0

新加坡硕士留学条件解读(推荐20篇)

浏览

7582

范文

1000

2024年学生出国留学申请

范文类型:申请书,适用行业岗位:学生,留学,全文共 4560 字

+ 加入清单

"All I know about leadership I learned from . . ." What items could a person use to describe leadership qualities?

Inspired by the student council advisors at my high school.

Student council was a big part of my life in high school. I have participated in it since my frst year of high school. When I frst joined, I was quiet, na?ve, and unwilling to participate in many activities. I was scared to meet new people and afraid to apply myself. This all began to change. Half way through my frst year in student council, one of the advisors can up to me and asked why I did not participate that much. I did not have an answer for her and did not know how to respond. After this, I began to think of an answer. I became frustrated and decided to change. I started to show up at events and had a great time. I realized I loved this and wanted to start leading these activities. In my sophomore, junior, and now my senior year of high school, I asserted myself and took on a strong leadership role in student council. I did not fgure out the answer to why I was so reserved until this year with the help of this question.

When I looked up leadership in the dictionary, it said that it was the capacity to lead and the act or instance of leading. These are two very broad defnitions of leadership. Many people have different notions of what this word actually means. When I was challenged to use different items to describe what leadership actually is, I thought this was going to be a hard and obnoxious task. What could I learn from comparing leadership to a stuffed animal or a rubber chicken? But when I sat down to come up with a couple of answers, I realized that leadership could be compared to almost anything a person wants.

All I know about leadership I learned from a calculator. A calculator can add everything together to come up with the best answer. It can delet e what is unnecessary and only include what is important. It can solve any type of problem. These are all important equalities a leader has to have. A leader has to be able to add all of the ideas together to make the best possible plan. Leaders have to know how to decipher the good and the bad out of an idea. They have to be versatile and know how to deal with different types of issues.

All I know about leadership I learned from a ball. A ball is able to bounce back up after it is dropped. It is round and has no creases. A ball can be thrown back and forth to different people. All of these qualities are also leadership qualities. A leader has to be ready for every situation that is thrown at him or her. He or she has to be able to bounce back from any setbacks and never dwell on the past. Leaders have to exhibit many qualities and never be closed-minded about a situation. A leader must be able to delegate when he or she cannot get the work done. They have to trust everyone they lead to be able to "catch the ball" and keep a project rolling.

This activity made me realize that being a leader is so much more than just having authority and having the ability to take control of a situation. A leader has to be trusting of all the people he or she leads and, leaders must be able to combine ideas into one encompassing idea. They cannot sit in the background and watch events happen; they have to jump in and be involved. They should not delegate all their responsibilities away.

Leadership is more than what the dictionary says it is.

I learned through all of this that I have many of these qualities.

I have the ability to solve problems, lead through adversity, and be versatile. From answering this question, I realized that I could lead effectively, even if my leadership style is different from other individuals. When I joined student council in my frst year of high school, I did not have these qualities because I was never put into a situation where I had to lead. I was too reserved to try. When I tried, I learned that I could succeed in this. I did not realize until I answered this question about leadership. I was never able to see that being a leader is not just about taking control of a group and telling everyone what to do When I was a freshman, I thought leadership was this. I did not know that did not have to be forceful and strict. I stereotyped a leader then. Thisis where I went wrong. A leader is about being yourself and never letting anyone change you. I thought I had to change to be a good leaderOnly when I expanded my comfort zone did I realize this was not trueIt only took three years and a silly question/game to fgure this out.

此致

敬礼!

申请人:

__年__月__日

展开阅读全文

更多相似范文

篇1:医学硕士学位论文开题报告范文_开题报告_网

范文类型:汇报报告,全文共 1816 字

+ 加入清单

医学硕士学位论文开题报告范文

题目:病人倒地呼救智能开关设计

(一)选题背景

随着科学技术的日新月异和生活水平的迅速提高,人们对于身体健康保障的要求越来越高。医`学教育网搜集整理当病人突出心脏病、脑溢血、低血糖、癫痫病等突发性疾病时,病人的生命安危将在很大程度上决定于病人能否在最短时间内得到有效的救助。由此自然促进了急救业务的发展和常用急救知识的普及。但是在国内,整个急救体系还处于起步阶段,存在的很多隐患可能在病人突发症病后影响急救效率。例如,如果一个心脏病人在路边散步时突然发病倒在路过该怎么办?打电话?如果附近没有公共电话呢?找人帮忙?一旦被非专业人员错误处理,导致延误治疗很可能弄巧成拙。打车送医院?资料表明,当病人心跳停止后 5-10min脑细胞就开始死亡。换句话说:在这种情况下必须要让专业急敌人员尽快到场才能保证病人的生命安全。从这个角度进行思考,我提出了这么一个设想:能不能设计一种装置使得病人因突然发病而跌倒到医生赶到救治的过程得到尽快的简化呢?

我在专利局查阅有关资料之后,发现国内目前尚没有此类产品的设计。一个类似创意的设计是:在一个瓶子内设置两个金属接点,瓶子内部灌一些水银。当人站立时,水银集中在一个接点处,电路断开。当人倒地时,瓶子的倾斜使水银同时接触到2个接点,电路被触发,瓶子内置的警报器发出警报,示意求助。这个设计显然是很粗糙的。

(1)它只是通过身体倾斜的角度来决定是否报警,而不是按照真正的生理状况,必然会出现很高的误报率。

(2)它无非是在最短时间内引起了别人注意,却并没有使整个过程简化,所以对于提高救护效率不会起到实质影响。

结合我自己的设想和现有设施的缺陷,我希望做出一套“倒地后急救体系”:当病人倒地之后,用一个监测装置感知病人诸如血压、脉搏等生理状况并进行数值分析。医`学教育网搜集整理一旦确定病人已经发病,就发出无线电信号给最近的急救站,急救站通过gps定位病人的位置并以最快的速度调度急救人员。

但是,经过两个多月的探讨,几乎没有任何进展,我几乎到了要放弃的地步。但是,在老师不断的鼓励和启发下,有一天,灵感幸运地光顾了我的大脑——声光求助,有线、无线电话报警都是成熟的技术,关键在于没有一个能判断病人因其他原因跌倒与突然发病而跌倒的智能开关装置。

一旦这个设计能够实现,将会具有重大的实际价值和社会价值。首先它使病人在急救最关键的一个环节上得到了最大的保障,很大程度降低了突发性疾病的危险性;其次,它会使急救行业出现新的概念、新的运营模式,也会促进相关产品(如gps)的普及和推广;另外,它可以使众多患有突发性疾病的中老年人以轻松、乐观的情绪面对生活,参与更多的社会活动,由此产生的社会效应将非常可观。

(二)研究方案

1.纵观整个设计思路,大致可分为三大部分

第一阶段:到医院进一步收集有关病人(尤其是老年人)发病摔倒时候的具体生理反应的资料,比如倒地姿势,血压、脉搏的变化状况等。这一阶段的关键任务就是要通过资料分析抓住普通状况下摔倒和因病倒地的不同。而资料估计将以心电图和血压数值的收集为重点。

第二阶段:选择适当的方式接收所需的生理信号。这一阶段的关键在于选择适当的传感器以接收相对微弱的生理信号。估计这一阶段要考虑的问题是选择什么性能的传感器和如何分布传感器,以达到最理想的试验效果。

第三阶段:设计分析电路。这一阶段的任务就是要通过逻辑电路对传感器接收的电信号进行分析以判断使用者身体状况是否正常。主要难点就在于如何找到一个适当的数学模型匹配实验数据和如何把模型通过电路实现。目前主要有两大实施方案:一是通过逻辑电路进行信号运算、识别;二是使用单片机编程识别。医`学教育网搜集整理第一种方案的好处是处理问题直接,但当需要处理的信号相当复杂时,依靠单片机编程就显得比较合适。选取哪种方案还要视具体情况而定。

第四阶段:把以上各阶段结果整合到一起,完成成品。

整个工程将主要由周庆林老师和周伟老师指导完成。大体时间安排如下:

xx年12月15日-xx年1月15日 资料积累

xx年1月15日-6月1日 模型完成

xx年6月1日-8月 整个系统检测、完善

2.预期研究成果

(1)得到具体的数学模型用来根据血压、脉搏等生理参数判断使用者身体状况。

(2)完成“倒地后急救体系”中病人状况监测/报警系统的具体设计和其他两部分(gps和急救站的示意性设计),并能在演示中实现三大系统的协调工作。

共2页,当前第1页12

展开阅读全文

篇2:工程建设招标设标合同条件[页24]_合同范本

范文类型:合同协议,适用行业岗位:工程,招投标,全文共 1365 字

+ 加入清单

工程建设招标设标合同条件

59.4 对指定分包人的付款对一切由于任何指定分包人完成的工程或提供的货物、材料、工程设备或服务,承包人有权得到下列款额:

(a)按监理工程师的指示并根据分包合同规定由承包人付给或应付给的实际费用。

(b)工程量清单中如开列有由承包人提供有关劳务费用或由监理工程师按本文第52款确定并按本文第58.2款规定,指个支付的费用。。

(c)关于一切其他费用与利润,按已支付或应支付的实际价值的百分率计算,当工程量清单中对该暂定金额规定有比率时,即按承包人对该项目填写的比率计算;或者当未作此项规定时,则按承包人在投标书中附录中填写的比率计算,当工程量清单中为此目的在某一专项中做出这种规定时,也应在该处重复填写此比率。

59.5 对指定分包人的付款证书

在根据第6o款规定颁发包括关于任何指定分包人已做的工作或已提供的货物、材料、工程设备或服务和任何费用的支付证书之前,监理工程师有权要求承包人提供证明,证明以前的证书中包括的关于该指定分包人的工作或货物材料、工程设备或服务的费用(扣除保留金)均已由承包人支付或偿请。倘若承包人未曾提供上述证明,除非承包人:

(a)书面通知监理工程师他有合理的理由扣留或拒绝支付该项款额及(b)向监理工程师送交合理证明,证明他已将上述情况以书面形式通知该指定分包人,业主应有权根据监理工程师的证书直接向该指定分包人支付分包合同中已规定的而承包人未曾支付的一切款项,但扣除保留金,并以冲帐方式从业主应付给或可能应付给承包人的款项中将业主支付的上述金额扣回。

在监理工程师已发给证书,且业主已如上述直接付款的情况下,在发给承包人的任何进一步的证书时,监理工程师应从该证书的付款中扣除上述直接支付的款额,但不应拒发或拖延按合同条款规定应发的证书。

证书与支付

60.1 月报表

承包人应在每月末应向监理工程师提交四份接监理工程师要求的格式报表,每份均由监理工程师按第15.1款规定的承包人代表签字,报表包括承包人认为到月底自己有权得到的以下有关各项的款额:

(a)已实施的永久工程的价值;

(b)工程量表中的任何其它项目,包括承包人的设备、临时工程、计日及类似项目;

(c)表列材料及承包人在工地交付的用于永久工程的待安装设备发票价值的百分比,如投标书中附录中所注明的;

(d)按第70款的调整;

(e)按合同规定承包人有权得到的任何其它金额。

如适应,月报表应包括如下项目并按其顺序考虑:

(l)截止到本月末已实施完成永久工程以人民币计价的估计合同值,该值应据56款规定为工程量清单中书明的场本单价乘以由监理工程师测定的工程量。

(2)按(1)中所述方法截止到上月末完成的永久性工程的估算合同值。

(3)以当地货币表示的本月永久工程合同估算值,即上述(1)减掉(2)。

(4)据表1所表明的外币百分比计算出(3)项中当地货币和外币的数额根据52款规定,它是受变更影响的。

(5)据52款规定,以反映以当地货币和外币表示的费用的变化数额。

(6)截止到本月末已完成并获批准的计日工数额,减去所有以前以中期付款证书所批准的数额,并据工程量清单计日工表确定的内容书明当地货币和外汇的数额。

共35页,当前第24页1234567891011121314151617181920212223242526272829303132333435

展开阅读全文

篇3:标准硕士论文致谢范文_论文致谢信_网

范文类型:致谢词,全文共 502 字

+ 加入清单

标准硕士论文致谢范文

在本论文即将完成之际,谨此向我的导师XX教授致以衷心的感谢和崇高的敬意!本论文的工作是在李老师的悉心指导下完成的。李老师以他敏锐的洞察力、渊博的知识、严谨的治学态度、精益求精的工作作风和对科学的献身精神给我留下了刻骨铭心的印象,这些使我受益匪浅,并将成为我终身献身科学和献身事业的动力。

在攻读硕士的这三年里,导师不仅为我创造了优越的科研和学习环境,使我得以在计算机科学领域中自由翱翔,同时在思想上、人生态度和意志品质方面给予了谆谆教诲,这些教益必将激励着我在今后的人生道路上奋勇向前。

真诚感谢教研室的博士和师兄硕士,他们不仅在学术上给我指引,而且在生活上予以帮助,从他们身上我学到很多知识。感谢项目组成员在项目开发中的互助合作,正是集体的努力才使得项目进展顺利。

由衷感谢我的室友同学,他们开创性的研究拓展了我的学术视野,无数次的争论和探讨使我的研究工作有了长足的进展。

衷心的感谢我的父母和其他亲朋好友对我的关心、支持和理解,没有他们对我的关心、鼓励和支持,我无法完成现在的硕士学业。

最后,感谢曾经教育和帮助过我的所有老师。衷心地感谢为评阅本论文而付出宝贵时间和辛勤劳动的专家和教授们!

展开阅读全文

篇4:水利水电土建工程施工合同条件_合同范本

范文类型:合同协议,适用行业岗位:工程,全文共 1268 字

+ 加入清单

水利水电土建工程施工合同条件

水利水电土建工程施工合同条件

第一部分 通用合同条款

一、词语涵义

1.词语涵义

除上下文另有要求者外,合同中下列词语应具有本条所赋予的涵义:

1.1 有关合同双方和监理单位的词语

(1)发包方:指专用合同条款中写明的当事人以及取得该当事人资格的合法继承人。

(2)承包方:指已由发包方授标,并与发包方正式签署协议书的当事人以及取得该当事人资格的合法继承人。

(3)分包人:指本合同中从承包方分包某一部分工程的当事人。

(4)监理单位:指专用合同条款中写明的由发包方委托对本合同实施监理的当事人。

1.2 有关合同组成文件的词语

(1)合同:指由发包方与承包方签订的为完成本合同规定的各项工作所列入本合同条件第3条的全部文件以及其它在协议书中明确列入的文件。

(2)技术条款:指本合同的技术条款和由监理单位作出的或批准的对技术条款的任何修改或补充文件。

(3)图纸:指招标图纸和发包方按合同规定向承包方提供的所有图纸(包括配套说明和有关资料)以及投标图纸和由承包方提交并经监理单位批准的所有图纸(包括配套说明和有关资料)。

(4)施工图纸:指上述第(3)项规定的图纸中由发包方提供或由承包方提交并经监理单位批准的直接用于施工放样的图纸。

(5)投标书:指承包方为完成本合同规定的各项工作,向发包方提交并为发包方所接受的投标报价书、已标价的工程量清单和经发包方确认进入合同的其它文件。

(6)中标通知书:指发包方正式向承包方授标的通知书。

1.3 有关工程和设备的词语

(1)工程:指永久工程和临时工程。

(2)永久工程:指按本合同规定应建造的并移交给发包方使用的工程(包括工程设备)。

(3)临时工程:指为完成本合同规定的各项工作所需的各类非永久工程(不包括施工设备)。

(4)主体工程:指专用合同条款中写明的全部永久工程中的主要工程。

(5)单位工程:指专用合同条款中写明的单位工程。

(6)工程设备:指构成或计划构成永久工程一部分的机电设备、金属结构设备、仪器装置及其它类似的设备和装置。

(7)施工设备:指为完成本合同规定的各项工作所需的全部用于施工的设备、器具和不包括临时工程和材料在内的其它一切物品。

(8)承包方设备:指承包方的施工设备。

(9)进点:指承包方接到开工通知后进入施工场地。

1.4 有关工期的词语

(1)开工通知:指发包方委托监理单位通知承包方开工的函件。

(2)开工日期:指开工通知中写明的开工日。

(3)完工日期:指本合同规定的全部工程、单位工程或部分工程完工和通过完工验收后在移交证书(或临时移交证书)中写明的完工日。

1.5 有关合同价格和费用的词语

(1)合同价格:指协议书中写明的为完成合同规定的各项工作应付给承包方的总金额。

(2)费用:指为实施本合同所发生的所有开支,包括管理费和应分摊的其它费用,但不包括利润。

1.6 其它词语

(1)施工场地(或施工地):指由发包方提供的用于本合同工程的场所以及在合同中指定作为施工场地组成部分的其它场所。

共22页,当前第1页12345678910111213141516171819202122

展开阅读全文

篇5:财政票据管理办法解读

范文类型:办法,全文共 603 字

+ 加入清单

一、什么是财政票据?

答:《财政票据管理办法》(以下简称《办法》)对财政票据作了明确定义:财政票据是指“由财政部门监(印)制、发放、管理,国家机关、事业单位、具有公共管理或者公共服务职能的社会团体及其他组织依法收取政府非税收入或者从事非营利性活动收取财物时,向公民、法人和其他组织开具的凭证。”同时规定,“财政票据是财务收支和会计核算的原始凭证,是财政、审计等部门进行监督检查的重要依据。”

二、财政票据有哪些类型?

答:根据政府非税收入征管和单位财务管理需要,《办法》将财政票据分为非税收入类票据、结算类票据和其他财政票据三类。其中,非税收入类票据包括非税收入通用票据、非税收入专用票据和非税收入一般缴款书;结算类票据主要是指资金往来结算票据;其他财政票据包括公益事业捐赠票据、医疗收费票据、社会团体会费票据和其他应当由财政部门管理的票据。

三、我省现有财政票据有哪些种类?

答:我省现有财政票据14种,其中:非税收入类票据8种,包括非税收入通用票据1种,即非税收入统一收据,非税收入专用票据6种,即罚没收据、幼儿园托儿所收费收据、人民法院诉讼费专用票据、河道工程修建维护费收据、高速公路通行费收据、城市路桥车辆通行费收据,非税收入一般缴款书1种,即非税收入一般缴款书;结算类票据1种,即资金往来结算票据;其他财政票据5种,即公益事业捐赠票据、医疗收费票据、社会团体会费票据、住宅专项维修资金收据和社会保险费收据。

展开阅读全文

篇6:硕士毕业论文开题报告的结构与写法_开题报告_网

范文类型:汇报报告,全文共 996 字

+ 加入清单

硕士毕业论文开题报告的结构写法

课题开题报告主要包括以下几个方面:

(一)课题名称

课题名称就是课题的名字。这看起来是个小问题,但实际上很多人写课题名称时,往往写的不准确、不恰当,从而影响整个课题的形象与质量。这就是平常人们所说的“只会生孩子,不会起名字”。那么,如何给课题起名称呢?

第一,名称要准确、规范

准确就是课题的名称要把课题研究的问题是什么,研究的对象是什么交待清楚。课题的名称一定要和研究的内容相一致,不能太大,也不能太小,要准确地把你研究的对象、问题概括出来。

规范就是所用的词语、句型要规范、科学,似是而非的词不能用,口号式、结论式的句型不要用。因为我们是在进行科学研究,要用科学的、规范的语言去表述我们的思想和观点。

第二,论文白哦体要简洁,明确,不能太长。

不管是硕士毕业论文或者其它的论文,名称都不能太长,能不要的字就尽量不要,一般不要超过20个字。

(二)硕士毕业论文题目达到的目标

课题研究的目标也就是课题最后要达到的具体目的,要解决哪些具体问题,也就是本课题研究要达到的预定目标:即本课题研究的目标定位,确定目标时要紧扣课题,用词要准确、精练、明了。相对于目的和指导思想而言,研究目标是比较具体的,不能笼统地讲,必须清楚地写出来。只有目标明确而具体,才能知道工作的具体方向是什么,才知道研究的重点是什么,思路就不会被各种因素所干扰。

(三)本课题国内外研究的历史和现状(文献综述)。

一般包括:把握其研究的广度、深度、已取得的成果;寻找有待进一步研究的问题,从而确定本课题研究的平台(起点)、研究的特色或突破点。参考总课题报告。

(四)课题研究的目的、意义

研究的目的、意义也就是为什么要研究、研究它有什么价值。这一般可以先从现实需要方面去论述,指出现实当中存在这个问题,需要去研究,去解决,本课题的研究有什么实际作用,然后,再写课题的理论和学术价值。

(五)硕士毕业论文写作的基本内容

我们有了课题的研究目标,就要根据目标来确定我们这个课题具体要研究的内容,相对研究目标来说,研究内容要更具体、明确。并且一个目标可能要通过几方面的研究内容来实现,他们不一定是一一对应的关系。大家在确定研究内容的时候,往往考虑的不是很具体,写出来的研究内容非凡笼统、模糊,把研究的目的、意义当作研究内容,这对我们整个课题研究十分不利。因此,我们要学会把课题进行分解,一点一点地去做。这样论文代写起来就容易了。

展开阅读全文

篇7:2024出国留学推荐信范文

范文类型:推荐信,适用行业岗位:留学,全文共 1762 字

+ 加入清单

Dear Colleagues:

As a teacher in Department of Biology, Nankai University, a leading university in China, I am very pleased to take this opportunity to recommend one of my favorite students to your PhD program.

In September, 20xx, Miss Zhang was my students in General Biology, the first professional course they take in the field. She likes it very much. I teach her in an open and interactive manner, she is active and passionate about answering class questions. Miss Zhang is bright, energetic and enthusiastic girl who loves speaking out her own ideas. She never escapes from those points of which she is skeptical. Apart from that, she often puts forward her ideas upon questions and exchanges all of her innovate ideas with me after class.

Upon ending of General Biology course, I asked my students to write an essay upon their understanding of biology. I discovered Miss Zhang’s essay was so impressive and persuasive; her careful essay comes from dozens of references to Biology literatures. In essay Miss Zhang stretched out her creative thinking upon status quo of biological research and branches in the field of biology. All of this speaks to her creative and logical and scientific thinking capability. I am gladly to say that Miss Zhang has a clear understanding about General Biology, that comprehension has been reflected fully in her essay. Therefore Miss Zhang got a full point for her essay in her class, and other students took it as model essay for granted.

I believe Miss Zhang’s industriousness, passion and dedication will make her an ideal candidate you are seeking for your program, so I highly recommend her without any hesitation to you. And I will greatly appreciate it if you could accept her into your program.

Sincerely yours,

Prof. ×××

展开阅读全文

篇8:工程建设招标设标合同条件第1部分_合同范本

范文类型:合同协议,适用行业岗位:工程,招投标,全文共 14803 字

+ 加入清单

工程建设招标设标合同条件(第1部分)

定义及解释

1.1定义

合同(如下文定义)中以下的用词及词句,除根据上下文另有要求外,应具有本条所赋予它们的涵义:

(a)(1)“业主”指____(名称)及其法定继承人,不包括其任何受让人(除承包人同意外)。业主可在本合同项下指定一家采购全权代理机构,如果已经指定,则在投标须知前附表第23栏中指明采购代理机构的名称、采购、监督和支付的范围,以及在招标期间及随后的授标等问题上的责任。

(2)“承包人”指其投标书被业主接受的当事人,或其法定继承人,不包括其任何受让人(除业主同意外)。

(3)分包人指在合同中提及的承担部分工程施工的当事人或经监理工程师、同意已分包了部分工程的任何当事人,及取得该当事人资格的法定继承人,但不包括其任何受让人。

(4)“监理工程师”指由业主指定的为执行合同规定的任务的监理工程师、即________(监理工程师单位名称)或由业主任命并书面通知承包人代行监理工程师职权的当事人。

(5)“监理工程师代表”指根据22款规定随时由监理工程师任命的个人。

(6)“承包人授权代表”是指由承包人任命由业主批准,在本合同项下代行承包人全权的个人。

(7)“熟练工人”指的是熟悉放样、对复杂工程能进行监督的工人,包括设备操作人员。

(8)“非熟练工人”指的是持普通手工工具,包括小型动力工具进行施工作业的人员。

(b)(l)“合同”指合同条件、规范、图纸、工程量清单、投标书、中标通知书、合同协议及明确地包括在中标通知书或合同协议中的其他文件。

(2)“规范”指包括在合同中的工程规范及根据51款调整、增加的工程规范,或由承包人提供的非经监理工程师批准的规范。

(3)“图纸”指由监理工程师根据合同向承包人提供的所有图纸、计算书和类似的技术资料,以及由承包人提供的经监理工程师批准的所有图纸、计算书、样品、图案、模型、操作和维修手册以及类似的其他技术资料。

(4)“工程量清单”是投标书的组成部分,并已填写报价且完整的工程量清单。

(5)“投标书”是指承包人向业主提供的按合同条款规定并为中标通知书所接受的,为工程的施工、竣工及保修而做的有报价的建议书(6)“中标通知书”指业主正式接受投标的通知。

(7)“合同协议”指在9.1款中提及的合同协议。

(8)“投标书附录”是指附在本合同条件之后,并构成投标书的附件。

(c)(1)“开工日期”指承包人接到工程根据41款发出的开工通知的日期。

(2)“竣工日期”指合同中规定,并从开工日期开始计算的工程或任何区段或部分工程完工井通过竣工检验的时间(或据44款规定延长的时间)。

(d)(1)“竣工检验”指在合同中规定的,或由监理工程师和承包人另行商定,并对应在全部工程、或某一区段或部分在业主接受之前由承包人负责完成的试验。

(2)“接收证书”指根据48款发出的证书。

(e)(l)“合同价”指在中标通知书中写明的,根据合同条款,用以支付承包人为实施并完成工程和保修应付的总金额。

(2)“保留金”指根据60.4款由业主保留的所有款项的累计金额。(f)(1)“工程”指永久性工程及临时性工程或视情况为两者之一。

(2)“永久性工程”指根据合同规定将建设的永久性工程(包括设备)。

(3)“临时性工程”指在施工并完成工程及保修中所需的及有关的各种临时工程(不包括承包人的设备)。

(4)“设备”指定于构成或构成永久工程组战部分的机器装置或类似的物件。

(5)“承包人设备”指不包括构成或预定构成部分永久性工程的设备、材料或其他物品在内的所有施工并完成工程及保修所需的、任何性质的设备及物品(不包括临时工程)。

(6)“分段工程”指在合同中特别规定的作为工程—部分的分段工程。

(7)“工地”指为工程施工由业主提供的用地及在合同中特别注明的将构成部分工地的任何其他场所。

(g)“费用”指不论在工地内或工地外已合理发生或将要发生的所有开支,包括:

管理费及可合理分摊的费用,但不包括任何利润补贴。

(2)“日”指日历日。

(3)“元”和缩写“RMB¥”指合同中作为地方货币单位的人民币元。

(4)“外币”指工程施工所在国以外国家的货币,包括港币。

(5)“书面函件”指任何手写、打印或印刷函件,包括电传、电报及传真通讯。

1.2标题和旁注

各个条款中的标题及旁注不应视为条款的一部分,在合同条款或合同本身的解释也不应加以考虑。

1.3注释

凡指当事人或当事人各方的字词应包括公司和有关法人资福的任何组织。

1.4单数和复数

仅表明单数形式的词也可以代表复数,根据上下文需要而定,反之亦然。

1.5通知、同意、批准、证明和决定

除非另有规定,凡合同条款中提及的由任何人发出、给予的任何通知、同意、批准、证明或决定应是书面形式的。并应对“通知”、“证明”或“决定”等词作相应的解释。任何这种同意、批准、证明或决定不应被无理收回或延误。

1.6给业主和监理工程通知的地址

(a)给业主通知的地址是____(地址名称)

(b)给监理工程师通知的地址是:_____(地址名称)

监理工程师和监理工程师代表2.1监理工程师的职责和权力

(a)监理工程师应履行合同中规定的职责。

(b)监理工程师可以使用在合同中规定的或必要时由合同暗示的权力。但规定:除下列(4)(I)和(4)(I I)条外,监理工程师在根据下列条款行使其职责之前应取得业主明确的批准:

(1)根据第4款,批准工程任何部分的分包合同;

(2)证明第12款项下增加的费用;

(3)决定第51款,发出变更指令,但下列情况除外:

(I)如果发生非常紧急情况,监理工程师认为将造成人员伤亡、或危及工程或邻近的财产或从业主的权益考虑需立即采取行动,在这种情况下,监理工程师被授权发布处理这种危机状况所必需的指令或命令,承包人应实施一切工作或按监理工程师的命令竭尽全力去处置或减轻危急状况。尽管监理工程师的命令未事先征得业主的批准,承包人仍应立即执行这些命令。

监理工程师应根踞第52款规定,确定因上述命令而增加的合同费用,并通知承包人,抄报业主;

(Ⅱ)如果单项或累积批准的工程数量变化不超过合同价的5%,或不超过某一特定项目总费用的15%,除非这种数量变化在图纸或其他招标文件中联部是可以预知的及除外的。

(5)确定第52款项下的费率或价格;或(6)批准重大设计变更,这些变更将影响原设计的基本性能或能力。

(c)除了在合同中有明文规定外,监理工程师无权免除合同中规定的承包人义务。

2.2监理工程师代表

监理工程师代表应由监理工程师任命并向监埋工程师负责,应履行和行使监理工程师按2.3款规定可能赋予他的职责和权力。

2.3监理工程师授权的权力

监理工程师随时可将赋予他自己的任何职责和权力授权给监理工程师代表,他可以随时收回其授权。任何这种授权或收回其授权均应以书面形式,并且只有在业主和承包人收到这一授权通知后方可生效。

任何根据这一授权由监理工程师代表给承包人的通知应与监理工程师发给承包人的通知有同等效力。但:

(a)监理工程师代表对任何工作、材料或设备的批准不影响监理工程师不批准这种工程、材料或设备和发出纠正指令的权力;

(b)如果承包人对监理工程师代表给予的调知有疑问,其可以向监理工程师询问,监理工程师应确认、取消或变更此种通知的内容。

2.4助理的任命

监理工程师或监理工程师代表对以任命任何数量的人员,协助监理工程师代表履行其2.2款规定的职责。他应通知承包人这些人员的姓名、职务及权限。这些助理人员无权发出指令给承包人。除非此指令是使其履行职责及保证可以按合同接收材料、设备或工艺所必须发出的指令,由他们之中任何人出于上述目的而发出的这些指令应视同为出监理工程师代表发出的。

2.5书面指令

由监理工程师发出的指令应为书面形式,但如果由于某种原因,监理工程师认为有必要以口头的形式发出这类指令,承包人应遵照执行。无论在这一口头指令执行前或执行后,由监理工程师发出的对这一指令的书面确认应视与本条规定的指令有相同的意思。

还规定,如果在7天内,承包人书面确认监理工程师的口头指令,这种确认在7天内未被监理工程师以书面的形式的拒绝,这一指南针令应视为监理工程师的指令。

该规定同样适用于监理工程师代表及根据2.4款任何的监理工程师的或监理工程师代表的助理人员发出的指令。I 2.6监理工程师行为公正

按照合同规定,监理工程师通过以下方式行使权力:

(a)作出决定,发表意见或同意,或(b)表示满意或批准,或(C)决定价值,或(d)采取其他可能影响业主或承包人的权力和义务的行动时,监理工程师应根据合同规定的条款并考虑所有的因素,公正行使其这些权力。任何这类的决定、意见、同意、表示满意或批准,定价或采取的行动均可按67款的规定予以公开,评审或修订。

转让和分包3.1合同的转让

承包人无业主的事先同意(尽管1.5条规定,这种同意应由收主单独决定)不应将合同或其他任何部分,或合同中合同名下的任何收益或利益转让。但除了:

(a)按合同规定到期或即将到期的,以承包人的银行为受益人的收费,或(b)将承包人的权力转让给其担保人(假使担保人已支付了承包人损失或债务),以获得免除其他方面的债务。

4.1分包

承包人不得将整个合同全部分包出去。除非合同另有规定承包人不应在未得到监理工程师的同意前将合同的任何部分分包出去。任何有关的同意,不应免除承包人根据合同应担负的任何责任或应尽的任例义务,并应象对待其自己、其代理人、其服务人员及其工作人员的行为、违约及疏忽一样,对任何分包人、分包人代理、分包人的服务人员及工作人员的行为、违约及疏忽负责。

承包人在下列事项方面无需征得这样的同意:

(a)提供劳务(b)按合同规定的标准购买材料;

(C)分包工程的任何部分给合同中已写明的分包人。

4.2分包人义务的转让

当分包人在所进行的工作或其提供的货物、材料、设备或服务等方面,为承包人承担了合同规定的保修期结束后的任何延长期限的连续义务时,承包人可在该期满后的任何时候,在业主的要求和由业主承担费用的情况下把未结束的这种义务的利益转让给业主。

合同文件5.1语言和法律

本合同中文件用英语/中文拟定,如果合同文件是用一种以上的语言拟定的,则据以分析和解释该合同中的那种语言是英语/中文,因而称之为“法定语言”。

5.2合同文件的优先顺序

构成合同的文件应互为解释。当这些文件出现多义性或不一致性解释时,监理工程师应作出解释和校正,并对此向承包发出指令。除非合同中另有规定,在发生分歧时,合同文件应按以下顺序优先考虑:

(a)合同协议书;

(b)中标通知书;

(c)投标书;

(d)合同条件;

(e)技术规范的组成文件:

(1)包括在合同文件中的书面技术规范。

(2)参考资料中包括的技术规范。

(f)图纸的合成资料(1)标明的尺寸。

(2)文字注释。

(3)图解显示。

(g)已报价的工程量清单;以及(h)形成合同的其他文件。

6.1图纸、文件的保管和提供

图纸应由监理工程师单独保管,但应免费向承包人提供四套复制件,承包人需要更多复制件的,则应费用自理。除了严格用于合同目的,承包人不能在未得到监理工程师批准的情况下让第三者使用或向第三方转让图纸、规范及其他由业主或监理工程师提供的文件。

一旦保修证书发出,承包人应将所有根据合同提供的图纸、规范及其他文件返还监理工程师。

承包人应向监理工程师提供4套所有按照第7款由承包人提交经监理工程师批准的图纸、规范及其他文件和复制件,连同一些不能照像复制成相同质量的资料的复制件在内。另外,如监理工程师有书面要求,承包人亦应向监理工程师提供为业主使用的相应图纸、规范及其他文件。业主将支付相应的费用。

6.2一套图纸应保存在工地

上述一套提供给承包人的图纸或由承包人自己提供的图纸,应由承包人保存在工地,这些图纸应能随时提供给监理工程师及其书面授权的任何其他人员检查和使用。

6.3施工进度的打乱

凡出现监理工程师如不在合理的时间内发出进一步的图纸和指令,工程进度或计划将拖延或打乱时,承包人应通知监理工程师并抄报业主。通知应包括所需的图纸或指令,需要的理由和时间以及如果拖延提供将造成工程的延期或进度的打乱等详细说明。

6.4图纸延期和图纸延期所产生的费用

在任何情况下,如因监理工程师未曾或不能在一合理时间内发出承包人根据第6.3条发出的通知中所要求的任何图纸或指令,致使承包人蒙受延误进度和(或)细致费用的增加,则监理工程师与业主及承包协商后,应决定:

(a)任何据44款承包人有权得到的延期,及(b)应增加到合同价中该项费用的金额;

并相应通知承包人和抄报业主。

6.5承包人未提交图纸

如果监理工程师没有或不能向承包人提供图纸或发出指令是全部或部分由于承包人未按合同要求提交图纸、规范或其他文件,监理工程师将在作出有关6.4款的决定时应将承包人的失误考虑在内。

7.1补充图纸和指令

监理工程师有权随时向承包人发出为合理和恰当地进行施工和完成工程及保修所必需的补充图纸和指令。承包人应遵照执行共受其约束。

7.2由承包人设计的永久性工程

凡合同中明确规定部分永久性工程应由承包人设计时,承包人应将下列文件提交监理工程师批准;

(a)为使监理工程师对该项设计的适用性和完备性进行审查并表示满意所必需的图纸、规范、计算书及其他资料;

(b)详细的操作及维修手册及竣工后永久工程的图纸,以使业主能操作、维修、拆除、组装及调整所设计的水久性工程,在这类使用和维护手册连同竣工图纸未提交并由监理工程师批准之前,该工程不能被认为已可被第48款移交。

7.3批准不影响责任

监理工程师据7.2款规定进行的批准并不能解除承包人根据合同应担负的责任。

一般义务8.1承包人的一般责任

承包人应根据合同的各项规定,以应有的细心和勤勉,对工程进行设计(如果在合同中有规定)、施工并完成工程和保修。承包人应根据合同规定或根据合同合理推论,提供为设计、施工、完成工程和保修所必需的全部的(无论是临时性的或经常性的)监督、劳务、材料、机具、承包人的设备及所有其他物品。

8.2现场操作和施工方法

承包人应对整个现场各种操作和施工方法的适用性、稳定性和安全性全面负责。但规定,除了在下文中写明或另有协议外,承包人对永久性工程的设计或规范或对不是由承包人制定的临时工程的设计或规范不负责任。如果合同明文规定,部分永久性工程由承包人设计,即使有监理工程师的批准承包人也应对这部分工程全面负责。

8.3制错误的通知

承包人应将其在审阅合同文件及施工过程中发现的工程设计或技术规范中的任何错误、遗漏、误差和缺陷及时通知监理工程师。

9.1合同协议书

承包人应签订并履行由业主拟定的合同协议,格式附于本合同条件之后(必要对对其进行修改)。

1O.1履约担保

承包人应在收到中标通知书后28天内为适当履行合同向业主提供履约担保,履约担保应用银行保函格式,由业主可接受的银行开具,数额加投标书附录的规定。当向补主提供银行履约保函时,应通知监理工程师。该银行保函格式附于本合同条件后。按本条款要求发生的费用由承包人承担。

10.2履约担保的有效朗

同约如保的有效期限应截止到承包人根据合同履行并完成了工程及修补任何缺陷。

在根据62.1款发出保修证书以后,不应再对履约担保提出索赔,并在发出上述证书后的14天内应将履约如保退还给承包人。

10.3根据履约担保的索赔

在任何情况下,业主按照履约担保提出索赔之前,皆应通知承包人,说明导致索赔的违约性质。

1l.l现场考察

在承包人提交投标书前,业主应向承包人提供由业主或业主代表根据有关该工程的调查所取得的水文及地表以下条件的资料。承包人而对这些资料的自行解释负责。

在承包人提交投标书之前,应被认为己视察和检查了现场及其周围环境;以及与之有关的数据,并对下列内容表示满意(指在可能的范围内对成本及时间的考虑):

(a)工地的形成及性质,包括地表以下的条件;

(b)水文和气候条件;

(c)为工程施工、完成工程及维修缺陷所需的材料及工作的范围和性质;

(d)进出工地的方式及承包人可能需要的食宿条件。并且,一般还应认为承包人已取得有关诸如下述可能对其投标有影响或起作用的风险意外事故及所有其他情况的全部必要资料。

承包人应被视为其投标书是建立在上述由业主提供的资料及承包人对现场的检查和考察的基础上的。

11.2数据资料的获取

根据第11.1款规定由业主提供的数据资料应认为将包括(如果有的话)合同其他条款中所列出的数据资料,业主提供这些数据资料的查阅地点为_______(地址名称)。

查阅这些数据资料不应收取任何费用,承包人在交纳一定的复制费用后可得到这些数据资料的复制(印)件。

12.1反控标书的完备性

承包人应被认为已对投标书和工程量清单中所写明的单价和费用的正确性及完备程度十分满意。除在合同中已有规定外,工程量清单及投标书应包括所有根据合同规定的义务(包括有关货物、材料、设备及服务的提供及暂定金额下的意外开支)及所有为正确施工、完成工程并保修所必需的全部有关事宜。

12.2不利的外界障碍和条件

在工程的施工过程中,如果承包人在工地现场遇到了气候条件以外的实际的障碍或不利条件,这种情况在承包人看来是有经验的承包人不可预见的,承包人应立即通知监理工程师并抄报业主。在收到这一通知时,如果监理工程师认为这种障碍或情况不可能为一个有经验的承包人所合理预见时,在与承包人及业主协商后,监理工程师应决定:

(a)根据44款承包人有权得到的延期;及(b)承包人在遇到上述情况时所发生的费用,这笔费用应加到合同价款中、并且将上述决定相应通知承包人及抄报业主。在做出这一决定时,监理工程师应考虑所有由监理工程师发给承包人的有关指令及在无监理工程师具体指令时,承包人采取的可为监理工程师接受的任何适当合理的措施。

13.1工程应符合合同规定

除由于法律或实际上不可能做到的情况外,承包人应严格按合同规定进行工程施工、完成工程及保修,达到使监理工程师满意的程度。承包人应严格遵守与执行监理工程师就涉及或有关该项工作的任何事项所发出的指令,无论这些事项在合同中与否写明。承包人应只接受监理工程师的指令,或按第2款的规定接受监理工程师代表的指令。

14.1应提交的施工计

承包人在中标通知书发出日后的28天内,应向监理工程师提交两份工程施工计划以征求其同意,工程施工计划的格式和细节应符合监理工程师的合理要求。不论何时当监理工程师要求时,承包人还应以书面形式将其为工程施工而拟采用的方法和安排的总说明提交监理工程师,以供参考。

14.2施工计划的修订

承包人应每三个月对施工计划进行一次修订,其中包括(a)已制定的每月预计完成的主要工作量;和(b)业主向承包人支付的安排表。

如果监理工程师随时认为工程的实际进度与已取得批准的最新进度计划不符合时,监理工程师可要求承包人提交修订后的计划,以确保工程在工期内竣工。

14.3须提交的现金流动估算表

在中标通知书发出后28天内承包人应向监理工程师提交一份作为参考的详细的季度现金流动估算表,此现金流动估算应为承包人根据合同有权得到的支付金额。如监理工程师提出要求,承包人应每季度对现金流动估算表进行一次修订。

14.4承包人不能免除的职责

提交给监理工程师并得到其同意的施工计划以及提供总说明和现金流动估算表,并不能免除承包人根据合同规定所应负的任何职责。

15.1承包人的监督

只要监理工程师认为是为妥善履行合同规定的承包人义务所必须时,承包人就应在施工过程中提供一切必要的监督。承包人或其授权的、经监理工程师批准的(监理工程师可以随时撤回批准)称职的代表应用其全部时间进行该工程的监督。该授权代表应代表承包人接受监理工程师或根据第2款接受监理工程师代表的指令。

如果监理工程师撤回对承包人代表的批准,考虑到如下所述的更换代表的要求,承包人在收到撤换通知后,在实际可能的限度内从速将其调出工地,且不得在工地任何地方再雇用此人,并任命另一位由监理工程师批准的代表。

15.2承包人代表的语言能力

如果监理工程师认为承包人的代表对英语/中文的运用均不熟练,则承包人至少应安排一名称职的翻译随时留在工地现场,以确保监理工程师的指令和信息适时传达。

一定比例的承包人的监理人员应会使用中文作为工作语言,或承包人应随时在工地现场保持足够数量的称职的译员,以确保监理工程师的指令和信息适时传达。

16.1承包人的雇员

承包人应为施工并完成工程及保修在工地上提供:

(a)只有在本行业中技术熟练。经验丰富的技术助理,及能对工程施工予以适当监督的领班和工长以及(b)使承包人能按合同要求及时履行其义务所需要的熟练技工,半熟练技工及普通工。

16.2当地的雇员

根据当地规定,要求承包人在可行和合理的范围内尽量雇用当地劳务。

16.3监理工程师有权反对和要求解雇

监理工程师有权反对并要求承包人立即从工程中撤换其提供的、在监理工程师看来行为不轨或履行其职责时不能胜任、玩忽职守的人员或监理工程师认为在工地的出现是不适宜的人员,这种人员一旦撤换,无监理工程师的批准不得重新在工地上工作。任何被如此撤掉人员应从速被替换。

17.1放样

承包人应负责:

(a)根据监理工程师书面给定的原始基准点、基准线和参考标高,对工程进行精确放样。

(b)按上所述,正确布置工程各部分的位置、行高、尺寸及基准线。

(C)与上述责任有关而提供的一切必要的仪器设备及劳力。

如果在施工过程中,工程任何部分的位置、标高、尺寸及基准线出现了误差。承包人在监理工程师的要求下,应以自己的费用纠正此等误差,达到使监理工程师满意为止。除非这种误差是基于监理工程师以书面发出错误数据造成的,在此种情况下监理工程师将根据第52款规定确定应增加的合同价格,并相应通知承包人及抄报业主。

监理工程师对任何放线或标高的检查不应以任何方式免除承包人对放样准确所负的责任,承包人应仔细保护和保存在放样中应使用的基准点、龙门板、测桩和工程放样所用的其他物件。

18.1钻孔和探坑

在工程施工期间的任何时候,如果监理工程师要求承包人钻孔或勘探开挖,除非有关此工程项目或暂定金额已包括在工程量清单中,否则监理工程师应根据第51款规定为这种要求发出指令。

19.1安全、保卫和环境保护

在工程的施工、完成工程及保修的过程中,承包人应:

(a)全面负责有权在工地上施工的人员的安全,并使工地(只要这些工地已由其管辖)和工程(只要这些工程尚未完成或由业主占用)保持良好的秩序,以避免发生人身事故,及(b)为了保护工程或为了公众及其他人员的安全及方便,在监理工程师或任何依法建立的主管机关所要求的时间和地点、承包人应以其自己的费用提供并维修所有的照明、护栏、围墙、警告标志以及守卫设施,及(c)采取一切合理措施,保护工地及工地周围的环境,避免污染、噪音或由于其施工方法的不当造成的对公共人员和财产等的危害或干扰。

19.2业主的责任如果业主根据第31款规定,需使用自己的工人在工地上进行作业,对于这些作业业主应:

(a)全权负责有权在工地上工作的人员的安全,及(b)保持工地良好的秩序,防止对上述人员的伤害。

根据31款,如果业主在工地上雇用了其他的承包人,业主应要求他们负有同样责任,保证安全和避免伤害。

20.1工程的照管

从开工日起直到发给移交证书之日止的全部工程期间内,承包人应全权负责工程上使用的材料、待安装的设备及工程本身的照管。在业主接到全部工程后业主将负责这些事宜。

但:

(a)如果监理工程师发出了永久性工程的某一分段工程或部分工程的移交证书,承包人应从发出移交证书之日起,不再对这些分段或部分工程的照管负责,此时对那一区段或那一部分工程的照管责任移交给业主;

(b)承包人应对其担保在保修期内完成的剩余工程及所用的材料、待安装的设备的照管完全负责,直到这些工程根据第49款规定完成。

20.2弥补损失或损坏的责任

在承包人负责照管期间,如果工程或其它任何部分或材料或是待安装的工程设备,除了20.4款规定的风险以外的任何原因造成了任何损失和损坏,承包人应以其自己的费用弥补此损失与损坏,使这些永久性工程符合合同各项要求,达到监理工程师满意的程度。承包人亦应对其在履行49款及50款规定的义务中由承包人一方进行作业的过程中造成的对工程的任何损失或损坏负责。

20.3因业主风险导致报失或损害

由于第20.4款中规定的枉间风险或是与其它风险综合作用引起损失或损坏时,如果监理工程师要求承包人应按监理工程师要求的程度来弥补损失和损坏,监理工程师应根据52款规定决定增加合同价的金额,同时相应地通知承包人及抄报业主,在因综合风险造成了损失和损害的情况下,监理工程师应决定业主及承包人各自应承担风险的比例。

20.4业主的风险

业主的风险包括:

(a)在完成工程中与中华人民共和国有关的情况下:

(1)战争,敌对行动(无论宣战与否),入侵,外敌行动;

(2)革命,起义,军事政变,或内战;

(3)电离放射,由任何核燃料或核燃烧或有毒放射物爆发或核原料爆发及校成爆发后的有害物品引起的放射性污染;

(4)由飞行器以及音速或超音速飞行物产生的冲击波压力;

(5)暴乱或骚乱及秩序的混乱,除非这些情况是限于承包人的雇员及分包人或由工程。的施工引起的。

(b)由于业主使用或占用永久性工程的枉何分段工程或部分工程引起的损失和损坏,除非这种占用是合同规定的;

(c)由于工程设计引起的某种程度上损失及损坏,不包括由承包人设计的部分工程及其负责的部分;

(d)任何自然界力量的作用(发生在工地现场或中华人民共和国境内的其他地点而对本合同的履行有直接的影响),而一个有经验的承包人:

(l)不能合理预见到,或(2)能合理预见到,但他既不能:

(I)合理地采取措施以避免这种力量所造成的损失或损害,也不能:

(D)合理地加以防范。

21.1工程及承包人设备的保险

在不限制第20款规定的承包人或业主的义务和责任的条件下,承包人应当对下列各项进行保险:

(a)以全部重置成本对工程连同工程使用的材料和待安装的设备进行保险;

(b)以这种重置成本追加15%的额外金额,以弥补由于补救损失或破坏而招致的任何额外和附加的费用,包括业务费和工程任何部分拆迁费以及运走任何性质的渣土的费用;

(c)由承包人带进现场的属于承包人的设备和其他东西,保险的金额要足够在现场上重置。

承包人在工程量清单中所列出的各项保险费,业主将按承包人实际支出的保险收据核实支付。

21.2保险范围

第21.1款(a)和(b)款的保险应以承包人及业主的共同名义保险,并包括:

(a)从工地上开工日起到有关相应的工程或根据不同情况的分段或部分工程被发出了移交证书为止的期限内,业主和承包人方面除21.4款规定以外的各种原因引起的损失及损坏,及(b)由承包人负责的:

(1)由于保修期开始之前的原因造成保修期间内损失或损害,及(2)承包人在其根据49款和50款规定施工时引起的损失和损坏。

21.3对不能收回的金额的责任

任何未保险的或不能从保险公司收回的金额,应分别由业主或承包人根据ZO款规定的责任承担。

21.4除外责任

第21.1款规定的保险责任不包括20.4款a(1)到(4)所列的风险造成的损失和损坏。

22.1对人身和财产的损害赔偿

除合同另有规定外,承包人应免除业主对下列事宜的损失和对其赔偿:

(a)任何人员的死亡或受伤,或(b)由于工程的施工、竣工及保修可能产生的或引起的对(工程以外的)任何财产的损害及有关索赔、诉讼程序、赔偿费、费用、诉讼费等所有有关的除22.2款规定的特殊情况外的所有费用。“

22.2例外情况

第22.1款涉及的例外情况指:

(a)工程或其任何部分所永久使用或占用的土地。

(b)业主为工程施工或部分施工在其上、其下、在其中或通过其工作的任何土地的权力。

(C)根据合同施工、完成工程及保修不可避免对财产造成的损坏。

(d)由于业主、其代理人、雇员或其他承包人(均非本工程承包人雇用的)的行为或过失引起的对人身的死、伤或对财产的损失、损坏,或与此有关的任何索赔、诉讼、损害赔偿、诉讼费、指控费及其他开支,或有些伤害或损害是由承包人及其雇员、代理人引起的,但部分原因及在某种程度上是由业主、其雇员、代理人及其他承包人引起的,这一点应予公平合理地考虑。

22.3业主的保障

业生应保障承包人免予承担属于22.2款规定的例外情况下所有索赔、诉讼、损害赔偿、诉讼费、指控费及其他开支。

23.1第三方保险电话业主财产

承包人应不限于22款规定的他的或业主的义务和责任的条件下以承包人及业主的共同名义进行人身伤亡(第24款规定除外)保险及财产(工程除外)损失或损害保险。

但第22.2款(a)、(b)和(c)款规定的情况除外。

23.2最低保险金额

第三方保险的投保金额不得低于投标书用录中规定的数额,仅对于投保的事故次数不限。

24.1工人的事故及伤残

业主不对承包人及任何分包人所雇用的工人和其他人员的伤害及其补偿负有责任,除非伤害及赔偿是由业主及其代理人、雇员的行为及错误适成的。承包人应保障并持续保障业主不承担(除业主如前所述应负责的情况外)有关的伤害及补偿,及所有有关的索赔、诉讼、损害赔偿、诉讼费、费用与其他开支。

24.2工人事故的保险

承包人应在全部工程施工期间对所有其雇用的工人进行此类保险并持续这种保险。但对于任何分包人雇用任何人员,如果分包人已经对上述雇员进行了保险,使业主根据保险单得到补偿,则本条款前述的承包人保险义务即得到履行,但在必要时,承包人应要求分包人向业主提交有关的保险单及本期保险金的支付收据。

25.1保险证明及条款

承包人应在工程开工前向业主提供根据合同要求的保险投保证明,并在:

(a)承包人所需保险的工作开始7天前,或(b)开工后84天内向业主提交保险单。

在向业主提交证明和保险单时,承包人应通知监理工程师。保险单应与发出中标通知书前双方同意的一般条款一致。承包人应使所有由其负责的在中国人民保险公司,或事先经业主批准的任何合格保险公司投保的保险及经业主批准的保险条款生效。

25.2保睑的完备性

承包人应在施工进度、范围、性质发生变化时通知保险人,以确保根据合同条款在所有时间内有完备的保险,并根据要求向业主提交有效的保险单及本期保险费的支付收据。

25.3对承包人未保险的补救办法

如果承包人未使或未保证任何合同规定的保险生效,或未按25.1款规定的时间向业主提供保险单,业主在任何这种情况发生时,将使或保证任何这些保险生效并支付的保险金,及随时从支付给或应支付给承包人的款项中扣回,或视同到期债务从承包人处扣回。

25.4遵守保险单的条件

在承包人或业主未能遵循据合同生效的保险单条款。责任一方应赔偿另一方由此而造成的全部损失及赔款。

26.1邀守法律、规章

承包人应在所有方面,包括发出所有通知、支付各种费用方面遵守:

(a)所有与工程施工、完成工程,保修有关的由国家或省颁布的法令、法规或其他法律、或任何地方或其他合法机构的规章或地方法规,及(b)其财产或权利受到或可能受到该工程以任何方式影响的公共团体和公司的规章制度。

承包人应使业主免于受到有关破坏这些规定的所有处罚及承担有关这方面的责任。但业主应负责取得工程进展所必须的计划、区域划分或其他类似的批准,并根据22.3款规定,给承包人补偿。

27.1化石处理

所有在工地被发掘的化石、硬币及有价值的物品,或文物、结构物及有地质、考古价值的其他遗迹和物品,就业主和承包人而言,应被视为业主的绝对财产。承包人应采取合理措施防止其工人或其他人员移动、损害任何这类物品,并在发现后立即通知监理工程师并按监理工程师的指令处理这些物品。如果由于处理此类事宜使承包人延误了工期/或支付了费用,监理工程师应在与承包人和业主协商后,决定:

(a)任何根据44款规定承包人有权得到的延长工期,及(b)应加入到合同价的一笔款额,并相应的通知承包人及抄报业主。

28.1专利权

承包人应保护和保障业主免于承担由于工程上使用的或有关的或准备采用的任何承包人的设备、材料或工程设备等方面侵犯任何专利权、设计商标或名称或其它受保护权利的行为而引起的所有索赔和诉讼的费用,并保护和保障业主免予承担由此导致或与此有关的损坏赔偿、诉讼费、指控费和其它开支。但由于执行监理工程师提供的设计或技术要求而侵犯上述权利的情况除外。

28.2矿区使用费

除另有规定外,承包人应支付为获得工程所需要的石料、砂子、砾石、粘土或其他材料等所发生的吨位费和其他矿区使用费、租金及其他支出或补偿费(如果有的话)。

29.1对交通和毗邻财产的干扰

在符合合同要求所许可的范围内,在施工、完成工程及保修过程中、所必需的一切操作均不应对:

(a)公众的便利,及(b)公用道路或私人道路,以及通往属于业主或他人财产的人行道的进入,使用或占用,产生不必要及不适当的干扰。

承包人应保护并保障业主免予承包人负责的上述事项所导致或与之有关的一切索赔,诉讼、损害赔偿、诉讼费、费用及其他开支。

3O.1避免对道路的损坏

承包人应采取一切合理的手段,防止与现场连接或通往现场的道路和桥梁受到承包人或其任何分包人因交通而造成的损坏。尤其应当选定运输线路、选择和使用运输工具、限制和分配运载重量。从而使因运输原材料、设备和承包人的设备或临时工程而不可避免的这类运输尽量限制,不致对这类道路和桥梁适成不必要的损坏或损伤。

3O.2承包人设备或临时工程的运输

除合同另有规定,承包人应对其通往工地或位于通往工地路线上的为运输承包人设备或临时工程的任何桥梁的加固或更换或改善其任何道路交付相应的费用。承包人应免除业主对由于这种运输引起的任何此类道路桥梁损坏的赔偿责任,包括直接向业主提出的索赔要求。承包人应通过谈判处理此类索赔,并支付所有由此类损坏引起的索赔。

30.3材料或工程设备的运输

尽管有30.1款规定,如果在运输材料和设备时,对通往工地或位于通往工地路线的任何道路或桥梁造成任何损坏,在承包人得知这一损坏或接到被授权的官方提出的索赔要求后,应立即通知监理工程师及业主。根据法律规定,要求材料和工程设备的运输者对道路主管部门给予损坏赔偿,业主不负责支付所有有关的费用。在其他情况下业主通过谈判,解决争端,并支付有关索赔的金额,并免除承包人对有关的索赔、起诉、损害赔偿、诉讼费、指挥费及其他开支的责任。只要监理工程师认为索赔或部分索赔是由于承包人未能按30.1款规定履行其责任,监理工程师在与业主及承包人协商后,将决定这一笔失职引起的应支付的款额,业主将从承包人的款项中扣回,也可以从任何应支付或到期应支付给承包人的款项中扣除同等数额,并通知承包人及业主。也规定,业主应通知承包人纠纷将在问时协商解决及将从承包人的那一笔款项中扣回上述金额。在解决这一纠纷前,业主应与承包人协调。

3O.4水运

在工程的性质要求承包人使用水路运输的条件下,本条上述各项规定应解释为“道路”一词的含意包括船闸、码头、海堤或与水路有关的其他结构物,而“运输工具”一词的含意包括船舶,而且具有与上述规定同样的效力,30.5工程施工交通

承包人应自行安排在公共道路上特殊的施工交通许可,并承担有关费用。

30.6当地运输服务

鼓励承包人在承运施工机械和材料中最大限度地使用当地的搬运和运输服务,承包人应只同在中国依法成立和登记的运输组织签订合同。

31.1为其他承包人提供机会

按照监理工程师的要求承包人应向以下人员提供其进行工作的一切合理机会:

(a)业主所雇用的任何其他承包人及其工人,(b)业主的工人,及(c)在工地上或工地附近进行该合同未包括的任何工作的、业主可能雇用的任何合法机构的工人,或进行业主可能签订的与该工程有关的或附属工程的任何其他合同项目下工作的工人。

31.2为其他承包人提供方便

据31.1款,按监理工放师的书面要求,承包人应:

(a)为任何其他承包人、或业主或任何这样的主管部门提供由承包人负责维修保养的任何道践或通道,或(b)允许这些人使用在工地上的临时工程或承包人的设备,或(C)为这些人员提供住河性质的其他服务,监理工程师应据52款决定增加合同的费用并相应通知承包人及抄报业主。

32.1承包人保持现场整洁

在工程施工期间,承包人应合理地保持现场不出现不必要的障碍,排除雨水或污水,并应将任何承包人的设备和多余材料储存并作出妥善安排,从现场清除非运走任何废、垃圾及不再需要的临时工程。

33.1竣工时的现场清理

发出任何移交证书后,承包人应立即从已签发了移交证书的那部分工地上将所有有关的承包人的设备、多余材料、垃圾及各种临时工程清除、移走,这使部分工程及工地保持清洁,使监理工程师满意。在保修期结束之前,承包人有权为完成保修期内的义务,将其需要的材料、承包人的设备,临时工程保留在工地。

展开阅读全文

篇9:关于硕士研究生毕业论文开题报告范文_开题报告_网

范文类型:汇报报告,全文共 4016 字

+ 加入清单

关于硕士研究生毕业论文开题报告范文

1.11毕业论文选题的原则

毕业论文选题一般要求满足以下原则:

①开拓性:前人没有专门研究过或虽已研究但尚无理想的结果,有待进一步的探讨和研究,或是学术界有分歧,有必要深入研究探讨的问题;

②先进性:硕士毕业论文要有新的见解,博士毕业论文要做出创造性成果;

③成果的必要性:所选课题应有需要背景,针对实际的和科学发展的需要,即应有实际效益或学术价值;

④成果的可能性:课题的内容要有科学性,难易程度和工作量要适当,充分考虑到在一定时间内获得成果的可能性。

以上要求说明,毕业论文题目不是给定的,而是研究出来的,只有在对所研究领域的过去、现在的研究资料等信息进行全面把握、深入分析的基础上,才能够确立满足以上“四性”要求的选题,从而为完成高质量的毕业论文奠定坚实的基础。无论是结合导师已有科研任务的选题,还是自选课题,选题之前的“信息积累”与“发现问题”均是研究生所必须经历的过程,尽管导师已完成了以上过程,但导师并不能替代研究生,这就是研究生学习、研究的独立性要求。

1.22开题报告的内容与撰写要求

开题报告的内容一般包括:题目、立论依据(毕业论文选题的目的与意义、国内外研究现状)、研究方案(研究目标、研究内容、研究方法、研究过程、拟解决的关键问题及创新点)、条件分析(仪器设备、协作单位及分工、人员配置)等。

2.1开题报告——毕业论文题目

题目是毕业论文中心思想的高度概括,要求:

①准确、规范。要将研究的问题准确地概括出来,反映出研究的深度和广度,反映出研究的性质,反映出实验研究的基本要求——处理因素、受试对象及实验效应等。用词造句要科学、规范。

②简洁。要用尽可能少的文字表达,一般不得超过20个汉字。

2.2开题报告——毕业设计立论依据

开题报告中要考虑:

①毕业论文的选题目的与意义,即回答为什么要研究,交代研究的价值及需要背景。一般先谈现实需要——由存在的问题导出研究的实际意义,然后再谈理论及学术价值,要求具体、客观,且具有针对性,注重资料分析基础,注重时代、地区或单位发展的需要,切忌空洞无物的口号。

②国内外研究现状,即文献综述,要以查阅文献为前提,所查阅的文献应与研究问题相关,但又不能过于局限。与问题无关则流散无穷;过于局限又违背了学科交叉、渗透原则,使视野狭隘,思维窒息。所谓综述的“综”即综合,综合某一学科领域在一定时期内的研究概况;“述”更多的并不是叙述,而是评述与述评,即要有作者自己的独特见解。要注重分析研究,善于发现问题,突出选题在当前研究中的位置、优势及突破点;要摒弃偏见,不引用与导师及本人观点相悖的观点是一个明显的错误。综述的对象,除观点外,还可以是材料与方法等。

此外,文献综述所引用的主要参考文献应予著录,一方面可以反映作者立论的真实依据,另一方面也是对原著者创造性劳动的尊重。

2.3开题报告——毕业设计研究方案

开题报告中要考虑:

①研究的目标。只有目标明确、重点突出,才能保证具体的研究方向,才能排除研究过程中各种因素的干扰。

②研究的内容。要根据研究目标来确定具体的研究内容,要求全面、详实、周密,研究内容笼统、模糊,甚至把研究目的、意义当作内容,往往使研究进程陷于被动。

③研究的方法。选题确立后,最重要的莫过于方法。假如对牛弹琴,不看对象地应用方法,错误便在所难免,相反,即便是已研究过的课题,只要采取一个新的视角,采用一种新的方法,也常能得出创新的结论。

④研究的过程。整个研究在时间及顺序上的安排,要分阶段进行,对每一阶段的起止时间、相应的研究内容及成果均要有明确的规定,阶段之间不能间断,以保证研究进程的连续性。

⑤拟解决的关键问题。对可能遇到的最主要的、最根本的关键性困难与问题要有准确、科学的估计和判断,并采取可行的解决方法和措施。

⑥创新点。要突出重点,突出所选课题与同类其他研究的不同之处。

2.4开题报告——毕业设计条件分析

突出仪器设备等物质条件的优势。明确协作单位及分工,分工要合理,明确各自的工作及职责,同时又要注意全体人员的密切合作。提倡成立导师组,导师组成员的选择要充分考虑课题研究的实际需要,要以知识结构的互补为依据。

以上就毕业论文开题报告之构成要素的撰写进行了简要的介绍。要写好开题报告,除了掌握必要的开题报告的写法之外,笔者认为,思想上一定高度重视,平时要勤动笔,并善于学习借鉴他人开题报告的优点。(选自:《浙江中医学院学报》2019.9,原文:“撰写研究生开题报告的技巧与方法”作者:张红)

开题报告写作规范

一、开题报告的写作应包含以下几方面的内容:

1、综述本课题国内外研究动态,说明选题的依据和意义;

2、研究的基本内容,拟解决的主要问题;

3、研究步骤、方法及措施;

4、研究工作进度;

5、主要参考文献。

二、开题报告的排版要求:

封面为四号宋体,正文为小四号宋体,页边距为左3cm,右2.5cm,上下各2.5cm,标准字间距,标准行间距,页面统一采用a4纸。

三、开题报告的字数要求:

正文字数不得少于3000字。

设计策划硕士毕业论文开题报告

设计计划学是一门新兴的综合性边缘学科,它研究的是如何保证设计的优良度和高效性,以及如何指导设计的展开。在设计需要科学计划这一概念已成为现代设计界共识的情况下,我国业界内部对设计计划学的认识与研究,还没有跟上设计发展需要的步伐。针对我国设计教育现状,本书将就该学科的教学方面,提出一套科学的行之有效的设计计划方法。以期为设计类学生深入理解设计,更好地掌握设计的方法提供必要的指导。

二.学术价值分析

1.选题依据

计划在今天已逐渐成为一门显学,大至国家事务,小至个人日常生活,社会各个领域都离不开计划,各类大大小小的成功项目,很大程度上都自觉或不自觉地导入,实施了相应的计划活动。计划学的兴起是知识经济时代资源整合化的大势所趋。而反映到艺术设计学的领域,我们可以发现,计划同样有极大的发展空间:如何设计,如何保证优良的设计,这都需要科学的调查研究,需要精准的分析定位,需要详实的设计依据,需要合理的组织安排,这些与我们通常理解的形式,风格的赋予层面的“设计”相异而相成的工作,就是设计计划的内容。而如何正确进行设计计划,存在着一个方法论的问题。在学科间的交叉融合成为当前学术主流的大环境下,设计计划应该可以打通各设计专业间的藩篱,为取得成功的设计提供行之有效的方法上的支持。

在设计先进国家,对设计计划方面已有一定程度的研究。尤其在设计方法研究方面,已取得比较成熟的结果,出现了一些有效的方法,如技术预测法,科学类比法,系统分析设计法,创造性设计法,逻辑设计法,信号分析法,相似设计法,模拟设计法,有限元法,优化设计法,可靠性设计法,动态分析设计法,模糊设计法等。这些方法侧重于不同的专业设计方向,而设计计划面临不同设计专业,更需要的是一种整合的灵活的解决问题的计划方法。这就需要我们针对计划自身的学科特点,从现有的成型的方法群中进行提炼,总结出一套适应现在情况的设计计划方法来。

2.创新性及难度

本文将参考管理决策方法与相关设计方法研究的成果,试图寻找一套对于我国设计师来说,明确可行的跨专业设计计划的方法体系。

本文致力于从简明实效的角度,为设计计划人员提供易于操控,而且便于和各个专业设计师进行沟通、交流的方法。要求该方法不仅对专业设计团队的计划环节有用,对个体设计人员的的设计工作也应具有指导作用。这就需要针对我国设计现状,从国内外各学科领域名目众多的相关方法中进行精心挑选,合理安排,科学综合的处理,创造出一套高效的计划方法来。虽然国外的相关成果业已成熟,但如何在众多不同侧重角度的方法中总结出理想的计划方法,需要我们对所有已知方法深入地认识和理解,同时明了我们设计各专业的工作规律,以期做到跨专业的有效性。

本文具有一定的难度。首先在对计划的理论性分析与研究中,需要树立对计划的正确理解与认识,进而廓清设计计划的概念。接着将在设计计划方法论层面的研究上,对设计计划及其方法论进一步阐述。鉴于国内现在并没有对设计计划有深入的的系统的研究,该书内容基本上属此方面问题的首次讨论,面临着缺乏大量相关经验及理论借鉴的景况,所以需要作者在目前积累的实践性资料和相关学科的研究成果中加以总结与深化。

本文最大的难度在于资料的搜集上,国内相关资料匮乏且本方向的研究缺乏交流的气候,而由于我院互联网情报系统的不完善和出于对技术保密的考虑,也很难从互联网上得到理想的资料。作者只能从书店,图书馆和其他专业的老师和同学手中求取所需要的信息。当然本研究方向的直接信息是很缺少的,更多是从其它方向的研究成果中搜集所需要的信息资料。方法的研究是一个涉及面很广的课题,也需要从很多领域进行比较分,探索总结。而从一个学科到另一个学科的跳跃性研究,需要迅速转换思维及反复调整视点,这也对作者的思维技能,思考方式,学术视野及知识积累等方面的研究素质提出了很大的挑战。

3.研究方案的可行性和合理性

由于国际设计交流间的局限和我国设计界的特殊情况,尤其是国内设计教育上的某种封闭性和滞后性,我国业界对设计计划方法的认知尚不够深入,还缺乏一套完整的,在教学和实践中简明且易于操作的设计计划方法。经初步调查,当前学界内仅有的几本相关著作,也仅限于对西方某些设计方法与程序的简单的介绍,没有很专业地从计划的层面进行系统阐述,而市场上连篇累牍的相关书籍主要是从市场营销和工商管理方面着手,对设计类诸专业的设计计划,并不具备现实指导作用。所以亟待有这么一套专业性较强的设计计划方法及其论著出现。在某种程度上,本书的出现将对设计计划这一门新兴学科,起到填补教学用书空白的作用。而从技术的角度而言,本书的完成也有相当的可行性,在分院近几年来的设计策划课程的教学中,已为之积累了大量新鲜的实践性,经验性资料。而分院的教育架构,亦为这个跨专业的研究项目做好了充分的人力物力资源上的准备。

展开阅读全文

篇10:2024年网络条件下党员教育调研情况总结_党团工作总结_网

范文类型:工作总结,适用行业岗位:党工团,全文共 1872 字

+ 加入清单

2016年网络条件下党员教育调研情况总结

白石桥社区在党务工作者队伍建设上,由书记负责,完善党内班子建设,通过选举产生书记、副书记和委员,多数在党内担任职务的人员都是社区工作人员,有利于日常组织开展当内工作,研究和讨论实际问题,这样的选举结果,更有利于社区党务工作有人办事,高效办事,能办好事。

一、网络发展趋势

现有的电信网络,主要是在任意两个用户之问提供一对一的、双向的、实时的连接。现有的广播电视网,是一个单向的信息分配网络,近年来广播电视行业也开始利用一些新的数字调制技术,发展网络数字电视。因特网的连接方式和它所能提供的业务,则是综合了上述两种极端的情况。今后网络发展有三网合一的趋势。

二、网络化对社区党员教育工作的现实影响

在党员教育上,白石桥社区以执行党员管理“三会一课”制度为主,定期组织召开党员大会、支部委员会、党小组会,按时上好党课,同时每月15日定为党员集中学习日,组织开展一次党员集中学习活动。

但由于各种因素影响,党员集中学习报到率偏低。社区退休党员多,对于退休的这部分党员,由于年龄身体健康状况等因素,党员们主观上认为参与建设和社会活动的机会越来越少了,对继续学习积极性不足,真正能严格做到参加党内生活和支持党内工作的,寥寥无几,多数只能根据身体状况,视情况参加活动,白石桥社区党总支组织的集中学习,离退休党员实际平均参与率不足70%。这部分党员因为年龄偏大,接触网络信息和网络技术很少,信息网络化趋势对他们影响不大。

对于在各类社会单位和外地工作的党员,又存在另一类问题,由于工作关系和党组织关系脱离,组织党内活动经常遭遇工作单位要求和党组织要求冲突的尴尬,由于目前社会压力大,党员大多在单位担任要职,一旦冲突严重,大多数时候党员会选择工作单位的安排,而放弃党组织的安排,社区党总支出于对党员的体谅,大多数时候也只能谅解。以白石桥社区党总支的情况为例,此类党员参加每月学习日参与率不足50%。

社区每周开展远程教育,对党员和居民全部开放,目前信息网络化技术的发展,党员接受各类网络信息非常便利,因此社区远程教育工作站优势不明显,党员参与的积极性不高。这一类党员接触网络信息多,有些党内学习教育活动可以通过网络实现。

三、网络化对党员思想状况和行为方式的影响

网络的自由度特别高,更难于控制和监管;它的共享性特别强,谁也不可能完全垄断信息资源和信息系统;它的交互性特别突出,“一言堂”在互联网条件下不会有市场。与前述互联网的技术特点和社会文化特点相伴生,信息宝藏与信息垃圾共存于一“网”,给党员思想状况带来了冲击。

四、网络化对党员教育带来的挑战

(一)党员思想控制面临挑战

由于互联网的出现和普及,打破了信息传播的空间限制,使各种合法的不合法的、健康的不健康的信息快捷方便进人党员的眼界,一旦出现热点问题,与此相关的信息寻访及讨论数量都会直线上升,范围之广、速度之快都是无法想象的。这种完全开放的、互动式的传播,使社会对个人思想行为和制约机制发生了变化,不再能够进行有效的监督。

(二)党员教育载体面临挑战

网络使得党员教育的渠道和阵地迅速扩大,如果我们不注意利用互联网加强思想政治工作,就不能最大限度地减少互联网所带来的负效应。

(三)党组织工作者素质面临挑战

网络是由人来创造和管理的,而党组织工作者对互联网的掌握、熟悉和运用及其创造力和想象力决定了网上网络化条件下党员教育的成效。在传统的党员教育过程中,党组织工作人员处于一种信息优势的地位。通过这种信息优势,在教育过程中比较容易树立威信,得到受教育者的尊重和认可。然而,在网络时代,这种优势部分丧失了。部分党务教育工作者由于对计算机基础知识特别是网络知识和技能知之较少,面对飞速发展的计算机和网络科技往往不知所措,心有余而力不足。因此,提高素质是他们迎接网络时代挑战的一个重要课题。

五、网络化对党员教育带来的机遇

(一)教育阵地和教育内容扩大化

网络的发展使网络传播日益成为一种重要的传播手段。教育方式不在局限于传统教育的书本和课堂,受众更加广泛。

(二)教育便利化

随着计算机和通信技术的不断发展,网上快速传播、同步交流、网络教育不在受空间和距离的影响,党员同志可以在不同的地方通过网络实现同时教育,有利于组织外地工作党员参加学习教育,通过网络教育,组织教育活动时间和费用上也更经济。

六、意见和建议

针对社区单位党员和外地工作党员,可以收集网络邮箱和qq号等,形成网络教育模式,形成党支部或党小组网络教育群,对阶段性不具备现场参加学习教育活动的党员,可以通过网络手段,组织学习教育,参加组织生活。

展开阅读全文

篇11:附条件买卖合同

范文类型:合同协议,全文共 1437 字

+ 加入清单

条件买卖合同书

附条件买卖合同书

买受人:_____________________

出卖人:_____________________

兹因买受人向出卖人购买附表一的标的物,依动产担保法规定,双方约定条款如下:

一、买卖标的物:_____________________

二、买卖标的物业已点交买受人占有使用,但买受人未付清全部价款之前功尽弃(或买受人所交付支票未全部兑现之前),出卖人保有标的物及其附件的所有权。买受人使用标的物,应遵守下列条件:

(一)标的物应置放于______________(处所)。买受人妥善保管维护使用。未经出卖人书面同意,不得将标的物移离上述地点。

(二)出卖人得随时派员至标的物所在地点,检查标的物的状况。

(三)买受人不得毁损标的物或涂灭标的物上名称、商标、厂牌与编号。

(四)标的物(包括零件、附件)因火灾、盗窃以及天灾地变等不可抗力而发生的损失,概归买受人负担。

(五)买受人不得交标的物出借、让与、出质、出卖、提供担保或为其他任何处分。

三、买卖人取得所有权的方法:_________________________________

四、买受人取得所有权的条件:买受人付清全部价格时(如系开票据时,于该票据全部兑现时),买受人始行取得标的物所有权。

五、第三条所定付款,如买受人有任何一期未付情况(或所开票据有任何一张不兑现情况),经出卖人以挂号函发信期限三日催告(发信日为准),买受人仍未清偿时,买受人并愿迳受强制执行。出卖人得申请法院强制执行收回买卖标的物。其已付价款,全部视为买受人使用标的物的折旧损害赔偿,不得请求退还。如标的物有毁损,买受人应按出卖人通知的数额赔偿。

六、买受人如将标的物保险,其受益人应列为出卖人。

七、就本合同所生纠纷之一切诉讼(包括连带保证人部分)以______________法院为第一审管辖法院,强制执行收回标的物,则由标的物所在地的地方法院管辖。

八、其他条件

(一)双方应即日向管辖登记机关,办理动产担保附条件买卖合同的登记。如买受人不协同出卖人办理登记,任凭出卖人随时收回标的物,并赔偿出卖人的一切损失,买受人无异议。

(二)本        件动产担保附条件买卖合同登记有效期间为三年,自登记日起算。

(三)出卖人收回标的物十日内,买受人得以现金缴付余额全部(或未兑付票据全部)及偿还出卖人收回的一切费用于出卖人后,领回原标的物。其领回位置,由买受人自理。

(四)其他未定事项,概依有关法律的规定办理。

九、买受人的连带保证人,就买受人因本合同而生的一切债务,负连带责任,并愿抛弃民法保证各条内有关保证人和权利。连带保证人所负责任,以保证至履行本合同所生全部债务时为止。保证人非经出卖人的书面同意,不得借故中途退保。

十、出卖人依第五条收回的买卖标的物,经拍卖所得的价金与买受人已付的价金合计总数不足清偿全部货款时,买受人及连带保证人仍应负全部清偿责任。

附表(略)

买受人:__________________

住址:____________________

身份证号:________________

连带保证人:______________

住址:____________________

身份证号:________________

出卖人:__________________

住址:___________________

身份证号:________________

_________年______月_____日

附条件买卖合同书

附条件买卖合同书

展开阅读全文

篇12:新加坡培训学习心得体会

范文类型:心得体会,适用行业岗位:培训,全文共 211 字

+ 加入清单

感谢学校的信任,让我在此次培训中心担任班级副班长,除了配合班长做好各项管理工作和班级服务外,我也懂得了如何更好的与老师们沟通,提升了自己组织协调能力。在如何提升班主任组织能力研讨会中,各位老师的精彩发言让我获益非浅,如何提升班级凝聚力,如何选聘班委,如何把握宽与严的尺度,如何及时了解和掌握学生思想动态等都给了我很大的启示,对为我今后的工作有很大帮助,我愿与大家共成长共奋斗,努力为学校的人才培养和今后的发展建设贡献力量。

展开阅读全文

篇13:中学办学条件标准化建设自评报告[页2]_自评报告_网

范文类型:汇报报告,适用行业岗位:中学,全文共 1267 字

+ 加入清单

中学办学条件标准化建设自评报告

三、自评情况

a1:学校设置与校舍

(1)学校总体规划设计因地制宜,布局合理,校园绿化、美化良好,充分发挥环境的育人作用。学校校园有围墙及坚固大门,并有警卫室,高标准的体育运动场地在校园内,为学生健康安全的体育活动提供了保障。环境优美的校园,不存在脏乱差情况,各种线路架设较规范、整齐、安全。校舍建筑设计规范,两座教学楼分别于XX年和XX年进行了加固,没有发生过安全事故。学校26个教学班规范、整洁并配有 “班班通”设备,上课方便实用。

(2)特种教室种类齐全,设施配套。学校有物理、化学实实验室,生物实验室、多媒体教室、音乐教室、美术教室、图书室、心理咨询室、卫生室、微机室等,各特种教室使用率高,符合标准要求。

(3)高标准的学生公寓已经竣工,近期将要投入使用。内部设施(水电暖)齐全,布局合理,卫生整洁,地面、厕所均为瓷砖铺设。学生公寓有专门的管理机构——宿舍管理处,有六名专职教师和两名校领导值班,确保学生住宿安全。

(4)学生标准化餐厅能容纳近千名学生用餐,干净卫生,学生洗刷用水方便,餐厅内设小卖部,方便了学生的日常学习和生活。

a2:运动场地及室外设施

学校拥有400m环形跑道的标准操场,内设标准足球场,除此之外,学校还建有标准篮球场三个,乒乓球台十个,各种体育设施齐全。各场地布局合理,无杂物,学校使用率较高。单杠、双杠、肋木等室外体育器械配备齐全,安放牢固,场地平整,为师生日常健身提供了保证。各种运动器材、设施利用率高,眼保健操,阳光体育活动正常开展,体育运动会每年一次,活动规范,效果好。

a3:教育教学装备

(1)学校各种实验室的专用设备和仪器达到了教育部《中小学理科实验装备规范》和《山东省中小学实验室建设与配备标准》中的一类标准。实验教学仪器的配备是按教育部教基字()16号文件中规定的标准进行配备的,学校并根据实际情况进行了相关的选配。

(2)音乐和美术器材学校按照教育部现行配备目录中的一类标准进行了配备,完全可以适合当前教学要求。体育器材,学校根据教育部现行配备目录中的必配标准和一类选配标准进行了配备,完全符合相关规定要求。音乐、舞蹈、美术室内设施达到了《山东省中小学实验室建设与配备标准》的要求。

(3)学校现有图书总量计70000余本,达到生均40本的要求。报刊110种,超过相关规定要求。自XX年至今,又新添图书7000余册,年均增添新书占藏书标准的2%以上。图书室有相关借阅制度,管理规范,借阅记录齐全,能够满足教师学生的使用要求。

(4)学校平时注重教育信息化装备的有效利用,同时利用学校网站进行最大限度的教学研究活动。学校有学生用机120余台,教师每人一机,都能够连接互联网。学校校园网使用正常,能够与市、区教育局及其他学校实现资源共享。物理、化学、生物实验室配有多媒体终端设备,师生使用规范正常。

(5)卫生保健室设施与设备齐全,全部按《国家学校体育卫生条件试行基本标准》配备,各种设施、药品按要求摆放,整齐有序。学校配有一名专职校医,给师生带来了便利。

共3页,当前第2页123

展开阅读全文

篇14:巴中市健全落实社会治安综合治理领导责任制实施细则解读

范文类型:细则,适用行业岗位:领导,全文共 632 字

+ 加入清单

问:请您介绍一下《实施细则》起草的主要背景。

答:去年,中央、省委分别出台了《关于健全落实社会治安综合治理领导责任制的规定》《四川省健全落实社会治安综合治理领导责任制实施办法》,首次以党内法规的形式明确了综治领导责任制。为认真贯彻落实中央《规定》和省委《实施办法》,推动提升我市社会治安综治治理水平,3月22日,市委、市政府以“两办”名义制定出台了《巴中市健全落实社会治安综合治理领导责任制实施细则》,结合我市实际,对健全落实综治领导责任制相关内容和要求做了细化、明确和强调,为进一步压实综治责任链条、推进“平安巴中”建设、提升社会治理水平提供了有力保障和支撑。

问:制定出台《实施细则》的主要目的是什么?

答:《实施细则》制定的核心目的就是落实各级党政和各级领导干部抓综治工作和平安建设的责任。通过发挥“关键少数”的作用,鲜明工作导向,传导工作压力,浓厚工作氛围,形成一级抓一级、层层抓落实的良好工作格局,使各级领导班子、领导干部切实担负起维护一方稳定、确保一方平安的重大政治责任。

问:《实施细则》的适用范围主要是哪些?

答:本细则主要适用于全市各级党的机关、人大机关、行政机关、政协机关、审判机关、检察机关及其领导班子、领导干部,人民团体、事业单位、国有企业及中央、省驻巴单位领导班子、领导干部参照执行本细则,也即是全市范围内的所有党政机关、事业单位和编制内的所有领导干部,都受《实施细则》的影响和约束,都必须履行综治领导责任,必须执行和落实《实施细则》的规定和要求。

展开阅读全文

篇15:出国留学介绍信英文精选范文

范文类型:介绍信,适用行业岗位:留学,全文共 497 字

+ 加入清单

申请人,___,男,25岁,1995年08月05日出生,20__年7月毕业于____旅游管理专业。

我喜欢旅游,大学我选择了旅游管理专业,开始系统学习旅游管理知识,课程涉及__国家的旅游文化,当时__国家独特的文化内涵给了我很大的感触,我想自己毕业后如果能到__国家进一步学习,对开阔视野提升知识面一定会有很大的帮助,但是要去__国家,语言是首先要解决的问题,毕业后,我选择到烟台昂立外语学院学__国家语,经过一段时间的学习,我发现国内学校教的大都为书面化的东西,只有到__国家才能领悟到精确的本土文化,我跟父母说了我的想法,父母表示大力支持,,并且他们已经为我提供了足够的留学资金。

正好有朋友给我推荐了白石大学,这所大学可以先学习基础语言后学习专业,我觉得挺不错,为了我的梦想,我会在学校努力学习语言,语言合格后,继续留在本校读研,相信本校的专业一定会让我学有所成的。

学成回国后,我准备开个主题旅游策划公司,实践自己所学知识。我对所学的这个专业充满激情和动力,当然,我更热爱我的祖国和爸爸妈妈,相信通过我的努力,我会更好的回报祖国的培养和爸妈的养育之恩。

此致

敬礼!

介绍人:__

20__年_月_日

展开阅读全文

篇16:软件工程硕士开题报告范文_开题报告_网

范文类型:汇报报告,适用行业岗位:工程,全文共 5245 字

+ 加入清单

软件工程硕士开题报告范文

一、课题的意义

选择一个适合的产品开发过程对于成功完成产品开发有着至关重要的作用。一个定义良好的过程,可以有效地指导和监控产品开发实践活动,提高产品开发的效率、质量和可预测性。但是,如果过程定义不合理,却会反过来制约我们的工作,导致挫折、低效、低质量甚至失败。

产品开发是一个多学科综合的过程。以消费电子产品为例,在产品开发过程中,软件、硬件、结构件和定制件等各个学科和专业小组的活动互相依赖、交叉并行。传统的产品开发过程往往采用串行、离散、重量级的方法,存在着以下问题:

串行的产品开发过程不能有效支持产品开发的迭代本质,项目的风险往往在后期集中爆发,导致项目进度失控或产品草率交付。

传统产品开发过程把各个学科和专业小组的活动视为一系列静态的、离散的过程,对于多学科交叉并行活动缺少有效综合与协调。

传统产品开发过程采用的重量级方法导致大量的文档工作和漫长的开发周期,难以快速交付高质量的产品。

随着产品的智能化、自动化和信息化程度越来越高,产品的功能和结构日趋复杂,其开发难度也不断增大。同时,技术和工艺水平的飞速提高,以及激烈的市场竞争导致产品的更新换代更加频繁,也使得开发时间日益缩短。在开发难度提高和开发时间缩短的双重压力下,传统的产品开发过程已经不能满足消费电子产品开发的需要。因此,建立一个高效的产品开发过程有着重大的意义。

二、国内外现状分析

为了解决传统串行的产品开发过程导致的产品设计改动量大、开发周期长、成本高、质量差等问题,人们提出了并行工程(Concurrent Engineering)与集成产品和过程开发(Integrated Product and Process Development, IPPD)的思想,这些思想对于建立产品开发过程有着重要的指导意义。但是并行工程与IPPD本身并没给出具体的产品开发过程定义,尤其是对于产品开发的迭代本质和多学科交叉并行特性缺乏具体的过程方法予以支持。

在产品开发中,系统工程(Systems Engineering)起着统领全局,综合、协调各个学科和专业小组的关键作用。对于产品开发过程方法的研究和实践,是系统工程的重要组成部分。在系统工程领域,现有的各种系统生命周期模型和系统工程过程模型从各个不同的方面对产品开发过程进行了描述,现有的重量级的产品开发过程大多数正是在这些模型的基础上建立起来的。但这些模型本身比较抽象化和一般化,不足以作为产品开发过程定义。同时,由于系统工程长期以来主要应用于大型/超大型系统(如武器系统、航天飞机等),在应用这些模型进行产品过程定义时必须非常小心,否则容易产生过于重量级的过程。

反观软件工程(Software Engineering)领域,对于软件开发过程的研究和实践近年取得了很大的进展,迭代开发正取代传统的瀑布模型逐渐成为软件过程方法的主流。基于迭代开发的产品化的软件开发过程——RUP的出现,标志着迭代开发方法的成熟。以迭代开发为核心的一批敏捷方法(Agile Methods),代表着软件开发过程研究和实践中极为活跃的部分。但是这些过程和方法主要关注于软件开发过程,对于其他学科的活动通常只是作为软件开发过程的外部环境加以考虑,而不是从全局上予以综合和协调。

产品开发、系统工程、软件工程3个领域的过程方法各有所长,但都满足不了消费电子产品开发过程的要求,尤其对于多学科综合的迭代开发方法都缺乏具体的解决方案。

三、研究目标和内容

本课题的研究目标是为消费电子产品建立一个能够有效支持产品开发迭代本质、有效综合与协调多学科交叉并行活动、轻量级的产品开发过程。

由于现有的过程方法都满足不了消费电子产品开发过程的要求,尤其对于多学科综合的迭代开发方法都缺乏具体的解决方案。因此,我们在综合产品开发、系统工程、软件工程等领域先进的过程方法的基础上,提出了一个适合于消费电子产品的、基于迭代开发方法的、多学科综合的开发过程——多学科集成迭代过程(Multidisciplinary Integrated Iterative Process, MIIP)。在这里:

“多学科”是指MIIP能够有效综合与协调多学科交叉并行的开发活动;

“集成”有两方面的含义,一是MIIP在产品开发过程中集成了各个学科和专业小组的活动,二是MIIP在过程方法上集成了RUP、敏捷方法、系统工程、并行工程、IPPD等多种过程方法的先进思想和经典实践;

“迭代”是指MIIP基于迭代开发方法。

本课题的研究内容主要包括:

1. 分析消费电子产品开发的多学科集成迭代特征,并为之建立合适的过程;

2. 研究迭代过程在多学科交叉并行情况下存在的问题,并寻求解决方案;

3. 将多学科集成迭代过程应用到具体的项目中,在实践中检验和完善;

4. 总结多学科集成迭代过程应用的经验教训,为企业乃至整个行业的过程改进提供经典实践。

[注:一般研究内容3-6个,每个研究内容要展开来陈述一下]

四、关键技术研究

[注:关键技术研究是指要解决的关键问题,不是要使用的主要技术]

多学科集成迭代过程(MIIP)以软件工程领域的RUP和敏捷方法为基础,将其扩展到系统工程领域,同时吸收了并行工程与IPPD的思想。MIIP的研究需要深入分析并解决好以下几个问题:

1. 消费电子产品开发过程具备什么样的过程特征?

2. 如何为消费电子产品开发过程建立合适的过程?

3. 对于消费电子产品,产品开发过程应具备什么程度的敏捷性?

4. 软件开发的迭代过程是否同样适用于硬件、结构件和定制件等其他学科的产品组件的开发?

5. 在多学科交叉并行的情况下如何进行迭代?

6. 各个学科如何在迭代之间进行协同?

7. 各个学科在独立并行和同步协调之间如何进行权衡?

8. 在实践中,产品开发如何实现从传统的串行过程到迭代过程的转变?

[注:关键问题3个以上,并建议每个问题要展开来陈述一下]

五、研究方案

本课题的研究方法主要包括:

1. 文献阅读:大量阅读文献,了解业界成熟的过程理论、经典实践和最新研究进展,建立充实的理论基础。

2. 过程资产分析:分析Z公司(一个大型的消费电子产品提供商)过程资产库中的现有过程定义文档,并将其与实际执行结果相比较。

3. 项目历史数据分析:分析Z公司项目历史数据,特别是项目计划、监控、度量结果和技术类工作产品,了解项目的实际执行过程。

4. 人员访谈:访谈Z公司项目经理、开发人员和过程改进人员,了解现有过程模型存在的问题及其根源和人们的期望。

5. 过程定义:在分析消费电子产品开发过程的特征之后,建立与之相适应的多学科集成迭代过程。

6. 讨论和评审:在新过程的设计过程中定期与相关专业人员进行讨论和评审,集思广益。

7. 过程试点:在Z公司选择一个现有项目进行试点,在实践中检验和完善过程定义。

8. 试点总结:总结多学科集成迭代过程应用的经验教训,为Z公司乃至整个行业的过程改进提供经典实践。

1. 基于复用定义软件总线架构

2. 面向快速软件服务的个体敏捷过程拟包括以下子过程:

a) 需求与组件池的匹配过程

b) 派生组件的开发过程

c) 需求的验证过程

d) 快速服务交付过程

e) 组件反馈维护过程

3. 借鉴CMMI和PSP来建立面向快速软件服务的个体能力成熟度模型,并进行评估

[注:如果是开发系统,则可画个系统结构图,并说明开发语言、工具、框架等]

本课题的研究经费来自Z公司的过程改进费用,Z公司有一支专职的过程改进队伍,并且已经具备一定的过程资产和项目历史数据,过程的试点项目已经选定,多学科集成迭代过程的核心思想已经开始在该项目中应用。课题研究各方面的资源已基本具备,可以支持研究工作的开展。

六、计划进度

[注:一般从开题到答辩是一年时间]

2019.10 开题

2019.12 定义面向快速软件服务的个体敏捷过程

2019.03 定义面向快速软件服务的个体敏捷过程中个人能力成熟程度

2019.04 选择2-3个专业服务项目进行推广试点

2019.06 对试点专业服务项目进行评估与改进

2019.07 撰写学术论文

2019.08 部门内部推广

2019.10 学位论文定稿和答辩准备

参考文献

[2] 熊光楞,徐文胜,张和明,范文慧。并行工程的理论与实践。清华大学出版社,施普林格出版社,2019

[3] 傅立丰,张耀宗,刘长红。并行工程的发展及应用。机械加工与自动化,2019(9)

[4] R. Winner, J. PenneU, H. Bertrand, M. Slusarczuk. The Role of Concurrent Engineering iWeapons System Acquisition. IDA Report R-338, Institute for Defense Analyses, 1988

[5] 朱焕立,刘玉宾。并行工程的产生、应用及研究现状。中州大学学报,2019(4)

[6] 万立,郑霞,刘清华。产品全生命周期管理平台的集成产品开发流程实现研究。计算机辅助工程,2019(6)

[7] International Council oSystems Engineering. Systems Engineering Handbook, Versio2a. INCOSE, 2019

[9] International Council oSystems Engineering. Guide to the Systems Engineering Body of Knowledge.

[10] Alexander Kossiakoff, William N. Sweet. Systems Engineering Principles and Practice. Wiley-Interscience, 2019

[11] Systems Thinking and Systems Engineering.

[12] Watts S. Humphrey. Managing the software process. Addison-Wesley, 1989

[13] WintoRoyce. Managing the Development of Large Software Systems. Proceedings of IEEE Westcon, 1970

[14] Frederich P. Brooks Jr.. The Mythical Man-Month. AddisoWesley Longman, 1995

[15] Roger S. Pressman. Software Engineering: A Practitioner’s Approach, Fifth Edition. McGraw-Hill Companies, Inc., 2019

[16] Steve McConnell. Rapid Development: Taming Wild Software Schedules. Micosoft Press, 1996

[17] Walker Royce. Software Project Management: A Unified Framework. AddisoWesley Longman, 1998

[18] Barry W. Boehm. A Spiral Model of Software Development and Enhancement. IEEE computer, 1988(5): 61~72

[19] Craig Larman. Agile & Iterative Development: A Manager’s Guide. PearsoEducation, Inc., 2019

[20] Barry W. Boehm. Anchoring the software process. IEEE computer, 1996(7): 73~82

[21] Philippe Kruchten. The Rational Unified Process: AIntroduction, Second Edition. Addison-Wesley, 2019

[22] Ivar Jacobson, Grady Booch, James Rumbaugh. The Unified Software Development Process. AddisoWesley Longman, Inc., 1999

[23] 沈备军,陈诚,居德华。敏捷软件过程的研究。计算机研究与发展,2019(11)

[24] Manifesto for Agile Software Development.

[26] 钱乐秋,张敬周,朱三元。Agile方法研究综述。计算机应用与软件,2019(6)

展开阅读全文

篇17:关于硕士学位论文开题报告写作的思考_开题报告_网

范文类型:汇报报告,全文共 1973 字

+ 加入清单

关于硕士学位论文开题报告写作的思考

开题报告的重要性和意义

从研究生培养管理的角度讲,开题报告是研究生学位论文工作的重要环节,是为阐述、审核和确定学位论文题目而举行的报告会。开题报告是一个阶段性考核,是中期筛选工作的重要内容之一,是对学位论文质量进行管理和监控的一个首要环节,是监督和保证研究生学位论文质量的重要措施。

从研究生的角度讲,开题报告的实质是向老师们汇报自己的学位论文准备情况,同时让老师们就自己的研究思路给予评价和提出建议,从而达到进一步明确研究目标,理清研究思路,以及在文献和研究方法方面从老师那里获得更多帮助的目的。因此开题报告的意义在于:

促使研究生做好论文的准备工作

为做好开题报告,研究生要进行调查研究、查阅有关资料和文献,了解国内外在这方面已进行的工作以及还有哪些不足,本课题重点研究什么、有什么价值,了解现有理论和实验研究的条件和手段等。通过开题报告工作,使研究生选题的目的更加明确,工作重点更为合适。

保证论文质量

为使开题报告能够顺利通过,研究生必须在开题报告前做好准备,导师以及二级学院有关教师须参加研究生开题报告并严格审核,对于选题合适、方法得当、措施落实的论文批准开题;对于尚有不足,要求做修改补充的,必要时再次进行开题报告。

开题报告的主要内容

开题报告的实质是向老师汇报自己论文的准备情况,在这个任务目标的引导下,研究生应该就选题、文献综述、研究的内容、方法与拟实现的创新等方面进行全面、深入的介绍说明,并且接受老师的批评和建议。开题报告的主要内容应包括:

论文题目的确定

选题是撰写学位论文的首要环节和第一步,选题是否妥当直接关系到论文的质量,甚至关系到论文的成功与失败。要选好题目必须注意:1、选题要符合研究方向,不能超出本专业研究方向的范围随意去选,这样的论文答辩时会有问题。2、选题要有价值性、新颖性,凡是难以提出自己见解的题目最好不要去选,答辩很难通过。3、论文选题范围要适度。论文选题应该“小题大做”,不要“大题小做”。4、选题的可行性。如果选题缺少实现的必要条件,也是不可取的。例如资料很少无法下手,进行实证研究,找不到合适的替代变量或者实证数据很难获得。5、选题的明确性。有的同学在选题时,问题不明确,选题中包含两个甚至多个问题。

论文选题的背景和意义

这一部分要回答的问题是:为什么选这样的一个论题,选择的这一研究问题有什么理论和实践意义。题目确定后要求对选题的意义进行论述,选题意义包括理论意义和实践上的意义。首先要说明该选题在理论上可能会有什么样的贡献,要说明你所研究的这个问题在理论发展轨迹中的位置。

国内外相关文献综述

这一部分要回答的问题是:在我选择的这一论题上,前人的研究已有哪些有价值有意义的成果,已有的成果还存在哪些不足需要进一步探讨,或者对这一问题的研究还可以采用哪些更好的方法。

选择你所综述的文献应该紧紧围绕所研究的问题,有的同学却将许多与所研究问题比较远的文献也写进来。这种文献综述显然是不符合要求的。综述主要是归纳材料,比如将该课题的研究历史划分阶段、将该课题的一些重要的学术观点归纳成类,对该课题的一些有代表性的观点进行评价。当然更重要的是要在归纳和评价中找到该课题存在的问题,比如站在今天的思想水准看,过去的研究还有哪些不足?我对过去研究成果有哪些不同意见?在这一研究课题方面还有哪些新的学术增长点?从自己的条件看可以从哪些方面获得新的突破?有了这样细致的分析与估价,写作者就能确定自己的定位,顺利地进入写作阶段。

研究的角度、方法与拟实现的创新点

在这一部分要把研究问题的方法、角度以及初步的思路写出来,方法运用应该写得具体一些,比如运用博弈论的方法、问卷调查的方法、计量经济学的方法、案例分析的方法等等,但文字要简练,因为只是初步的构思,不必长篇累牍。

拟实现的创新是论文的亮点,要“具体”,“恰当”地写出创新的要点,不要太抽象,要把自己的思路与现有的研究有什么不同的地方说出来,还要说出自己的思路在什么地方比起现有的研究有进步,否则就不能说是“创新”。

主要内容与写作大纲

这一部分可以将论文大的框架写出来,但不需要太具体。论文大纲应该是紧紧围绕选题从不同的角度、不同的方面对这一问题进行论述,写作大纲必须与题目保持紧密的相关性,前后章节要有一定的逻辑性,并且内容不能过于陈旧,一般的知识性介绍不能大篇幅地写进论文中。

主要参考文献

参考文献对于评价一个开题报告质量的高低起着非常重要的作用,老师通过学生所提供的参考文献的数量和质量,可以看到学生对所研究的问题是不是有了充分的了解。通常,老师可以看出在这一问题研究中,比较有价值或比较经典的文献学生是否读过。如果学生所提供的参考文献数量少且价值不高,那么不用看具体内容老师就能断定,该同学的开题报告质量不会很高。因此同学们也应该重视参考文献部分。

展开阅读全文

篇18:英国留学学生合同书

范文类型:合同协议,适用行业岗位:留学,学生,全文共 795 字

+ 加入清单

甲方:_____________省_____________高等财经学校

乙方:_________________学生

1、甲方录取乙方为_______________级_______________班正式在校生,在校期间享有学习和发表意见的权利。

2、甲方设教学时间为_______________至_______________年,在此期间甲方将按照国家教育部规定的各专业教学大纲内容进行教学、管理、考核、评审等。

3、乙方在校学习期间要服从学校整体安排,有任何事情必须向学校提前申请,学校各级管理部门将按照学生申请事项的管理规定办理。(如乙方不经批准私自旷课、违反校纪、校规及各项制度,在校内外打仗斗殴等,学校将给予警告、记过、留校察看等处分并装入学生档案。勒令退学或被开除学籍者和中途辍学者,各项费用不退)。

4、乙方在学校学习期间要严格遵守学校的各项规章制度,要认真学习,如乙方出现学习等困难,学校教务处、学生处将委派教师及时辅导或组织培训,并适当加课或补课,乙方要服从甲方安排。

5、新生入学壹周内如因参军、出国、迁居外省需持国家有关单位证明可以根据新文件规定办理退学,其它时间或其它理由一律不予办理。

6、乙方入学后思想要积极上进,靠近学校党、团组织,积极参加学校组织的各项活动,不得自行组织活动、郊游及到江河游泳否则造成后果自行承担。(希望每位学生入学后参加意外保险)

7、乙方要按甲方学校规定的期限交纳学杂费,无正当理由不交或迟交使学业受影响者,后果自负。

8、乙方学习期间每学期要按时参加各科考核,各科成绩必须合格(一次补考机会),取得国家教育部验印的大专、本科毕业证书后(全国通用)并由学校及劳动人事部门负责为毕业生在行政、工商企事业单位及南方沿海城市等安置工作,本科、专科月工资_____________元以上,中专月工资________________元以上(每人可享受二次调配)。

展开阅读全文

篇19:硕士研究生学位论文开题及撰写的规定_开题报告_网

范文类型:制度与职责,汇报报告,全文共 1075 字

+ 加入清单

硕士研究生学位论文开题及撰写的规定

论文开题

1、硕士生在选题、调研的基础上填写选题申请表,并在所在学科范围内作开题报告,由导师主持并邀请本学科的专家参加,一般不少于五人;

2、开题报告应包括以下内容:

(1)课题来源(部委、省、市、自选)及选题依据,着重说明国内外的研究现状和已取得成果的分析;

(2)课题在理论或实际应用等方面的价值,以及可能达到的水平;

(3)课题研究的方法和手段、步骤和进度、最终目标,以及完成论文所需的研究和实验条件等;

(4)研究过程中预计可能遇到的困难或问题,并提出解决的方法和措施;

(5)论文工作量与经费的来源。

3、开题报告后,经参加人员认真讨论作出决议。通过后,由导师写出综合意见(一式二份),经教研室、学院学位分委会签署意见后,送所在学院归档备查;

4、开题报告通过后,方可进入论文工作阶段。如未获通过者,在1~2个月内按同样程序重作开题报告,仍未通过者,则按有关规定处理;

5、开题报告通过后,原则上不得改题。如确有特殊原因需改题者,须由硕士生写出书面报告,指导教师签署意见,经学院负责人审批后,报研究生院备案,并应在1~2个月内按同样程序重作开题报告。

论文撰写

学位论文的撰写应注意以下几方面:

1、硕士生应在自己论文课题范围内,系统地查阅国内外文献和了解国内外有关科技发展情况,对搜集的文献资料作出分析和评述。同时还必须清楚地阐明本论文的目的、意义,所要解决的问题和解决问题的可能途径,并提出研究方案;

2、硕士论文的内容应在理论分析,测试技术,计算方法,数据处理,仪器设备,工艺改革,新产品开发,工程设计、实际应用等某一方面有新见解或新内容,例如:

(1)利用前人或本人的理论和方法,解决前人没有解决的一个问题(这个问题可以是该领域中有意义的问题,也可以是比较重要问题中的一个重要环节);

(2)在实验研究中,能获得有意义的新成果,并有初步的解释;

(3)建立国内没有的(或改进国内已有的)、比较先进的实验装置,并取得可靠的实验数据;

(4)将本学科或其他学科的基本原理或技术应用于所研究领域,取得新的成果或有一定的实用价值和经济效益;

(5)在解决工程实际问题上,有创新和推广价值,或可取得明显的经济效益。

3、论文的理论部分,要概念清晰,分析严谨,实验数据要真实,计算结果正确无误;对所得出的结论,应作理论上的阐述与讨论;

4、论文应由硕士生本人独立作出,若属几个人合作研究的项目,论文内容应侧重于本人的研究工作,有关共同工作部分应加以说明;

5、学位论文应按要求装订成册,如实验数据较多或程序较长,也可将此数据或程序以附件形式单独装订成册。

展开阅读全文

篇20:2024年学生出国留学申请

范文类型:申请书,适用行业岗位:学生,留学,全文共 1080 字

+ 加入清单

尊敬的_大学老师领导:

您好!我是___,是入党积极分子,__省三好学生,在日常的学习和生活中我处处以身作则,以榜样的力量感染和带动我的同学。我在学习上勤奋刻苦,始终成绩优异,我就读的学校是一所拥有近四千名学生的省级示范校,每学期我校都要进行一次10所省级示范性高中的联合考试,每个年级的考生约一万三千多人在这类地区联考中,我的成绩始终名列前茅。20__年上学期我考取了地区联考第一名,本校年级第一名,班级第一名。20__年下学期地区第一名,本校年级第一名,班级第一名,20__年上学期地区第9名,英语单科成绩第一;本校第2名,班级第一名。20__年下学期地区第一名,本校年级第一名,班级第一名。20__年高三的第一次考试我考取第一名。我从初中起就多次参加全国中学生奥林匹克各学科竞赛,并于20__年获全国中学生奥林匹竞赛一等奖,20__年获全国中学生奥林匹竞赛英语、数学、化学竞赛一等奖、物理竞赛二等奖。读高中后20__年我获取全国中学生英语能力竞赛一等奖,全国中学生数学竞赛希望杯三等奖。20__年获全国中学生生物、数学竞赛决赛资格。各学科竞赛拓宽了我的学习思路,检验了我的学习效果,也争强了我的自信心。

20__年8月我升入高中,12月份我校有一名不幸身患尿毒症的同学叫___,面对着一个年轻的生命在顽强的与死神抗争。我决定和我的同学一起发起一次奉献爱心的捐赠活动,以集体的力量挽救这个年轻的生命。我写了倡议书,在学校号召老师和同学们为___同学捐款,还到社会上进行宣传,得到老师、同学和社会各界人士的帮助,共捐款6万余元。为邱纯亮同学做换肾手术奉献了我们的一份爱心。我们的爱心捐赠活动在社会上引起了强烈的反响。我市电视台在晚间最近新闻栏目专门做了报道。挽救这个濒临枯萎的生命的过程,震撼了我的心灵。因为我有能力通过自己的努力,延续一个年轻的生命,同时,爱心捐赠活动也验证了我的组织能力,凝聚力和感召力,更是对我自身综合素质的一次检验。在后来的班级工作和组织其他活动的时候我的自信心更强了。

当迈入了_大学的校门,也就步入了我生命中的最重要、最精彩的阶段。我会珍惜在校园中渡过的分分秒秒,在这大师云集、神圣的学术殿堂、在这群贤毕至的高等学府,如饥似渴的吸纳最新的知识和信息,发扬林业学子的优良传统,刻苦学习、精益求精,通过脚踏实地的努力使自己成为本专业的优秀学生,同时努力探索和验证与本学科、本专业相关的科学知识,以唯物和科学的态度勤奋地学习、深刻地思索、不懈地寻求本学科领域的最新知识,使自己成为本学科领域的有发展潜力和有培养价值的学生,成为北京林大的骄傲。

展开阅读全文