遵守业主和甲方企业的相关规章制度,做好安全、文明施工、环境和职业健康安全、劳动保护等工作;

2、严格按照设计图纸、施工验收规范、有关技术要求及施工组织设计精心组织施工,确保工程质量达到约定的标准,对本合同劳务承包范围内的工程质量向甲方负责;根据业主或甲方的计划要求(包括调整后的计划),合理组织,科学安排作业计划,投入足够的人力、物力、保证工期;承担由于自身责任造成的质量返修;

3、及时报告合同履行中存在的问题,定期向甲方报告工程进展情况;

4、服从甲方和业主的监督、检查、管理;接受甲方和业主有关人员对质量、进度、技术、安全生产、文明施工、环境保护等方面的管理;接受甲方随时检查;

5、堆放材料、机具、合理使用甲方提供或租赁给乙方使用的机具、周转材料及其他设施;

6、乙方在施工时,安装工人必须穿戴由甲方指定的装束,并有醒目的标志;

7、乙方应提前3个工作日向甲方材料部以书面形式报告材料计划;

8、乙方应保证其项目部的所有施工人员的工资发放,乙方所有施工人员不得以任何理由向甲方索取工资。因乙方管理不善,赞成工资不能发放到位的,甲方有权立即终止合同;

9、负责工地施工安全及人员安全,如发生安全事故造成人员伤残的,3万元以内由乙方自行解决。

第十条 其它

1、乙方未经甲方同意,不得以甲方名义从事与履行本合同无关的事项,如发生,乙方承担全部的法律责任和经济损失;

2、如乙方施工组织不力,不能保质保量完成进度计划,甲方有权随时撤换队,由此造成的甲方和乙方的经济损失全部由乙方承担;

3、甲、乙双方在履行合同发生争议,可以自行协商解决;否则,双方应在合同签订所在地劳动仲裁部门或人民法院解决;

4、发生争议后,除非出现下列情况,双方都应继续履行合同,保持工作连续,保护好已完工作成果:

4.1、单方违约导致合同确已无法履行,双方协议终止合同;

4.2、调解要求停止合同工作,且为双方接受;

4.3、仲裁机构要求停止合同工作;

4.4、法院要求停止合同工作。

5、保修期间,乙方应在接到维修通知后按甲方要求内容和时间派人维修,若乙方未按甲方要求执行,甲方可委托其它单位或人员修理,其费用由乙方的质保金内扣除。

6、安全事故双方协商无法解决时,由劳动部门仲裁。

7、未尽事宜,双方协商解决。

甲方(公章):_________ 乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇8:建设工程承包合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 1798 字

+ 加入清单

甲方:_______

乙方:_______

按照《中华人民共和国民法典》的原则,结合本工程具体情况,双方达成如下协议。

第一条工程概况

1.1工程名称:

工程地点:

工程内容:

承包范围:

1.2开工日期:

竣工日期:

总日历日期:

1.3质量等级:

1.4合同价款:

第二条合同文件及解释顺序。

第三条合同文件使用的语言文字、标准和适用法律。

3.1合同语言:

3.2适用法律法规:

3.3适用标准、规范:

第四条图纸。

4.1图纸提供日期:

4.2图纸提供套数:

4.3图纸特殊保密要求和费用:

第五条甲方驻工地代表。

5.1甲方驻工地代表及委派人员名单:

5.2实行社会监理的总监理工程师姓名及其被授权范围(如果有):

第六条乙方驻工地代表。

第七条甲方工作。

7.1施工场地具备开工条件和完成时间的要求:

7.2水、电、电讯等施工管线进入施工场地的时间、地点和供应要求:

7.3施工场地内主要交通干道及其与公共道路的开通时间和起止地点:

7.4工程地质和地下管网线路资料的提供时间:

7.5办理证件、批件的名称和完成时间:

7.6水准点与坐标控制点位置提供和交验要求:

7.7会审图纸和设计交底的时间:

7.8施工场地周围建筑物和地下管线的保护要求:

第八条乙方工作

8.1施工图和配套设计名称、完成时间及要求:

8.2提供计划、报表的名称、时间和份数:

8.3施工防护工作的要求:

8.4向甲方代表提供办公和生活设施的要求:

8.5对施工现场交通和噪音的要求:

8.6成品保护的要求:

8.7施工场地周围建筑物和地下管线的保护要求:

8.8施工场地整卫生的要求:

第九条进度计划

9.1乙方提供施工组织设计(或施工方案)和进度计划的时间:

9.2甲方代表批准的时间:

第十条延期开工。

第十一条暂停施工。

第十二条工期延误。

第十三条工期提前。

第十四条检查和返工。

第十五条工程质量等级。

15.1工程质量等级要求的经济支出:

15.2质量评定仲裁部门名称:

第十六条隐蔽工程、中间验收。

16.1中间验收部位和时间:

第十七条试车。

第十八条验收和重新检验。

第十九条合同价款及调整。

19.1调整的条件:

19.2调整的方式:

第二十条工程预付款。

20.1预付工程款总金额:

20.2预付时间和比例:

20.3扣回时间和比例:

20.4甲方不按时付款应承担的违约责任:

第二十一条工程量的核实确认。

21.1乙方提交工程量报告的时间和要求:

第二十二条工程款支付。

22.1工程款支付方式:

22.2工程款支付金额和时间:

22.3甲方违约的责任:

第二十三条甲方供应材料设备。

23.1甲方供应材料、设备的要求(附清单):

第二十四条乙方采购材料设备。

第二十五条设计变更

第二十六条确定变更价款。

第二十七条竣工验收。

27.1乙方提交竣工资料和验收报告的时间:

27.2乙方提交竣工图的时间和份数:

第二十八条竣工结算。

28.1结算方式:

28.2乙方提交结算报告的时间:

28.3甲方批准结算报告的时间:

28.4甲方将拨款通知送达经办银行的时间:

28.5甲方违约的责任:

第二十九条保修。

29.1保修内容、范围:

29.2保修期限:

29.3保修金额和支付方法:

29.4保修金利率:

第三十条争议。

30.1争议的解决程序:

30.2争议解决方式:

第三十一条违约。

31.1违约的处理:

31.2违约金的数额:

31.3损失的计算方法:

31.4甲方不按时付款的利息率:

第三十二条索赔。

第三十三条安全施工。

第三十四条专利技术、特殊工艺和合理化建议。

第三十五条地下障碍和文物。

第三十六条工程分包。

36.1分包单位和分包工程内容:

36.2分包工程价款的结算办法:

第三十七条不可抗力。

37.1不可抗力的自然灾害认定标准:

第三十八条保险。

第三十九条工程停建或缓建。

第四十条合同生效与终止。

40.1合同生效与终止:

第四十一条合同份数:

41.1合同副本份数:

41.2合同副本的分送责任:

41.3合同书制定费用:

合同订立时间:____年__月__日

发包方(章):承包方(章):

地址:________ 地址:_______

法定代表人:_____ 法定代表人:_______

委托代理人:_____ 委托代理人:_______

电话:________ 电话:__________

传真:________ 传真:__________

开户银行:______ 开户银行:________

帐号:________ 帐号:__________

邮政编码:______ 邮政编码:________

展开阅读全文

篇9:挡土墙工程承包合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 785 字

+ 加入清单

甲方:

乙方:

甲方将TJ12标段的挡土墙施工劳务费承包给乙方,甲、乙双方根据合同法及本着平等、信任自愿协商达成如下合同:

工程概况及主要工程量

一、工程概况

1、挡土墙施工处于公路水沟边,土质为新填起来较松软。应注意雨水及山沟流水,护面墙、挡土墙采取浆砌片(卵)石(含沟缝灌浆或抹面)。预埋排水管,低值易耗材料。直至交工验收等一切人工费,(甲方只提供模板、架杆、斗车、振动棒、搅拌机和生产产品的材料,其余材料均包含在单价内,由乙方负责)。

2、 各挡墙断面设置不一样,具体方量以实际方量为准。

合同内容

二、甲方以清包工的形式承包给乙方,工程承包价以护面墙、挡土墙砌筑,勾缝或抹面,预埋排水管直至交工验收等一切人工费,每立方米元/m3大写:计算,总方量以实际丈量为准。

三、付款方式,每月路基队支付甲方工程款后5个工作日内,甲方按乙方完成工程量的80﹪支付给乙方(指完成的合格工程),其余工程款待整体挡土墙或护面墙完工,甲方验收合格后一个月内支付15%,余下的作为保证金待整个工程(指乐雅高速公路TJ12标段所有结构物、护面墙、水沟等)完工验收后一个月内付清。

四、甲方的权利与责任

1、 甲方指派工程施工监督人员对乙方进行质量监督及相关指导。

2、 当施工时遇到地界纠纷不清时由甲方负责协商。

3、 监督人员发现施工质量问题,有权责令施工停止或返工。

五、乙方的权利与责任

1、 因工程为清包工的形式承包给乙方,有关施工中所需要的小型机具,工具等相关费用由乙方自行负责。

2、 乙方要保证挡土墙的砌筑牢固性、安全性,若在一年之内有任何质量问题,由乙方负责一切损失。

3、 甲方提供的材料、机具,乙方负责看管,如有丢失,损坏,乙方照价赔偿。

六、施工安全;乙方在施工过程中,必须安全施工、文明施工如有安全事故概由乙方负责。

七、本合同一式两份,甲乙双方各执一份,签字后生效。

甲方签字: 年 月日 身份证号:

展开阅读全文

篇10:建设工程设计合同范本

范文类型:合同协议,适用行业岗位:工程,设计,全文共 17782 字

+ 加入清单

Design Contract for Construction Project (II)

(专业建设工程设计合同)

(Design Contract for Professional Construction Project)

工 程 名 称: 10KV变电所新建工程

Project Name:10KV Substation New Construction

工 程 地 点:

Project Site:

合 同 编号:Contract No.:

(由设计人编填) (Filled in by Designer)

设计证书等级: 设证甲级A121001826

Design Certification Rank: Design Certificate Class A 121001826

发 包 人:Employer:

设 计 人: 电力勘察设计院

Designer: Electric Power Survey Design Institute

签 订 日 期:Date:

中华人民共和国建设部国家工商行政管理局

Supervised and Manufactured byMinistry of Construction of People’s Republic of

China and the State Administration of Industry and Commerce

发包人:Employer:

设计人:电力勘察设计院 Designer: Electric Power Survey Design Institute

发包人委托设计人承担 10KV变电所新建工程设计,工程地点为 ,经双方协商一致,签订本合同,共同执行。

The Employer entrusts the Designer to undertake 10KV Star Mall Plaza 1 # Substation New Construction; the project site is No.6, Bei’Er Zhong Road, Tiexi District, Shenyang City. Upon agreement by both parties through consultation, the two parties shall sign and implement the Contract jointly.

第一条 本合同签订依据 Article 1: This Contract is signed in accordance with:

1.1《中华人民共和国合同法》、《中华人民共和国建筑法》和《建设工程勘察设计市场管理规定》。

1.1 Contract Law of the People’s Republic of China, Construction Law of the Peoples Republic of China and Market regulations of Construction Survey and Design.

1.2国家及地方有关建设工程勘察设计管理法规和规章。

1.2 Laws and regulations of the related state and local construction survey and design management.

1.3建设工程批准文件。1.3 Documents of Approval for Construction.

第二条 设计依据Article 2 Design Basis

2.1发包人给设计人的委托书或设计中标文件

2.1 The Trust Deed or Design Documents of the tender accepted provided to the designer by the employer;

2.2发包人提交的基础资料2.2 Fundamental materials submitted by the employer;

2.3设计人采用的主要技术标准是:2.3 The major technical standards adopted by the designer are:

B-01R5-SJ-02-20xx标准、规程、规范

B-01R5-SJ-02-20xx Standards, Procedures, Norms

第三条 合同文件的优先次序Article 3 Priority of Contract Document

构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一致,则根据如下优先次序来判断:

The documents consisting of this Contract may be deemed as demonstrating mutually; if there is any ambiguity or discordance in the contract document, the following priority shall be followed to judgment,

3.1合同书 3.1 The Contract;

3.2中标函(文件) 3.2 Letter of Acceptance (Document);

3.3发包人要求及委托书 3.3 Requirements of the employer and Letter of Authority;

3.4投标书 3.4 The Tender

第四条 本合同项目的名称、规模、阶段、投资及设计内容(根据行业特点填写)

Article 4 Name, Scale, Phase, Investment and design Content for the Contract Items (fill in based on industry characteristics)

10KV星摩尔购物广场1#变电所新建工程

10KV Star Mall Plaza 1 # Substation New Construction

变电所电气及10KV进线

Electric and 10KV inlet wire of the substation

变电所设在地下,内设6台1600KVA变压器及2台1250KVA变压器。

The substation is underground, with six 1,600KVA transformers and two 1,250KVA transformers inside.

10KV电源分别由劝工变、历工变电所各新出电缆新路径电缆敷设至用户

变电所。

The 10KV power line is laid along the new cable roads of Quangong Substation and Ligong Substation respectively, toward the customer substation with cables.

第五条 发包人向设计人提交的有关资料、文件及时间

Article 5 Relevant materials, documents and time submitted to the designer

本工程供电方案 1份 20xx-2-25

Power supply scheme of this project 1 25 February, 20xx

用电负荷资料 1份 20xx-2-25

by the employer

Electricity load data 1 25 February, 20xx

第六条 设计人向发包人交付的设计文件、份数、地点及时间

Article 6 Documents, number of copies, location and time submitted to the employer by the designer

设计图纸 8份 20xx-04-15

Design drawing 8 copies 15 April, 20xx

概算书 6份 20xx-04-15

Book of estimates 6 copies 15 April, 20xx

注:待发包人结清全部设计费后,由设计人将设计文件交付沈阳供电公司客户工程部

Note: After the party issuing contract settles up the total design fee, the above design documents will be submitted to the Project Division of Shenyang Power Supply Company by the designer.

第七条 费用Article 7 Expenditure

7.1双方商定,本合同的设计费为设计费按设计价格(20xx)10号文计取 万元。收费依据和计算方法按国家和地方有关规定执行,国家和地方没有规定的,由双方商定。

7.1 It is agreed between both parties that the design fee under this contract is calculated and charged according to the document No.10 (20xx) Design Prices. The charging basis and method are in accordance with relevant national and local provisions, and will be determined by both parties through negotiation, if there is no relevant national or local provision.

7.2 如果上述费用为估算设计费,则双方在初步设计审批后,按批准的初步设计概算核算设计费。工程建设期间如遇概算调整,则设计费也应做相应调整。

7.2 If the above expense is estimated design fee, both parties shall check the design fee as per the approved budgetary estimate of the preliminary design, after the examination and approval of preliminary design. During the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly.

第八条 支付方式Article 8 Form of Payment

8.1本合同生效后三天内,发包人支付设计费总额,计 16 万元作为定金(合同结算时,定金抵作设计费)。

8.1 The party issuing contract shall pay the total design fee, within three days after the execution of this contract, that is, 160000 RMB as a deposit (the deposit will be seen as a part of design fee, at the time of contract settlement).

8.2设计人提交 全部 设计文件之前,发包人结清设计费,不留尾款。

8.2 Before the designer submits all design documents. the design charge is all squared by the employer, and no final payment left.

8.3双方委托银行代付代收有关费用。

8.3 Both parties commission bank to pay and collect related fees.

第九条 双方责任Article 9 Responsibility of Two Parties

9.1 发包人责任9.1 Responsibility of the Employer

9.1.1发包人按本合同第五条规定的内容,在规定的时间内向设计人提交基础资料及文件,并对其完整性、正确性及时限负责。发包人不得要求设计人违反国家有关标准进行设计。

发包人提交上述资料及文件超过规定期限15天以内,设计人按本合同第六条规定的交付设计文件时间顺延;发包人交付上述资料及文件超过规定期限15天以上时,设计人有权重新确定提交设计文件的时间。

9.1.1 The Employer shall deliver basic materials and documents to the designer within the specified time in accordance requirements stipulated in Article 5, and shall be responsible for their completeness, correctness and time limit. The employer shall not request the designer to design by violating the concerned national standards.

If it exceeds the prescribed time limit within fifteen (15) days when the employer delivers above materials and documents, the designer can postpone accordingly the time of delivering the design documents in accordance with Article 6 in the Contract; if it exceeds the prescribed time limit over fifteen (15) days when the employer delivers above materials and documents, the designer is entitled to decide again the time of delivery of design documents.

9.1.2发包人变更委托设计项目、规模、条件或因提交的资料错误,或所提交资料作较大修改,以致造成设计人设计返工时,双方除另行协商签订补充协议(或另订合同)、重新明确有关条款外,发包人应按设计人所耗工作量向设计人支付返工费。

9.1.2 When the employer alters entrusted design items, scale and conditions, or delivers the wrong materials, or delivers mostly revised materials so that the designer rework for the design, the employer shall pay for rework cost for the designer based on the amount of the work performed by the designer except the supplemental agreement (or contract ) signed separately, and the relevant articles specified again by both parties through the consultation.

Prior to signing the contract, if the employer has satisfied to design work which is done by the designer, the employer shall pay the corresponding design charge.

在未签订合同前发包人已同意,设计人为发包人所做的各项设计工作,发包人应支付相应设计费。

9.1.3在合同履行期间,发包人要求终止或解除合同,设计人未开始设计工作的,不退还发包人已付的定金;已开始设计工作的,发包人应根据设计人已进行的实际工作量,不足一半时,按该阶段设计费的一半支付;超过一半时,按该阶段设计费的全部支付。

9.1.3 During implementation of the Contract, when the employer requests to terminate and cancel the contract, the down payment paid by the employer shall not be returned if the designer doesn’t begin the design work; if the designer starts the design, the employer shall pay half of design charge in the phase if it is less than half of the actual amount of work performed by the designer; if it exceeds the half, the full design charge in the phase shall be paid in all.

9.1.4发包人必须按合同规定支付定金,收到定金作为设计人设计开工的标志。未收到定金,设计人有权推迟设计工作的开工时间,且交付文件的时间顺延。

9.1.4 The employer shall pay the down payment in accordance with stipulations of the Contract. Reception of the down payment is the mark of commencement of design work for the designer. If the down payment is not received, the designer is entitled to put off the time of commencement of design work, and postpone accordingly the time of delivery of documents.

9.1.5发包人应按本合同规定的金额和日期向设计人支付设计费,每逾期支付一天,应承担应支付金额千分之二的逾期违约金,且设计人提交设计文件的时间顺延。逾期超过30天以上时,设计人有权暂停履行下阶段工作,并书面通知发包人.发包人的上级或设计审批部门对设计文件不审批或本合同项目停缓建,发包人均应支付应付的设计费。

9.1.5 The Employer should pay charges for design to the Designer at the amount and date provided in this Contract. For each day of overdue payment, 2‰ of the overdue payment shall be paid as damages for overdue payment and the time for delivery by the Designer shall be extended accordingly. Where the delay of payment has exceeded 30 days, the Designer shall have the right to suspend the performance of the work at the next stage and give written notice to the Employer. In case the higher authority or competent department of design approval would not approve the design documents or the engineering construction of this contract is suspended or stopped, the Employer should pay the payable charges for design.

9.1.6发包人要求设计人比合同规定时间提前交付设计文件时,须征得设计人同意,不得严重背离合理设计周期,且发包人应支付赶工费。

9.1.6 The employer requests the designer should deliver the design documents ahead of the time specified by the Contract, it shall need the approval of the designer, and shall not deviate gravely from the rational design period, and the employer shall pay for the crashing charge.

9.1.7发包人应为设计人派驻现场的工作人员提供工作、生活及交通等方面的便利条件及必要的劳动保护装备。

9.1.7 The Employer should offer conveniences in aspects of working, living and traffic and necessary labor-protection equipments.

9.1.8设计文件中选用的国家标准图、部标准图及地方标准图由发包人负责解决。

9.1.8 The Employer shall be responsible for the national standard drawing, ministerial standard drawing and local standard drawings.

9.1.9承担本项目外国专家来设计人办公室工作的接待费(包括传真、电话、复印、办公等费用)。

9.1.9 The Employer shall bear the expenses for receiving foreign expert in charge of the engineering to the Designers office (including expenses on fax, telephone, copy and office affairs).

9.2设计人责任9.2 Responsibilities of the Designer

9.2.1设计人应按国家规定和合同约定的技术规范、标准进行设计,按本合同第六条规定的内容、时间及份数向发包人交付设计文件 (出现9.11、9.12、9.14、9.15、规定有关交付设计文件顺延的情况除外).并对提交的设计文件的质量负责。

9.2.1 The designer shall perform the design in accordance with provisions of the State and the technical codes and standards stipulated in the Contract, deliver the design documents in accordance with contents, time and number of copies to the employer specified in Article 6 (exclusion of the case where the design documents shall be prolonged accordingly stipulated in Article 9.11, 9.12, 9.14 and 9.15), and be responsible for quality of the delivered design documents.

9.2.2设计合理使用年限为 25 年。

9.2.2 The design life of the engineering construction shall be 25 years.

9.2.3负责对外商的设计资料进行审查,负责该合同项目的设计联络工作。

9.2.3 Responsible for examining for design materials of foreign businessman, and responsible for design liaison of the Contract project.

9.2.4设计人对设计文件出现的遗漏或错误负责修改或补充。由于设计人设计错误造成工程质量事故损失,设计人除负责采取补救措施外,应免收受损失部分的设计费,并根据损失程度向发包人支付赔偿金,赔偿金数额由双方商定为实际损失的 %。

9.2.4 The designer shall be responsible for revision or supplement to the mistakes or omission of the design documents. The designer shall be free of the design charge of loss part besides remedial measures taken for casualty loss of construction quality caused by the designer due to the wrong design, and shall pay compensation money for the employer based on degree of loss. Amount of compensation which is decided by two parties through consultation is % of actual loss.

9.2.5由于设计人原因,延误了设计文件交付时间,每延误一天,应减收该项目应收设计费的千分之二。

9.2.5 If the delivery of design documents is delayed for the Designers reason, each day overdue will result in the reduction of 2‰ of the design charges for the project.

9.2.6合同生效后,设计人要求终止或解除合同,设计人应双倍返还发包人已支付的定金。

9.2.6 After the contract enters into force, the Designer may require termination or cancellation of the contract and the Designer should return the down payment in double.

9.2.7设计人交付设计文件后,按规定参加有关上级的设计审查,并根据审查结论负责不超出原定范围的内容做必要调整补充。设计人按合同规定时限交付设计文件一年内项目开始施工,负责向发包人及施工单位进行设计交底、处理有关设计问题和参加竣工验收。在一年内项目尚未开始施工,设计人仍负责上述工作,可按所需工作量向发包人适当收取咨询服务费,收费额由双方商定。

9.2.7 Upon delivery of the design documents, the Designer shall participate in the inspection on the design by the relevant higher authority as provide and shall be responsible for necessary adjustment and supplements to the content within the original scope of the design according to the inspection conclusion. The Designer shall start the construction within one year upon delivery of the design documents within the specified time limit and shall be responsible for the technological disclosure to the Employer and construction unit, handling with relevant matters on design and participation in the acceptance upon completion of the engineering construction. In case the engineering construction has not started within one year, the Designer shall still be responsible for the above work and may collect reasonable service charge for consultancy from the Employer according to the needed workload. The amount of the service charge shall be discussed and determined by the Parties.

第十条 保密Article 10 Confidentiality

双方均应保护对方的知识产权,未经对方同意,任何一方均不得对对方的资料及文件擅自修改、复制或向第三人转让或用于本合同项目外的项目。如发生以上情况,泄密方承担一切由此引起的后果并承担赔偿责任。

Both Parties shall protect each other’s intellectual property rights. Without prior consent, neither party shall revise, copy or transfer to a third party or use for the project other than the project of this Contract any materials and documents of the other party. Under such circumstances, the disclosing party shall be responsible for all the any consequence it resulted and shall bear the relevant compensation.

第十一条 仲裁Article 11: Arbitration

本建设工程设计合同发生争议,发包人与设计人应及时协商解决。也可由当地建设行政主管部门调解,调解不成时,双方当事人同意由 沈阳 仲裁委员会仲裁。双方当事人未在合同中约定仲裁机构,当事人又未达成仲裁书面协议的,可向人民法院起诉。

If any dispute arises in connection with this Engineering Service Contract, it shall be settled by friendly consultation of the Parties, or be submitted to the competent local construction administration department for mediation. Where the dispute can not be settled by mediation, it shall be submitted to the Shenyang Arbitration Committee for settlement. Where the Parties have not agreed on the arbitration organization in the Contract nor conclude arbitration agreement in written form, the dispute will be brought to the People’s Court.

第十二条 合同生效及其他Article 12: Contract effective and miscellaneous

12.1发包人要求设计人派专人长期驻施工现场进行配合与解决有关问题时,双方应另行签订技术咨询服务合同。

12.1 As per the request of the Employer for dispatch of personnel to stay on the Construction site so as to coordinate and solve relevant issues, the individual technical consultant service contract shall be signed by both parties.

12.2设计人为本合同项目的服务至施工安装结束为止。

12.2 Service provided by the Designer for the Project in this Contract will be concluded until the completion of construction and installation.

12.3本工程项目中,设计人不得指定建筑材料、设备的生产厂或供货商。发包人需要设计人配合建筑材料、设备的加工订货时,所需费用由发包人承担。

12.3 In the projects of the Contract, Designer shall not appoint manufacturers or Designers of construction materials and equipments. Where there is a necessity that Designer shall cooperate with Employer in ordering the process of construction materials and equipments, the relevant charge shall be paid by Employer.

12.4发包人委托设计人配合引进项目的设计任务,从询价、对外谈判、国内外技术考察直至建成投产的各个阶段,应吸收承担有关设计任务的设计人员参加。出国费用,除制装费外,其他费用由发包人支付。

12.4 The Employer entrusted the Designer to cooperate with the engineering work of imported project and design personnel undertaking relevant design assignment shall be included in all stages from enquiry, business negotiation, domestic and overseas technical inspection until the production period. The charge for overseas business trip and other relevant charge will be paid by Employer except the charge for purchasing dress.

12.5发包人委托设计人承担本合同内容以外的工作服务,另行签订协议并支付费用。

12.5 Additional agreement for any other service, which Employer entrusts Designer to provide, however, out of the scope of the Contract, shall be signed and the payment shall be paid correspondingly.

12.6由于不可抗力因素致使合同无法履行时,双方应及时协商解决。

12.6 For any failure to perform any term or condition of this Contract due to the force majeure, both parties shall, in good faith, attempt to settle amicably and by mutual agreement.

12.7本合同双方签字盖章即生效。一式 贰 份,发包人 壹 份,设计人 壹 份。

12.7 The Contract is effective once after both parties stamped and signed. There are totally __two_ copies of the Contract, Employer retains __one_ copies, and Designer retains __one__ copies.

12.8本合同生效后,按规定应到项目所在地省级建设行政主管部门规定的审查部门备案;双方认为必要时,到工商行政管理部门鉴证。双方履行完合同规定的义务后,本合同即行终止。

12.8 Once this Contract became effective, it should be registered in the Auditing Section stipulated by Provincial Administrative Ministry of Construction where the Project locates. Where is necessity mutually agreed by both parties, the Contract shall be certified by Local Administration for Industry and Commerce. This Contract is to be concluded once after both parties fulfilled their own responsibilities.

12.9双方认可的来往传真、电报、会议纪要等,均为合同的组成部分,与本合同具有同等法律效力。

12.9 Any correspondence, include faxes, telegram, meeting minutes agreed by both parties, are components of the Contract, which shall have the same validity with this Contract.

12.10未尽事宜,经双方协商一致,签订补充协议,补充协议与本合同具有同等效力。

12.10 As for matters not covered in this Agreement, supplementary agreement may be concluded by the Parties separately and such supplementary agreement shall have the same legal validity with this Contract.

发包人名称:Name of the Employer: 设计人名称:Name of the Designer:

(盖章)(Stamp) (盖章)(Stamp)

法定代表人:(签字)Legal representative: (signature) 法定代表人:(签字)Legal representative: (signature)

委托代理人:(签字)Authorized proxy: (signature) 委托代理人:(签字)Authorized proxy: (signature)

项目经理:(签字)Project Manager: (signature) 项目经理:(签字) Project Manager: (signature)

住 所: Address: 住 所:Address:

邮政编码: Postcode: 邮政编码: Postcode:

电 话: Tel.: 电 话:Tel.:

传 真: Fax: 传 真:Fax:

开户银行: Bank: 开户银行: Bank:

银行帐号: Bank account: 银行帐号:Bank account:

建设行政主管部门备案: 鉴证意见: Verification opinion:

Record at the competent construction

administration department:

(盖章) (Stamp) (盖章)(Stamp)

备 案 号: 经 办 人:

Record No.: Agent:

备案日期: 年 月 日 鉴证日期: 年 月 日

展开阅读全文

篇11:建设工程施工合同条件_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 11845 字

+ 加入清单

建设工程施工合同条件

一、词语涵义及合同文件

第一条 词语涵义。建设工程施工合同文本,由建设工程施工合同条件(以下简称合同条件)和建设工程施工合同协议条款(以下称协议条款)组成。其用词用语除协议条款另有约定外,应具有本条所赋予的涵义。

1.发包方(简称甲方):协议条款约定的、具有发包主体资料和支付工程价款能力的当事人。

2.甲方驻工地代表(简称甲方代表):甲方在协议条款中指定的代表人。

3.承包方(简称乙方):协议条款约定的、具有承包主体资格并被发包方接受的当事人。

4.乙方驻工地代表(简称乙方代表):乙方在协议条款中指定的代表人。

5.社会监理:甲方委托具备法定资格的工程监理单位或人员对工程进行的监理。

6.总监理工程师:工程监理单位委派的监理总负责人。

7.设计单位:甲方委托的具备相应资质等级的设计单位。

8.工程造价管理部门:国务院各有关部门、各级建设行政主管部门或其授权的工程造价管理部门。

9.工程质量监督部门:国务院各有关部门、各级建设行政主管部门或其授权的工程质量监督机构。

10.工程:协议条款约定具体内容的永久工程。

11.合同价款:按有关规定或协议条款约定的各种取费标准计算的,用以支付乙方按照合同要求完成工程内容的价款总额。

12.经济支出:在施工中已经发生,经甲方确认后以增加预算形式支付的合同价款。

13.费用:甲方在合同价款之外,需要直接支付的开支和乙方应负担的开支。

14.工期:协议条款约定的合同工期。

15.开工日期:协议条款约定的工程开工日期。

16.竣工日期:协议条款约定的工程竣工日期。

17.图纸:由甲方提供或乙方提供经甲方代表批准,乙方用以施工的所有图纸(包括配套说明和有关资料)。

18.施工现场:经甲方批准的施工组织设计或施工方案中施工现场总平面图规定的场地。

19.书面形式:根据合同发生的手写、打字、复写、印刷的各种通知、任命、委托、证书、签证、备忘录、会议纪要、函件及经过确认的电报、电传等。

20.不可抗力:指因战争、动乱、空中飞行物体坠落或其他非甲乙方责任造成的爆炸、火灾,以及协议条款约定等级以上的风、雨、雪、震等对工程造成损害的自然灾害。

21.协议条款:结合具体工程,甲、乙方协商后签订的书面协议。

第二条 合同文件及解释顺序

合同文件应能互相解释,互为说明。除合同另有约定外,其组成和解释顺序如下:

1.协议条款;

2.合同条件;

3.洽商、变更等明确双方权利义务的纪要、协议;

4.招标承包工程的中标通知书、投标书和招标文件;

5.工程量清单或确定工程造价的工程预算书和图纸;

6.标准、规范和其他有关技术资料、技术要求;

7.双方确认的往来信函、传真、电子邮件。

当合同文件出现含糊不清或不相一致时,在不影响工程进度的情况下,由双方协商解决(实行社会监理的,可先由总监理工程师作出解释);双方意见仍不能一致的,按第30条约定的办法解决。

第三条 合同文件使用的语言文字、标准和适用法律。合同文件使用汉语或协议条款约定的少数民族语言书写和解释、说明。

适用于合同文件的法律是国家的法律、法规及协议条款约定的部门规章或工程所在地的地方法规。

施工中必须使用协议条款约定的国家标准、规范;国家没有相应标准、规范时,可使用协议条款约定的专业或工程所在地地方的标准、规范。甲方应按协议条款约定的时间向乙方提供一式两份约定的标准、规范。

国内没有相应标准、规范时,乙方应按协议条款约定的时间和要求提出施工工艺,经甲方代表批准后执行;甲方要求使用国外标准、规范的,应负责提供中文译本。本条所发生购买、翻译和制定标准、规范的费用,均由甲方承担。

第四条 图纸。甲方在开工日期15天之前按协议条款约定的日期和份数,向乙方提供完整的施工图纸,乙方按协议条款要求做好图纸保密工作。需要特殊保密的措施费用由甲方承担。乙方需要增加图纸份数,甲方应代为复制,复制费用由乙方承担。

双方一般责任

第五条 甲方代表

甲方任命驻施工现场的代表,按照以下要求,行使合同约定的权力,履行合同约定的职责:

1.甲方代表可委派有关具体管理人员,承担自己部分权力和职责,并可在任何时候撤回这种派。委派和撤回均应提前5天通知乙方。

2.甲方代表的指令、通知由其本人签字后,以书面形成交给乙方代表,乙方代表在回执是签署姓名和收到时间后生效。确有必要时,甲方代表可发出口头指令,并在48小时内给予书面确认,乙方对甲方代表的指令应予执行。甲方代表不能及时给予书面确认,乙方应于甲方代表发出口头指令后3天内提出书面确认要求,甲方代表在乙方提出确认要求后3天内不予答复,应视为乙方要求已被确认。乙方认为甲方代表指令不合理,应在收到指令后24小时内提出书面申告,甲方代表在收到乙方申告后24小时内作出修改指令或继续执行原指令的决定,以书面形式通知乙方。紧急情况下,甲方代表要求乙方立即执行的指令或乙方虽有异议,但甲方代表决定仍继续执行的指令,乙方应予执行。因指令错误发生的费用和给乙方造成的损失由甲方承担,延误的工期相应顺延。

3.甲方代表按合同约定,及时向乙方提供所需指令、批准、图纸并履行其他约定的义务,否则乙方在约定时间后24小时内将具体要求、需要的理由和迟误的后果通知甲方代表,甲方代表收到通知后48小时内不予答复,应承担由此造成的经济支出,顺延因此延误的工期,赔偿乙方有关损失。

实行社会监理的工程,甲方委托的总监理工程师按协议条款的约定,部分或全部行使合同中甲方代表的权力,履行甲方代表的职责,但无权解除合同中乙方的义务。

甲方代表和总监理工程师易人,甲方应提前7天通知乙方,后任继续承担前任应负的责任(合同文件约定的义务和其职权的承诺)。

第六条 乙方驻工地代表

乙方任命驻地负责人,按以下要求行使合同约定的权力,履行合同约定的职责;

1.乙方的要求、请求和通知,以书面形式由乙方代表签字后送交甲方代表,甲方代表在回执上签署姓名和收到时间后生效;

2.乙方代表按甲方代表批准的施工组织设计(或施工方案)和依据合同发生的指令、要求组织施工。在情况紧急且无法与甲方代表联系的情况下,可采取保证工程和人员生命、财产安全的紧急措施,并在采取措施后24小时内向甲方代表送交报告。责任在甲方,由甲方承担由此发生的经济支出,相应顺延工期;责任在乙方,由乙方承担费用。

乙方代表易人应提前7天通知甲方,后任继续承担前任应负的责任(合同文件约定的义务和其职权内的承诺)。

第七条 甲方工作

甲方按协议条款约定的时间和要求,一次或分阶段完成以下工作:

1.办理土地征用,青苗树林赔偿,房屋拆迁,清除地面,架空和地下障碍等工作,使施工场地具备施工条件,并在开工后继续负责解决以上事项遗留问题;

2.将施工所需水、电、电讯线路从施工场地外部接至协议条款约定地点,并保证施工期间的需要;

3.开通施工场地与城乡公共道路的通道,以及协议条款约定的施工场地内的主要交通干道,满足施工运输的需要,保证施工期间的畅通;

4.向乙方提供施工场地的工程地质和地下管网线路资料,保证数据真实准确;

5.办理施工所需各种证件、批件和临时用地、占道及铁路专用线的申报批准手续(证明乙方自身资质的证件除外);

6.将水准点与坐标控制点以书面形式交给乙方,并进行现场交验;

7.组织乙方和设计单位进行图纸会审,向乙方进行设计交底;

8.协调处理施工现场周围地下管线和邻近建筑物、构筑物的保护,并承担有关费用。

甲方不按合同约定完成以上工作造成延误,承担由此造成的经济支出,赔偿乙方有关损失,工期相应顺延。

第八条 乙方工作

乙方按协议条款约定的时间和要求做好以下工作:

1.在其设计资格证书允许的范围内,按甲方代表的要求完成施工图设计或与工程配套的设计,经甲方代表批准后使用。

2.向甲方代表提供年、季、月工程进度计划及相应进度统计报表和工程事故报告。

3.按工程需要提供和维修非夜间施工使用的照看、看守、围栏和警卫等。如乙方未履行上述义务造成工程、财产和人身伤害,由乙方承担责任及所发生的费用。

4.按协议条款约定的数量和要求,向甲方代表提供在施工现场办公和生活的房屋及设施,发生的费用由甲方承担。

5.遵守地方政府和有关部门对施工场地交通和施工噪音等管理规定,经甲方同意后办理有关手续,甲方承担由此发生的费用,因乙方责任造成的罚款除外。

6.已竣工程未交付甲方之前,乙方按协议条款约定负责已完工程的成品保护工作,保护期间发生损坏,乙方自费予以修复。要求乙方采取特殊措施保护的单位工程的部位和相应经济支出,在协议条款内约定。甲方提前使用后发生损坏的修理费用,由甲方承担。

7.按合同的要求做好施工现场地下管线和邻近建筑物、构筑物的保护工作。

8.保证施工现场清洁符合有关规定。交工前清理现场达到合同文件的要求,承担因违反有关规定造成的损失和罚款(合同签订后颁发的规定和非乙方原因造成的损失和罚款除外)。

乙方不履行上述各项义务,造成工期延误和工程损失,应由甲方的损失给予赔偿。

施工组织设计和工期

第九条 进度计划

乙方应在协议条款约定的日期,将施工组织设计(或施工方案)和进度计划提交甲方代表。甲方代表应按协议条款约定的时间予以批准或提出修改意见,逾期不批复,可视为该施工组织设计(或施工方案)和进度计划已经批准。

乙方必须按批准的进度计划组织施工,接受甲方代表对进度的检查、监督。工程实际进展与进度计划不符时,乙方应按甲方代表的要求提出改进措施,报甲方代表批准后执行。

第十条 延期开工

乙方按协议条款约定的开工日期开始施工。乙方不能按时开工,应在协议条款约定的开工日期5天之前,向甲方代表提出延期开工的理由和要求。甲方代表在3天内答复乙方。甲方代表同意延期要求或3天内不予答复,可视为已同意乙方要求,工期相应顺延。甲方代表不同意延期要求或乙方未在规定时间内提出延期开工要求,竣工日期不予顺延。

甲方征得乙方同意以书面形式通知乙方后可推迟开工日期,承担乙方因此造成的经济支出,相应顺延工期。

第十一条 暂停施工

甲方代表在确有必要时,可要求乙方暂停施工,并在提出要求后48小时内提出处理意见。乙方按甲方要求停止施工,妥善保护已完工程,实施甲方代表处理意见后向其提出复工要求,甲方代表批准后继续施工。甲方代表未能在规定时间内提出处理意见,或收到乙方复工要求后48小时内未予答复,乙方可自行复工。停工责任在甲方,由甲方承担经济支出,相应顺延工期;停工责任在乙方,由乙方承担发生的费用。因甲方代表不及时作出答复,施工无法进行,乙方可认为甲方已部分或全部取消合同,由甲方承担违约责任。

第十二条 工期延误

对下述造成竣工日期推迟的延误,经甲方代表确认,工期相应顺延。

1.工程量变化和设计变更;

2.一周内,非乙方原因停水、停电、停气造成停工累计超过8小时;

3.不可抗力;

4.合同中约定或甲方代表同意给予顺延的其他情况。

乙方在以上情况发生后5天内,就延误的内容和因此发生的经济支出向甲方代表提出报告,甲方代表在收到报告后5天内予以确认、答复,逾期不予答复,乙方即可视为延期要求已被确认。

非上述原因,工程不能按合同工期竣工,乙方承担违约责任。

第十三条 工期提前

施工中如需提前竣工,双方协商一致后签订提前竣工协议,合同竣工日期可以提前。乙方按此修订进度计划,报甲方批准。甲方应在5天内给予批准,并为赶工提供方便条件。提前竣工协议包括以下主要内容:

1.提前的时间;

2.乙方采取的赶工措施;

3.甲方为赶工提供的条件;

4.赶工措施的经济支出和承担;

5.提前竣工收益(如果有)的分享。

质量与验收

第十四条 检查与返工

乙方应认真按照标准、规范和设计的要求以及甲方代表依据合同发出的指令施工,随时接受甲方代表及其委派人员的检查检验、为检查检验提供便利条件,并按甲方代表及委派人员的要求返工、修改,承担由自身原因导致返工、修改的费用。因甲方不正确纠正或其他非乙方原因引起的经济支出,由甲方承担。

以上检查检验合格后,又发现由乙方原因引起的质量问题,仍由乙方承担责任和发生的费用,赔偿甲方的有关损失,工期相应顺延。

以上检查检验不应影响施工正常进行,如影响施工正常进行,检查检验不合格,影响正常施工的费用由乙方承担。除此之外影响正常施工的经济支出由甲方承担,相应顺延工期。

第十五条 工程质量等级

工程质量应达到国家或专业的质量检验评定标准的合格条件。甲方要求部分或全部工程质量达到优良标准,应支付由此增加的经济支出,对工期有影响的应给予相应顺延。

达不到约定条件的部分,甲方代表一经发现,可要求乙方返工,乙方应按甲方代表要求的时间返工,直到符合约定条件。因乙方原因达不到约定条件,由乙方承担返工费用,工期不予顺延。返工后仍不能达到约定条件,乙方承担违约责任。因甲方原因达不到约定条件,由甲方承担返工的经济支出,工期相应顺延。

双方对工程质量有争议,请协议条款约定的质量监督部门仲裁,仲裁费用及因此造成的损失,由败诉一方承担。

第十六条 隐蔽工程和中间验收

工程具备复盖、掩盖条件或达到协议条款约定的中间验收部位,乙方自检合格后在隐蔽和中间验收48小时前通知甲方代表参加,通知包括乙方自检记录、隐蔽和中间验收的内容、验收时间和地点。乙方准备验收记录。甲方没有及时检查的,乙方可以自行检查,填写隐蔽工程检查记录并送交甲方。事后甲方对该隐蔽工程进行检查,符合质量标准的,检查费用由甲方负担;不符合质量标准的,检查费用由乙方负担。乙方没有通知甲方检查,自行隐蔽工程的,甲方有权检查,检查费用由乙方负担。

工程质量符合规范要求,验收24小时后,甲方代表不在验收记录签字,可视为甲方代表已经批准,乙方可进行隐蔽或继续施工。

第十七条 试车

设备安装工程具备单机无负荷试车条件,乙方组织试车,并在试车48小时前通知甲方代表,通知包括试车内容、时间、地点。乙方准备试车记录。甲方为试车提供必要条件。试车通过,甲方代表在试车记录上签字。

设备安装工程具备联动无负荷试车条件,甲方组织试车,并在试车48小时前通知乙方,通知包括试车内容、时间、地点和对乙方应作准备工作的要求。乙方按要求做好准备工作和试车记录。试车通过,双方在试车记录上签字后,方可进行竣工验收。

由于设计原因试车达不到验收要求,甲方负责修改设计,乙方按修改后设计重新安装。甲方承担修改设计费用、拆除及重新安装的经济支出,工期相应顺延。

由于设备制造原因试车达不到验收要求,由该设备采购一方负责重新购置或修理,乙方负责拆除和重新安装。设备为乙方采购,由乙方承担修理或重新购置、拆除及重新安装的费用,工期不予顺延;设备由甲方采购,甲方承担上述各项经济支出,工期相应顺延。

由于乙方施工原因试车达不到验收要求,甲方代表在试车后24小时内提出修改意见。乙方修改后重新试车,承担修改和重新试车的费用,工期不予顺延。

试车费用除已包括在合同价款之内或协议条款另有约定的,均由甲方承担。

甲方代表未在规定时间提出修改意见,或试车合格不在试车记录上签字,试车结束24小时后,记录自行生效,乙方可继续施工或办理竣工手续。

第十八条 验收和重新检验

甲方代表不能按时参加验收或试车,须在开始验收或试车24小时之前向乙方提出延期要求,延期不能超过两天。甲方代表未能按以上时间提出延期要求,不参加验收或试车,乙方可自行组织验收或试车,甲方应承认验收或试车记录。

合同价款与支付

第十九条 合同价款及调整

合同价款在协议条款内约定后,任何一方不得擅自改变。协议条款另有约定或发生下列情况之一的可作调整。

1.甲方代表确认的工程量增减;

2.甲方代表确认的设计变更或工程洽商;

3.工程造价管理部门公布的价格调整;

4.一周内非乙方原因造成停水、停电、停气累计超过8小时;

5.合同约定的其他增减或调整。

乙方应在上述情况发生后10天内,将调整的原因、金额以书面形式通知甲方代表,甲方代表批准后通知经办银行和乙方。甲方代表收到乙方通知后10天内不作答复,视为已经批准。

第二十条 工程款预付

甲方按协议条款约定的时间和数额,向乙方预付工程款,开工后按协议条款约定的时间和比例逐次扣回。甲方不按协议预付,乙方在约定预付时间10天后向甲方发出要求预付的通知,甲方收到通知后仍不能按要求预付,乙方可在发出通知5天后停止施工,甲方从应付之日起向乙方支付应付款的利息并承担违约责任。

第二十一条 工程量的核实确认

乙方按协议条款约定时间,向甲方代表提交已完工程量的报告。甲方代表接到报告后3天内按设计图纸核实已完工程数量(以下简称计量),并在计量24小时前通知乙方。乙方为计量提供便利条件并派人参加。乙方无正当理由不参加计量,甲方自行进行,计量结果视为有效,作为工程价款支付的依据。甲方代表收到乙方报告后3天内未进行计量,从第4天起,乙方报告中开列的工程量即视为已被确认,作为工程价款支付的依据。甲方代表不按约定时间通知乙方,使乙方不能参加计量,计量结果无效。

甲方代表对乙方超出设计图纸要求增加的工程量和因自身原因造成返工的工程量,不予计量。

第二十二条 工程款支付

甲方根据协议条款约定的时间、方式和甲方代表确认的工程量,按构成合同价款相应项目的单价和取费标准计算、支付工程价款。甲方在其代表计量签字后10天内不予支付,乙方可向甲方发出要求付款的通知,甲方在收到乙方通知后仍不能按要求支付,乙方可在发出通知5天后停止施工,甲方承担违约责任。

经乙方同意并签订协议,甲方可延期支付工程价款。协议须明确约定付款日期和从甲方计量签字后第11天起计算应付工程价款的利息率。

材料设备供应

第二十三条 甲方供应材料设备

甲方按照协议条款约定的材料设备种类、规格、数量、单价、质量等级和提供时间、地点的清单,向乙方提供材料设备及其产品合格证明。甲方代表在所供材料设备验收24小时前将通知送达乙方,乙方派人与甲方一起验收。无论乙方是否派人参加验收,验收后由乙方妥善保管,甲方支付相应保管费用。保管期间材料设备发生损坏丢失,甲方不按规定通知乙方验收,乙方不负责材料设备的保管,损坏丢失由甲方负责。

甲方供应的材料、设备与清单不符,按以下情况分别处理:

1.材料设备单价与清单不符,由甲方承担所有价差。

2.材料设备的种类、规格、质量等级与清单不符,乙方可拒绝接收保管,由甲方运出施工现场并重新采购。设备到货时如不能开箱检验,可只验收箱子数量。乙方开箱时须请甲方到场,出现缺件或质量等级、规格与清单不符,由甲方负责补足缺件或重新采购。

3.甲方供应材料与清单规格型号不符,乙方可代为调剂串换,甲方承担相应经济支出。

4.到货地点与清单不符,甲方负责倒运至清单指定地点。

5.供应数量少于清单约定数量时,甲方将数量补齐。多于清单约定数量时,甲方负责将多余部分运出施工现场。

6.供应时间早于清单约定日期,甲方承担因此发生的保管费用。

因以上原因或迟于清单约定供应时间,由甲方承担相应的经济支出。发生延误,相应顺延工期,甲方赔偿由此造成乙方的损失。

经乙方检验通过之后发现有与清单的规格、质量等级不符的情况,甲方仍应承担重新采购及拆除的重建的经济支出,并相应顺延工期。

第二十四条 乙方采购材料设备

乙方根据协议条款约定,按照设计和规范的要求采购工程需要的材料设备,并提供产品合格证明。在材料设备到货24小时前通知甲方代表验收。对与设计和规范要求不符的产品,甲方代表拒绝验收,由乙方按甲方代表要求的时间运出施工现场,重新采购符合要求的产品,承担由此发生的费用,工期不予顺延。甲方不能按时到场验收,验收后发现材料设备不符合规范和设计要求,仍由乙方修复或拆除及重新采购,并承担发生的费用,赔偿甲方的损失。由此延误的工期相应顺延。

根据工程需要,经甲方代表批准,乙方可使用代用材料。因甲方原因使用时,由甲方承担发生的经济支出;因乙方原因使用时,由乙方承担发生的费用。

设计变更

第二十五条 设计变更

乙方对原设计进行变更,须经甲方代表同意,并由甲方取得以下批准:

(1)超过原设计标准和规模时,须经原设计和规划审查部门批准,取得相应追究投资和材料指标;

(2)送原设计单位审查,取得相应图纸和说明

施工中甲方对原设计进行变更,在取得上述两项批准后,向乙方发出变更通知,乙方按通知进行变更,否则,乙方有权拒绝变更。

双方办理变更、洽商后,乙方按甲方代表要求,进行下列变更:

1.增减合同中约定的工程数量;

2.更改有关工程的性质、质量、规格;

3.更改有关部分的标高、基线、位置和尺寸;

4.增加工程需要的附加工作;

5.改变有关工程的施工时间和顺序。

第二十六条 确定变更价款

发生第二十四条约定的变更后,在双方协商的时间内,乙方按下列方法提出变更价格,报甲方代表批准后调整合同价款和竣工日期:

1.合同中已有适用于变更工程的价格,按合同已有的价格计算、变更合同价

款;

2.合同中只有类似于变更情况的价格,可以此作为基础确定变更价格,变更合同价款;

3.合同中没有类似和适用的价格,由乙方提出适当的变更价格,送甲方代表批准执行。

甲方代表不能同意乙方提出的变更价格,在乙方提出后10天内通知乙方提请工程造价管理部门裁定(实行社会监理的,由总监理工程师暂定,事后提请工程造价管理部门裁定),对裁定仍有异议,按第三十条约定的方法解决。

竣工与结算

第二十七条 竣工验收

工程具备竣工验收条件,乙方按国家工程竣工有关规定,向甲方代表提供完整竣工资料和竣工验收报告。按协议条款约定的日期和份数向甲方提交竣工图。甲方代表收到竣工验收报告后,在协议条款约定时间内组织有关部门验收,并在验收后5天内给予批准或提出修改意见。乙方按要求修改,并承担由自身原因造成修改的费用。

甲方代表在收到乙方送交的竣工验收报告后10天内无正当理由不组织验收,或验收后5天内不予批准且不能提出修改意见,可视为竣工验收报告已被批准,即可办理结算手续。

竣工日期为乙方送交竣工验收报告的日期,需修改后才能达到竣工要求的,应为乙方修改后提请甲方验收的日期。

甲方不能按协议条款约定日期组织验收,应从约定期限最后一天的次日起承担工程保管费用。

因特殊原因,部分单位工程和部位须甩项竣工时,双方订立甩项竣工协议,明确各方责任。

第二十八条 竣工结算

竣工报告批准后,乙方应按国家有关规定和协议条款约定的时间、方式向甲方代表提出结算报告,办理竣工结算。甲方代表收到结算报告后应及时给予批准或提出修改意见,在协议条款约定时间内将拨款通知送经办银行,并将副本送乙方。银行审核后向乙方支付工程款。乙方收到工程款后15天内将竣工工程交付甲方。

由于甲方违反有关规定和约定,经办银行不能支付工程款,乙方可留置部分或全部工程,并予以妥善保护,由甲方承担保护费用。

甲方无正当理由收到竣工报告后30天内不办理结算,从第31天起按施工企业向银行计划外贷款的利率支付拖欠工程款的利息,并承担违约责任。

第二十九条 质量保证期

乙方按国家有关规定和协议条款约定的保修项目、内容、范围、期限及保修金额和支付办法,进行保修并支付保修金。

保修期从甲方代表在最终验收记录上签字之日算起。分单项验收的工程,按单项工程分别计算保修期。

保修期间,乙方应在接到修理通知之日后10天内派人修理,否则,甲方可委托其他单位或人员修理。因乙方原因造成返修的费用,甲方在保修金内扣除,不足部份,由乙方交付。因乙方之外原因造成返修的经济支出,由甲方承担。

采取按合同价款一定比率,在甲方应付乙方工程款内预留保修金办法的,甲方应在保修期满后20天内结算,将剩余保修金和按协议条款约定利率计息的利息一起退还乙方,不足部分由乙方交付。

争议、违约和索赔

第三十条 争议

甲乙双方因合同发生争议,要求调解、仲裁、起诉的,可按协议条款的约定,采用以下一种或几种方式解决:

1.向协议条款约定的单位或人员要求调解;

2.向有管辖权的仲裁机关申请仲裁;

3.向有管辖权的人民法院起诉。

发生争议后,除出现下列情况的,双方都应继续履行合同,保持施工连续,保护好已完成工程。

1.合同确已无法履行;

2.双方协议停止施工;

3.调解要求停止施工,且为双方接受;

4.仲裁机关要求停止施工;

5.法院要求停止施工。

第三十一条 违约

甲方代表不能及时给出必要指令、确认、批准,不按合同约定履行自己的各项义务、支付款项及发生其他使合同无法履行的行为,应承担违约责任(包括支付因其违约导致乙方增加的经济支出和从应支付之日起计算的应支付款项的利息等),相应顺延工期;按协议条款约定支付违约金和赔偿因其违约给乙方造成的窝工等损失。

因乙方原因致使建设工程质量不符合约定的,甲方有权请求乙方在合理期限内无偿修理或者返工、改建。经过修理或返工、改建后,造成逾期交付的,乙方应承担违约责任。

因乙方原因致使建设工程质量不符合约定,造成人身和财产损害的,乙方应承担损害赔偿责任。

除非双方协议将合同终止,或因一方违约使合同无法履行,违约方承担上述违约责任后仍应继续履行合同。

因一方违约使合同不能履行,另一方欲中止或解除全部合同,应提前10天通知违约方后,方可中止或解除合同,由违约方承担违约责任。但违约方迟延履行或者有其他违约行为致使严重影响订立合同所期望的经济利益的,对方可以不经催告解除合同。

第三十二条 索赔

甲方未能按合同约定支付各种费用、顺延工期、赔偿损失,乙方可按以下规定向甲方索赔:

1.有正当索赔理由,且有索赔事件发生时的有关证据;

2.索赔事件发生后20天内,向甲方发出要求索赔的通知;

3.甲方在接到索赔通知后10天内给予批准,或要求乙方进一步补充索赔理由和证据,甲方在10天内未予答复,应视为该项索赔已经批准。

其他

第三十三条 安全施工

乙方按有关规定,采取严格的安全防护措施,承担由于自身安全措施不力造成事故的责任和因此发生的费用。非乙方责任造成的伤亡事故,由责任方承担责任和有关费用。

发生重大伤亡事故,乙方应按有关规定立即上报有关部门并通知甲方代表。同时按政府有关部门要求处理。甲方为抢救提供必要条件。发生的费用由事故责任方承担。

乙方在动力设备、高电压线路、地下管道、密封防震车间、易燃易爆地段以及临街交通要道附近施工前,应向甲方代表提出安全保护措施,经甲方代表批准后实施。由甲方承担保护措施费用。

在有毒有害环境中施工,甲方应按有关规定提供相应的防护措施,并承担有关的经济支出。

第三十四条 专利技术、特殊工艺和合理化建议

甲方要求采用专利技术和特殊工艺,需负责办理相应的申报、审批手续、承担申报、试验等费用。乙方按甲方要求使用,并负责试验等有关工作。乙方提出使用专利技术和特殊工艺,报甲方代表批准后按以上约定办理。

乙方提出合理化建议涉及到对图纸、设计和施工组织设计的更改及对原定材料、设备的换用,必须经甲方代表批准。

以上发生的费用和获得的收益,双方按协议分摊或分享。

第三十五条 地下障碍和文物

乙方在施工中发现文物、古墓、古建筑基础和结构、化石、钱币等有考古、地质研究等价值的物品或其他影响施工的地下障碍物时,应在4小时内通知甲方代表,并报告有关管理部门和采取有效保护措施。甲方代表应在收到通知后12小时内对乙方采取的措施给予批准或提出处理意见。甲方承担保护措施的费用,延误的工期相应顺延。

第三十六条 工程分包

乙方可按投标书和协议条款约定分包部分工程。

乙方与分包单位签订分包合同后,将副本送甲方代表。分包合同与本合同发生抵触,以本合同为准。

分包合同不能解除乙方任何义务与责任。乙方应在分包场地派驻相应监督管理人员,保证合同的履行。分包单位的任何违约或疏忽,均视为乙方的违约或疏忽。

除协议条款另有约定,分包工程价款由乙方与分包单位结算。

第三十七条 不可抗力

不可抗力发生后,乙方应迅速采取措施,尽力减少损失,并在24小时内向甲方代表通报情况,按协议条款约定的时间向甲方报告损失情况和清理、修复的费用。

不可抗力发生后,乙方应每隔10天向甲方报告一次损失情况。

因不可抗力发生的费用由双方分别承担:

1.工程本身的损害由甲方承担;

2.人员伤亡由其所属单位负责,并承担相应费用;

3.造成乙方设备、机械的损坏及停工等损失,由乙方承担;

4.所需清理修复工作的责任与费用的承担,双方另签补充协议约定。

不可抗力的认定标准是_______。

第三十八条 保险(如有时)

甲方按协议条款的约定,办理建筑工程和在施工场地甲方人员及第三方人员生命财产和保险。

乙方办理自己在施工场地人员生命财产和机械设备的保险。

投保后发生事故,乙方应在15天内向甲方提供损失情况和估价的报告,如损害继续发生,乙方在15天后每10天报告一次,直到损害结束。

第三十九条 工程停建或缓建

由于政策变化、不可抗力以及甲乙双方之外原因导致工程停建或缓建,使合同不能继续履行,乙方应妥善做好已完工程和已购材料、设备的保护和移交工作;按甲方要求将自有机械设备和人员撤出施工现场。甲方应为乙方撤出提供必要条件,支付以上的经济支出,并按合同规定支付已完工程价款和赔偿乙方有关损失。

已经订货的材料、设备由订方负责退货,不能退还的货款和退货发生的费用,由甲方承担。但未及时退货造成的损失由责任方承担。

第四十条 合同的生效与终止

本合同自协议条款约定的生效之日起生效。在竣工结算、甲方支付完毕,乙方将工程交付甲方后,除有关保修条款仍然生效外,其他条款即告终止,保修期满后,有关保修条款终止。

第四十一条 合同份数

合同正本两份,具有同等效力,由甲乙双方签字盖章后分别保存。副本份数按协议条款约定,由甲乙双方分送有关部门

展开阅读全文

篇12:建设工程外架劳务分包合同

范文类型:合同协议,适用行业岗位:工程,全文共 4556 字

+ 加入清单

甲方(发包方):_____________________________(以下简称甲方)

乙方(承包方):_____________________________(以下简称乙方)

根据《中华人民共和国民法典》、《中华人民共和国建筑法》及其它有关法律、法规,遵循平等自愿、公平和诚实信用原则,双方就分包工程施工项协商一致,签订本分包劳务合同,双方共同遵照执行。

一、工程概况

1、工程名称:___________

2、工程地点:___________

二、承包范围及承包方式:(以下描述的工程范围及介绍仅是概括性的,包括并不仅限以下内容,乙方应全面了解工程承包的实际范围,并承担其所有风险)。

1、外墙综合脚手架及支模加固用的钢管工程:

1.1、外墙综合脚手架:外架,施工爬梯,卸料平台,塔吊、施工电梯围护,安全挡板搭拆,所有花杆、施工电梯防护门油漆,安全网挂设及更换,悬挑防护,脚手板铺设,兜网挂设,悬挑工字钢,钢丝绳设置,所有临边防护(含基坑及地库顶板上防护),电梯井,地面进入人货电梯及进入楼层安全通道,钢筋、木工加工棚各2个及甲方需要的相关加工棚、防护棚等及所有工地需要搭设的安全防护人工费用均由乙方承担,此项包人工。

1.2、所有材料由甲方提供,材料进场后由乙方按甲方指定要求进行堆码整齐及管理。此项包人工管理费及损耗费。

以上均包材料装卸,包保管,包损耗,包维修,包安全生产、文明施工,包质量、包进度、包验收的形式承包三、承包内容及单价

1、承包内容:

1.1、随时保持场内清洁,材料按规格整齐堆码;所有承包内容项目的场内转运、搭设、拆除;挂安全网、密目网及扎丝;含硬质防护的人工;铺脚手板;悬挑防护搭设(含展示区悬挑层按建设方要求做好吊顶等所有工作);悬挑工字钢加工制作安装;钢管刷标识漆;安全挡板制作及安装;施工爬梯搭设;卸料平台搭设;五口四临边防护;安全通道搭设及防护;电梯井、电缆井、通风井等搭设及水平防护;垂直机械围护及运输、安全通道搭设;木工棚、钢筋棚及甲方要求搭设的加工棚、防护棚;施工期间的局部加固、修改、维护和更换安全网、密目网(含多次维护和更换工作);挂安全标识牌及未它标语牌;其它成品保护、完工清及架子内杂物的定期清理。

1.2、按工程承包范围内容,所有外架钢管、扣件必须进行油漆涂刷处理;

1.3、乙方施工所需安全劳保用品自理,施工人员须持证上岗。

1.4、负责外脚手架日常维护、安全检查、安全加固;满足外墙砌体及外墙装修工程施工进度及时拆除、改搭、加固等并完善安全网挂设。

1.5、严格按施工规范和施工方案施工。

1.6、乙方必须服从甲方管理,无条件接受晨辉建筑工程(集团)有限公司兰亭湾畔一期(三标)项目部质量、进度、安全生产文明施工管理规定。

2、综合单价包干价:

2.1、外墙综合脚手架士0.00以上按建筑面积计算:____ 元/M2 ;地下室部分按实际搭设面积计算: _____ 元/M2;另工字钢安装用电焊工及悬挑架支护模增加4000元/层/栋。

综合包干单价包括但不仅限下列内容:

精选合同协议

①单价工作内容中,已说明了主要施工工艺,施工工序,次要工序和配合内容虽未说明,均已包含在其中。

②加强员工安全生产、文明施工、环境健康教育,自觉完善、维护安全设施。单价中包含文明施工、安全用工费及管理费。

③本综合单价包括人工费、施工工具费。

④综合单价包括:措施费(夜间施工费、材料转运费、生产工具使用费),规费(养老、失业、医疗、工伤、保险)。

⑤乙方不得以市场物价上涨,货币价格浮动,生活费用提高,工资的基限提高等任何理由要求增加费用或提高价格。如乙方在施工期间采用停工方式要求提高价格,甲方仍按原合同付款条件支付工程款,已完部份的工程量按50% 结算,并有权另找承包商施工,乙方不得干涉。

四、甲乙双方责任

1、甲方责任:

1.1、乙方进场前必须与其签订安全协议,并于进场当日对其进行安全教育。

1.2、甲方负责协助解决现场施工事宜的协调及材料堆放场地。

1.3、甲方现场人货电梯、塔吊无偿提供给乙方使用,其它机械及工具均为乙方自已负责。

1.4、每完成一个施工段的外架搭设,双方必须进行验收后才能使用;督促乙方在施工过程中经常性地对外架检查、维护、加固。

1.5、甲方免费提供乙方工人住宿房间,乙方工人可自费在甲方食堂就餐。

2、乙方责任:

2.1、乙方必须爱护甲方提供的施工机具,如有损坏或遗失,应照价赔偿。

2.2、乙方必须按照工程图纸、甲方施工方案、工艺标准、技术交底以及甲方其它要

3、求组织施工作业;必须按期、保质、保量、安全地完成所承包的分项工程。若因为乙方没有按照甲方要求,一切费用与后果由乙方承担,并按甲方规章制度处罚,操作工人的劳保物品统一由乙方劳务队负责。

2.3、乙方按甲方施工组织设计和技术交底中有关成品保护的要求作好成品保护工作。

2.4、乙方委派________ 为施工负责人,联系电话:_______________ 。

五、工期

1、主体主要节点总控时间控制(具体作业时间按项目部审批的进度计划,不得延误):标准层平均3天/层。进度必须符合甲方进度计划的要求,如因乙方原因造成延误工期,甲方按1000元/天给予处罚。

2、工期16个月(各栋楼分别单独计算工期,工期自每栋首层外架开始搭设时计算),超过16个月按余下外架的建筑面积2元/m2计算租金。

六、质量要求及奖罚:

1、乙方必须确保外墙综合脚手架分部分项工程质量达到《国家建筑安装工程

质量验收评定标准》达到“省双优”标准,所有分项工程合格率达到100%以上。如未达到“省双优”标准,外墙综合脚手架承包单价扣除3元/平方米结算。

凡不符合国家验收规范及甲方要求,甲方有权令其返工,返工所有工料费用由乙方负责并承担甲方工期损失。返工后仍达不到要求时,甲方有权指令相关班组协助其返工,返工费用由乙方承担并对乙方罚款500元/次。

2、严格执行质量“三检”制度,每道工序完成后,乙方根据甲方要求首先进行自检、互检、交接检并做好记录,合格后方可要求甲方安全员进行验收。

对不进行自检、互检、交接检或无记录或记录与事实不符即要求甲方安全员验收,每发生一次,罚款500 元。

精选合同协议

3、甲方安全员在施工过程中或验收评定时提出的整改意见,乙方必须照章执行,对拒不执行整改意见的,或整改不及时的,或整改后仍达不到质量要求的每次罚款500 元。

七、安全责任

1、因乙方脚手架搭设不规范造成安全事故,或者乙方施工人员不按有关安全操作规程作业施工,造成安全事故处理的医药费及赔付总额10万元以内由乙方承担(甲方配合办理保险公司赔偿);赔付总额在10万元以上的安全事故,则扣除保险公司赔付金额,甲方承担赔偿金外的70%,乙方承担赔偿金外的30%。

2、乙方施工人员必须服从甲方现场生产指挥,并有权拒绝违章指挥。乙方未戴安全帽人员按50元/次/人处罚。

3、由甲方其他工种在施工中造成的安全事故,其责任由甲方承担。

八、文明施工及奖罚:

1、乙方在施工期间,应加强班组内部文明施工教育,搞好现场文明施工及住宿范围内的清洁卫生。

2、乙方作业层及施工现场、材料堆场的材料堆放必须在甲方指定地点且整齐、井然有序。

3、乙方下班前,应将作业层的垃圾运至工地指定地方,不得到处乱扔,否则甲方指派专人清理,所用人工费从乙方结帐单中200%的工程款中扣出。

4、乙方在施工期间,严禁在作业层违章作业、野蛮施工以及打赤膊、穿拖鞋、骂人、争吵等不文明行为。如若发生对管理人员威肋,打架、爬塔吊、到项目部闹事等恶性行为,不论其任何理由及原因,项目部每次给予5000.00元罚款,情节严重者将该分包班组清退出场,结算单价按50%计,并移送公安机关处理。

5、按《长沙市建筑施工现场安全质量标准化达标实施手册》要求对现场进行维护、保持。

九、付款方式(项目部代付工人工资):

4.1、乙方工人进场三天内必须提供工人身份证复印件交到甲方办公室,由财会室统一注册做好工资表;

4.2、进度款金额确定后乙方按甲方付款比例出工人工资表并由甲方财务室审核签字,项目部财会室统一代发工人工资,多出部分由乙方承包负责人领取;

4.3、如乙方做虚假工资表而延误工人工资发放的时间由乙方承担全责;

4.4、如工人工资超出乙方在甲方结算金额时,由乙方负责填补此部分资金缺口,甲方不承担此任何责任。

4.5、未交身份证和未在项目部注册人员项目部不承担其工资发放义务,无身份证人员立即清理出场。

十、其它事项

1、签订劳务合同后计划工人进场前,乙方必须将拟进场人员造册上报甲方综合办公室,所报花名册人员必须与相应人员本人身份证名字相符。乙方必须保证其队伍的人员稳定,不能随意变动,如需变动或增减人员,必须在三天前向甲方提供变更人员名单。甲方有权随时对乙方人员进行查对,一旦发现乙方人员与其花名册不符,每人次罚款50元。乙方人员与其花名册不符者所发生的伤、亡事故,甲方将视其为私招乱雇,勿论原因,一切后果由乙方负责,所发生的一切费用由乙方承担并按项目规章制度对其处罚,情况严重者送公安机关处理。

2、所有劳保费用包含在包干单价中,甲方不另承担。乙方须随时做好酷暑、雨、雪天施工的准备,配备酷暑、雨、雪天施工所需的电风扇、雨衣、雨鞋等劳动保护用品。

精选合同协议

3、乙方指派的施工负责人不得擅自离开施工现场,且每日早、晚均要向甲方对口专业管理人员报到,偶尔离开须向甲方请假并委托代理负责人,如未请假离开或未委托代理负责人,每次罚款100元。乙方其他管理人员、班组长未经甲方同意,任何时候(包括节假日及双抢期间)均不得擅自离岗,否则每发现一人次罚款80元/人.天且乙方应赔偿甲方因此而造成的损失。节假日、农忙季节乙方施工人员不得减少,每减少一人,罚款50元/人/天。

4、施工过程中,如无甲方指令,乙方不得以任何理由擅自停工或擅自调出施工人员或待工,否则视为乙方违约。出现上述情况,甲方有权安排其它施工单位进场,同时,乙方同意已完工程不办理结算,剩余全部工程款视为乙方同意作为对甲方的违约赔偿金。

5、合同履行期间,如乙方施工质量,工程进度确实无法满足甲方要求,甲方有权单方终止合同,乙方同意无条件及时退场并向甲方赔偿一切损失。

6、该工程乙方进场后如果由于开发商原因停工超过一月以上时,乙方承诺不向甲方索取任何费用(含误工、进出场等一切费用)并承担此风险。如乙方已完成部分工程量则按合同约定单价结算,未开始施工则终止合同。如停工一月以上甲方通知乙方开工,则30天以外部分按乙方现场人数每人每天补30 元生活费用,除此之外再无任何费用。

7、乙方承包工程范围内工作内容不得转包,如甲方发现可单方中止合同,乙方已完工量不结算并扣除乙方已交的合同履约金,所有责任由乙方承担。

8、乙方必须做好承包范围内的成品和半成品保护工作,并不得破坏其它范围内的成品和半成品,否则按损失状况加倍处罚。

9、乙方管理人员、班组长纳入甲方项目管理部统一管理,乙方应确保甲方的指令政令畅通。

甲方:____________________乙方:____________________

代表:____________________代表:____________________

签定日期:____年___月___日

展开阅读全文

篇13:建设工程施工劳务承包合同

范文类型:合同协议,适用行业岗位:工程,全文共 2882 字

+ 加入清单

甲方、__________________

乙方、__________________

依照《中华人民共和国民法典》及国家相关法律、法规和公司文件相关规定,遵循平等、自愿、公平和诚信的原则,甲、乙双方就_______(工程)劳力施工承包事宜协商达成一致。订立本合同。

第一条 工程概况

工程名称、______________

工程地点、______________

第二条 工程承包范围

___________________________________

第三条 工程工期

1.计划开工日期、_______年_______月_______日,计划完工日期、_______年_______月_______日,总日历天数_______天;

2.主要节点工期、___________________________________

3.乙方应无条件执行甲方的进度计划安排(包括新调整的进度计划)。

第四条 工程质量标准

所承包工程范围内的工程质量必须达到_____________________第五条组成合同文件及解释顺序

组成本合同的文件及优先解释顺序如下、

1.本合同;

2.本合同附件;

3.招投标文件;

4.本工程施工图纸及国家现行或行业标准规范;

注、上述文件应互为补充,在合同中出现含糊不清或不相一致时,按上述顺序解释,不能清楚解释时,在不影响工程正常施工进度的情况下由双方协商解决。

第六条 标准规范

本合同适用标准规范、____________________________

第七条 甲方责任和义务

1.负责统一制定各项管理目标,组织编制施工计划、物资需用量计划表,实施对工程质量、工期、安全生产、文明施工、计量检测、实验化验的控制、监督、检查和验收。

2.负责与业主、监理、设计及有关部门工作联系,协调现场工作关系。

3.根据工程情况要求乙方增减施工人数,满足施工生产需要。对施工质量底劣、技术差、不服从指挥、有违法乱纪行为的人员予以清退。

4.及时提供由甲方供应的施工机械设备、周转材料。

5.按本合同约定,向乙方支付劳动报酬。6.统筹安排、协调解决乙方施工人员生活临时设施、用水、用______________其费用、

7.协助乙方办理现场施工人员出入证件,其费用由乙方自理。

第八条 乙方责任和义务

1.遵守国家政策和法律法规;遵守业主和甲方企业的相关规章制度,做好安全、文明施工、环境和职业健康安全、劳动保护等工作。

2.严格按照设计图纸、施工验收规范、有关技术要求及施工组织设计精心组织施工,确保工程质量达到约定的标准,对本合同劳务承包范围内的工程质量向甲方负责;根据业主或甲方的计划要求(包括调整后的计划),合理组织,科学安排作业计划,投入足够的人力、物力、保证工期;承担由于自身责任造成的质量返修、工期拖延损失及各种罚款。

3.应按招标文件要求和承诺的管理人员、安全员(持证)保质保量到位。技术工人必须按国家规定持上岗,技工必须有职业技能操作证,持证率达到100%。特殊工种必须有特种作业操作证,持证率达到100%

4.服从甲方和业主的监督、检查、管理;接受甲方和业主有关人员对质量、进度、技术、安全生产、文明施工、环境保护等方面的管理、接受甲方随时检查其设备、材料保管、使用情况及其操作人员的有效证件、持证上岗情况;

5.做好施工场地周围建筑物、构筑物和地下管线和已完工程部分的成品保护工作。因乙方责任发生损坏,应自行承担由此引起的一切经济损失及各种罚款、6.按甲方统一规划堆放材料、机具;妥善保管、合理使用甲方提供或租赁给乙方使用的机具、周转材料及其他设施、

7.按国家政策规定与每个务工人员签订《劳动合同》并按合同所约定的条款支付务工人员工资(务工人员工资每月造册备案),承担因此项工作不到位而引起的纠纷或当地相关行政部门的处罚及责任后果;

8.为其施工人配备必要的劳动保护和安全防护用品(如安全帽、安全带、工作服、手套及其它相关的防护用品);

9.进场施工人员要求具备思想素质好、身体健康、技术熟练等条件;禁止18岁以下的未成年人和55岁以上的老人及体弱病残人员;禁止使用不法人员,乙方应承担因使用以上不合格人员而引起的责任和后果。

10.甲方在资金暂时不到位,业主未能按时拔付工程款的情况下,乙方不得因此而影响正常施工,不得聚众闹事,做到对甲方的谅解。

第九条 环境保护、安全生产和文明施工

1.甲方应集中组织对乙方进场施工人员进行安全生产、文明施工、环境保护以及公司相关制度等方面的教育;依据国家法律法规及公司相关规章制度、监督、监控乙方的相关工作实施情况,使其体系有效运行。

2.乙方应遵守工程建设安全生产有关管理规定,严格按安全施工标准进行施工;加强对现场操作工人的安全教育;认真落实安全措施,采取必要的安全防护措施,消除事故隐患,确保安全生产;随时接受安全检查人员依法实施的监督检查。由于自身安全措施不力及违章操作造成事故,承担一切责任后果和经济费用。

发生安全事故,乙方应按有关规定立即上报甲方有关部门,同时按国家有关法律规定对事故进行处理。

3.乙方就严格执行建设主管部门及环保、消防、环卫等到有关部门对施工现场的管理规定,做到文明施工;保证施工现场整洁有序,符合文明施工的有关规定和要求,维护甲方良好的企业形象,并承担因违反有关规定造成的损失和罚款。

加强现场管理,采取一切适当的措施,保护现场内外环境,限制由施工作业引起的噪音或其它污染;避免对公众和第三方财产造成损害和妨碍。

第十条 材料、设备供应与管理

1.甲方提供给乙方使用的周转材料实行调拔制,根据工程计划需要向乙方提供。

2.乙方就妥善保管、合理使用甲方供应的材料、设备(包括领用、保管、装卸、退库、办理相关手续、按甲方指定的场内地点归类堆放);因保管和使用不善发生丢失、损坏,乙方应按领用时的价格赔偿。

3.材料按预算分折量对乙方实行限额领料,乙方应合理用料、注重节约。如材料使用超出预算用量,则超出部分的费用由乙方承担;材料节约部分,由甲乙双方按_______比例分成。

第十一条 承包方式、价格及包含的内容

1.承包方式及单价2.承包价格所包含的内容、承包价格包括施工期间乙方的各类风险及施工人员工资和调遣费、小型机具费用;各类材料的场内二次倒运;自然气候影响停水、停电、待料等不可预见工日费用;包括周转材料的领用、装卸、看护、保管、退库;劳动保护用品费用(安全帽、安全带、手套等);安全防护设施的搭拆(安全网、防护栏杆、防护棚等);文明施工费用(包括上级部门对现场的各类检查所发生的临时用工);承包工程范围内的配合测量放线、材料试验、电工、机械设备维修和安装拆卸配合用工;预防一般性自然灾害所采取的措施用工费用;

甲方负责人签字:_____________乙方负责人签字:_____________

住址:_____________身份证件号码:_____________

_____________年_____________月_____________日_____________年_____________月_____________日

展开阅读全文

篇14:建设工程承包施工合同

范文类型:合同协议,适用行业岗位:工程,全文共 3815 字

+ 加入清单

发包人:

承包人:

为加强企业管理,提高企业经济和社会效益,甲方决定将所承揽的工程实行内部承包,为明确甲乙双方的责任、权利和义务,结合本工程的实际情况,经双方协商一致,签订本合同。

一、工程概况:

1、工程名称:

2、工程地点:

3、工程内容:

承包范围:

承包范围:。

1、承包人对本工程进行施工总承包,即按本工程施工图纸的内容除业主另行专业分包项目的全部百叶制作、安装工程等均由承包人负责总承包施工。

2、承包人按合同约定的承包范围:包工、包料、包工期、包质量、包安全、包交房、包工程全部风险的全部项目。

3、承包人不得对承包工程主体工程项目进行分包,其他项目未经发包人允许不得分包,一经发现承包人擅自分包,承包人须按合同总价的10%向发包人赔付违约金,发包人有权立即终止本合同,承包人于合同终止日十天内无条件退场,所造成的一切损失均由承包人负责,劳务分包除外。

4、承包人对承包范围内的全部工程的质量、安全、工期、文明施工等负有完全责任。承包人对施工现场内的其他单位、人员负有安全文明施工及安全的总包管理责任和连带责任。

二、质量标准: 质量标准:达到〈〈建设工程施工质量验收统一标准〉〉合格标准。

三、合同工期: 合同工期总日历天数:天。

四、承包方式及合同价款:暂定金额:

五、结算及付款方法

1、结算办法:参照甲方与业主签订的施工合同的相应条款。

2、乙方应向甲方上交本工程总造价的2.5%作为甲方的管理费,用作甲方协调费。若协调费不超出所缴管理费,甲方不再收取;若超出则甲乙双方按比例分摊。税金、定额测定费等,由甲方代扣代交,各种税费均由乙方承担。

3、本工程与建设单位发生的工程款拨付、材料供应等经济业务,均由甲方财务部门或委托代理人凭甲方统一印制的手续办理,否则出现所有经济纠纷与民事责任,甲方概不负责。

4、乙方向甲方支取工程款,需持甲方统一印制的本企业内部收款收据,并经甲方分管负责人和经办人签章后,报甲方主要负责人审批,待批准后到甲方财务部门办理拨款。否则甲方财务部门可拒付。另:乙方不得以任何形式私自去建设单位支取工程款,更不能以白条形式支取工程款。否则甲方将按乙方支款总额的20%收取罚金,并有权利更换施工队伍。

5、拨款方式:执行甲方与建设单位所签订施工承包合同约定的拨款方式,在建设单位工程拨款到位的情况下,扣除应上交有关部门税费等款额后剩余转付乙方。

但在下列情况下,乙方承诺甲方可拖欠乙方工程款:

建设单位拖欠甲方工程款;

甲方尚未同建设单位办理竣工结算;

虽然甲方已同意建设单位办理竣工结算,但甲方对乙方已付款比例不低于建设单位对甲方已付款占应付款的比例。

6、竣工结算完,甲方收到业主全部结算时30天内与乙方履行内部结算,等甲方收到建设单位全部工程款后,甲方财务部门与乙方进行财务结算,余款在扣除保修金后一次付清。

7、因乙方原因在施工中发生的安全事故由乙方负责,承担全部经济责任,并接受甲方的处罚。

六、物质供应:

1、甲方与建设单位合同约定的建设单位供应给甲方的物资,为甲方供应给乙方的物资。

2、乙方自购材料应为合格品,合格证应齐全,且应保证材料质量,出现材料质量问题应有乙方自负。

3、乙方供应的产品应为合格产品,乙方施工机具应为符合机械设备安全管理规章制度及有关规范要求的合格机具,否则出现的一切质量事故由乙方负责。

七、甲方职责:

1、负责与建设单位及上级各部门联系工作,办理工程拨款,协助乙方办理有关施工手续,收缴各种税费。

2、负责履行甲方与建设单位签订的承包合同内容,协调组织工程管理工作。

3、提供业主提供的图纸,有关技术人员会同乙方参加图纸会审,对工程的工期、质量、造价、交付使用后的保修向建设单位负责,全面检查指导,督促乙方的工程进度,监督、检查乙方的工程质量、施工、技术、财务管理、安全生产及文明施工等各项工作,在检查中发现的各类问题,勒令乙方限期整改,并依据国家法律有关条款、合同及约定、甲方的规章制度对乙方进行处罚。

4、负责质量检查监督,审查乙方的各类月报表。

5、甲方有权对乙方使用施工材料的质量、实际消耗量等,进行检查或抽查,发现有质量问题和材料实际使用量与额定消耗量出入较大时,除追究乙方相应责任外,并处以罚金,并随时更换施工队伍。

八、乙方职责:

1、乙方应严格遵守执行甲方的各项规章制度和要求,接受甲方的管理模式及各项管理,严格按规范和施工图的实际要求施工,并按现行的施工规范标准组织施工,确保工程质量,自觉接受上级各有关部门及甲方的质量检查、监督和管理,对承包范围内的工程向甲方负责。

2、依据施工组织设计好施工准备工作,积极组织劳动力,按进度计划组织实施,确保工程按期完成。当乙方进度、质量、安全等不能使甲方满意时,甲方有权解除本合同,其损失有乙方承担。

3、负责工程的图纸会审,及时搜集整理施工中发生的签证手续,负责编制完整合格的质检、技术、安全、经济资料,参加甲方通知参加的各种会议,按时向甲方递交各类准确的报表和计划,工程竣工后及时向甲方递交竣工验收报告,及时准确地编制竣工图决算,在上级有关质量监督部门验收达标后,按要求向甲方及有关单位送交完整的技术资料存档,工程竣工档案资料送交甲方工程管理部一份存档。

4、按施工组织设计及甲方等有关部门的要求,自觉做好安全工作,自觉接受甲方及上级有关部门的检查和指导,做到安全生产,杜绝人身设备等安全事故的发生。乙方施工期间本工程出现的一切安全事故塌事故、大面积传染病和集体食物中毒事故等,包括但不仅限于以上内容)、质量事故及违约罚款,均由乙方承担一切费用和责任,并接受甲方的罚款和各项处罚。

5、按施工平面布置图布置现场,搞好现场文明施工,工程交工前负责施工范围内已完工程的成品保护。

6、对乙方责任造成的工程质量问题无偿修理和返工,对甲方与建设单位合同约定的保修期间内的保修项目无偿保修。

7、积极配合甲方催要工程款。

8、甲方与业主所签订合同中承包人的义务、责任,对本合同中的乙方均具有约束力。

9、乙方人员施工中发生的人身及设备事故和工作时间以外及施工现场外的任何意外伤害事故,由乙方承担全部责任和全部费用,并全部承担各方罚款。

10、乙方不得将承包的本工程以任何形式再转包或分包给任何单位,否则乙方接受甲方的罚款及经济损失。

11、乙方必须每月及时足额发放其在本合同工程中施工的所有人员的工资,否则在乙方承担责任的前提下,甲方有权从乙方应得任何工程款项中扣除应发员工工资相等的款项,代乙方直接发放到被拖欠者手中,此款项作为甲方向乙方的拨付工程款,乙方予以承认并办理财务手续,接受甲方处罚。

九、进度计划及工期控制:

严格按照招标文件要求和投标文件承诺的工期施工,如因乙方原因未能按时完成,甲方经要求无效后,可采取果断措施直至终止合同,由此发生的各种费用均有乙方负责,因乙方原因造成的本工程工期延误,乙方应全部分摊建设单位对甲方的罚金,甲方还按企业内部规定加罚乙方。

十、质量检查与验收:

1、乙方应严格按现行施工规范标准及图纸要求施工,自觉接受建设单位、质量监督站、监理及甲方的检查,并对检查查出的问题,自觉整改返工,由于乙方原因导致的工程质量事故由乙方负全部责任和承担全部费用。

2、阶段验收,应在资料合格自检合格的基础上通知有关部门验收;竣工验收应在甲、乙、建设单位初验达到规定等级后,由乙方递交竣工报告,报请质量监督部门评定等级。如达不到合格要求的等级,乙方应承担甲方对建设单位合同约定或文件规定的罚金和损失,乙方还应按照甲方内部规定接受处罚。

十一、安全文明施工:

1、乙方应建立在安全施工保证体系,设专职安全员,制定安全施工生产管理制度和安全文明生产责任制度,并按规定采取严格安全防护措施,在施工中发生的一切安全事故,乙方应负完全责任和承担一切经济损失,包括各级罚款。

2、发生重大伤亡事故,乙方立即通知甲方,如有隐瞒不报,除承担责任外,按照规定给予经济处罚。

现场达到滕州市安全文明工地标准。

十二、工程保修:

按甲方同建设单位合同约定的保修期从工程正式办理竣工验收之日起算起,保修期内保修范围乙方应无条件无偿保修,待保修期满建设单位将保修金返还给甲方后,再由甲方返还给乙方。

十三、补充条款:

1、乙方必须保证工程质量、工期、安全,因乙方原因造成的业主、监理等对甲方的各类罚款,均由乙方承担。另外甲方将酌情对乙方进行处罚。

2、水电费、临设等均由乙方承担。

3、保修金按甲方与业主签订合同的保修条款规定,由乙方承担。

4、施工过程中的资料费、试验费等应由乙方承担的部分,全部由乙方承担。

5、本合同不详、表述不到位的全部执行甲方与业主签订的合同。

十四、其他事项:

1、本合同一式四份,甲方一份,乙方一份,自双方签字盖章后生效,至工程交付建设单位使用、双方内部结算、财务结算、工程款交付完毕后,除保修款仍然有效外,其他条款即告终止,保修期满后有关保修条款失效。

2、本合同条款双方应严格遵守,如有违约,由违约方承担一切损失及责任。

3、本合同在有效期间内出现争议和纠纷时由双方协商调解,如调解不成,须在甲方所在地的仲裁部门进行仲裁或法院诉讼。

4、双方在签订本合同的同时须签订《安全生产管理协议书》、《消防安全协议书》。

甲方:_________乙方:_________

法定代表人:_________ 法定代表人:_________

_________年____月____日 _________年____月____日

展开阅读全文

篇15:企业网站建设合同_合同范本

范文类型:合同协议,适用行业岗位:企业,全文共 1503 字

+ 加入清单

企业网站建设合同(三)

甲方:__________________________??????

签定日期:______年_____月_____日

乙方:__________________________???

签定日期:______年_____月_____日

甲乙双方经过友好协商,在平等互利的原则下,就甲方委托乙方建立企业网站及网站推广事宜达成合同如下:

第一条 甲方委托乙方代办域名申请注册服务:

1.甲方委托乙方申请国际顶级域名____个,价格____元/___年域名名称:_____________________________;

2.甲方委托乙方申请中文域名______个,价格_____元/___年,域名名称:_________________________;

3.域名费用合计:____________元。

第二条 乙方向甲方提供网络主机空间租用服务,服务内容包括:经济型网站______元/年,<100m主机空间,5个e-mail信箱,无限制数据流量,高速网络带宽,在线订购>标准型网站______元/年,<150m主机空间,5个e-mail信箱,支持asp语言,access数据库,无限制数据流量,高速网络带宽>精美型网站______元/年,<___m主机空间,___个e-mail信箱,支持_________,无限制数据流量,高速网络带宽,在线订购>

第三条 网页制作服务。甲方委托乙方制作甲方网站所需页面。甲方须提供样本或文本文件,不能提供时,须乙方代拍产品照片时,乙方收取成本费。企业网站首页设计制作费:_______元,企业网站简体设计制作费:_______元,企业网站繁体设计制作费:_______元,企业网站英文设计制作费:_______元,企业网站日文设计制作费:_______元,网页制作费用合计______元。超出问题按____元/页计费。

第四条 付款方式:本合同签定后,甲方应支付域名注册费,主机租用费和网站首页设计费共______元。网页制作完成并上传至互联网后,甲方应在一周内将余款付清。付款方式为:现金,汇票或银行电汇。

第五条 违约责任甲方违约或不付费时,乙方有权关闭甲方租用的服务器的使用帐号,由此造成的损失由甲方承担。因不可抗力<战争,台风,地震,海啸,国家政策等>之外原因,造成乙方服务器停止运行,乙方以天为基本单位,向甲方赔偿延长租用服务。全部赔偿金额不超过网站空间租用费用的90%甲方网站信息由甲方提供给乙方,甲方必需保证提供数据的合法性,不违反国家有关规定,不损害其他企业利益,对甲方网站上的内容,乙方不付任何法律责任。

第六条 免责条款由于internet是全球互联网络,因此由于其他通路上的偶然因素,造成用户的访问速度下降,有时在对服务器进行设置或安装用户程序时可能会产生一段时间的中断,以上现象在任何服务器上都有可能发生,是正常现象,甲乙双方对此表示认同。

第七条 售后服务???

网站完成后一年内,乙方为甲方免费添加网页___张,产品___个。其他______________。

第八条 合同期限本合同期为___年,从_____年_____月_____日至_____年_____月_____日,在合同期内发生纠纷,双方友好协商解决,协商不成,由仲裁委员会仲裁裁决。本合同到期前一个月未接到甲方终止本合同的有关正式文件,视为双方续约,续约期限为______年。

第九条 其他本合同未尽事宜,经双方协商达成一致意见,作为合同附件,与本合同具有同等法律效力。本合同一式两份,双方各执一份,自己方收到的甲方的付款之日起生效<以乙方开具的收款凭证为准备>。

共2页,当前第1页12

展开阅读全文

篇16:工程劳务分包施工合同书

范文类型:合同协议,适用行业岗位:工程,全文共 1524 字

+ 加入清单

承包人:

劳务分包人:

日期: 年 月 日

依照《中华人民共和国民法典》、《中华人民共和国建筑法》、《中华人民共和国招标投标法》及相关法律、行政法规和工程所在地有关政策文件规定,结合本工程的具体情况,遵循平等、自愿、公平和诚实信用的原则,合同双方就工程的劳务分包施工事项经协商一致,订立本分包合同。

一、工程概况

1.工程名称:

2.工程地点:

3.工程类型及规模:

二、劳务分包人资质情况

建筑劳务有限公司

资质证书号码

发证机关:

资质专业及等级:

有效期至: 年 月 日

三、劳务分包工程施工范围和工作内容

1. 劳务分包工程施工范围:完成承包人提供的工程施工设计图纸的劳务分包工作内容(含设计变更)。

因劳务分包人自身原因无法满足承包人要求,承包人保留调整劳务分包作业范围的权利,劳务分包人不得由此向承包人提出任何索赔(成本、费用、利润或竣工时间延长)或其他权利主张。

劳务分包人施工范围包括(但不限于)以下工作内容:完成承包人提供的工施工设计图纸的劳务分包工作内容(含设计变更)。

四、劳务分包合同价格与合同价格形式

1.签约合同价(含增值税)人民币(大写): 元¥: 元。

2.合同价格形式:固定总价合同清包工

五、工期、质量、安全要求

1.工期

计划开工日期:年 月 日﹙最终以承包人发出的开工通知为准﹚。

计划完(竣)工日期: 年 月 日

合同工期总日历天数为: 天。合同总日历天数与根据前述计划开始、完(竣)工日期计算的天数不一致的,以合同总日历天数为准。

节点工期在专用合同条款中约定。

2.质量标准

质量标准:按照国家施工质量验收标准一次验收合格。

质量创优:确保,争创。

3.安全文明施工管理目标

达到□省级安全文明工地 □AAA级安全文明标准化工地 要求。

六、组成本合同的文件

本协议书与下列文件一起构成合同文件:

1.中标通知书(如果有);

2.专用合同条款及其附件;

3.通用合同条款;

4.投标函及其附录;

5.劳务分包人向承包人作出的各项承诺;

6.技术标准和要求;

7.图纸;

8.已标价工程量清单或预算书;

9.其他合同文件。

合同履行过程中,合同当事人法定代表人或授权代理人签署的有关工程的洽商、变更、会议纪要等书面协议或文件视为本合同文件的构成部分(以倒顺序时间解释)。

在合同订立及履行过程中形成的与合同有关的文件均构成合同文件的组成部分。

上述各项合同文件中包括合同当事人就该项合同文件所做出的补充和修改,属于同一类型内容的文件应以最新签署的为准。

七、承诺

1.承包人承诺按照劳务分包合同约定的期限和方式支付合同价款。

2.劳务分包人承诺,按照法律规定及合同约定组织完成劳务分包工作,确保劳务作业质量和安全,不进行转包及再分包,并按时足额的向劳务作业人员发放工资。

3.劳务分包人承诺,按照合同约定的工期和质量标准,完成本协议书第三条约定的劳务分包工程施工内容,并在质量保修期内承担保修责任。

4.劳务分包人承诺,合同及合同附件中的各项管理规定及制度均已完全理解并承诺严格执行。如有违反,愿按合同条款及管理规定和制度的约定接受处罚。

5.劳务分包人承诺,履行总包合同中与分包工程有关的承包人的所有义务,承担工程质量缺陷的连带责任。

八、合同的生效

1.合同订立时间:年 月 日

2.合同订立地点:玉林市

3.本合同一式四份,具有同等法律效力,承包人二份,劳务分包人执 二 份,经双方签字盖章后生效,合同履行完毕后失效。

特别声明:本合同为劳务分包合同,必须加盖承包人印章方能有效。在合同履行过程中任何有关合同性质的协议、经济往来函件(涉及工期延长、费用增加、质量降低等方面)必须加盖承包人印章,项目部印章签订的上述协议、函件等均无效。

甲方(公章):广西万胜建设工程有限公司 乙方(公章):

年 月 日 年 月 日

展开阅读全文

篇17:江苏省建设工程招标代理合同_合同范本

范文类型:合同协议,适用行业岗位:工程,招投标,全文共 4989 字

+ 加入清单

江苏省建设工程招标代理合同

依据《中华人民共和国招标投标法》、《中华人民共和国合同法》及其它有关法律、法规、规章,_________(以下简称委托人)与_________(以下简称代理人)就_________(工程名称)的招标事宜,经充分协商,达成一致意见,特订立本合同。

一、委托人委托代理人的工程(以下简称"本工程")概况

1、工程地点:_________

2、工程项目审批文件:_________

3、资金来源:_________

4、工程规模:_________

5、总投资额:_________

二、委托代理范围

1、委托代理招标内容(有委托的在□中打√,并说明具体内容,无委托的在□中打×):

□勘察

□设计,具体包括:_________

□施工,具体包括:_________

□监理,具体包括:_________

□设备,具体包括:_________

□材料,具体包括:_________

2、委托代理范围内单项合同估算价:_________

3、委托代理的事项(有委托的在□中打√,无委托的在□中打×):

□代拟发包方案;

□发布招标公告(发出投标邀请书);

□编制资格预审文件;

□组织接收投标申请人报名;

□审查潜在投标人资格,确定潜在投标人;

□编制招标文件;

□编制工程量清单;

□编制工程标底;

□组织现场踏勘和答疑;

□组织开标、评标;

□草拟工程合同;

□编制招投标情况书面报告;

□与发包有关的其它事宜:_________

三、委托人的权利

1、委托人有权参与招投标的有关活动。

2、委托人有权要求代理人及时提供代理工作阶段性的进展情况。

3、委托人有权要求代理人更换不称职的人员或应回避的人员。

4、委托人有权确定代理人的具体工作内容。

5、如委托人或建设行政主管部门发现代理人在代理活动中违反有关的法律、法规或建设程序并经确认,委托人有权要求代理人纠正,直至中止合同。

四、委托人的义务和责任

1、委托人在代理人开展招标代理业务之前应按照有关规定办全本项目招标所需的有关审批手续,使招标工作具备条件。

2、委托人应当向代理人及时、无偿、真实、详细的提供招投标代理工作范围内所需的文件和资料(如建设批文、资金证明、地质勘察资料、施工图纸等)。

3、对代理人提出的书面要求,委托人应当在_________日内做出书面答复,如因此造成的时间延长由委托人负责。

4、在合同履行期间,委派熟悉业务、知晓法律法规、工作认真负责的_________作为委托人的代表,配合代理人工作。

5、委托代理咨询项目中如内容、时间等有重大调整,委托人应当书面提前_________日通知代理人,以便调整相应的工作安排,如因此造成的时间延长由委托人负责。

6、委托人不得泄露依法应当保密的任何信息。

7、在法律规定的时限内签订工程合同,并在签订合同后提交招投标监管机构备案。

8、承担由于自己过失造成代理人的经济损失。

9、委托方及其工作人员,不得以任何形式向代理人收受或索要回扣、好处费、礼金、有价证券和其它礼物;不得在代理人报销应由个人支付的费用。

10、委托人应当完成的其它工作:_________。

五、代理人的权利

1、有权拒绝违反国家法律、法规和规章以及建设行政主管部门有关规定的人为干预。

2、依据国家有关法律法规的规定,在授权范围内办理委托项目的招标工作。

3、有权建议更换不称职或有其它原因不宜参与招标活动的委托方人员。

4、如委托人的某些条件和要求不符合现行的法律、法规或程序,代理人可以建议委托人进行修改。拒不修改的,代理人有权单方面终止履行合同。

5、除发包方案、中标通知书及招投标情况书面报告由委托人盖章签字,中标通知书再加盖代理人公章外,自拟定发包方案至提交招投标情况书面报告所形成的资料、文件均只需由代理人盖章签字。

六、代理人的义务和责任

1、按照国家法律、法规以及建设行政主管部门的有关规定从事招投标代理活动。

2、在委托授权范围内为委托方提供招标代理服务,不得将本合同所确定的招标代理服务转让给第三方。

3、有义务向委托方提供招标计划以及相关的招投标资料,做好相关法律、法规及规章的解释工作。

4、代理方工作人员如与本工程潜在投标人有任何利益关系应主动提出回避。

5、在代理活动中不得泄露依法应当保密的任何信息。

6、对代理过程中提出的技术方案、数据参数、技术经济分析结论负责。

7、代理人成立招标代理项目组,并任命_________为项目组组长,负责该项目招标代理工作。项目组组成人员情况见附件一。

8、因代理人的单方过失造成的经济损失,应当向委托人进行赔偿。累计赔偿总额不应超过建设工程招标代理服务费总额(除去税金)。

9、因不可抗力导致代理合同不能全部或部分履行,代理人不承担责任。

10、代理人不得采用行贿、给予其他利益或者诋毁他人等不正当手段进行竞争。

七、招标代理服务收费的计取

1、根据国家现行取费政策,按照以下计算方法确定招标代理服务费金额:_________

2、招标代理服务费的支付,采用以下_________方式。

(1)由委托人支付。

(2)与投标人约定,由中标人支付。

采用第(2)种方式支付招标代理服务费的,招标文件必须写明,并包含在投标报价中。

3、支付招标代理服务费的时间:_________

八、委托人对代理人完成本合同委托内容的时间要求

1、代理工作开始时间:_________

2、代理工作完成时间:_________

非代理方原因造成的时间延误,结束时间相应延长;代理结束以完成_________时间为准。

九、违约和争议的解决

1、由于一方违约造成的损失,由违约方承担,另一方要求违约方继续履行合同时,违约方承担上述违约责任后仍应继续履行合同。

2、由于违约造成第三方损失的,也由违约方在赔偿另一方损失的基础上再赔偿第三方损失。

3、双方对代理合同条款变更时必须另签补充合同条款,补充合同条款作为本代理合同的组成部分与主合同具有同等法律效力。

4、委托人与代理人在合同履行期间发生争议时,可以和解或者要求有关主管部门调解。一方不愿和解、调解或者和解、调解不成的,双方可以选择以下_________方式解决争议:

(1)双方约定向_________(工程所在地)仲裁委员会申请仲裁。

(2)向有管辖权的人民法院起诉。

十、合同份数

双方约定合同正本一式三份,双方各执一份,报招投标监督机构一份,副本_________份,各执_________份。

补充条款:_________。

委托人(公章):_________ 代理人(公章):_________

法定代表人(签章):_________ 法定代表人(签章):_________

地址:_________ 地址:_________

电话:_________ 电话:_________

传真:_________ 传真:_________

邮编:_________ 邮编:_________

开户银行:_________ 开户银行:_________

帐号:_________ 帐号:_________

_________年____月____日 _________年____月____日

签订地点:_________ 签订地点:_________

附件

附件一:工程代理项目组组成人员情况及事项表

┌──────┬─────────────┬────┬──────────┐

│工程项目名称│ │招标内容│ │

├──────┴─────────────┴────┴──────────┤

│ 人 员 情 况 │

├───┬─────┬───────┬──────┬──────┬────┤

│姓 名│ 职 务 │ 职 称 │ 注册资格 │ 上岗证号 │ 备注 │

├───┼─────┼───────┼──────┼──────┼────┤

│ │ 组长 │ │ │ │ │

├───┼─────┼───────┼──────┼──────┼────┤

│ │ 成员 │ │ │ │ │

├───┼─────┼───────┼──────┼──────┼────┤

│ │ 成员 │ │ │ │ │

├───┼─────┼───────┼──────┼──────┼────┤

│ │ 成员 │ │ │ │ │

├───┼─────┼───────┼──────┼──────┼────┤

│ │ 成员 │ │ │ │ │

├───┴─────┴───────┴──────┴──────┴────┤

│ 代理事项及承办人安排 │

├─────────────┬─────┬─────────┬──────┤

│ 代 理 事 项 │承办人签名│ 代 理 事 项 │承办人签名 │

├─────────────┼─────┼─────────┼──────┤

│代拟招标方案 │ │编制标底 │ │

├─────────────┼─────┼─────────┼──────┤

│发布招标公告(投标邀请书)│ │组织现场踏勘和答疑│ │

├─────────────┼─────┼─────────┼──────┤

│投标申请人报名 │ │组织开标、评标 │ │

├─────────────┼─────┼─────────┼──────┤

│编制资格预审文件 │ │代拟中标公示 │ │

├─────────────┼─────┼─────────┼──────┤

│审查潜在投标人资格 │ │代拟中标通知书 │ │

├─────────────┼─────┼─────────┼──────┤

│编制招标文件 │ │草拟工程合同 │ │

├─────────────┼─────┼─────────┼──────┤

│编制工程量清单 │ │编制招投标书面报告│ │

├─────────────┴─────┴─────────┴──────┤

│ │

│ │

│代理人:(盖章) │

└────────────────────────────────────┘

注:本表中承办人签名一栏必须由本人亲自签字。

附件二:建设工程招标代理授权委托书

_________(委托人即招标人的法定代表人的姓名)系_________(招标人名称)的法定代表人,现授权委托(招标代理机构名称),为(拟招标项目名称)的代理人,以招标人的名义办理以下事项(有委托的在□中打√,无委托的在□中打╳):

□代拟发包方案;

□发布招标公告(发出投标邀请书);

□编制资格预审文件;

□组织接收投标申请人报名;

□审查潜在投标人资格,确定潜在投标人;

□审查潜在投标人资格,确定潜在投标人;

□编制招标文件;

□编制工程量清单;

□编制工程标底;

□组织现场踏勘和答疑;

□组织开标、评标;

□草拟工程合同;

□编制招投标情况书面报告;

□与发包有关的其它事宜:_________。

招标代理人在代理招标过程中办理上述事宜所签署的一切文件和处理与之有关的一切事务,委托人均予以承认,但发包方案、中标通知书、招投标情况书面报告需经委托人签署。代理人无转委托权。

本授权委托书的有效期为_________。

特此声明。

委托人(盖章):_________

法定代表人(签字):_________

_________年____月____日

展开阅读全文

篇18:土方工程承包合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 693 字

+ 加入清单

工程负责人(以下简称甲方):

承包人(以下简称乙方),经双方协商一致制定本条款,双方务必遵照执行。

一、承包项目:本工程地块土方的开挖、运弃、平整。

二、承包方式:包挖、包运、平整,不得转包。

三、承包价格:开挖、运输土方元/m3(石砂)。

四、工期要求:按图纸要求尺寸进行开挖,自月日开始施工,在天内完成基地土方的挖、运、填土方均需按图纸要求整平。

五、质量与施工要求:

1、基地的平面位置、底面尺寸、边坡坡度、标高和持力层等应符合设计图纸的要求,偏差控制在施工规范允许范围内。

2、做好水沟和排水设施。达到位置、尺寸和标高符合设计要求。

3、回填土时,应清除草皮、杂物和排除积水,并应分层夯实,夯实后的密实度应达到设计要求。

4、土方挖完后须经设计、建设(监理)、公司、质监站检查符合要求后,方为合格;否则承担整修、返工费用。

六、安全要求:

1、开工前、乙方应做好本工种工人的安全思想教育和安全注意事项并做好交底记录。

2、严格按照土方工程施工技术操作规程中的安全注意事项进行施工。否则出现安全事故,概由乙负责。

3、遵守工地规章制度,服从现场管理人员的指挥及上级有关部门的监督管理。

4、开挖的土方应按指定的地点堆放。保证施工道路畅通。

5、雨季施工应注意边坡稳定,加强检查工作,必要时可适当放缓边坡或设置支撑挡土板。

6、发现地下水或预埋管道、电缆线等应及时报告工地负责人并做好排水防水和其他措施。

七、结算方式:

采用现金支付形式,开挖完成经验收合格后的第2天支付清工程款,。

八、仲裁与调解:

如若发生劳动争议和经济纠纷,双方同意由劳动仲裁部门或人民法院进行调解。

单位工程负责人(甲方):

承包班组长(乙方):

年月日

展开阅读全文

篇19:水电站建设工程施工劳务分包合同

范文类型:合同协议,适用行业岗位:工程,全文共 3365 字

+ 加入清单

承包人(甲方):地址:劳务分包人(乙方):地址:风险提示:严格签订劳务分包合同

承包方与劳务分包方应当严格签订劳务分包合同,避免一旦发生工期、质量问题,由于未签订劳务分包合同或虽然签订劳务分包合同但合同约定不明确,施工企业就很难维护自己的权益。:

劳务分包人合法运作必须包含两种形式:

一是与有劳务资质的建筑施工企业即劳务分包人(总承包企业或专业承包企业)建立劳务分包合同关系;

二是与特定地区若干经过岗前培训的自然人中的每一个工人签订劳动合同。为确保甲方承建的__________工程劳务承包合同工程顺利完工,根据施工安排,甲方将________工程承包给乙方施工。根据《民法典》、《建筑法》的有关规定,为明确甲乙双方在施工过程中的职责,经双方协商,签订如下协议:

一、工程概况

1、工程名称:

2、工程地点:

3、工程内容:

4、承包方式:

二、工程期限

1、开工日期:________年____月____日。

2、竣工日期:________年____月____日。

3、总工期为: 共________个日历天。

三、工程造价

1、工程实际造价按甲方施工技术部门签证的实际完成的且经业主、监理验收合格的工程量乘以合同的单价计算。

2、本工程造价单项价格一次包死,不受天气变化、市场价格、职工生活费用增加、甲方相关工程施工进度、国家政策调整等因素的影响,如遇不可抗力,双方协商解决(不可抗力是指当事人不能预见、不可避免、不能克服的事情)。

3、单价:______________;工程量:__________________;合同总价:___________________。

四、工程结算

1、施工期间甲方每月向乙方支付当月计量总额的70%。乙方工程全部完工经甲方验收合格后支付至工程结算总造价的90%,甲方工程全部完成进入保修期后支付至95%,扣留的总造价的5%转为质量保证金。甲方每期向乙方支付款项时均应扣除:甲方向乙方所供材料费用、机械使用费用;乙方向甲方所借的费用;甲方向乙方开据的罚款票据金额;合同规定扣除的其他款项。

2、乙方应合理使用甲方拨付的工程款,并不得挪用。每期工程款拨付时,乙方应将上期拨付资金使用情况上报甲方财务部门审核,同时将上月工人签字的工资表复印一份交到甲方财务部门。

3、工程竣工结算以设计图纸和工程实物为依据,按乙方实际完成的且经甲方、监理、业主验收合格并经甲方工程部门复核认可的工程数量结算。

4、本质量保证金的比例为结算工程总造价的5%。缺陷责任期为甲方交工证书签发之日起________年,工程保修期为行缺陷责任期满之日算起________年。在工程缺陷责任期内或保修期内发生质量问题进行处理的费用从工程保留金扣除。

五、材料设备的供应

1、凡甲方统一采购的特殊材料设备,未经甲方同意,乙方不得自购,一经发现自行采购将按所列单价的_______倍进行处罚,且自购材料设备不得在本工地使用。甲方采购的材料设备不得用于其他工地,更严禁将材料出售。乙方超过计划使用材料设备______%的部分,甲方按合同执行期间市场最高价的______%对乙方加收资金占用费、采购保管费、补材料差价等费用。如乙方私自出售甲方供应材料,一经甲方发现将按合同执行期间两倍对乙方进行处罚。

2、水电由乙方自行解决,若利用甲方供电的,电费按______元度收取,用电数量为正常消耗量加损耗量。

六、施工图纸

1、甲方在开工前5天内,向乙方提供一套复印的施工图纸。

2、甲方提供的施工图纸、说明、技术交底和有关材料作为施工的有效依据,正式开工前由乙方会同甲方共同审阅,施工中如有疑问及时向甲方专业工程师请示,由甲方专业工程师负责解释。

3、非经甲方提供的施工图纸、技术交底,不能作为乙方永久性工程的施工依据。

4、变更设计按甲方专业工程师书面提供的变更设计文件为准。

5、乙方因施工需要根据设计图纸自行绘制的施工用图纸,必须报请甲方审核批准后方可使用。

七、甲方的工作

1、按本合同约定的分工范围和要求,供应工程所需的主要材料和设备。

2、负责对乙方进行施工技术交底,并对乙方工程质量、进度及安全文明施工进行监督。

3、对乙方进行技术指导和质量监督,对乙方的施工进度、工程质量、安全生产、文明施工等进行监督检查,发现问题及时向乙方提出整改意见,必要时有时有权发出停工令和返工令,甲方有权对乙方开具罚款票据。4根据施工现场情况及时会同监理进行检查验收。

5、按本合同约定办理计量支付手续,拨付和结算工程价款。

八、乙方的工作

1、编制施工方案报送甲方,经甲方审定后组织实施。

2、服从甲方、甲方上级主管部门及本工程业主、监理的规章制度和管理规定。

3、坚持文明施工,做好施工现场环境保护、劳动保护和安全生产。

4、乙方各操作人员必须持有相关有效证件才允许上岗,不得无证作业。

5、对已完工的工程和安装的设备,在验交前应负责保管,保证其完好状态。

6、及时发放所雇佣民工的工资,严禁拖欠民工工资

7、在工程缺陷责任期内,负责工程的缺陷修复。风险提示:劳务分包人资质

必须严格审查分包单位的资质。主要是审核资质证书、营业执照的真实性、有效性、是否与承接的任务等级要求相符。分包人提供的有关证书复印件应与原件核对并加盖对方套红印章留存。

承包方一旦没有严格审核分包人资质,将工程分包给没有资质的分包单位或者分包单位超越资质等级的,造成合同无效情形,甚至给承包单位造成额外损失。

九、劳务分包人资质

1、资质证书编号:_________________________________;

2、资质专业及等级:_______________________________。

十、工程质量

1、乙方必须严格按照本工程设计文件、现行技术规范及相关工程施工规范组织施工,并随时接受甲方专业工程师和监理工程师的抽查和重点检查,并提供必要的检查条件。

2、乙方所承包的工程,按本工程技术规范检查验收,工程质量保证合格率100%,优良率达到95%以上,并达到甲方项目质量计划的质量目标。

3、凡因乙方原因造成的施工质量不合格的工程,乙方应在甲方规定的时间内无偿返工,达到工程质量验收标准。若返工后仍达不到工程质量验收标准的,由乙方承担违约责任。十

一、安全施工

1、在施工中,乙方必须遵守国家和行业关于安全生产的规定,重视施工现场作业安全,制定安全措施,做好特殊工种的劳动保护工作。

2、乙方负责施工范围内的安全事故处理及一切安全责任。乙方必须安排专业的安全管理人员,负责施工段内的一切安全,经常检查设备、机械、安全标志的完好情况,杜绝一切安全事故的发生。

3、为了保护工程、保障施工人员和群众的安全,在必要的地点和时间内,乙方应设置照明、安全警戒标志和看守。同时做好劳动保护保证措施及相应工程项目要求的硬件措施,甲方不承担任何费用。

4、一旦发生伤亡事故,乙方必须立即通知甲方代表和急救机构,甲方代表应按规定向上级安全、建设主管部门报告。甲方应为抢救提供必要的条件,所有的费用由乙方承担,甲方不承担任何连带责任。十

二、工程转包与分包本工程不允许分包或转包,若乙方违反这一规定,甲方有权单方终止本合同,并没收履约保证金。十

三、违约责任

1、因甲方责任和不可抗力原因造成工程延误的,合同工期顺延。

2、因乙方施工质量达不到设计和规范要求的,甲方有权要求乙方返工或返修,其费用由乙方承担,影响工期的,由乙方承担违约责任。

3、因乙方责任导致工程不能继续施工的,甲方有权解除合同,由此造成的经济损失由乙方承担。

4、若乙方不经甲方同意而自行终止合同,甲方有权只按乙方所完成合格工程的工程量的60%予以支付,剩余的40%作为甲方对乙方的违约罚款,不再支付给乙方,同时没收履约保证金。十

四、附则

1、本合同未尽事宜,双方另行协商解决并根据实际和需要签订补充协议,补充协议和本合同具有同等的法律效力。

2、本合同自双方代表签字盖章后生效,合同履行完毕,自行失效。

3、本合同一式份,双方各执份,具有同等法律效力。

4、因履行本合同发生争议,双方协商不成的,双方均可向合同履行地的人民法院起诉。甲方:代表人:联系方式:合同签订地:合同履行地:签订时间:________年____月____日乙方:代表人:联系方式:合同签订地:合同履行地:签订时间:________年____月____日

展开阅读全文

篇20:工程劳务合同范本_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 2118 字

+ 加入清单

工程劳务合同范本

合同编号:__________

甲方:____________________

乙方:____________________

根据《中华人民共和国合同法》、《中华人民共和国建筑法》及其它相关法律和行政法规的准则,甲方将_______________工程中的部分工程、工序承包给乙方。为明确双方权利与义务,在公平合理的基础上,经双方协商,达成以下条款,望共同遵守。

第一条 合同文件

作为本协议的附件,下列文件与本协议共同组成合同文件,并与本协议具有同等效力:

1.本项目施工技术规范、技术交底、作业指导书、图纸;

2.本项目工程质量检查、验收标准;

3.本项目施工安全标准;

4.本项目施工组织设计;

5.本项目施工进度计划(含节点计划);

7.业主、监理和甲方的文件;

8.甲乙双方的补充协议、会议纪要、承诺。

第二条 承包单价

详见(附件),不调价。

第三条 有关约定

1.乙方对甲方负责,承认并严格按照甲方与业主签订的有关质量、安全、技术、环保、文明施工等标准,在甲方下达的施工进度计划(含节点计划)内完成施工。

2.计量支付

2.1 乙方完成承包的工程项目后,甲方依据乙方完成的合格工程数量和工程量清单(附件1)单价进行计量支付。

2.2 乙方应按甲方的施工计划组织施工。若因乙方原因导致施工计划未能完成时,甲方有权向乙方索赔由此而发生的延期赔偿金(赔偿金=____‰×标的额×延期天数)。此偿金最高限额为任务量总价的____%。同时,甲方有权终止本合同。

2.3 本工程不支付工程预付款,乙方应有结算支付前的资金垫付能力。

3.工程材料供应

3.1 所需主要材料均由乙方负责,需经甲方检验合格方可使用。

3.2 因道路堵塞、自然灾害等不可抗拒外力造成材料不能及时到场而影响施工,乙方不得向甲方提出索赔。

4.测量、试验、检验等技术工作

4.1 甲方根据需要随时进行以书面为主要形式的技术交底、测量。

4.2 甲方负责工程试验检验工作,乙方应在甲方监督下配合甲方实验室检验。

5.乙方不得转包。否则,甲方有权解除合同。乙方承担由此造成的损失,并向甲方支付本合同总价_____%的违约金。

6.隐蔽工程经甲方、监理验收合格后方能进行下道工序施工。

7.甲方承包给乙方的单价涵盖了工程施工的全部费用。乙方作为经济实体应履行国家规定的一切社会义务(劳动、医疗、工伤等各种保险、各种税费等)。

8.依据《劳动法》,乙方应按时、足额(不低于当地政府公布的最低工资标准)发放员工劳动报酬。甲方有权监督,必要时甲方有权代付(直接将工资发放到乙方员工手中)。

9.甲方承包给乙方的单价包含乙方的工伤保险及第三方责任险。故乙方的工伤事故费用及连带费用由乙方全额承担。

10.乙方现场施工负责人、技术负责人的变动需经甲方同意,离开工地需向甲方履行请假手续。

11.乙方完成工作量(按实体数量计算)由甲方委托代表签认后生效。工程款由甲方技术、安质、物资、合同、财务等部门负责人签认,甲方队长批准后支付。

12.甲方有权就乙方的履约能力做出评估,如果乙方无能力履约(特别是质量、工期、安全),甲方有权终止合同,并有权按合同标的总额的_____%向乙方索赔损失。

13.本合同签订后,乙方人员、设备必须按承诺的时间进入施工现场。否则,甲方有权解除合同或对乙方违约做出相应处罚(处罚标准由甲方根据乙方违约程度确定,处罚限额为乙方任务量总价的____%)。

14.乙方对本工程安全负责,配备必要的安全防护设施,并按照国家有关安全生产法律、行政法规、操作规程办事,服从甲方安全监督和管理,不管何种原因,造成的人身伤亡、机械事故,由乙方承担全部责任,甲方不承担任何责任。

15.乙方必须做到现场文明施工和环境保护,包括控制扬尘、降低噪音等一切与此有关的作业,并配备满足工程施工的各种标识、标牌。

16.乙方应采取措施积极配合甲方的业主或监理工程师的定期或不定期的检查、评比,如因乙方原因,在业主或监理工程师的检查、评比中使甲方受到处罚或影响甲方评比成绩,甲方将对乙方进行两倍的罚款或根据评比结果对乙方进行处罚。如因乙方的原因造成严重影响甲方信誉的事件,甲方有权解除乙方合同。

第四条 争议解决

若履行合同时发生争议,双方约定以下列方式进行解决:

1.和解。双方在自愿要友好的基础上,互相沟通、互相谅解,通过协商解决;

2.调解。在第三方的主持下,通过第三方的说服、引导、调停的方法解决争议,达成协议;

3.仲裁。协商、调解不成的,由________市仲裁委员会仲裁。

第五条 附则

1.本合同未尽事宜需双方协商签订补充协议,补充协议与本合同具有同等法律效力。

2.本合同经双方签字盖章后生效,至工程竣工交验、结清工程尾款、保修期满后自然失效。

3.本合同正本2份,双方各1份;副本2份,甲方2份。

甲方:______________ 乙方:______________代表人:____________ 代表人:____________电话:______________ 电话:______________合同订立时间:________年________月______日

附件1:工程量清单(略)