0

建筑师英文面试【实用20篇】

浏览

7399

范文

1000

建筑公司承包合同书

范文类型:合同协议,适用行业岗位:建筑,企业,全文共 5337 字

+ 加入清单

以钢管为主的脚手架。即以钢管为主,并辅以其它型钢杆件所构成的脚手架,如设有槽钢顶托或底座的里脚手架,有连接钢板的挑脚手架等。建筑公司承包合同怎么写呢以下是小编整理的建筑公司承包合同,欢迎参考阅读。 建筑公司承包合同范文一 甲方: 乙方: 根据《民法典》和《建筑安装承包条例》的有关规定,本着平等互利的原则,为明确双方在合作中的权利义务,结合本工程的实际要求,经双方友好协商,特订立本合同:

一、工程名称: 建筑面积:

二、承包范围:

1、双排钢管落地式外脚手架的搭设及拆除;

2、本项目所需要的安全网、兜网及必要的安全防护、钢筋棚、安全通道;

3、内脚手架材料由乙方提供(钢管、扣件、顶托)甲方负责搭设及拆除;

4、基础部分所用材料由乙方提供(钢管、扣件、顶托),甲方自行搭设、拆除。基础部分在2.2米以下则不计建筑面积,如超出2.2米,则按半层建筑面积计算。

三、承包价格及工期:

1、项目按实际建筑面积(以甲方图纸为准)搭设的脚手架承包价格为 元㎡;

2、本工程工期为________年____月____日至____月日止。

四、乙方的职责及义务:

1、乙方班组属甲方项目的组成部分,服从项目部的领导,接受甲方的管理和监督,做到组织严谨,规范施工。脚手架必须按照甲方提供的施工方案及现场管理人员的要求搭设,安全网的安装必须做到平整,牢固及立体美观。达到安全主管部门的检查标准,如检查不合格,其返工损失由乙方承担,如因甲方错误的施工方案及错误指挥而导致的返工,则返工损失由甲方承担;

2、负责脚手架材料进场保管及维护;

3、乙方在施工过程中必须严格按照甲方所提供的要求操作规范施工,确保施工安全。

4、必须确保项目工期要求,如因脚手架影响工期,其责任由乙方承担。

五、甲方的职责及义务:

1、提供乙方施工人员,看场人员住宿工棚及生活用水用电;

2、提供脚手架材料垂直运输及设备使用;

3、甲方负责协调各工种的工作;

4、甲方用完内脚手架必须及时清理至地面。 做到扣件解开归堆,钢管归堆,如未及时清理,造成乙方材料丢失,甲方负责赔偿;

5、甲方按合同所约定的条件向乙方支付工程款。

六、付款方式: 按工程进度,在

第一次悬挑工字钢付的 ,拆除全部脚手架须付到工程款的 ,余款在工程竣工验收后三个月内付清。

七、其它:

1、工程完工后,乙方不开具税务发票;

2、如遇工程超期,甲方须向乙方支付超期使用费,合一个月每平方米2元;

3、如有本项目工作人员发生偷盗行为,按每次不低于3000元罚款,由甲方落实代办扣罚,情节严重的送公安机关处理。 未尽事宜,甲、乙双方协商解决,本合同一式二份,双方各执一份,自签定之日起生效,如单方违约,由违约方担责。 甲方: 乙方:________年____月____日 建筑公司承包合同范文二 发包方(以下简称甲方): 承包方(以下简称乙方): 根据 建设工程需要,甲方将钢管脚手架搭拆工程承包给乙方施工,按照《中华人民共和国建筑法》和《安全生产法》及相关法规的规定,结合本工程具体情况,为明确双方责任,经协商签订本合同。

一、 工程名称:

二、 工程地点:

三、承包方式:

1、劳务承包(包工包料),包质量、工期、安全生产与文明施工。

四、搭拆方式:

五、承包范围 : 建设项目: 外脚手架的搭拆(包括四口、五临边的防护、人行通道及甲方指定的防护搭拆和所需材料及甲方施工作业时所需竹跳板和外墙防护所需工字钢及除预埋件钢筋是甲方的,其余全是乙方工程)。密网、平网的安置及所有竹跳板的铺设,但不包含装修时的

第二次脚手架搭拆,中途外架的破坏以及丢失的脚手架等附件材料由乙方负责。一切安全标语及所有广告牌均由乙方按甲方要求的时间安装合格。 工期要求:外架拆除时间为 天,内架拆除时间为 天,内架拆除不包含

第二次结构时间(但算时间内搭满堂脚于架算起),超出由甲方另付租金。

六、承包价格:按房屋建筑面积单价 元平方米面积计算。

七、工程进度款支付

1、工程进度款支付方式:施工层完工后按进度价款支付。最后每月按进度的 支付。

2、竣工决算:竣工决算价款核签时间,全部合同完工后内付清总工程量价款的 ,尾款在工程竣工验收 个月内结清。

八、质量标准及验收要求

1、乙方搭设的脚手架必须符合国家标准,符合当地政府主管部门的要求,符合甲方创建文明工地的要求,如果上级检查不合格,一切后果均由乙方承担。

2、脚手架必须跟随施工形象进度分析分层连体搭设,分层验收,分层使用。

3、乙方的施工人员必须熟悉脚手架搭设的安全操作规程,必须持有效上岗证,严格按规范、标准的要求搭设,严格执行有关高空,悬空作业的规定。

4、乙方必须按施工方案实施,必须遵守甲方安全员的交底操作,按安全员开出的整改单整改,不按时整改或拒绝整改,甲方有权处以必要的罚款。

5、乙方完成一层脚手架搭设,在自检互检合格后,报甲方复检验收合格,并经有关人员签字后才能使用。如需返工,由乙方承担相关费用。

6、外架每步之间必须加设一道扶手,作业层脚手板与建筑物墙体缝隙大于 15c时必须进行防护。

九、安全施工

1、乙方在施工中必须坚持

2、严格服从甲方及有关部门的安全监督,指导管理,严格遵守执行现场施工安全管理规章制度,加强施工安全防护措施,做好

3、禁止向下抛物,违者每次处罚100元。

4、严禁机械带病和漏电作业。严禁违反安全操作堆积和安全生产管理规章制度,违章指挥和违章作业,任何人不得在不符合规定施工条件和存在安全隐患的情况下强行施工。乙方有权拒绝违章指挥。

5、乙方有违返安全生产管理规章制度者按甲方安全生产管理规章制度进行处罚。

6、乙方承包人为本项承包施工范围的

第一安全责任人(亦为安全员),与甲方签订《安全施工合同》,对本项承包施工范围的具体施工作业安全全面负责,并承担其责任。负责做好工人岗前安全教育培训和安全技术交底,负责做好日常 安全施工布置、检查工作。

7、乙方必须注重安全施工,提高安全意识,加强安全防范,杜绝安全事故隐患,当发现安全隐患时必须立即停工并及时报告处理,严格做到无安全事故发生。

8、甲方责任:

(1)、甲方必须为乙方施工人员办理安全保险。

(2)、开工前甲方必须为乙方人员进行安全教育和技术交底。

(3)、甲方施工前完成现场三通一平,同时给乙方提供施工图纸。

(4)、负责现场材料的垂直运输。

(5)、甲方必须监督木工所用的钢管按时拆除并堆放整齐,没有乙方的同意不准损坏和锯掉钢管,若有发现必须照价赔偿。

十、其他条款

1、不可抗力

(1)双方关于不可抗拒的约定:不可抗拒包括战争、动乱、空中飞行物体坠落或其他非甲乙双方责任造成的爆炸、火灾及暴风雨、洪水、地震等自然灾害。

(2)因不可抗拒事件导致费用及延误的工期按以下方法承担:

①工程本身的损害因工程损害导致

第三人人员伤亡和财产损失,由甲方承担。

②乙方机械设备损坏及停工损失,由乙方承担。

③工程所需清理、修复费用,由甲方承担。

3、合同解除

(1)甲乙双方协商一致,可以解除合同。

(2)因不可抗力使合同无法履行,可以解除合同。

(3)因一方违约致使合同无法履行,可以解除合同。

(4)因乙方责任不能履行合同中途解除合同者,乙方按完工进度价款了 进行结算清付。

(5)合同解除后,不影响双方在合同中的约定的结算和清理条款的效力。

4、制度管理

(1)乙方必须无条件服从甲方及各职能部门的管理,遵守执行各项管理规章制度,遵章守纪守法,搞好团结友爱,搞好相互协作,如有违纪违章者将严格 按照有关规章制度进行处罚。

(2)乙方工作人员的食宿场所,由乙方自行负责,并保证饮食安全。

(3)乙方若不服从甲方和有关部门的正常管理,不能保证工程质量和工期要求者,甲方有权单方面终止合同。 十

一、合同生效与终止

1、 本合同订立时间:年月

2、 合同订立地点:

3、合同生效:本合同若有未尽事宜,经双方协商签订补充协议生效。

4、合同终止:双方履行合同全部义务,竣工决算价款全部支付终止。

5、合同份数:本合同一式两份,由双方各执一份。 发包人(盖章): 承包人(盖章): 联系电话: 联系电话:________年____月____日 建筑公司承包合同范文三 发包方: ____市城南建筑安装有限公司 承包方: 承包方为发包方承包务,为明确责任,恪守信用,特签本合同(合同签订地:城XX公司办公室),共同遵守。

一、承包方负责范围

1、包工范围:

(1)搭拆外墙双排脚手架。

(2)建筑物内四口、五临边防护,钢筋棚、搅拌机棚及施工现场需要进行防护的有关设备设施,并做好成成品保护,严禁非架体人员拆除防护体系。注:大型通道防护、高压线防护不在内、工地现场办公室不在承包范围之内。

(3)无架体的,做临边防护;有架体的,架体内立杆支外墙间距超过0.2必须做防护。

2、包料范围

(1)除发包方提供部分钢管、扣件外,承包商提供本工程外架、内架支模所需的钢管、扣件、安全网、竹笆等架体施工材料,其中安全网、竹笆、油漆、拉丝等含在人工费内,合计每平方米22.0元人民币包死,所提供的安全网、竹笆必须为合格的新材料,工程量按建筑面积计算。承包方提供的钢管、扣件按租赁费计算,钢管按0.009元米天,扣件按0.005元个天计取。必须优先使用发包方提供的钢管、扣件,并在使用后如数归还。所有钢管的刷漆由承包方施工,并不在计取费用。

(2)一次性外架安全网,必须清洁干净;

(3)一次性外架竹笆片(每2步铺一层);

(4)一次性铅丝、油漆;

3、脚手架专项施工方案由承包方负责编制,其中悬挑脚手架方案的编制和论证发包方给予承包方6000元补助,承包方编制的方案必须符合有关标准、规范要求,并严格按照方案搭设。

4、工字钢悬挑方式:

(1)从 层顶开始悬挑,工字钢悬挑 次,具体悬挑位置按方案和规范高度来决定。

(2)如果地下室需搭设临时脚手架,搭拆人工费一次性包死2万元整。悬挑架以下的临时架搭拆按建筑面积 元∕㎡计算。拆除临时架体后的临边防护由承包方搭设,不再计取费。

(3)发包方需要做悬挑下外墙粉刷时,承包方应该及时重新搭设落地式脚手架,工程量含在总建筑面积内。

(4)无架期间,应做好临边防护。

5、搭设质量标准:按方案规范搭设,并确保通过公司和上级主管部门的检查、验收,确保一次性通过市安全文明工地验收。如果在检查或验收中不达标,承包方承担由此造成的全部责任和经济损失,并根据发包方的奖罚制度予以经济处罚。

6、承包方必须提供完整的施工方案,施工所需的资质、证照及特种人员操作证件复印件并加盖原单位公章,严格按照施工方案实施。

7、及时组织人员进场,确保工程质量和进度,进行安全生产文明施工。若因承包方人员责任造成自方和发包方人员工伤事故的,对于2万元以内的费用全部由承包方支付,超出此费用的,超出部分的费用由发包方承担。如果因承包方人员违章和酒后作业等造成安全责任事故,承包方承担全部责任和由此造成的损失。

8、现场人员必须服从发包方管理。

9、搭设时间必须按发包方通知执行,发包方须提前____日通知。

10、架体搭建必须与主体工程同步,如因滞后造成安全事故或停工损失,承包方承担全部责任和损失。 1

1、按时拆除外架;接到发包方拆除外架通知之日起,____日内拆清全部外架(发包方要求终止停拆期间除外)。

二、发包方负责范围

1、负责现场协调工作

(1)负责外架基础周边硬化到位。硬化没有到位,后期产生的事宜由发包方负责。

(2)交叉作业时,协商解决,不允许延误工期。

(3)搭设时,负责用塔吊吊运脚手架材料至各个楼面;拆除时,负责用塔吊吊运各个楼面脚手架材料至地面。

(4)发包方施工工地四周必须建有围墙,如果不建围墙,承包方可以拒绝提供材料。

(5)悬挑架立杆底部内封闭材料,悬挑、连墙用预埋件(18圆钢)及其成型由发包方提供。

2、在进行脚手架搭设中,发包方负责监督和检查承包方施工。

3、发包方尽可能为承包方工作人员提供方便。

4、租赁的钢管、扣件数量以发包方出具的凭证为准。

5、发包方负责接收材料,钢管、扣件如有丢失由发包方负责赔偿。

三、其他及合同决算 其他超出范围的工程量由双方协商,具体费用由发包方所签的补贴单为准。

四、付款

1、脚手架施工至12主体付工程款总价的主体封顶付至工程款总价的 ,余款至 付清。

2、为避免付款凭证重复,发包方出具的凭证是唯一付款凭证。

3、延迟支付,发包方每日支付承包方违约金是应付款的1。

五、违约责任 脚手架搭设质量达不到市级合格要求,承包方负责无条件返工整改至合格为止,如发包方原因造成延误或损坏的由发包方负责。

六、争议解决办法 合同履行过程中,发生的争议协商解决,协商不成时,双方向合同签订地____区人民法院提出诉讼。

七、附则

1、结算时不提供发票,提供工人每月工资表,领取工程款。

2、本合同的图纸及双方另行协商签订的补充协议等亦是本合同不可分割的一部分。

3、本合同共计叁页,双方签字、盖章后生效,本合同一式两份,双方各执一份。

4、签订时间:________年____月____日。 补充:来回钢管全部由承包人负责运送,运送至施工现场的运费由承包方承担,拆除后运回的费用发包方按本____区内运费酌情补助。 发包方(签章): 承包方(签章): 委托代理人: 委托代理人: 身份证号: 身份证号:

展开阅读全文

更多相似范文

篇1:大学自主招生面试英文自我介绍

范文类型:自我评介,适用行业岗位:大学,招生,全文共 567 字

+ 加入清单

我是XX省XX学校的高三学生。我希望通过贵校的自主招生来实现我在贵校学习的梦想。

三年的高中生活就要结束了,贵校悠久的历史,深厚的文化底蕴,丰富的教学资源,良好的学术氛围,强烈的时代气息,为社会培养出许多杰出人才。我将选择贵校为第一志愿,非常渴望能在明年7月拿到贵校的录取通知书,成为一名光荣的校学生,成为一名对社会、对祖国有用的人才。

在多年的学习过程中,从小学习成绩一直领先的我,凭借自己的努力考入理想的高中——XX中学,经过三年的锤炼,我已经成长为意志坚强、底蕴深厚、成熟内敛、热爱生活、有爱心、有同情心、有上进心、德智体全面发展的优秀学生。

我是个乐观向上的年轻人。热爱生活,逆境也不畏惧,对生活充满信心和希望。我坚信,我的努力会让我达到成功的梦想。我喜欢感受快乐,我希望把快乐传递给我身边的每一个人,我为强者欢呼,为弱者流泪,我相信送人玫瑰手留余香。我用自己的真诚,博得良好的同学缘,老师们也都对我非常认可,这多来自我单纯、直率、热情的性格。

XX大学是我梦寐以求的大学殿堂,假如我这次有幸进步贵校,我将明确努力方向,能在大学汲取更多的知识,不仅是知识,更有献身祖国、为民族复兴贡献一份力量的情操。我将努力参加一些团体、论坛和各种活动,锻炼我的能力,把自己磨砺成一个贵校大学生所具备的独特文化品位、非凡才能和良好综合素质的优秀人才。

展开阅读全文

篇2:国际专利许可合同附英文[页6]_合同范本

范文类型:合同协议,全文共 1571 字

+ 加入清单

国际专利许可合同(附英文)

on_____________ day of____________,by and be-tween __________,organized and existing

under the laws of the people’s republic of china. with rehistered office at (hereinafter

referred to as party a) of the first part and __________,organized and existing under

the laws of ____________,with its principal office at________________.

witnessth

whereas the patent right which said in the contract os owned by party b.

whereas party b has the right and agreed to grant paryt a the rights to use,

manufac-ture and sell the contract products of the ppatented technology;

whereas party a hope to use the patented technology of party b to manufacture and sell

thecontract products;

both parties authorized representatives, through friendly negotiation, have agree

to en-ter into this contract under the ertms as stipulated below;

artide 1 definitions

for the purpose of this contract, the following terms have the following meanings;

1.1.‘patented technology’means those letters patent, and applications therefor

presently owned or hereafter acquired by party b and/or which party bhas or may have the

rigt to control or grant license thereof during the term hereof in any or all countries

of the world and which are applicable to or may be used in the manufacture of cotract

products.

1.2. ‘contract products’mians the products described in appendis2 annexed hereto,

to-gether with all improvements and modifications thereof or developments with respect

there-to.

1.3. ‘patty a’means____________. or his legal representative, agent and inhetitor

共21页,当前第6页123456789101112131415161718192021

展开阅读全文

篇3:建筑工程设计合同_合同范本

范文类型:合同协议,适用行业岗位:建筑,工程,设计,全文共 1810 字

+ 加入清单

建筑工程设计合同

工程名称:

委托单位:

设计单位:

设计编号:

合同编号:

____年____月______日订

建筑安装工程设计合同

订立合同双方:

建设单位:__________________,以下简称甲方;

设计单位:__________________,以下简称乙方。

为了明确责任,分工协作,共同完成国家建设项目的设计任务,根据《建设工程勘察设计合同条例》的规定和________批准的计划任务书,经甲乙双方充分协商,特签订本合同,以便共同遵守。

一,工程名称,规模,投资额,建设地点

甲方委托乙方承担_____工程的设计项目,建筑安装面积为______平方米,批准总投资为____万元,建设地点在_________

二,甲方的义务

1,甲方应在一九____年____月____日以前,向乙方提交业经上级批准的设计任务书,工程选址报告,以及原料(或经过批准的资源报告),燃料,水,电,运输等方面的协议文件和能满足初步设计要求的勘察资料,需要经过科研取得的技术资料。甲方在一九____年____月______日施工图设计前,应提供经过批准的初步设计文件和能满足施工图设计要求的勘察资料,施工的条件,以及有关设备的技术资料。甲方对上述资料必须保证质量,不得随意变更。

2,及时办理各设计阶段的设计文件审批工作。

3,在工程开工前,甲方应组织有关施工单位,与乙方进行设计技术交底;工程俊工后,甲方应通知乙方参加竣工验收。

4,在设计人员进入施工现场进行工作时,甲方应提供必要的工作条件,并在生活上予以方便。在设计和施工过程中因技术上的特殊需要进行试制试验,所需一切费用以及为配合甲方到外地的差旅费均由甲方负责。

5,甲方必须维护乙方的设计文件,不得擅自修改;未经乙方同意,甲方不得复制,重复使用或擅自扩大建设范围。甲方有义务保护乙方的设计版权,不得转让给第三方重复使用。

三,乙方的义务

1.乙方必须在一九____年____月____日以前,向甲方交付初步设计文件;在一九______年____月____日以前,向甲方交付技术设计文件;在一九____年____月____日以前,向甲方交付施工图设计文件。其中,初步设计文件一式______份,技术设计文件一式____份,施工图设计文件一式____份,甲方另需增添文件分数和需要模型费,另行收费。一九____年____月____日以前,乙方必须向甲方提交完毕所有设计文件(包括概预算文件,材料设备清单)。

大型建筑安装工程,甲乙双方可视具体情况分阶段进行设计,在具备设计条件时,双方签订阶段设计合同,具体规定甲方应提交各阶段设计资料的名称和日期,乙方交付设计文件的日期,作为本合同的附件,详见附件(2)。)

2.乙方必须根据批准的设计任务书或上一阶段设计的批准文件,以及有关设计技术经济协议文件,设计标准,技术规范,规程,定额等提出勘察技术要求和进行设计,提交符合质量的设计文件。

3.初步设计经上级主管部门审查后,在原定任务书范围内的必要修改,乙方应负责承担。

4.设计单位对所承担设计任务的建设项目应配合施工单位进行施工前技术交底,解决施工中的有关设计问题,负责设计变更和修改预算,参加隐蔽工程验收和工程竣工验收。

四,设计的修改和停止

1.甲方因故要求修改工程的设计,经乙方同意后,除设计文件交付时间另定外,甲方应按乙方实际返工修改工日,每工日按____元增付设计费,或按设计阶段中返工的工作量百分比计算。

2.原定任务书如有重大变更而重作或修改设计时,须具有设计审批机关或设计任务书批准机关的意见书,经双方协商,另订合同。已经进行了的设计费用的支付,按前条办法计算。

3.甲方因故要求中途停止设计时,应及时用书面通知乙方,已付设计费不退,并按该阶段的实际耗工日,增付和结清设计费,同时结束合同关系。

五,设计费的数量和交付办法

本设计合同生效后____天内,甲方应向乙方交付相当于设计费的20%的定金,设计合同履行后,定金抵作设计费;乙方向甲方提交初步设计方案后____天内,甲方应向乙方支付____%的设计费;乙方向甲方提交施工图文件后____天内,甲方应向乙方结清全部设计费(设计周期较长的大型工程项目,施工图阶段的设计费,可按单项工程设计完成后分别拨付)。

六,奖励与违约责任

1.在合理的工程投资控制数内,由于乙方采用先进技术或合理建议而节省了工程投资,可以从节约投资额中提取__%奖励乙方。

共2页,当前第1页12

展开阅读全文

篇4:建筑脚手架租赁热门合同

范文类型:合同协议,适用行业岗位:建筑,全文共 556 字

+ 加入清单

甲方:

乙方:

甲乙双方经协商,就乙方租赁甲方脚手架一事达成一致,签订合同如下:

1、脚手架每套每天租金____________元。(每套含:门架二件、拉杆二件、连接器四件、踏板一件)。

2、脚手架轮子,每套(含轮子4个)每天租金__________元。

3、在乙方使用过程中如造成丢失或损坏,按实价赔偿。(门架每件160元,拉杆每件60元,连接器每件15元,踏板每件140元,轮子每个80元)。

4、乙方租赁甲方脚手架共计_________套,轮子共计______套,共交押金__________元。

5、脚手架每1.8×0.9m的作业面上,载荷应小于200Kg,多层作业面累计载荷应小于600Kg,且与地面水平高低差应小于25mm,脚轮螺杆调节高度应小于250mm,连接高度超过3组,须按装三角翼架或采取相应的安全措施。

6、乙方在租赁时,确保脚手架无质量问题,一旦租赁后,所发生事故由乙方全部承担。

7、乙方在使用过程中,造成事故责任由乙方全部承担。

8、乙方使用完脚手架后需持本合同和甲方结算,并当面终止合同。如用完不还,发生争议由有关部门裁决。

9、合同一经签定,双方均须严格遵守,如有违约,违约方要承担对方造成的全部损失。

10、此合同一式两份,双方代表人签字有效。

甲方:

乙方:

地址:

地址:

电话:

电话:

身份证号码:

年 月 日

展开阅读全文

篇5:建筑工程施工承包合同农村私人修建房屋

范文类型:合同协议,适用行业岗位:建筑,工程,乡村,全文共 4877 字

+ 加入清单

我国建筑施工企业项目管理体制改革不断深入,在建筑工程项目施工上我国逐渐实现建筑工程承包的管理模式。建筑工程施工承包合同你了解多少呢以下是小编为大家整理的建筑工程施工承包合同范文,欢迎参考阅读。

发包人:(以下简称甲方)

承包人:(以下简称乙方)

依照《中华人民共和国民法典》、《中华人民共和国建筑法》、《建设工程质量管理条例》及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方经协商一致订立本合同。

第1条:工程概况

1.1工程名称:

1.2工程地点:

1.3工程内容: ,总建筑面积约 平方米。

1.4承包方式:乙方以包工、包料、包工期、包质量、包安全、包验收、包保修的方式履行建筑施工承包责任。第2条:承包范围

2.1乙方承包范围:

2.1.1按甲方提供的施工图纸、设计说明以及图纸会审记录和有关变更文件、资料及所包含的内容,根据国家、省、市的有关规范、规程、标准等的要求进行施工,除 工程外,均由乙方负责施工,具体内容如下:建筑、结构、给排水、电气照明。

2.1.2未经甲方同意,乙方不得将承包工程的任何部分分包或将其承包的全部工程转包给

第三方,否则视为乙方违约,所造成的一切损失由乙方承担。

2.2甲方可指定发包的专业工程,不委托乙方施工:

2.2.1首层大堂装修、户内豪华装修、高低压配电、弱电工程、空调通风、煤气、智能化系统及周边防范、电信(包括宽带网)、电视、电梯及监控系统、幕墙、消防、市政园林工程、幕墙、中央空调及配套工程的专业设备安装等项目由甲方指定的分包单位承包,由甲方与专业工程公司签订施工分包合同,乙方须承担配合施工的责任。

2.3 甲定生产厂家乙负责采购的材料:钢筋:水泥:防水卷材:门窗:第3条:工程质量标准

3.1工程质量标准按国家现行施工验收规范及省市验收合格标准。

3.2保修期自本工程竣工验收合格之日起计。第4条:保修期

4.1本工程保修期为:

1、基础工程及主体结构工程为设计年限。

2、防水工程________年。

3、管线设备工程________年。

4、装修工程________年。

5、缺陷责任期:6个月。第5条:工期

5.1总工期: 天(本工期为从甲方下发的开工文件起到完成建筑工程竣工验收的时间,不包括不属于乙方承包范围的各专业工程的工期)。

5.2开工日期:________年____月____日,具体开工日期以甲方或甲方委托的监理公司下发的正式开工令为准。

5.3节点工期:

5.4合同文件中提及的工期,不包括劳动假日、公众假日和恶劣天气日子。

5.

5.如遇下列情况,经发包方现场代表签证后,工期相应顺延:

(1)按施工准备规定,不能提供施工场地、水、电源道路未能接通,障碍物未能清除,影响进场施工;

(2)凡发包方负责供应的材料、设备、成品或半成品未能保证施工需要或因交验时发现缺陷需要修、配、代、换而影响进度;

(3)重大设计变更,提供的工程地质资料不准,致使设计方案改变或由于施工无法进行的原因而影响进度;

(4)在施工中如因停电、停水8小时以上或连续间歇性停水、停电3天以上(每次连续4小时以上),影响正常施工;

(5)非承包方原因而监理签证不及时而影响下一道工序施工;

(6)未按合同规定拨付预付款、工程进度款或代购材料差价款而影响施工;

(7)人力不可抗拒的因素而延误工期。

5.5承包方必须按照约定的竣工日期或发包方同意顺延的工期竣工。

5.6因承包方原因不能按照协议书约定的竣工日期或发包方同意顺延的工期竣工的,承包方承担违约责任。第6条:承包方式

6.1本工程采用乙方包工包料、包质量、包工期、包安全、包风险、包经国家有关部门验收的形式进行总承包施工。

6.2在施工期间,其它有需要由乙方承包施工的项目(合同外项目、图纸会审变更部分和有关变更文件、资料及所包含的内容),以甲方的书面通知为准,相应费用、工期应经双方确认后调整。第7条:合同价

7.1工程款计价方式:

7.2付款方式:预付款:工程进度:工程结算款:第8条:合同生效

8.1合同订立时间:________年____月____日。

8.2合同订立地点: 。

8.3本合同自双方签字并盖章后生效。

8.4本合同文本正本贰份,甲方、乙方各壹份;各份均具同等法律效力。第9条:其它约定

9.1甲方付予乙方的工程款,乙方须优先支付工人工资;若乙方拖欠建筑工人工资,甲方有权从工程款中直接支付。乙方与其工人之间的争议与甲方无关,甲方不承担任何责任。

9.2本工程的安全防护、文明施工措施费,乙方须符合国家或省、市等的规范要求,且须保证安全防护、文明施工措施费专款专用。否则甲方有权停止安全防护、文明施工措施费的支付,索回已经支付的安全防护、文明施工措施费;因乙方未履行上述约定而造成的任何损失和责任,概由乙方承担。

9.3乙方向甲方承诺按照本合同约定进行施工、竣工并在质量保修期内承担质量保修责任。

9.4甲方向乙方承诺按照本合同约定的期限和方式支付合同价款及其他应当支付的款项。

9.5本合同未尽事宜,双方另行协商,签署补充合同。本合同正本两份,具有同等效力,由甲方乙方分别保存一份。甲方(公章):_________ 乙方(公章):_________法定代表人(签字):_________ 法定代表人(签字):________年____月____日 ________年____月____日建筑工程施工承包合同范文2发包方(以下简称甲方):承包方(以下简称乙方):甲、乙双方就住宅楼建筑工程承包事宜经过充分协商,达成协议,特签订本合同。

第一条 工程概况

1、工程名称:甲方名下私房住宅楼。

2、工程地点: 号。

3、承包范围:主体工程(从承台开始,圈梁,地台,一直到封顶)。内外墙批荡,四周外墙粘贴纸皮砖,楼梯贴步级砖,走廊、电梯口分别粘贴(详参照以下第4条)。楼层一至八层或共 层(不含夹层),框架结构,首层为商铺,夹层为摩托车库。二层以上为住宅套房,顶层为一个楼梯房,电梯机房(结算时作投影面积计算)。

4、承包方式:包清工。所有机械设备、排栅、模板、铁钉、铁线等全部由甲方负责。乙方只提供线锤、泥刀、水平尺、圈尺、灰刀等。注:本工程的水电安装工程(包括强、弱电),门窗制作安装、消防、排栅、防护网不包括在本承包内。

5、建设工期:本工程自________年____月____日开工,于________年____月____日竣工(其中主体工程 个月内完成)(详参照以下

第五条)。

6、工程质量:参照国家房屋质量有关要求执行。

7、承包价格:按每层投影面积计算,每平方米为人民币: 元整( 元)。包括天面楼梯屋、电梯机房,基础部分不计,化粪池不计。(凸窗部分只计一面,不计双面)

第二条 甲方工作

1、开工前向乙方进行现场交底,清除影响施工的障碍物;向乙方提供施工所需的用水、用电等有关方面,并说明使用注意事项。

2、准备后需的设备,材料运送到工地,但不负责材料运上楼层。

3、甲方指派人员监督及保护好建筑材料。

第三条 乙方工作

1、工栅搭设及施工现场每层的临时用水、用电以及放水保养。

2、参加甲方组织的现场交底,拟定施工方案和计划进度(作法说明),交甲方审定。

3、按要求组织施工,保质、保量,按期完成施工任务,解决由乙方负责的各项事宜。

4、严格执行施工规范,安全操作规程,防火安全规定,环境保护规定;严格按照图纸作法或说明进行施工,做好各项质量检查记录;参加峻工验收,编制工程结算。

5、遵守国家或地方政府及有关部门对施工现场管理的规定,妥善保护好施工现场周围的建筑物、设备管线,做好施工现场保卫和垃圾处理,模板等材料的堆放、清理;以及消防等方面的安全工作,协调好由于施工带来的扰民问题及与周围住户的关系。

6、工程峻工未移交甲方之前,负责对现场的一切设施和工程成品进行保护。

7、负责峻工后周边、内部场地,室内地面的环境清理。

第四条 工程内容及包工范围

1、甲方以清包工的方式发包给乙方。乙方自带行装及必须的生活品及用具,施工所用的平水尺、圈尺、吊锤、泥刀、灰刀等常规的使用工具。

2、包工范围:

①从柱头承台底标高起至正负零基础、圈梁、平基、地面硬底化。

②电梯井、化粪池。

③主体框架结构及主体砌砖工程(砌砖外围墙砌18c,套间之间的间墙砌18c,电梯井到顶四周砌18c,其余为12c砖墙)。

④屋面工程的栏墙(包括楼面防水线的捣制)。

⑤室内外墙、天花板全部水泥混合砂浆扫(批)荡,主楼墙外四周围四面粘贴纸皮砖。

⑥电梯出入口四面墙全粘贴瓷砖到顶,公共通道地面贴地砖,墙裙贴1.6米至1.8米高瓷砖。

⑦夹层车库包括天花板全批荡,地面过水泥沙浆。

⑧顶层天面铺设30c至40c高的预制砖块隔热。

⑨首层电梯入口、楼梯通道地面贴砖,通道贴砖到顶。

3、使用的泵车费用由甲方全部承担。乙方按图纸施工。若工程有变更修改,必须征得甲方同意方可变更。

第五条 关于工期的约定

1、因甲方未按约定完成工作,影响工期的,工期顺延。

2、因乙方责任,不能按期开工或中途无故停工,影响工期的,工期不顺延。

3、因设计变更或非乙方原因造成的停电、停水及不可抗力的原因,导致停工的,工期相应顺延。

第六条 关于工程质量及验收的约定

1、本工程以施工图纸的作法说明和国家制订的施工及验收规范为质量评定验收标准。

2、乙方应在接到甲方进场通知后安排施工人员进场,不得无故拖延、拒绝。应遵从甲方总施工进度计划和工期要求。由于乙方原因造成质量事故的,其翻工费用由乙方承担,工期不顺延。

3、甲、乙双方应及时对隐蔽工程和中间工程进行检查与验收手续,要对工程质量进行监督,检查隐蔽工程及负责验收。

4、遇到以下情况之一者,经甲方审核批准后生效:A.重大设施变更B.不可抗力上述情况发生两天内,乙方应将工期延误内容书面报告给甲方,甲方收到报告后两天内给予答复。

5、非上述原因,工程不能按期峻工,乙方应承担经济责任,每延误一天,罚款 元,从工费中扣除。因乙方原因中途停工,造成甲方损失由乙方承担经济责任。

6、工程峻工后,乙方应通知甲方验收,甲方自接到验收通知____日内验收,并办理验收有关手续。

第七条 关于工程工费的支付及结算约定

1、本工程根据施工进度情况分次拨付进度款,按完成工程进度分工种支付70%给乙方。余下部分待峻工验收后结算付清。具体按工种不同依照进度情况支付。如框架部分每完成一层,按 元∕平方计付70%的款项,以此类推。

2、工程峻工后,乙方按规定对工程实行保修。保修时间自通过验收之日算起,保修________年,外墙及屋面保修________年。甲方从乙方工费中扣除人民币 元整( 元)作乙方的质量保证金,保修期满则退还给乙方。

第八 有关安全生产和防火的约定乙方在施工期间应严格遵守《建筑安装工程安全技术规程》、《建筑安装工人安全操作规程》、《中华人民共和国消防条例》和相关的法规、规范。

1、乙方应按规定采取严格的安全措施,做到安全生产、文明施工,施工中发生的安全事故由乙方全部负责,任何人员进入工地必须戴好安全帽及其他需要的安全带、装置等。

2、按照施工规范的要求做好现场施工安全管理,根据需要设计现场照明和围护设施,防止发生工伤事故,确保现场人员的生命、财产安全。若因乙方责任发生的工伤事故,应积极处理并立即报告有关部门,因此带来的损失由乙方承担全部费用和责任。

3、加强现场安全保卫工作,防火、防盗、防抢,确保工程建设顺利进行。所用水泥袋由甲方收回处理。

4、材料堆放整齐,确保现场整洁。

5、自行办理所属现场施工人员的生命、财产保险,并支付保险费用。

6、接受甲方现场管理人员的监督和检查。其他:工程峻工、付清工程款后,本合同自动失效。未尽事宜,甲、乙双方协商后,可作出补充协议,补充协议与本合同具同等的法律效力。本合同一式两份,甲、乙双方各执一份,自双方签字之时起即生效。希双方共同守。

甲方(公章):_________ 乙方(公章):_________法定代表人(签字):_________ 法定代表人(签字):________年____月____日 ________年____月____日

展开阅读全文

篇6:房产建筑动漫设计合同书_合同范本

范文类型:合同协议,适用行业岗位:建筑,设计,全文共 1130 字

+ 加入清单

房产建筑动漫设计合同书

房产建筑动漫设计合同书

甲方:x房地产置业有限公司

乙方:信息科有限公司

产品名称:

一、制作项目:                                 (填胶片、磁带、三维、长度等)

二、制作总金额人民币大写为:                元。

三、付款方式:

1、本合同签订时,甲方需向乙方支付制作总金额的50%预付款,计人民币大写为:         元。

2、交付成品带时,付清余款计人民币大写为:          元。

四、初稿交付周期:       天,即      年   月   日至      年   月   日。

五、制作事项:

1、本合同签订后,乙方按照创意稿内容及合同所定内容周期完成各个阶段的拍摄制作,并按时交付甲方成品带,甲方负责验收。

2、甲方制作周期内可委派相关人员监督制作。

六、双方责任细则:

1、乙方应按质按量完成制作,按时交付成品带(beta盘1盘、vcd光盘1盘)。

2、甲方有责任和义务监督协助制作。

3、甲方承担所提供资料(文字、文稿、标志、图片、影像素材)发生的法律责任。

4、广告片后期制作初稿完成后,甲方审阅时应集中意见并及时提出明确修改方案,乙方可提供三次免费修改,甲方所提修改方案超过三次,乙方将视具体修改难度每次至少加收总制作费5%的修改费用。

5、本合同签订后,甲乙双方不能单方面终止合同,违约方将向对方支付违约金,违约金金额应为合同制作总金额的20%。

6、本合同履约过程中,如因甲方修改创意或提供的资料不全、未按时支付预付款等原因,影响交片日期,则交付日及制作周期顺延。如因不可抗拒的因素延误,甲乙双方及时友好协商解决。

7、在甲方付清余款后,乙方向甲方提交成品带,同时,该广告版权归甲方所有。

8、甲方如未按规定付款,每拖欠一日按未付金额的5‰支付乙方滞纳金。

9、乙方如未能如期完工,则每拖延一日按合同总金额的5‰支付甲方赔偿金。

七、如因执行合同引起的或与本合同有关的争执,甲乙双方友好协商解决,如协商不能解决式,应提交乙方所在地的法律仲裁机构进行裁决。

八、本合同双方代表签字及单位盖章后,立即生效。本合同一式两份,甲乙双方各执一份,所带附件为本合同不可分割的一部分,均具同等法律效力。

附件含:

(一)本次拍摄动漫片的创意文案;

(二)本拍摄动漫片的费用明细表)。

九、备注:

甲方:                                   乙方:

代表签字:                               代表签字:

地址:                                   地址

日期:                                   日期:

展开阅读全文

篇7:建筑工程施工承包合同农村私人修建房屋

范文类型:合同协议,适用行业岗位:建筑,工程,乡村,全文共 2056 字

+ 加入清单

发 包 人:(以下简称甲方)

承 包 人:(以下简称乙方)

依照《中华人民共和国合同法》、《中华人民共和国建筑法》、《建设工程质量管理条例》及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方经协商一致订立本合同。

第1条:工程概况

1.1工程名称:

1.2工程地点:

1.3工程内容: ,总建筑面积约 平方米。

1.4承包方式:乙方以包工、包料、包工期、包质量、包安全、包验收、包保修的方式履行建筑施工承包责任。

第2条:承包范围

2.1乙方承包范围:

2.1.1按甲方提供的施工图纸、设计说明以及图纸会审记录和有关变更文件、资料及所包含的内容,根据国家、省、市的有关规范、规程、标准等的要求进行施工,除 工程外,均由乙方负责施工,具体内容如下:建筑、结构、给排水、电气照明。

2.1.2未经甲方同意,乙方不得将承包工程的任何部分分包或将其承包的全部工程转包给第三方,否则视为乙方违约,所造成的一切损失由乙方承担。

2.2甲方可指定发包的专业工程,不委托乙方施工:

2.2.1首层大堂装修、户内豪华装修、高低压配电、弱电工程、空调通风、煤气、智能化系统及周边防范、电信(包括宽带网)、电视、电梯及监控系统、幕墙、消防、市政园林工程、幕墙、中央空调及配套工程的专业设备安装等项目由甲方指定的分包单位承包,由甲方与专业工程公司签订施工分包合同,乙方须承担配合施工的责任。

2.3 甲定生产厂家乙负责采购的材料:

钢筋:

水泥:

防水卷材:

门窗:

第3条:工程质量标准

3.1工程质量标准按国家现行施工验收规范及省市验收合格标准。

3.2保修期自本工程竣工验收合格之日起计。

第4条:保修期

4.1本工程保修期为:

1、基础工程及主体结构工程为设计年限。

2、防水工程5年。

3、管线设备工程2年。

4、装修工程2年。

5、缺陷责任期:6个月。

第5条:工期

5.1总工期: 天(本工期为从甲方下发的开工文件起到完成建筑工程竣工验收的时间,不包括不属于乙方承包范围的各专业工程的工期)。

5.2开工日期: 年 月 日,具体开工日期以甲方或甲方委托的监理公司下发的正式开工令为准。

5.3节点工期:

5.4合同文件中提及的工期,不包括劳动假日、公众假日和恶劣天气日子。

5.5.如遇下列情况,经发包方现场代表签证后,工期相应顺延:

(1)按施工准备规定,不能提供施工场地、水、电源道路未能接通,障碍物未能清除,影响进场施工;

(2)凡发包方负责供应的材料、设备、成品或半成品未能保证施工需要或因交验时发现缺陷需要修、配、代、换而影响进度;

(3)重大设计变更,提供的工程地质资料不准,致使设计方案改变或由于施工无法进行的原因而影响进度;

(4)在施工中如因停电、停水8小时以上或连续间歇性停水、停电3天以上(每次连续4小时以上),影响正常施工;

(5)非承包方原因而监理签证不及时而影响下一道工序施工;

(6)未按合同规定拨付预付款、工程进度款或代购材料差价款而影响施工;

(7)人力不可抗拒的因素而延误工期。

5.5承包方必须按照约定的竣工日期或发包方同意顺延的工期竣工。

5.6因承包方原因不能按照协议书约定的竣工日期或发包方同意顺延的工期竣工的,承包方承担违约责任。

第6条:承包方式

6.1本工程采用乙方包工包料、包质量、包工期、包安全、包风险、包经国家有关部门验收的形式进行总承包施工。

6.2在施工期间,其它有需要由乙方承包施工的项目(合同外项目、图纸会审变更部分和有关变更文件、资料及所包含的内容),以甲方的书面通知为准,相应费用、工期应经双方确认后调整。

第7条:合同价

7.1工程款计价方式:

7.2付款方式:

预付款:

工程进度:

工程结算款:

第8条:合同生效

8.1合同订立时间: 年 月 日。

8.2合同订立地点: 。

8.3本合同自双方签字并盖章后生效。

8.4本合同文本正本贰份,甲方、乙方各壹份;各份均具同等法律效力。

第9条:其它约定

9.1甲方付予乙方的工程款,乙方须优先支付工人工资;若乙方拖欠建筑工人工资,甲方有权从工程款中直接支付。乙方与其工人之间的争议与甲方无关,甲方不承担任何责任。

9.2本工程的安全防护、文明施工措施费,乙方须符合国家或省、市等的规范要求,且须保证安全防护、文明施工措施费专款专用。否则甲方有权停止安全防护、文明施工措施费的支付,索回已经支付的安全防护、文明施工措施费;因乙方未履行上述约定而造成的任何损失和责任,概由乙方承担。

9.3乙方向甲方承诺按照本合同约定进行施工、竣工并在质量保修期内承担质量保修责任。

9.4甲方向乙方承诺按照本合同约定的期限和方式支付合同价款及其他应当支付的款项。

9.5本合同未尽事宜,双方另行协商,签署补充合同。

本合同正本两份,具有同等效力,由甲方乙方分别保存一份。

甲方(公章):_________ 乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇8:建筑叉车租赁协议书

范文类型:合同协议,适用行业岗位:建筑,全文共 2272 字

+ 加入清单

项目名称:

甲 方:

乙 方:

合同编号:____________________________

签约地点:

签约日期:

叉车租赁合同

甲方:

乙方:

双方在诚实信用、平等自愿、公平公正、互惠互利的基础上,经友好协商共同制定此合同。

一、合同标的物:

二、到货时间:合同正式签订后,乙方根据甲方订单,在规定日期内送到甲方指定地点。

三、送货地点、方式、费用承担

由乙方负责运送并缷货至甲方指定地点,费用由乙方承担。

四、结算方式及期限

1、甲方先支付3个月租金为押金(租赁满一年后退还);之后按季度支付租金一次;

2、每次付款前乙方先行将等额增值税专用发票开至甲方,否则,甲方有权拒绝付款;

3、支付方式:银行电汇/银行承兑汇票。

五、 质量条款

1、符合该产品的国家标准和行业标准。

2、乙方保证其提供给甲方的产品质量良好符合本合同的质量标准条款。若乙方提供产品不符合双方约定的质量标准,乙方愿承担质量违约金,质量违约金额为本合同总价款金额的10%。甲方要求继续履行本合同的,乙方在承担质量违约金后,应及时更换符合质量条款的产品,否则给甲方造成经济损失,按照实际经济损失进行赔偿;甲方亦有权选择保留货物,总价款金额按本合同总价款的90%支付货物价款即可。

3、租赁期内,如果合同设备出现故障时,甲方应接到乙方报修电话后24小时之内到达现场,并及时排除故障保障乙方使用(甲方可根据乙方现场使用实际情况提供驻厂服务)。甲方有责任定期对合同设备进行维护保养、提供修理或更换部件。

六、质量检验

1、货物运到指定地点后,货物的验收以甲方的检验结果为准,乙方如有异议,应在收到甲方的验收结果3日内提出异议,双方共同到第三方检测机构送检,以该第三方的检测结果为准,检测费由乙方承担;如3日内未提出异议,视为对甲方验收结果的认可。

2、甲方在使用本合同产品过程中,发现产品存在质量问题,可同乙方一同到检验部门检验,乙方拒绝检验,甲方有权单独到检验部门检验,视为乙方对检验结果的认可。使用中的检验费用,若符合质量条款,由甲方负担;不符由乙方负担。

七、合同解除

1、如乙方发生以下行为之一的,甲方有权解除合同,乙方接到合同解除书面通知后3天内必须全部撤离甲方现场,甲方对乙方已交货量进行审计后,按照审计结果进行付款。

(1)乙方履行本合同期间,因自身原因无法按时足量交货,经甲方书面通知后10天内仍不能完成。

(2)本合同产品为分批或者分期交付的,甲方自行检验不符合质量条款;

(3)乙方履行本合同期间连续3次违反合同条款。

2、如因不可抗力导致本合同无法履行,甲方和乙方可以协议解除合同。

3、合同执行过程中,乙方单方面需解除或中止合同,需提前_30___天向甲方提交申请,经甲方同意后,双方签署合同解除协议,因合同解除造成甲方的一切损失由乙方承担。

八、商业贿赂之禁止

双方都同意坚决杜绝商业索贿、行贿及其他不正当商业行为。买卖双方任何一方发现以任何形式之商业贿赂给予另一方员工, 如“回扣”、“招待”、“娱乐”、“购房”、“就业”、“国内或国外旅游”、“馈赠”、“购物折扣”、“借钱给对方的采购员”以及其它一切公司职工或其家属物质上任何形式受益者,皆视为商业贿赂。一方接收他方辞、退职人员和跳槽人员也在本禁止条例之列。如发生上述情况,买卖双方任何一方有权书面通知对方,单方暂停本合同履行,调查事实,支付受损害方不少于商业贿赂额度10倍的违约金,并协同追究商业贿赂相关人员的责任,如情节严重或涉及刑事犯罪,则提交司法部门处理。

九、延期交货及溢短装条款

1、乙方应在约定的时间内,准时履行交货义务。若乙方迟延交货,每延迟一日应向甲方支付违约金 壹仟元(RMB)。甲方有权按延期天数要求乙方支付违约金,且有权取消后续订单。

十、不可抗力及风险转移

1、本款所称不可抗力,是指不能预见、不能避免并不能克服的客观情况。其中不包括一方员工罢工、政府政策变化、市场商业风险等情形。

2、合同一方因不可抗力不能履行合同的,根据不可抗力的影响,部分或者全部免除责任,但法律另有规定的除外。合同一方迟延履行后发生不可抗力的,迟延履行的一方不能免除责任。

3、合同一方因不可抗力不能履行合同的,应当在不可抗力发生之日起2日内通知对方,并应当在不可抗力发生之日起的合理期限内提供证明。

4、本合同标的物因不可抗力发生毁损、灭失的风险,在标的物由乙方运至甲方指定地点并从运输工具卸载且经甲方验收之前由乙方承担,验收合格后由甲方承担。合同一方迟延履行后发生不可抗力的,标的物毁损、灭失的风险由迟延履行的一方全部承担。

十一、争议管辖

本合同在履行过程中发生任何纠纷,双方应本着平等互惠的原则友好协商或通过第三方进行调解解决,协商或调解不成,任何一方都有权向人民法院提起诉讼,双方约定诉讼管辖法院为甲方公司所在地的人民法院管辖。

十二、其他条款

1、合同中任何印刷字体未经双方签字、盖章确认的删除、涂改、添加一律无效。

2、乙方保证合同标的产品由合同约定的厂家加工、生产,不得委托合同约定以外的其他厂家进行加工、生产,否则乙方应一次性支付合同总价款10%的违约金,且甲方有权拒收货物。

3、本合同未尽事宜,双方可另行订立补充协议,作为本合同不可分割的一部分,与本合同具有同等的法律效力。

4、本合同一式肆份,甲方持叁份,乙方持壹份。经双方签字和盖章后发生法律效力。 甲方:(章)

地址:

法定代表人:

委托代理人:

电话:

开户银行:

帐号:

邮政编码:

签约时间:

年 月 日 乙方:(章) 地址: 法定代表人: 委托代理人: 电话: 开户银行: 帐号: 邮政编码: 签约时间:

年 月 日

展开阅读全文

篇9:建筑工地实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:建筑,全文共 924 字

+ 加入清单

建筑工地实习报告范文

一.实习目的

认识实习是工程管理专业基础必修的实践性教学环节。通过实地参观,使我们通过实践对土木工程的施工现场和施工体系进行考查,了解土木工程建筑、结构、施工的基本知识,建立起初步的工程意识,激发我们对土木工程专业后续课程的求知欲,为学习专业基础课和专业课奠定感性认识的基础。使我们进一步了解土木工程专业,培养学生热爱专业,增加学习和从事本专业的自信心。

二.实习内容

1.认识建筑结构,建筑材料,建筑机械。

2.了解某些结构的施工工艺。

3.观看建筑施工视频。

4.辅导老师讲解理论知识。

5.了解施工图的表达内容,初步掌握阅读施工图的方法。

三.实习时间

XX年7月2日——XX年7月11日

四.实习地点

xx科技大学综合楼及学生公寓施工现场

认识实习是工程管理专业教学计划中重要的教学环节,是学生在校学习期间理论联系实际、增长实践知识的重要手段和方法之一。认识实习主要对工地进行参观,了解工程施工和管理的主要流程。为了让我们对这门自己即将从事的专业获得一个感性的认识,为今后专业课的学习打下坚实的基础,我们院的老师带领我们进行了为期2个礼拜的认识实习。在实习过程中,我们以老师帮我们找的建筑工地及讲座为主,我们对工地进行了参观,了解了工程施工和管理的主要流程,认识建筑材料,建筑机械,施工技术并且熟悉工程管理制度,为将来从事工程施工和管理打下实践基础。现将实习成果汇报如下:

实习第一天老师为我们播放了安全施工的视频,为同学们讲解安全施工的重要性,并要求同学们在进入施工现场后要有较强的自我保护意识。提到安全文明施工,我在学校的工地看到了很多的不足之处。

整个施工现场,安全文明施工标语少得可怜;大门上虽写着“施工重地,闲人免进”,但字迹早已不清晰,一般很难看到;施工现场内各工作区分隔不明确;施工材料似乎是随意堆放,拆卸掉的脚手架杂乱的堆在场内,未能及时清理出场;有很大一部分施工人员未戴安全帽,有些施工人员工作时很随意,工作态度不严谨。有一次进工地时我居然还在正在施工的楼层看到了无人看管,到处乱跑的四五岁大的孩子。以上所列各项足以说明该工地的安全员相当失职。一项工程本应是服务于人,惠及于人的,如果由于有关人员及部分监管人员的监管不力使一项工程

展开阅读全文

篇10:英文聘用合同聘用外国人_合同范本

范文类型:合同协议,全文共 4772 字

+ 加入清单

英文聘用合同(聘用外国人)

Ⅰ Party A ___________wishes to engage the service of Party B______________ as______________. The two parties, in a spirit of friendly cooperation, agree to sign this contract and pledge to fulfill conscientiously all the obligations stipulated in it.

ⅡThe period of service will be from the______day of______,20__ to the ______day of______,20__

Ⅲ The duties of Party B (see attached pages)

Ⅳ Party Bs monthly salary will be ¥_______ yuan RMB,__ % of which can be converted into foreign currency monthly.

Ⅴ Party As Obligations

1. Party A shall introduce to Party B the laws, decrees and relevant regulations enacted by the Chinese government, the Party A work system and regulations concerning administration of foreign experts.

2. Party A shall conduct direction, supervision and evaluation of Party Bs work.

3. Party A shall provide Party B with necessary working and living conditions.

4. Party A shall provide co-workers.

5. Party A shall pay Party Bs salary regularly by the month.

Ⅵ Party Bs obligations

1. Party B shall observe the laws, decrees and relevant regulations enacted by the Chinese government and shall not interfere in Chinas internal affairs.

2. Party B shall observe Party As work system and regulations concerning administration of foreign experts and shall accept Party As arrangement, direction, supervision and evaluation in regard to his/her work. Without Party As consent, Party B shall not render service elsewhere or hold concurrently any post unrelated to the work agreed on with Party A.

3. Party B shall complete the tasks agreed on schedule and guarantee the quality of work.

4. Party B shall respect Chinas religious policy, and shall not conduct religious activities incompatible with the status of an expert.

5. Party B shall respect the Chinese peoples moral standards and customs.

Ⅶ Revision, Cancellation and Termination of the Contract

1. Both parties should abide by the contract and should refrain from revising, canceling, or terminating the contract without mutual consent.

2. The contract can be revised, canceled, or terminated with mutual consent. Before both parties have reached an agreement, the contract should be strictly observed.

3. Party A has the right to cancel the contract with a written notice to Party B under the following conditions;

(1) Party B does not fulfill the contract or does not fulfill the contract obligations according to the terms stipulated, and has failed to amend after Party A has pointed it out.

(2) According to the doctors diagnosis, Party B cannot resume normal work after a continued 30 day sick leave.

4. Party B has the right to cancel the contract with a written notice to party A under the following conditions:

(1) Party A has not provided Party B with necessary working and living conditions as stipulated in the contract.

(2) Party A has not paid Party B as scheduled.

Ⅷ Breach Penalty

When either of the two parties fails to fulfill the contract or fails to fulfill the contract obligations according to the terms stipulated, that is, breaks the contract, it must pay a breach penalty of US$500 to 2,000 (or the equivalent in RMB).

If Party B asks to cancel the contract due to events beyond control, it should produce certifications by the department concerned, obtain Party As consent, and pay its own return expenses; If Party B cancels the contract without valid reason, it should pay its own return expenses and pay breach penalty to Party A. If Party A asks to cancel the contract due to events beyond control, with the consent of Party B, it should pay Party Bs return expenses; if Party A cancels the contract without valid reason, it should pay Party Bs return expenses and pay a breach penalty to Party B.

Ⅸ The appendix of this contract is an inseparable part of the contract and has equal effect

Ⅹ This contract takes effect on the date signed by both parties and will automatically expire when the contract ends. If either of the two parties asks for a new contract, it should forward its request to another party 90 days prior to the expiration of the contract, and sign the new contract with mutual consent. Party B shall bear all expenses incurred when staying on after the contract expires.

Ⅺ Arbitration

The two parties shall consult with each other and mediate any disputes which may arise about the contract. If all attempts fail, the two parties can appeal to the organization of arbitration for foreign experts affairs in the State Administration of Foreign Experts Affairs and ask for a final arbitration.

This Contract is signed at_____________ , in duplicate, this_____ day of _______,20__, in the Chinese and _______ languages ,both texts being equally authentic.

Party A                                     Party B

(Signature)                                   (Signature)

展开阅读全文

篇11:国际专利许可合同附英文[页14]_合同范本

范文类型:合同协议,全文共 1545 字

+ 加入清单

国际专利许可合同(附英文)

be carried out by the joint group consisting of party a’s and party b’s representatives

accordingto the schedule and contents stipulated in appendix 7 to the contract. lf the

performance of the contracted product is in conformity with the technical specifications

stipulated in ap-pendix 1, such testshall be considersd as qualified and the

representatives of both parties shll sign the inspection and testing certificate for the

proper performance of the contracted product in quadruplicate, 2copies for each party.

7.2 if the verification test demonstrates that the performance of the contracted

prod-uct isnot in conformity with prescribed technical specifications, both parties

shall, throughamicable negotiations,make a joint study of and analyse the cause and

take measures to e-liminate the defects and carry out asecond test. when the second test

demonstuates tha the performance is qualified, both parties shall sign a testing

certificate for the proper perfot- mance

7.3 if party b is responsible for the failure of the first test, party b shall send

at ist own expense technical ersonnel for the second test.

7.4 if the second test fails again and the failure is attributed to party b, party b

shallindemnify party a for any losses sustained and shall take effective measures to

eliminate thedefects and carry out a third test.

7.5 if the third test again fails, and if party b is responsible for the failure,

party a has the right to terminate the contract at its discretion and lodge claims as

共21页,当前第14页123456789101112131415161718192021

展开阅读全文

篇12:建筑脚手架租赁热门合同

范文类型:合同协议,适用行业岗位:建筑,全文共 1122 字

+ 加入清单

甲方(出租方):

乙方(承租方):

乙方因承建__________工程,工程地点在___________,租用甲方建筑器材,根据《中华人民共和国民法典》及有关规定,在平等互利的基础上,经双方协商一致,签订本合同,以资共同遵守执行。

一、乙方租用甲方钢管、扣件、顶托按实际数量以收货单据为准,租赁届满,乙方归还租赁物,租赁期限为不定期。

二、乙方在收货时点清器材数量,验收质量,如有异议及时向甲方提出更换。乙方承担器材自收货时起至归还止这一期间丢失、毁损甲方概不负责。乙方送回租用的器材时,甲方按国家有关部门制定的验收标准进行检验。

三、甲方将乙方租赁的货物送至乙方工地,由乙方卸车;归还时由乙方送回甲方时由甲方卸车。

四、乙方授权________,身份证号码为_____________,乙方现指定的收货人为__________身份证号码为_________________,收货人在本合同项下的收货行为乙方均予确认。

五、乙方要货数量必须提前一天通知给甲方,否则造成相关责任甲方概不负责,但如果因甲方的原因给乙方造成的损失由甲方赔偿。

六、器材成本价及租金收取标准:____________________________________。

七、租期起止时间自发货之日起至送回之日止(送货当天不计),租期不足三十天,按日计算租金。租金结算以发货单和验收单为结算凭据。乙方应于每月的五号提请甲方结算租金。

八、付款方式:按本工地劳务公司于建设单位签订的合同付款方式同样,建设单位付劳务公司进度款,劳务公司付物资租赁站次月租金,乙方逾期天不交付租金,甲方有权解除合同。合同解除后至租赁物收回前,甲方有权按照租金标准收取。

九、乙方须妥善使用和保管租用的器材。所租器材只限本合同工程使用,不得转租、转借、转换工地;不得截断、焊接、打眼;如转租、转借、转换工地,须经甲方同意。

十、租赁期限届满后,如乙方没有归还租赁物,则甲方可以视同租赁物已被乙方丢失,甲方有权要求赔偿,按赔偿费支付时器材的市场价折旧予以赔偿。

十一、承租方承租钢管需定制标杆、加刷指定颜色油漆时,要提前通知出租方,出租方按双方商定价格收取油漆费。

十二、在履行合同中如有纠纷,双方应尽量协商解决,协商不成的,双方有权向___________人民法院提起诉讼。任何一方为实现债权所支出的费用包括诉讼费、鉴定费、律师费等均由败诉方承担。

十三、本合同一式三份,双方各执一份,担保方持一份,自双方签字盖章之日生效,至全部租金和有关费用结付完毕之日失效。

甲方(盖章)

乙方(盖章)

担保方(盖章)

地址:

地址:

地址

负责人:

项目负责人:

法定代表人

委托代理人:

委托代理人:

电话:

电话:

电话

签订合同日期:____年___月___日

展开阅读全文

篇13:建筑企业劳动合同

范文类型:合同协议,适用行业岗位:建筑,企业,全文共 3512 字

+ 加入清单

0 编号: 甲方(用人单位) 乙方(员工姓名)

甲方:

乙方:姓名:___________ 性别:_______

根据《中华人民共和国劳动法》、《中华人民共和国劳动合同法》,甲乙双方本着合法、公平、平等自愿和诚实信用的原则,经协商一致订立本合同,并承诺将共同遵守。

甲方的各项规章制度按规定程序制定后,通过公司员工行为规范标准手册公示、告知,乙方有义务及时主动学习和掌握。甲方规章制度以上述方式公示满一周,视为乙方已知晓。在订立本合同时,乙方已充分知晓甲方的各项规章制度,甲乙双方已就劳动合同期限、试用期限、聘用岗位及工作内容、工作地点、工作时间和休假、劳动报酬、社会保险、公司福利、劳动保护、劳动条件等情况进行沟通。双方一经签字,即证明乙方对上述情况已有清楚了解。

在签订本合同时,乙方须保证已经终止(解除)了与原用人单位之间的劳动关系,或没有与其他用人单位存在劳动关系,否则,由此引发的纠纷及全部法律责任由乙方负全责。

一、劳动合同期限

第一条 本合同为:

固定期限劳动合同,自 年 月 日起至 年 月 日止;其中试用期至 年 月 日止。

二、工作内容和工作地点

第二条 乙方同意根据甲方生产(工作)需要,担任: 岗位(工种)工作。

第三条 乙方必须按照甲方关于本岗位生产(工作)任务和责任制的要求,认真履行岗位职责。

三、工作时间和休息休假

第四条 :

每天不超过8小时,每周不超过40小时的标准工时工作制;

第五条 甲方因工作需要,可经双方协商后延长工作时间。

四、劳动保护和劳动条件

第七条 甲方提供符合国家有关卫生、健康标准的工作环境,建立健全生产流程,制定工作或操作流程及相应规范,保障乙方的人身安全。

第八条 甲方负责对乙方进行政治思想、职业道德、业务技能、操作规程或工作规范、劳动安全卫生及有关规章制度的教育和培训。

第九条 如乙方为女职工,甲方将按《中华人民共和国妇女权益保障法》规定为乙方提供孕期、产期和哺乳期的劳动保障。

五、劳动报酬

第十条 乙方在甲方工作期间,甲方应遵循按劳分配、同工同酬的原则,按国家和集团公司有关规定,按时以货币形式支付乙方应得的劳动报酬。

第十一条 按照国家《个人所得税法》,乙方有义务按照个人薪酬所得缴纳个人所得税。甲方有责任在发放乙方个人薪酬时,代为扣缴乙方的个人所得税。

六、社会保险和福利待遇

第十三条 在合同期内,甲乙双方须依法参加基本养老、基本医疗;乙方按规定委托甲方代为扣缴本人应缴纳社会保险金。

第十五条 乙方因工负伤和患职业病的医疗待遇,按国家有关规定执行。

第十六条 乙方在孕期、产期、哺乳期的待遇,按国家有关规定执行。

七、劳动纪律

第十七条 乙方应树立主人翁责任感,严格遵守国家各项法律、法规,遵守甲方的各项制度和纪律,服从甲方的领导、管理和教育。

第十八条 乙方应积极参加甲方组织的政治思想、职业道德、业务技术、劳动安全、规章制度等方面的教育和培训。

第十九条 乙方在工作中,要牢记“用户至上、质量第一”的服务宗旨,遵守职业道德,廉洁奉公,维护公司良好形象和声誉。

第二十条 乙方在工作中,应坚守工作岗位,严格履行岗位职责,牢固树立安全第一的思想,严格执行作业标准和安全操作规程,确保通信畅通、生产安全和人身安全。

第二十一条 甲方因工作原因,需要在公司内部调整乙方工作岗位(工种)的,或受甲方派遣从事其它临时性工作的,乙方必须服从甲方的调整或派遣。

第二十二条 乙方在合同期间,有义务保守甲方的商业秘密(商业秘密,是指不为公众所知悉、能为权利人带来经济利益、具有实用性并经权利人采取保密措施的技术信息和经营信息。)和因工作原因接触到的第三方的商业秘密,泄露商业秘密属严重违反规章制度,造成损失的,赔偿给甲方造成的全部损失。

八、劳动合同的变更、解除、终止和续订

第二十三条 订立本合同所依据的法律、法规、规章发生变化,本合同内容相应变更。

第二十四条 订立本合同所依据的客观情况发生重大变化,致使本合同无法履行,经双方协商一致可以变更本合同相关内容。

第二十五条 经甲乙双方协商一致,本合同可以解除。

第二十六条 有下列情形之一,甲方可以单方面解除本合同:

(一)乙方在试用期内,被甲方考核证明不符合录用条件的;

(二)乙方违反甲方劳动纪律或规章制度,达到可以解除劳动合同条件的;

(三)乙方失职、营私舞弊,给甲方造成经济损失或信誉损害的;

(四)在工作中玩忽职守、违章作业,造成重大事故、员工死亡事故、重大伤亡事故之一的;

(五)乙方被依法追究刑事责任、被劳动教养或被人民检察院起诉的;

(六)乙方提供虚假或不真实的本人信息和劳动关系状态,影响甲方的判断而录用的;

甲方依据本条六款规定,可随时解除劳动合同,并不作任何经济补偿或赔偿。

第二十七条 有下列情形之一,甲方实施经济性裁员的,应按以下程序进行:

需要裁减人员20人以上或者裁减不足20人但占企业职工总数百分之十以上的,甲方提前30日向工会或者全体职工说明情况,听取工会或者职工的意见后,裁减人员方案向劳动行政部门报告后实施:

(一)依照企业破产法规定进行重整的;

(二)生产经营发生严重困难的;

(三)企业转产、重大技术革新或者经营方式调整,经变更劳动合同后,仍需裁减人员的;

(四)其他因劳动合同订立时所依据的客观经济情况发生重大变化,致使劳动合同无法履行的。

第二十八条 乙方有下列情形之一,甲方不得解除劳动合同:

(一)在本单位患职业病或因工负伤,医疗终结,经劳动鉴定委员会确认丧失或部分丧失劳动能力的;

(二)患病或非因工负伤,在规定的医疗期内的;

(三)女职工在孕期、产期、哺乳期内的;

(四)在本单位连续工作满十五年,且距法定退休年龄不足五年的;

(五)法律、行政法规规定的其他情形。

第二十九条 乙方解除劳动合同,需提前30日以书面形式通知甲方;乙方在试用期内解除劳动合同,需提前3日以书面形式通知甲方;涉密员工应提前3—6个月通知。

给甲方造成经济损失尚未处理完毕;或正在被审查和例行审计期间;或未按照劳动合同约定承担违约责任;或订立有保密期协议的,乙方不得解除劳动合同。

乙方未提前30日书面通知甲方而解除劳动合同,甲方将依法追究其违约赔偿责任:包括:

1、甲方招收录用乙方所付广告费等费用;

2、甲方为乙方支付的培训费用,包括培训费、差旅费、住宿费、实习费等;

3、对生产、经营和工作造成的直接经济损失;

4、本合同约定、专项协议约定及规章制度规定的其他赔偿费用。

第三十条 有下列情形之一,乙方可随时通知甲方解除劳动合同:

(一)未按照劳动合同约定提供劳动保护或者劳动条件的;

(二)未及时足额支付劳动报酬的;

(三)未依法为乙方缴纳社会保险费的;

(四)甲方的规章制度违反法律、法规的规定,损害乙方切身权益的;

(五)以欺诈、胁迫的手段或者乘人之危,使乙方在违背真实意思的情况下订立或者变更劳动合同,致使劳动合同无效的;

(六)甲方以暴力、威胁或以非法限制人身自由的手段强迫乙方劳动;或者甲方违章指挥、强令冒险作业危及乙方人身安全的。

第三十一条 有下列情形之一,劳动合同终止:

(一)劳动合同期满的;

(二)乙方开始依法享受基本养老保险待遇的;

(三)劳动合同约定的工作任务已完成的;

(四)乙方死亡,或者被人民法院宣告死亡或者宣告失踪的;

(五)甲方被依法宣告破产的;

(六)甲方被吊销营业执照、责令关闭、撤销或者甲方决定提前解散的;

(七)法律、行政法规规定的其他情形。

第三十二条 本合同解除或终止,乙方应将合同期内甲方交给其使用、保管的物品、工具,以及乙方留存的工作文件、技术资料等一切与工作有关的材料,全部交还给甲方,工具、物品、文件资料等遗失的,乙方赔偿由此给甲方造成的损失;乙方应在终止、解除合同前,积极配合公司完成工作交接手续。

甲方在确认上述手续办理完毕后,为其开据终止、解除劳动合同证明,办理档案和社会保险等的转移手续。

除本合同第二十七条外,因乙方原因未办理完毕上述手续的,甲方有权不为乙方办理终止、解除合同手续。

第三十三条 年 月 日后劳动合同终止时,有下列情形之一的,乙方提出或者同意续订、订立劳动合同的,除乙方提出订立固定期限劳动合同外,应当订立无固定期限劳动合同:

(一)乙方在甲方连续工作满十年的;

(二)甲方(仅指国有控股企业)改制重新订立劳动合同时,乙方在甲方连续工作满十年且距法定退休年龄不足十年的;

(三)连续订立二次固定期限劳动合同,且乙方没有《中华人民共和国劳动合同法》第三十九条和第四十条第一项、第二项规定的情形,续订劳动合同的。

第三十四条 本合同未尽事宜,由甲乙双方协商解决。

第三十五条 本合同一式三份,甲乙双方各执一份,一份存档。

甲方(盖章) 乙方(签字)

年 月 日 年 月 日

展开阅读全文

篇14:般建筑违约保证金合同

范文类型:合同协议,适用行业岗位:建筑,全文共 664 字

+ 加入清单

甲方:

乙方:

为保证甲方招投标活动的顺利进行,甲乙双方就交纳投标保证金事项,达成一致意见,并签订如下条款,以供双方遵守:

1、乙方自愿报名参加甲方组织的位于______市______县 街甲方拟招标酒店的招投标活动,乙方向甲方交纳投标保证金人民币现金 万元(大写: 万元)。

2、乙方如在竞标中中标,甲方应向其签发中标确认书,甲方在七日内全额退还投标保证金,并按中国人民银行同期贷款利率支付资金利息。

3、乙方如在竞标中未中标,甲方在七日内全额退还乙方缴纳的投标保证金,并支付利息,利息的计算方法如下

1)如甲方在七日内全额退还保证金,应以乙方缴纳的保证金总额为基数,按中国人民银行同期贷款利率支付利息给乙方。

2)如甲方未在七日内全额退还乙方缴纳的投标保证金,甲方应以乙方缴纳的保证金总额为基数,并按中国人民银行同期贷款利率的四倍支付利息给乙方,利随本清。

4、乙方如在竞标中中标后,甲方无正当理由取消乙方的中标资格,甲方应全额退还乙方交纳的投标保证金本金,并且甲方还得向乙方支付乙方交纳的投标保证金总额的50%,作为违约赔偿金。

5、如果甲方组织的招投标活动,在乙方交纳保证金后六个月仍未结束,甲方应在六个月期满的次日,将乙方缴纳的保证金全额退还给乙方,并按中国人民银行同期贷款利率支付利息给乙方。如果甲方六个月期满后,没有全额退还乙方保证金,甲方应以乙方缴纳的保证金总额为基数,并按中国人民银行同期贷款利率的四倍支付利息给乙方,利随本清。

6、本协议书一式二份,甲乙双方各执一份,甲乙双方签字(盖章)后生效。

甲方:

乙方:

年 月 日

年 月 日

展开阅读全文

篇15:成都LED建筑安装合同

范文类型:合同协议,适用行业岗位:建筑,全文共 892 字

+ 加入清单

保险单号码:

┌────────────────────┬────────────┐

投保人姓名、地址

├────────────────────┼────────────┤

│被保险人姓名、地址及其在本工程中的身份 │

├────────────────────┼────────────┤

建筑安装工程名称、地址

└────────────────────┴────────────┘

本公司依照建筑、安装工程险条款及在本保险单上注明的其它条件,承保下

列财产:

┌─────────────┬────┬───┬───┬───┬──┐

保险项目

│保险金额│费率‰│保险费│免赔额│备注│

├─────────────┼────┼───┼───┼───┼──┤

│(1)建筑、安装工程(包括│

│永久和临时工程及物料)

├─────────────┼────┼───┼───┼───┼──┤

│(2)安装工程项目

├─────────────┼────┼───┼───┼───┼──┤

│(3)场地清理费

├─────────────┼────┼───┼───┼───┼──┤

│(4)被保险人在工地上的其│

│它财产(另附清单)

├─────────────┼────┼───┼───┼───┼──┤

│(5)建筑、安装用机器,设│

│备及装置(另附清单)

├─────────────┼────┼───┼───┼───┼──┤

│(6)其它财产

└─────────────┴────┴───┴───┴───┴──┘

总保险金额:人民币(大写)

--------------

保险期限:

个月:自

月 日起至

月 日二十四时止

保险费:人民币(大写)

-----------

经副理签章:

保险公司盖章:

┌───────────────────────────────┐

│注意:收到保险单后请核对,如有错误应通知更正

└───────────────────────────────┘

签单:

复核:

登记:

会计:

签单日期:

展开阅读全文

篇16:建筑工程协议书_合同范本

范文类型:合同协议,适用行业岗位:建筑,工程,全文共 1305 字

+ 加入清单

建筑工程协议书

为提高工程质量和自身效益,加速施工进度,服从上级x建建筑集团公司各级指导的指挥部的安全施工生产。

一、 工程地点和名称:

1、x市x卓、x小镇、x建建筑集团公司10# - 11#楼框架、木工单项专支摸板和拆除工程。

二、安全管理:

1、乙方进入现场施工、必须由甲方向农民工办理、人身保险、以免发生意外。

2、请所属施工人员、要严格按照公司的质量、进度、安全要求作业。否则:所遇到处罚,由责任方自负。

三、清包范围:

1、如乙方施工时;因材料不足、停电不能正常施工,误差工期,由甲方和乙方协商解决。

2、模板范围按建筑面积计算,从基础层到封楼顶开始计算,每平方为 元。

四、付款方式:

1、甲方按每月的实际完成工程量给乙方付款到 %每平方米。

2、框架主体封阁楼顶或拆除模板后,甲方给乙方付款到 %每平方米。

3、其它主体验收通过合格后,一个月内甲方给乙方支付清帐 %。

五、本《协议书》一式两份,双方各执一份。

六、本《协议书》自签订之日起,正式施工生效至账清自行失效。

七、本《协议书》未尽事宜,双方友好协商解决,协商不成,可向相关法定机关诉讼。

甲方: 身份证:

乙方: 身份证:

日期XX年 月 日

-----

发包方: (以下简称甲方)

承包方: (以下简称乙方)

有限公司陵水分公司厂房及设备基础,现已做好施工前各项工作准备,经研究同意以包工包料形式发包,为便于工程顺利进行,施工中明确甲、乙双方各自的权利、义务,经协商共同定立以下合同条款,以供共同遵守执行。

一、工程概况

1、工程名称:混凝土生产线设备基础、围墙、道路、生活区配套房及厂区绿化等工程。

2、工程地点:陵水县新村曲港。

3、工程结构:设备基础、堆场基础及剪刀墙、及其它公共设施。

二、工程承包范围根据发包方提供的施工图文件、土建、水电安装及说明的要求。乙方自备应符合施工要求的设备、器具、措施项目及其它费用完成工程。

三、合同工期

1、开工日期:XX年11月25日(首批图纸到之日计算)。

2、竣工日期:XX年1月25日:合同工期总日历天数:搅拌站60天。

3、工期提前或延误按第十一条执行。

四、施工管理质量标准,乙方在本工程项目中,应严格按照国家的法律法规进行施工,并接受甲方现场管理人员的监督,严格按照施工图纸,验收规范,保质、保量、按期、安全、文明完成本工程。工程质量必须达到合格等级标准以上,对不符合施工规范的工程,甲方有权开出整改通知及罚款单,按轴线及部位完成质量检验(土方开挖、模板制作、钢筋加工、钢筋绑扎、及各隐蔽部分的检验)所有砼浇筑匀要有甲方签发的浇筑令才能浇筑施工,施工单位私自浇筑的砼,第一次罚款1000元。第二次罚款XX元。否则由已方负责返工,一切经济损失及法律责任均由乙方负责。

五、合同价款(含3.3%建安税造价)

l、场地平整、基础土石方开挖及回填按实际发生机械台班计算机械台班费及乙方人员管理费(含边角、松土清理,回土分层注水夯实等)。

2.其它项日造价按海南省建筑工程综合定额计算,按定额站当期信息价调差。计算工程造价下浮3%。取费标准按三级建筑施工企业的取费标准取费。暂定搅拌站工程造价人民币:捌拾万元正(¥:800000元)。

共2页,当前第1页12

展开阅读全文

篇17:建筑工程居间合同标准专业范本

范文类型:合同协议,适用行业岗位:建筑,工程,全文共 2370 字

+ 加入清单

委托人(简称甲方):_____________公司。

住所:_________________________

法定代表人:___________________

手机:_________________________

居间人(简称乙方):_____________

甲乙方为了充分发挥双方各自的优势,合作共赢,根据《中华人民共和国民法典》及其相关法律法规和司法解释的规定,在平等、公平、自愿和诚实信用原则的基础上,经双方充分协商,甲乙双方自愿达成如下居间协议,共同遵照执行:

一、委托事项

1、乙方接受甲方委托,负责就引荐工程项目给甲方和业主单位(以下简称公司)直接洽谈,向甲方提供“公司”的重要信息,并最终促成甲方与“公司”签订工程(以下简称本工程)《施工合同》。

2、“居间成功”是指完成本条所列全部委托事项,甲方或甲方指定的公司与业主单位签订施工合同。甲方或甲方指定的公司与“公司”未签订书面工程《施工合同》,视为委托事项未完成。

二、乙方的义务

1、乙方必须向甲方提供有关业主单位“公司”的有关信息,内容包括但不限于公司的工商营业执照复印件、现有主要资产情况和拟建工程信息等。乙方有义务协助甲方对业主单位“公司”进行实地考察。

2、乙方承诺向甲方提供的关于业主单位“公司”的上述信息真实可靠。如果乙方提供的业主单位信息不真实,乙方无权收取居间报酬。

3、乙方在甲方与业主单位“公司”业主单位进行合同谈判期间,应尽到作为居间人的慎谨和诚实义务。促成业主单位“公司”将工程承包给甲方。

三、甲方义务

1、甲方负责提供资质证书、营业执照等相关资料,负责和业主单位“公司”进行合同谈判。

2、如果居间成功,则由甲方全面实际履行和业主单位“公司”所签订的工程施工合同约定义务。甲方因与业主单位“公司”履行施工合同而产生的一切法律纠纷,与乙方无关。

3、如果居间成功,则甲方应按本合同约定向乙方支付居间报酬。

4.甲方不得利用乙方提供的业主单位信息或者与业主单位合同谈判过程中掌握的信息,在乙方不知情的情况下,直接与业主单位签订本工程施工合同。

四、居间报酬的计算方法、支付时间和支付方式

1、本项目居间报酬为本工程《施工合同》中约定工程总造价的%。

2、本协议签订后3个工作日内,甲方向乙方预付居间报酬的30%,转入乙方指定的银行账户(户名:_____________,卡号:_____________,开户行:_____________。)中。待甲方与业主单位“公司”签订本工程《施工合同》2个工作日后,上述甲方转款归乙方所有并可自由支取。

3、从甲方向乙方预付居间报酬圆之日起至业主单位“公司”与第三人签订《施工合同》时止,乙方没有促成甲方与业主单位“公司”签订本工程施工合同,视为乙方居间不成功,乙方应10日内将甲方预付居间报酬无息退还甲方指定的银行账户内。

4、在居间成功之前,乙方不得动用甲方预付的居间报酬。在甲方预付居间报酬的当日,乙方应当为甲方出具《收条》并当面或邮寄给甲方法定代表人。

5、从甲方与业主单位“公司”签订本工程施工合同之日起10日内,甲方应付清乙方的全部居间报酬。

6、乙方完成居间任务并实际取得居间报酬后,须向甲方开具正规的税务发票或《收据》,相关的所得税由乙方自行承担。

五、居间报酬的承担

居间报酬是指乙方为完成委托事项实际支出的必要费用。乙方无论是否完成本合同所包含的委托事项,乙方同意全部自行垫付居间活动部分必要费用。

六、诚信原则

1、如果甲方与业主单位“公司”在本合同委托期内,未能签订本工程施工合同,没有征得居间方的书面同意,甲方不应再与业主单位“公司”直接进行合同协商谈判,否则乙方有权请求甲方按本合同第四条支付居间报酬。

2、如果甲方以相关企业或在四川当地成立的子公司及一切转投资公司等的名义与业主单位“公司”签订本工程施工合同,视为乙方完成居间任务;乙方有权请求甲方按本合同第四条支付居间报酬。

3、本合同的有效期(委托期限)为甲方向乙方预付居间报酬圆之日起至业主单位“公司”与第三人签订《施工合同》时止。乙方在委托期限必须积极推动业主单位“公司”与甲方进行实质性洽谈,并协助甲方和业主单位“公司”签订本工程施工合同。

七、本合同解除的条件

1.当事人就解除合同协商一致;

2.因不可抗力致使不能实现合同目的;

3.在委托期限届满之前,当事人一方明确表示或者以自己的行为表明不履行主要义务;

4.当事人一方迟延履行主要义务,经催告后在合理期限内仍未履行;

5.当事人一方迟延履行义务或者有其他违约行为致使不能实现合同目的。

八、合同终止

1、本合同签字生效后,乙方在委托期限内未促成甲方与业主单位“公司”签订施工合同,本合同自动终止。

2、如果居间成功,本合同完全履行完毕后终止。

3、甲乙双方协议解除合同或有其他法定事项时,本合同终止。

九、争议解决方式

如发生合同争议,双方友好协商解决;协商不成,起诉方只能向本工程合同履行地即建设项目所在地人民法院提起民事诉讼。本工程合同履行地为。

十、保密事项

1、甲乙双方均应充分保守本协议所涉及的商业秘密。

2、乙方不得以其在居间过程中获取的甲方商业秘密而作出不利甲方的任何行为,否则甲方有权拒绝支付乙方的居间报酬,并依法追究甲方的相应法律责任。

十一、其他事项

1、乙方不得将本合同委托事项进行转委托。

2、本合同一式贰份,双方各持一份,双方签字盖章或捺印后立即生效,每份具有同等法律效力。

十二、违约责任

甲乙双方任何一方违反本协议条款之一的,视为违约。违约方须按照本合同约定的居间报酬总额的30%向守约方支付违约金。

甲方:________________乙方(签字捺印):_____________

法定代表人(签字):_____________

或授权代表(签字):_____________

本合同签订日期为:_____________

展开阅读全文

篇18:建筑叉车租赁协议书

范文类型:合同协议,适用行业岗位:建筑,全文共 1592 字

+ 加入清单

甲方:_________

乙方:_________

双方本着自愿、平等、互惠互利、诚实信用的原则,就甲方出租叉车给乙方事宜,经双方友好协商,订立如下合同条款,以资共同恪守履行。

1、叉车名称,规格、型号,数量及其他附带配件设施

2、租赁期限

2.1该批叉车租赁期限为: ,其中免租期为: 。

2.2本合同租赁期满,双方尚未书面确认续签合同的,乙方继续使用该批叉车的,甲方没有提出异议,则本合同继续有效,租赁期限为不定期。

3、租金及支付方式

3.1每台叉车每月租金为:。

3.2月结,先用叉车后付款。如使用期限未满一个月,每台叉车租金以天数来计算,每台每天租金:。

3.3租金以方式支付。乙方交付租金前,甲方须向乙方交付相应的发票和收据并经乙方确认无误,否则乙方可以拒付相应款项。

4、叉车交付

4.1在本合同生效之日起,甲方将叉车按现状交付乙方使用,且乙方同意按照叉车及设施的现状承租。交付时双方对叉车的基本性能和现状以交接单的形式签字确认,并可附照片。

4.2叉车由甲方负责运输。待租赁期满合同终止后再由甲方负责运回。运费由甲方自行承担。

5、甲方的权利义务

5.1甲方应保证出租的叉车性能良好,能够保证安全使用。甲方应定期对叉车进行保养和检查,具体保养事项为:租赁期间叉车所有的正常维修、保养、检查费用有甲方自行承担。

5.2甲方负责叉车来回的运输,并自行承担运费。叉车在运输途中的风险由甲方承担,风险自乙方签收验收单后转移。租赁期满后,由甲方负责运回,风险自租赁期满之日转移给甲方。

5.3甲方应保证合法拥有叉车的所有权,且按照法律规定办理了叉车牌照。在租赁期限内,应为叉车办理各项保险,保险费用由甲方自行承担。

5.4甲方提供24小时随叫随到的全方位服务。接到报修电话后4小时内到达乙方现场,如果24小时内不能修复,甲方应在24小时内为乙方提供替用车辆,如不能修复且未能在约定期限内提供替用车辆,给乙方造成损失,甲方应承担违约责任,并赔偿乙方的相应损失。同时,乙方也可以解除本合同。

5.5如因不可抗力原因,导致叉车损坏或造成乙方损失,双方互不承担责任。

6、乙方的权利义务

6.1乙方应该保证正确使用叉车,由于操作不当或者人为损坏,维修费用由乙方承担。乙方在租赁期间叉车发生的电费、柴油费由乙方自行承担。

6.2在租赁期间,乙方享有叉车使用权,不得买卖转让或作为抵押,也不能将叉车用于任何非法活动。

6.3乙方应该爱护叉车,严格按照叉车的使用规范作业。未经甲方同意,乙方不得在本合同中叉车上增加或拆除任何部件,不得转移叉车的使用地点。

6.4在租赁期限内,乙方可以将叉车转租给乙方的关联公司使用,甲方不应提出任何异议。

6.5对于甲方不能按时修复的,亦不能提供替用车辆的,乙方有权请第三方进行维修,费用由甲方承担。

7、合同解除、终止条款

7.1甲方应保证对叉车具有完全及合法的出租权,否则乙方可以解除合同,甲方应支付乙方1月租金作为违约金。

7.2如因甲方原因导致乙方解除本合同的或甲方须提前解除本合同的,甲方应支付乙方1个月的租金作为违约金,如违约金不足以补偿乙方损失的,甲方另需赔偿。

8、保险责任,违约条款

8.1在租赁期间,甲方负责购买叉车的保险,若甲方未购买保险,由此产生的所有赔偿及责任由甲方自行承担。

8.2甲乙双方任何一方违反本合同约定,需要承担

9、争议解决

甲乙双方在履行本合同过程中发生争议,应协商解决。协商不成发生诉讼时由乙方所在地的人民法院管辖。

10、不可抗力

本合同履行期间,如发生不可抗力因素造成本合同无法履行的,合同终止。如因不可抗力造成双方损失的,双方各自承担其损失。

11、其他约定事项

12、本合同一式份,乙方生效。

甲方:_________

乙方:_________

法定代表人:_________

法定代表人:_________

_________年____月____日

_________年____月____日

展开阅读全文

篇19:建筑施工实习论文各种民用建筑的施工建设单位_实习报告_网

范文类型:汇报报告,适用行业岗位:建筑,全文共 7303 字

+ 加入清单

建筑施工实习论文--各种民用建筑的施工建设单位

实习方向:各种民用建筑的施工建设单位;

实习地点:鄂尔多斯市东胜区天骄北路

实习时间:XX年7月30日

指导老师:

项目名称:鄂尔多斯市天骄绿苑佳泰小区

建设单位:鄂尔多斯市亿成房地产开发有限公司

设计单位:鄂尔多斯市天工建筑工程设计有限公司

施工单位:鄂尔多斯市亿泰建筑有限公司

实习学生:内农大职业技术学院工程技术系04建工甲班   尹士廷

一、实习目的

通过接触和参加实际工作,充实和扩大自己的知识面,培养综合应用的能力,为以后课程以及日后走上工作岗位打下基础。

二、实习内容

参加测量工程、钢筋工程、模板工程、混凝土工程、砌筑工程施工全过程的操作实习,学习每个工种的施工技术和施工组织管理方法,学习和应用有关工程施工规范及质量检验评定标准,学习施工过程中对技术的处理方法。

三、实习概况

实习地点在鄂尔多斯市东胜区天骄绿苑佳泰小区参加施工实习,遵守实习单位和学校的安全规章制度,出勤率高,积极向工人师傅请教,善于发现问题,并运用所学的理论知识,在工地技术员的帮助下解决问题。对测量工程、钢筋工程、模板工程、混凝土工程等有了很具体的了解,同时对部分工程进行实践操作。实习期间完成了实习任务,达到了实习目的。

四、工程简介

(一)设计依据:

1、建设单位提供的与本工程有关的资料和设计任务书。

2、建筑和有关工种提供的作业图和有关资料。

3、国家现行有关规范、规程

1)《民用建筑热工设计规范》gb50176—93

2)《采暖通风与空间调节设计规范》gb50019—

3)《建筑给排水设计规范》gb50015—

4)《住宅设计规范》gb50096—1999

5)《新建集中供暖住宅分户热计量设计技术规范》dbj01—605—

6)《建筑设计防火规范》gbj16—87(XX年版)

7)《建筑给排水及采暖工程施工质量验收规范》gb50242—

8)《民用建筑节能设计标准》jgj26—95

4、已批的扩建审批意见;

5、建设单位提供的建筑周围市政条件资料;

6、业主对本工程的有关意见及要求;

(二)结构:

1、工程名称:天骄绿苑佳泰小区7#、9#、10#、11#、12#、15#楼。

2、建设地点:鄂尔多斯市东胜区天骄北路。

3、设计标准:建筑防火等级为二级;

建筑耐火等级为二级;抗震设防烈度为八级;

建筑耐久年限为50年;

结构类型为砖混住宅楼;

桩基础安全等级为二级;

屋面防水等级为三级,防水层合理使用年限为XX年。

4、主要经济指标:(以7#楼为例)

总建筑面积3851.12m2,共有a、b两种户型。a户型建筑面积为105.85 m2,b户型面积为101.85 m2,跃层面积为90.25 m2,楼梯面积为198.30 m2,阳台面积为171.05 m2。

5、建筑总高度、层高及标高

建筑层高为五层加跃层,建筑总高度为19.45m,一至五层层高均为2.95m,跃层高度为3.90m,室内外高差为0.900m,本工程室内地坪标高±0.000相当于绝对标高1442.000m。

6、建筑物的总尺寸

建筑物总长33.240,总宽11.640m。

7、基础

1)本工程采用钢筋混凝土桩基础,混凝土强度等级为c20,成桩方法为干作业钻孔成桩,基础持力层为细砂岩,单桩承载力为282kn,地基承载力特征值为250kpa。

2)桩基础的桩为摩擦桩,桩径 (圆孔桩)。

3)混凝土坍落度为80~100mm。

4)边坡处单桩进入持力层深度不小于2.5m局部陡坡边坡处单桩进入持力层深度不小于3.5m。

5)桩与桩之间采用承台梁连接,承台梁的尺寸为550×500mm,混凝土等级为c25。

8、主体

本工程主体采用 普通烧结砖和 水泥砂浆砌筑,各层梁、板、柱与梁的钢筋均为绑扎搭接。

楼房屋顶为坡屋顶,局部为有组织排水(跃层露台处),雨水管的公称直径为 。

(三)功能简介

本工程均为住宅,在跃层处设有2.7m2的露台,可供人们进行户外活动。

五、具体参加工作

第一部分:测量工程

施工测量是直接为工程施工服务的,其成果不仅是进行施工及施工检查的一条准绳,而且还是验证竣工工程的位置、标高和相互间关系尺寸是否符合设计要求的重要依据。

(一)测量仪器配置及建立控制网

根据工程特点及工程结构情况,主要测量仪器有:电子经纬仪1台、普通水准仪1台。

根据规划局提供给施工单位的水平坐标和水准点,建立适合本工程的测量定位轴线网络和标高控制网络,其中重要的控制坐标要做成标准的永久性坐标点。测量放线采用预放、粗放、精确定位的方法进行反复核查,确定平面控制轴线。±0.000m采用外控制法进行平面网络控制,依据现场情况确定基准点、控制点、通视点,±0.000m以上采用内控制法进行放线控制,将规划局给定的水准点利用水准仪引测到规划建筑物周围相对比较稳定的已建建筑物上。利用水准点作为高程控制依据,将绝对高程换算成相对高程。用钢尺、水准尺、水准仪传递高程,在各层测设出高程控制点(建筑五零线),并作出标识,同时定期对各标高进行复核,保证施工人员控制楼层标高。

(二)楼层放线:(现以楼房西山墙拐角为例)

由于楼层不高,我们是用线坠和经纬仪配合使用来放楼层轴线的。从上一层向一层垂吊下一层轴线技术人员把线坠吊到一层,量出垂线与墙体的水平距离,然后上一层人员在由垂线量出在一层相同的水平距离加上外墙到轴线的水平距离得出1轴和g轴(即轴线)。在西山墙的南北两个拐点处分别用同样的方法测出轴线1轴。注意的是:如果在西山墙引轴线,那么再放下一层的时候也要在此处引测。然后在到东山墙引g轴和19轴,再用工程线(如果拉不通工程线,就用经纬仪头测)把西山墙的g轴点和东山墙的g轴点连起来,再在整个楼板上把g轴放通,并用墨线把g轴和1轴都弹出来。剩下的轴线均用放出来的1轴和g轴作为参考轴线,用钢尺量出并用墨线弹出。如图1-1 >

1-1 标准层平面图

第二部分:钢筋工程

钢筋使用必须坚持先检查后使用的原则;钢筋必须有出厂合格证和检验报告,按国家规范进行复检合格后方可用于工程中,钢筋在现场加工,制作加工工序为:钢筋机械安装→钢筋对焊→锥螺纹加工→弯曲成型→钢筋绑扎。

1、钢筋性能

钢筋出厂质量证明书主要包括:钢筋的化学成分、拉力试验取得 值,弯曲试验取得的冷弯、反向弯曲情况,显微组织、脱碳、晶粒度、夹杂情况,冷热顶锻及硬度情况。

钢材的力学检验主要包括:钢筋拉伸试验所测得钢材的屈服点、抗拉强度、伸长率;冷弯试验所测钢材弯芯直径及弯曲角度情况。

2、钢筋加工

本工程钢筋,技术人员根据图纸及规范认真作出钢筋翻样,对复杂节点的钢筋要求进行放样,同时给据图纸机构分区、分部配套翻样,并按施工进度安排好钢筋的加工计划。钢筋加工现场抽样检查合格后,方可加工。根据施工进度和钢筋下料表加工成型。钢筋制作前应对弯曲、变形的钢筋进行调直处理,剔除有表面缺陷的钢筋。加工成型后应挂有明显料牌,标明形状规格、数量、部位、分段、分层、分部位、分施工顺序堆放整齐,专人发放。

钢筋加工的允许偏差

项   目允许偏差(mm)

受力钢筋顺长度方向全长的净尺寸±10

弯起钢筋的弯折位置±20

箍筋内净尺寸±5

3、钢筋绑扎

1梁和柱箍筋应与受力钢筋垂直设置。箍筋弯勾离合处,应沿受力筋方向错开设置,梁上(下)部受力,则弯勾离合处在下(上)方。为防止柱箍筋位移,柱筋上的外伸部位要加箍固定。

2板的主筋绑扎,短向钢筋在下,长向钢筋在上,梁板钢筋绑扎完成后,及时搭设人行道和混凝土运输道,严禁踩踏负筋。

3确保钢筋保护层和负筋高度,必须放垫块,垫块要按一定间距均匀布置。

4主梁与次梁相交时,均应在主梁两侧附加箍筋,箍筋加密区可以提高主梁的抗剪强度,另外次梁底筋应放在主梁纵筋之上。

5柱与梁相交处钢筋过密,且该处有搭接时则可将搭接部分移到柱的一侧,保证该处梁尺寸便于浇筑混凝土。

钢筋安装位置的允许偏差和检验方法

项   目允许偏差

(mm)检验方法

绑扎钢筋网长、宽±10钢尺检查

网眼尺寸±20钢尺量连续三当,取最大值

绑扎钢筋骨架长±10钢尺检查

宽、高±5钢尺检查

受力钢筋间  距±10钢尺量两端、中间各一点

排  距±5取最大值

保护层厚度基 础±10钢尺检查

柱、梁±5钢尺检查

板、墙、壳±3钢尺检查

绑扎箍筋、横向钢筋间距±20钢尺量连接三档,取最大值

钢筋弯起点位置20钢尺检查

预埋件中心线位置5钢尺检查

水平高差+3钢尺和塞尺检查

注:1、检查预埋件中心线位置时,应沿纵、横两个方向量测,并到其中的较大值;

2、表中梁类、板类构件上部纵向受力钢筋保护层厚度的合格点率应达到90%及以上,且不得有超过表中数值1.5倍的尺寸偏差。

3、当纵向受拉钢筋的绑扎搭接接头面各百分率不大于25%时,其最小搭接长度应符合下表规定

纵向受拉钢筋的最小搭接长度

钢筋类型混凝土强度等级

c15c20~c25c30~c35≥c40

光圆钢筋hpb235级45d35d30d25d

带肋钢筋hrb335级55d45d35d30d

hrb400级、rrb400级-55d40d35d

第三部分:模板工程

模板及其支架应根据工程结构形式、荷载大小、地基土类别、施工设备和材料供应等条件进行设计。模板及其支架应具有足够的承载能力、刚度和稳定性,能可靠地承受浇筑混凝土的重量、侧压力以及施工荷载。浇筑混凝土时模板及支架在混凝土重力、侧压力及施工荷载等作用下胀模(变形)、跑模(位移)甚至坍塌的情况时有发生。为避免事故,保证工程质量和施工安全,提出了对模板及其支架进行观察、维护和发生异常情况时进行处理的要求。

1、安装现浇结构的上层模板及其支架时,下层楼板应具有承受上层荷载的承载能力,或加设支架;上、下层支架的立柱应对准,并铺设垫板。

2、现浇多层房屋和构筑物的模板及其支架安装时,上、下层支架的立柱应对准,以利于混凝土重力及施工荷载的传递,这是保证施工安全和质量的有效措施。

3、模板的接缝不应漏浆;在浇筑混凝土前,木模板应浇水湿润,但模板内不应有积水;

4、模板与混凝土的接触面应清理干净并涂刷隔离剂,但不得采用影响结构性能或妨碍装工程施工的隔离剂;

5、浇筑混凝土前,模板内的杂物应清理干净;

6、对清水混凝土工程及装饰混凝土工程,应使用能达到设计效果的模板。

7、无论是采用何种材料制作的模板,其接缝都应保证不漏浆。木模板浇水湿润有利于接缝闭合而不致漏浆,但因浇水湿润后膨胀,木模板安装时的接缝不宜过于严密。模板内部和与混凝土的接触面应清理干净,以避免夹渣等缺陷。本条还对清水混凝土工程及装饰混凝土工程所使用的模板提出了要求,以适应混凝土结构施工技术发展的要求。

现浇结构模板安装的允许偏差及检验方法

项   目允许偏差(mm)检验方法

轴线位置5钢尺检查

底模上表面标高±5水准仪或拉线、钢尺检查

截面内部尺寸基础±10钢尺检查

柱、墙、梁+4, -5钢尺检查

层高垂直度不大于5m6经纬仪或吊线、钢尺检查

大于5m8经纬仪或吊线、钢尺检查

相邻两板表面高低差2钢尺检查

表面平整度32m靠尺和塞尺检查

注:检查轴线位置时,应沿纵、横两个方向量测,并取其中的较大值。

8、对跨度不小于4m的现浇钢筋混凝土梁、板,其模板应按设计要求起拱;当设计无具体要求时,起打针高度宜为跨度的1/1000~3/1000。

9、固定在模板上的预埋件、预留孔和预留洞均不得遗漏,且应安装牢固,其偏差应符合下表规定。

预埋件和预留孔洞的允许偏差

项  目允许偏差(mm)

预埋钢板中心线位置3 寸,只允许在,不允许小。在允许偏差表中,不允许的偏差都以“0”来表示。

11、底模及其支架拆除时的混凝土强度应符合设计要求;当设计无具体要求时,混凝土强度应符合下表规定。

底模拆除时的混凝土强度要求

构件类型构件跨度(m)达到设计的混凝土立方体抗压强度

标准值的百分率(%)

板≤2≥50

2,≤8≥75

8≥100

梁、拱、壳≤8≥75

8≥100

悬臂构件-≥100

由于过早拆模、混凝土强度不足而造成混凝土结构构件沉降变形、缺棱掉角、开裂、甚至塌陷的情况时有发生。为保证结构的安全和作用功能,提出了拆模时混凝土强度的要求。该强度通常反映为同条件养护混凝土试件的强度。考虑到悬臂构件更容易因混凝土强度不足而引发事故,对其拆模时的混凝土强度应从严要求。

第四部分:混凝土工程

结构混凝土的强度等级必须符合设计要求。用于检查结构构件混凝土强度的试件,应在混凝土的浇筑地点随机抽取。取样与试件留置应符合下列规定:

1、每拌制100盘且不超过100m³的同配合比的混凝土,取样不得少于一次;

2、每工作班拌制的同一配合比的混凝土不足100盘时,取样不得少于一次;

3、当一次连续浇筑超过100m³时,同一配合比的混凝土每200m³取样不得少于一次;

4、每一楼层、同一配合比的混凝土,取样不得少于一次;

5、每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定。

原材料每盘称量的允许偏差

材料名称允许偏差

水泥、掺合料±2%

粗、细骨料±3%

水、外加剂±2%

6、做混凝土试块:

先清理试块模,再在试块模上刷隔离剂,并把试块模的紧固螺旋拧紧,以免放入混凝土后发生跑模。注意刷隔离剂时不要刷的过多,过2到3分钟后从混凝土罐中用铁锹将混凝土铲入试模。然后用钢筋棍将混凝土捣实,直到不再有气泡冒出。最后将混凝土表面抹平,放到无震动荷载处。等到24小时后拆模,拆模时在试块上表明标号日期。

混凝土试件尺寸及强度的尺寸换算系数

骨料最大粒径(mm)试件尺寸(mm)强度的尺寸换算系数

≤31.5100*100*1000.95

≤40150*150*1501.00

≤63200*200.05

浇筑混凝土板时混凝土的虚铺厚度要略大于板厚,振捣完毕后用1.5~4m的刮杠刮平,用木抹子抹平,并根据构造柱钢筋上的控制线线拉线检查板底标高,严格控制平整度,尤其在墙、柱的根部。

楼梯混凝土从上至下的浇筑,现振捣板底混凝土,达到踏步位置后,在于踏步混凝土一起浇筑,不断连续向上浇筑,并随时用木抹子将踏步上表面抹平。

混凝土垫层的浇筑:钉控制桩,垫层厚度为10公分,强度等级为c15,宽度为700mm,混凝土采用平板式振捣器振捣,混凝土振捣密实后,以钉的控制桩上的标高拉的工程线为准检查平整度,高出的地方铲掉,低的地方补平,用木抹子抹平。

六、实习中存在的问题:

不实践很多问题都考虑不到,实践后才知道什么情况都可能遇到,这就要求我们必须有丰富的实践经验,像刚刚走出校门的实习生实践经验还很不丰富,但理论中的东西要是也什么都不会,那在实习过程中就吃不开了。到了施工现场经过一段时间的实习,才体会到并不是课本中学的东西用不上,而是要看你会不会用,懂不懂得变通和举一反三的道理。本次实习中比较严重的问题有以下几个:

问题一:对理论知识掌握不够扎实,例如:混凝土、砂浆试块的养护时间,做试块时应该振捣到什么程度,混凝土浇筑完毕后的养护温度、养护时间,另外对混凝土出现裂缝分析不出原因等等。这些概念都很模糊,实习时用到了才知道自己没学好,在学校时只是为了应付考试为了过关,才在考试的前几天报老师讲过的重点死记硬背上几遍,一等考试过去后脑子里就是一片空白,不管以后又用与否就都在记忆里消失了。等到需要时才知道自己还没记住这些,就像现在进入施工现场没有人会问你这些,但是作为一个技术人员,不知道试块该怎么养护、混凝土出现裂缝是什么原因等一系列的问题,还怎么能指导施工呢?

针对这个问题解决的办法就时在以后的学习中做到扎实掌握,不死记硬背做到灵活运用,与实践相接合。

问题二: 熟悉图纸的能力差,对平面的图形想象不出立体的样子。致使不能明确的判断出施工的对错。

问题三:对于最新的施工规范不知道,致使不能很快的判断出施工的对错。

问题四:对于一些施工顺序还不太明了,对每一个施工过程的操作不了解。

问题五:理论联系实际的能力差。对于建筑方面的一些出新了解太少。

问题六:实际中的建筑标高和结构标高在计算施工标高时容易混淆,尤其用五零线控制墙体、门窗洞口的控制高度时容易出错,分不清什么时候包括了地面做法,什么时候不包括。

七、实习的经验及收获:

首先本此实习最大的收获就是学会了适应环境。未去工地之前我从没想象国两个月的实习我能承下来。但是通过这次实习我适应了这种工地生活。虽说以后不一定去工地工作,但有了这段时间的锻炼,不论以后做什么工作心中都有了一种吃苦耐劳的毅力,也学会了适应环境。另外就是在工地上知道了一些与学校不同的问题,就是在工地上知道了作为一名技术人员应该怎样去和工人交流等。

其次,通过这次实习使我对工程方面的有关知识在实际上有了更深一些的了解。应该说在学校学习再多的专业知识也只是理论上的,与实际还是有点差别的。这次实习对我的识图及作图能力都有一定的帮助,识图时知道哪些地方该注意、须细心计算。在结构上哪些地方须考虑施工时的安全问题,在绘图时哪些地方该考虑实际施工中的问题。到即能施工又符合规范要求,达到设计、施工标准化。没有这次实习也许绘图只是用书本上的照搬照画,不会考虑太多的问题,更不可能想到自己的设计是否能施工。

集中标注说明

注写形式表达内容附加说明

或基础主梁编号,具体包括代号、序号(跨数及外伸状况):一端有外伸; :两端有外伸; :无外伸仅注跨数

界面尺寸:梁宽 梁高当加腋时,用 表示,其中 为腋长; 为腋高。

箍筋道数、强度等级、直径、第一种间距/第二种间距(肢数)

底部(b)贯通纵筋根数、强度等级、直径;顶部(t)贯通纵筋根数、强度等级、直径。底部纵筋应有1/2至1/3贯通全跨。

梁侧面纵向构造钢筋根数、强度等级、直径。为梁两个侧面构造钢筋的总根数

梁底面相对于基准面标高的高差。高者加+号,低者加-号,无高差不注

原位标注(含贯通筋)的说明

注写形式表达内容附加说明

基础主梁柱下与础次梁支座区域底部纵筋根数、强度等级、直径以及用“/”分隔各排钢筋根数。为该区域底部包括贯通筋与非贯通筋在内的全部纵筋。

附加箍筋总根数(两侧均分)强度等级、直径。在主次梁相交处的主梁上引出。

其他原位标注某部位与集中标注不同的内容一级原位标注,原位标注取值优先。

展开阅读全文

篇20:大学自主招生面试英文自我介绍

范文类型:自我评介,适用行业岗位:大学,招生,全文共 519 字

+ 加入清单

Each teacher goo! My name is . I am cheerful and lively personality,so I like making many friends. The interest is extensive. Especially the love of literature and history. I prepare to register for examination of Chinese Department. The student work rich experience.

I also actively participate in volunteer activities, because I am Philadelphia public-spirited. Finally glad school gave me a chance to let my life on such an important occasion to make this important decision, I hope you can give me a chance to learn.

展开阅读全文