0

镍氢电池出口需要什么(通用20篇)

浏览

983

范文

1000

外贸合同范本英文_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 2508 字

+ 加入清单

外贸合同范本英文

日期: 合同号码:

date: contract no.:

买 方: (the buyers) 卖方: (the sellers)

兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品:

this contract is made by and between the buyers and the sellers; whereby the buyers agree to buy and the sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:

(1) 商品名称:

name of commodity:

(2) 数 量:

quantity:

(3) 单 价:

unit price:

(4) 总 值:

total value:

(5) 包 装:

packing:

(6) 生产国别:

country of origin :

(7) 支付条款:

terms of payment:

(8) 保 险:

insurance:

(9) 装运期限:

time of shipment:

(10) 起 运 港:

port of lading:

(11) 目 的 港:

port of destination:

(12)索赔:在货到目的口岸45天内如发现货物品质,规格和数量与合同不附,除属保险公司或船方

责任外,买方有权凭中国商检出具的检验证书或有关文件向卖方索赔换货或赔款。

claims:

within 45 days after the arrival of the goods at the destination, should the quality, specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable, the buyers shall, have the right on the strength of the inspection certificate issued by the c.c.i.c and the relative documents to claim for compensation to the sellers

(13)不可抗力:由于人力不可抗力的原由发生在制造,装载或运输的过程中导致卖方延期交货或不

能交货者,卖方可免除责任,在不可抗力发生后,卖方须立即电告买方及在14天内以

空邮方式向买方提供事故发生的证明文件,在上述情况下,卖方仍须负责采取措施尽

快发货。

force majeure :

the sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the sellers shall advise the buyers immediately of the occurrence mentioned above the within fourteen days there after . the sellers shall send by airmail to the buyers for their acceptancea certificate of the accident. under such circumstances the sellers, however, are still under the obligation to take all necessary measures to hasten the deliveryof the goods.

(14)仲裁:凡有关执行合同所发生的一切争议应通过友好协商解决,如协商不能解决,则将分歧提

交中国国际贸易促进委员会按有关仲裁程序进行仲裁,仲裁将是终局的,双方均受其约

束,仲裁费用由败诉方承担。

arbitration :

all disputes in connection with the execution of this contract shall be settled friendly through negotiation. in case no settlement can be reached, the case then may be submitted for arbitration to the arbitration commission of the china council for the promotion of international trade in accordance with the provisional rules of procedure promulgated by the said arbitration commission . the arbitration committee shall be final and binding upon both parties. and the arbitration fee shall be borne by the losing parties.

买方: 卖方:

--------------------- ---------------------

(授权签字) (授权签字)

展开阅读全文

更多相似范文

篇1:大学生市场策划实习报告范文拓展:对外贸易专业实习报告

范文类型:方案措施,汇报报告,适用行业岗位:大学,学生,营销,外贸,全文共 1912 字

+ 加入清单

作为一名合格的大学生,社会实习是必经的过程,不管什么专业,都能在实习中获得自己以后从事的工作岗位所必需的技能。

时间过的飞快,为期一个月的实习结束了,在这段时间里,实习充实了我的学习生活,我学到了许多书本上无法体验的知识。通过实习,我感触颇多,得到许多新的认识,对许多问题多了深一层次的思考。回想起这两个月的生活,一个人在新的环境里,应付新的人际关系,本来就是挺辛苦的事,再加上工作的繁忙和紧张的生活节奏,这两个月来真可以用艰辛来形容了。还好这一切我都挺了过来,相反这些困难让我更加的了解自己、坚定信心,也让我从中得到了深刻的认识。以后我就是社会上的一份子了,责任也将越来越重。

实习,顾名思义,在实践中学习。在经过一段时间的学习之后,或者说当学习告一段落的时候,我们需要了解,自己的所学需要或应当如何应用在实践之中,因为任何知识都源于实践,归于实践,所以,要将所学付诸实践,来检验所学。然而,我们当然不希望实习仅止于此,那就太狭隘了。

我的实习,其实是工作。在这两个月中,有太多太多的感触,一时竟不知道从何说起。在此次实习中,我感悟颇多:

(1)坚持学以致用

我的工作是在公司的商务部见习外贸业务。

外贸业务员,算是与专业对口工作的不二选择了,而且我们曾于大三进行过TMT模拟实习,对外贸流程有一定的了解。然而经过在商务部一段时间的工作,我渐渐明白有时实际要比理论简单直接的多,但大多数情况下实际操作还是比理论要复杂、间接,通常是我在别人的实际操作中领会到了自己所学理论的重点及要旨。值得庆幸的是在两个月的时间里,公司的同事领导给予了我热情的指导和帮助,而我也虚心向他们请教学习,在理论运用于实践的同时,也在实践中更加深刻地理解了以前没有理解透彻的知识。

(2)加强英语及专业知识的学习

对于外贸人员而言,不仅要掌握够硬的专业知识,而且还必须会用英语与外商交流、谈判及写传真、书信。如果专业英语知识掌握不好,就很难胜任工作,甚至会影响业务的顺利进行。因此,在实习中要求我们加强英语的学习,掌握外贸专业术语基础。

(3)要有坚持不懈的精神

作为在校生,我们不管到哪家公司,一开始都不会给我们布置过多的工作任务,一般都是先让我们熟悉公司的工作环境,在这段时间里很多人会觉得很无聊,没事可做,便会产生离开的念头。在这个时候我们一定要坚持,不能轻易放弃。

再者,在外工作不比在家里或者学校,做的不好挨批是正常的事,承受能力差的同学很容易放弃。这时我们要直面问题,如果是自己的失误,一定要改正错误,吸取经验,争取不再犯;如果不是自己的责任也不要和上司顶嘴,领导有比我们更大的压力,他工作不顺心总要找个方式释放。走上社会,要学着“宰相肚里能撑船”,成大事者心中必能纳百川。

我只身一人在外工作,刚开始的几天觉得工作无聊,再加上想家的情绪“作祟”,真的有过放弃的念头,但是转念一想,我已经把行李带过来了,绝不能就这样回去,不能做一个逃兵,于是我坚持下来了,一个月,两个月……通过了这段时间的磨练,再加上四年远离家乡的大学生活,我的独立性越来越强。我相信,以后不管走到哪里,我能很快地适应新的环境,这对于我自身是一项难能可贵的技能。

(4)要虚心学习,不耻下问

在工作过程中,我们肯定会碰到很多的问题,有很多是我们所不懂的,不懂的东西我们就要虚心向同事请教。同时,我们也不要怕犯错。每一个人都有犯错的时候,工作中第一次做错了不要紧,重要的是知错能改。如此循序渐进,一定能够得到实质上的提高。

(5)要确立明确的目标,并端正自己的态度

平时,我们不管做什么事,都要明确自己的目标,到公司工作以后,要知道自己能否胜任这份工作,关键是看你自己对待工作的态度,态度对了,即使自己以前没学过的知识也可以在工作中逐渐的掌握。因此,要树立正确的目标,在实现目标的过程中一定要多看别人怎样做,多听别人怎样说,多想自己应该怎样做,然后自己亲自动手去多做。只有这样我们才能把事情做好。

通过本次的实习,我还发现自己专业知识中很多的不足,并为今后的学习指明了方向,同时也会为将来的工作打下一个良好的基础。在学校的TMT模拟实习中,我每次填单总是填不完整,抱着“反正不是真正的贸易,做错也没关系”的态度,时常不认真对待单据,经过这次的训练,我已经可以独立正确熟练地填制一些进出口常用单据。

经过两个月的工作,我的英语技能、制单操作和函电写作水平得到了提高。这次的实习让我懂得只有通过刻苦的学习,加强对业务知识的熟练掌握程度,在现实的工作中才会得心应手,应对自如。

在实际操作中,我深刻体会到,国际贸易的中间环节多,涉及面广,除交易双方当事人外,还涉及商检、运输、保险、金融、车站、港口和海关等部门等。

展开阅读全文

篇2:参加宴会需要注意哪些礼仪_商务礼仪_网

范文类型:礼仪,适用行业岗位:宴会,商务,全文共 1813 字

+ 加入清单

参加宴会需要注意哪些礼仪

人们通过宴会,不仅获得饮食艺术的享受,而且可增进人际间的交往。那么,参加宴会需要注意哪些礼仪呢?下面第一范文网小编告诉你。

参加宴会需要注意的礼仪:应邀

受邀者在接到邀请后,能否出席应尽早答复对方。若接受邀请则不宜随意改动,万一因故不能应邀出席,须向邀请者深致歉意。

参加宴会需要注意的礼仪:掌握出席时间

宾客一般宜略早一些到达或是准点到达,过早、过迟到场或者无故提前退场等都被视作不恭和失礼之举。

参加宴会需要注意的礼仪:抵达

如主人恭迎,则应趋前向主人握手、问好、致意,随主人或迎宾人员引导,步入休息厅或宴会厅。如果单独到达,则先到衣帽间挂大衣和帽子,然后前往主人的迎宾处,向主人问好。如是节日庆祝活动,就表示祝贺。

参加宴会需要注意的礼仪:赠花

可按宴请性质和当地习惯,赠送花束或花篮。

参加宴会需要注意的礼仪:入座

一般由侍者或女主人(主人)引导客人入席。各人应按座位的姓名卡入座,不可随意乱座。坐姿要端正、自然。

参加宴会需要注意的礼仪:进餐

入座后,不可玩桌上的酒杯、盘碗、刀叉、筷子等餐具。主人招呼即可以进餐。西餐进食,正确的做法是取得食品,即可开始食用,因为人手一份,不需等待。取菜时一次取得不要太多,需增加时,待侍者送上再取。进食时要文雅,吃东西时应闭着嘴细嚼慢咽,尽量不发出声音;喝汤时不要啜,汤菜太热,稍凉后再食用,忌用嘴吹去热气;嘴内有食物时切勿说话;吃剩的菜、用过的餐具、牙签及骨刺等都要放入骨盘内,忌随意乱扔;剔牙时,要用手或餐巾遮口。

参加宴会需要注意的礼仪:交谈

参加任何宴会,无论处于何种地位,都少不了与同桌人交谈,特别是左右座。如互相不认识,可先做自我介绍。

参加宴会需要注意的礼仪:宽衣

宴请过程中,无论天气如何炎热,均不得当众解开纽扣、拉松领带、脱下衣服。

参加宴会需要注意的礼仪:餐具的使用

餐具的使用要得法。中餐的餐具主要是碗、盘、筷,西餐则是刀、叉、盘子。通常宴请外国人吃中餐,亦以中餐西吃为多,既摆碗筷,又设刀叉。刀叉的使用是右手持刀,左手持叉,将食物切成小块,然后用叉送入嘴内。欧洲人使用时不换手,即从切割到送食均以左手持叉。美国人则切割后,把刀放下,右手持叉送食入口。就餐时按刀叉顺序由外往里取用。每道菜吃完后,将刀叉并拢平排放盘内,以示吃完。如未吃完,则摆成八字或交叉摆,刀口应向内。吃鸡、龙虾时,经主人示意,可以用手撕开吃,也可用刀叉把肉割下,切成小块吃。切带骨头或硬壳的肉食,叉子一定要把肉叉牢,刀紧贴叉边下切,以免滑开。切菜时,注意不要用力过猛撞击餐盘而发出响声。不容易叉的食品,或不易上叉的食品,可用刀把它轻轻推上叉。除喝汤外,不用匙进食。汤用深盘或用小碗盛放,喝时用汤匙由内往外舀起送入嘴,即将喝尽,可将盘向外略托起。吃带有腥味或怪味的食品,如鱼、虾、野味等均配有柠檬,可用手将汁挤出滴在食品上,可去腥。宴会中如发生意外情况,例如用力过猛,使餐具发出声响,或摔落地上,或打翻酒水等等,不要着急。餐具碰出声音,可轻轻向邻座(或主人)说一声“对不起”。餐具掉落可由服务员另换一副。酒水打翻溅到邻座身上,应表示歉意,协助擦干;如对方是妇女,只要把干净餐巾或手帕递上即可,由她自己擦干。

参加宴会需要注意的礼仪:喝咖啡

通常是清咖啡,有时加牛奶、糖块,饮姿要文雅、有礼。

参加宴会需要注意的礼仪:冷餐会

冷餐会、酒会,不要抢着去取食,不要围在菜台旁边,取够即退开。

参加宴会需要注意的礼仪:洗手

在上虾、蟹时,有时送上一小水盂,水面洒有玫瑰花瓣,柠檬片或茶水,供洗手用,切勿当作一道汤食用。洗时两手轮流沾湿指头,轻轻涮洗,然后用餐巾或小毛巾擦干。

参加宴会需要注意的礼仪:吃瓜果

吃梨、苹果等水果,不要整个咬,可先用水果刀切成几瓣,再用刀去皮、核,然后用手拿吃,削皮时刀口朝内,从外往里削。香蕉先剥皮,用刀切成小块块。橙子用刀切成块吃,柑桔、荔枝等则可剥了皮吃。其余如西瓜、菠萝等,一般已去皮切成块,吃时可用水果刀切成小块用叉取食。

参加宴会需要注意的礼仪:接受纪念品

有时主人备有小纪念品,宴会结束时,招呼客人带上。遇此,可稍赞扬,但不必郑重表示感谢。有时,外国访问者,往往把宴会菜单作为纪念品带走,有时还请同席者在菜单上签名留念。除主人特别示意作为纪念品的东西外,各种招待用品,包括糖果、水果、香烟等,都不要拿走。

参加宴会需要注意的礼仪:函谢

有时在出席私人宴请活动之后,往往致以便函或名片表示感谢。

展开阅读全文

篇3:最新开题报告需要写多少字_开题报告_网

范文类型:汇报报告,全文共 442 字

+ 加入清单

最新开题报告需要写多少字

基本内容及其顺序大约包括:论文的目的与意义;国内外研究概况;论文拟研究解决的主要问题;论文拟撰写的主要内容(提纲);论文计划进度;其它。 详细内容请看下文开题报告需要写多少字。

其中的核心内容是“论文拟研究解决的主要问题”。在撰写时可以先写这一部分,以此为基础撰写其他部分。

第一步.论文拟研究解决的问题

内容要求:

明确提出论文所要解决的具体学术问题,也就是论文拟定的创新点。

明确指出国内外文献就这一问题已经提出的观点、结论、解决方法、阶段性成果、……。

评述上述文献研究成果的不足。

提出你的论文准备论证的观点或解决方法,简述初步理由。

撰写方法:

你的观点或方法正是需要通过论文研究撰写所要论证的核心内容,提出和论证它是论文的目的和任务,因而并不是定论,研究中可能推翻,也可能得不出结果。开题报告的目的就是要请专家帮助判断你所提出的问题是否值得研究,你准备论证的观点方法是否能够研究出来。

一般提出3或4个问题,可以是一个大问题下的几个子问题,也可以是几个并行的相关问题。

展开阅读全文

篇4:进口合同样式一[页10]_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1304 字

+ 加入清单

进口合同(样式一)

8.4 买方检验人员若发现“设备”有缺陷和/或不符合本合同规定的规格时,有权提出意见,卖方应充分考虑并自费采取必要措施排除缺陷,当缺陷排除后,应再次检验和试验,由此引起的费用均由卖方负担。

8.5 买方检验人员在卖方国家和制造厂的检验不代替“设备”运抵买方合同工厂现场的开箱检验,亦不能免除卖方按本合同第十章规定的保证责任。买方人员不签署任何证明文件。

8.6 卖方应免费为买方人员提供方便的工作条件,如必需的技术文件、图纸、检验工具和仪器等。

8.7 如买方不能在本章规定的期限内派出人员参加上述检验工作时,卖方将自行检验。

8.8 卖方供应的全部“设备”的开箱检验应在合同工厂现场进行,卖方有权自费派遣他们的检验人员到合同工厂现场参加此项检验,买方应在检验前一个月将开箱日检验期通知卖方,并为卖方检验人员提供工作的方便。

在双方会同开箱检验中如发现“设备”有短少、缺陷、损坏或包装与本合同规定不符合或质量标准与本合同8.1条和10.1条规定不符时,应作详细记录,并由双方代表签字。如属卖方责任,此记录即为买方向卖方要求换货、修理或补齐的有效证明。

8.9 如不属买方原因,卖方检验人员不能参加开箱检验时,买方有权自行开箱检验。如发现本合同7.8条所述问题系属卖方责任时,应委托中国商品检验局出具证明,以此作为买方向卖方要求换货、修理或补齐的有效证明。

卖方接到买方索赔证书后,应立即无偿换货、补发短缺部分或降低货价,并负担由此产生的到安装现场的换货费用、风险以及买方的检验费用。如卖方对索赔有异议时,应在接到买方索赔证书后两个星期内提出异议,双方另行协商;逾期,索赔即作成立。

卖方换货和/或补交货物的时间,不迟于卖方收到买方索赔证书后__个月。

8.10 在开箱检验中,由于买方的原因,发现“设备”有损坏,通知卖方后,卖方应尽快补发、更换,其费用由买方负担。

8.11 上述检验并不能解除卖方对第九章、第十章所承担的责任。

8.12 在检验中,如发现卖方提供的检验所需的标准仍不完整或提供的不及时,经与卖方协商,买方有权按照买方国家现行标准进行检验。

第九章 安装、试车和验收

9.1 “安装”系指合同工厂全部设备、材料的装配、就位和联接等安装工作。“试车”系指机器和/或设备的单独或联动的试运转。

“投料试生产”系指合同工厂投入原料和公用工程以试生产。

“考核”系指检验本合同附件__所规定的各项保证数值而进行的试验。

“验收”系指如果考核结果表明,本合同附件__所规定的各项保证指标能够全部达到,则合同工厂即为买方所验收。

9.2 合同工厂的安装将在买方负责组织下和在卖方负责技术指导下进行,卖方有权对其进行详细设计有关的所有“设备”的安装以及界区接点的安装进行技术指导。

合同工厂的试车、投料试生产和考核应在买方组织安排下和卖方技术指导下进行。在安装工作开始前二个月,双方各自授权一名代表处理合同工厂从安装到验收期有关合同工厂的全部技术工作。具体工作应由双方代表友好协商安排。双方代表应充分合作,使合同工厂在本合同生效日后__个月内建设完毕。

共17页,当前第10页1234567891011121314151617

展开阅读全文

篇5:农产品进口合同书

范文类型:合同协议,适用行业岗位:外贸,全文共 659 字

+ 加入清单

根据《中华人民共和国民法典》和有关法律法规的规定,乙方接受甲方的委托,为甲方产品寻找海外客商,双方经协商一致,签订本合同。

第一条委托事项

甲方委托乙方寻找海外客商为甲方推销其产品:_______________________________

第二条委托事项的具体要求

1.甲方应保证所生产产品的合法性及保证产品质量。

2.甲方与海外客商交易的具体价格、交货方式、支付方式等由甲方与海外客商双方协商约定。

3.乙方不对甲方与海外客商的交易提供任何信用担保,以及甲方在以后的合同履约时和海外客户发生的一切纠纷,乙方概不承担连带和赔偿责任。甲方应严格按国家的“&;或条款”执行与海外客商所签定的合同。

第三条佣金的计算、给付方式、给付时间

1.甲方同意按每笔合同成交总额的______支付佣金给乙方。

2.给付方式及时间:

在甲方执行完合同后7天内一次性付给乙方。

第四条违约责任

1.甲方若不按本合同第三条的执行,逾期一天应支付乙方滞纳金,滞纳金系数为:总佣金的5‰天。

2.甲方同意凡乙方所介绍的海外客商,其将来与甲方发生的每笔业务,甲方都将按本合同的第三条支付佣金给乙方,否则,甲方愿接受合同成交额的30%罚款支付给乙方。

第五条争议解决方式

对违约行为若双方协商不成,可凭此合同向人民法院提出诉讼。

第六条本合同未尽事宜双方协商解决。本合同一式肆份双方各执贰份具有同等法律效用。本合同双方签字盖章即为有效。

甲方:______________________________

乙方:______________________________

年月日

展开阅读全文

篇6:货物出口合同样式二_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1677 字

+ 加入清单

货物出口合同(样式二)

合约编号:________

contract no._______

售货合约 sales contract

买方:_____ 日期:____年__月__日

buyers:_____ cate:_____

卖方:____ 中国___进出口公司___省分公司

sellers: china national metals & minerals import & export corporation,____branch

双方同意按下列条款由买方购进卖方售出下列商品:

the buyers agree to buy and the sellers agree to sell the following goods on terms and conditions set forth below:

──────────────┬───────┬──────┬──────

(1)货物名称及规格,包装及│ (2)数量 │ (3)单价 │ (4)总价

装运唛头 │ │ │

name or commodity and speci-│ quantity │ unit price │ total

fications packing and shipp-│ │ │amount

ing marks │ │ │

──────────────┼───────┼──────┼──────

(装运数量允许有 %的增减)│ │ │

(shipment quantity % more │ │ │

or less allowed │ │ │

──────────────┴───────┴──────┴──────

(5)装运期限

time of shipment:

(6)装运口岸

ports of loading

(7)目的口岸

port of destination:

(8)保险:投保___险,由___按发票金额___%,投保

insurance: covering risks for____% of invoice value to be effected by the

(9)付款条件:___……

terms of payment:___凭保兑的,不可撤消的,可转让的,可分割的即期

付款信用证,信用证以中国五金矿产进出口公司__分公司为受益人并允许分批装运和转船。

by confirmed irrevocable, transferable and divisible letter of credit in favour of china national metals & minerals import & export corporation___branch payable at sight allowing partial shipments and transhipment.

该信用证必须在___前开到卖方,信用证的有效期应为装船期后15天,在上述装运口岸到期,否则卖方有权取消本售货合约并保留因此而发生的一切损失的索赔权。

注意:开立信用证时,请在证内注明本售货确认书号码

china national

texties import and

export corporation

important: when establishing l/c, please

indicate the mumber of this sales

shantung branch

confirmation in the l/c.

买方(the buyers):_____

卖方(the sellers):_____

请在本合同签字后寄回一份存档

please sign and return one copy for out file.

展开阅读全文

篇7:转正自我鉴定需要怎么写

范文类型:鉴定书,全文共 507 字

+ 加入清单

假期里,我在电脑上看了《飞屋环游记》这部动画电影,下头就让我开启一场神秘的旅程。

小男孩卡尔怀揣着对于冒险的热爱偶遇假小子艾丽,而艾丽把整个屋子当成一艘大飞船游戏居然使他对这个女孩子有些着迷,相同的爱好最终使两个人成为了一生的爱侣。

他们有一个梦想,那就是有朝一日要去南美洲的“仙境瀑布”探险,但直到艾丽去世,这个梦想也未能实现。最终有一天,以往专卖气球的老人卡尔居然用五颜六色的气球拽着他的房子飞上了天空,他决定要去实现他们未曾实现的梦想。令卡尔始料不及的是,门廊居然搭上了一个自称是“荒野开拓者”的小男孩罗素,罗素的喋喋不休让卡尔对这个小胖墩格外厌恶。

一老一少在飞行中经过了千难万险最终看到了传说中的“天堂瀑布”,在相处过程中卡尔发现罗素其实是个惹人怜爱的孩子。在步行穿越一座森林时,他们遇到了不会飞的鹬凯文和一只会说话的狗狗逗逗,让老人惊讶的是他们还遇到了他少年的崇拜偶像——探险家查尔斯·蒙兹,并且他发现蒙兹居然是一个为达目的不择手段的坏人。这时,老人离自我的梦想之地仅有一步之遥……

故事讲完了,我深有感触,这部电影既表达了卡尔对艾丽的爱,更表达了老了有什么,只要你心不老,勇于冒险坚持不懈就能看到完美的未来。

展开阅读全文

篇8:自营出口结汇协议书

范文类型:合同协议,适用行业岗位:外贸,全文共 1217 字

+ 加入清单

协议甲方:_________银行_________分行

协议乙方:______________________公司

为防范汇率风险,经协商,甲方与乙方就甲方为乙方提供远期结汇/售汇业务事宜达成如下协议:

第一条 甲方按照本协议及国家有关规定为乙方叙作远期结汇/售汇。

第二条 乙方需按照中国人民银行及国家外汇管理有关规定,逐笔填写“远期结汇/售汇申请书”,向甲方申请办理远期结汇/售汇业务。

第三条 乙方保证在交割日甲方营业时间内,支付委托甲方购买/售出货币所需的全部人民币/外汇资金。

第四条 甲方在收妥乙方应付的全部人民币/外币交割资金后,即于收款日支付乙方应收的人民币/外币交割资金。

第五条 甲、乙双方均不得要求提前办理交割。

第六条 乙方如因特殊原因不能按期交割,可向甲方申请推迟交割。甲方只受理交割日前三个工作日前乙方提出的推迟交割申请。

第七条 因下列原因使本协议不能履行的,甲方可要求乙方承担由此造成的汇价损失,并可主动借记乙方在甲方的保证金账户,若乙方无法承担,该损失由乙方担保银行承担:

1.乙方未在交割前提交全部有效凭证及/或有效商业单据,及/或________________。

2.乙方不能按时向甲方交割(包括推迟交割),及/或________________。

3.收、付汇金额小于乙方申请金额。

第八条 远期结汇/售汇交易成交后,甲方应主动向乙方寄送“远期结汇/售汇交易证实书”。如成交后10天内乙方未收到甲方寄送的证实书,应及时向甲方查询;如交易成交后30天内未向甲方查询,该交易以甲方的记录为准,甲方亦不再负责补寄证实书。

证实书寄至:______________________________

通讯地址:______________________________

联系人:___________________________

电话:_______________________

传真:___________________

第九条 乙方可授权其有关人员与甲方办理远期结售汇业务。授权委托书应使用甲方规定格式,并由乙方法定代表人或其授权签字人签字、加盖公司印章。

第十条 乙方提交的“远期结汇/售汇申请书”及“授权委托书”为本协议不可分割的一部分。如某笔远期结汇/售汇业务发生纠纷,甲乙双方应根据本协议规定积极协商解决。

第十一条 本协议需经甲乙双方签字、盖章方能生效。甲方由有权签字人签字并加盖业务章;乙方由法定代表人或其授权签字人签字,并加盖公司法人章。本协议一式两份,甲方与乙方各执一份。

第十二条 本协议自甲、乙双方签字之日起生效,有效期为一年,对于届时尚未完结的业务仍受本协议约束。

甲方(盖章):_____________

法定代表人(签字):_______

_________年________月____日

乙方(盖章):_____________

法定代表人(签字):_______

_________年________月____日

展开阅读全文

篇9:纺织外贸实习心得

范文类型:心得体会,适用行业岗位:外贸,全文共 532 字

+ 加入清单

通过本次的实习,我还发现自己以前学习中所出现的一些薄弱环节,并为今后的学习指明了方向,同时也会为将来的工作打下一个良好的基础。之前,每次填单总是填不完整,而且会出现很多的小错误,经过这次的训练,我已经可以比较正确的填制一些必要的单据。虽然我们还未真正参与到业务中,只是做一些简单的工作,如填单,但这次的实习为我们提供了一个很好的锻炼机会,使我们及早了解一些相关知识以便以后运用到以后的业务中去。

通过这次的实习,我们可以熟练掌握实务的基本流程,同时让我懂得只有通过刻苦的学习,加强对业务知识的熟练掌握程度,在现实的工作中才会得心应手,应对自如。

总体来说,这次实习不仅仅是锻炼了我在贸易操作方面的一些技能,同时,经过这次实习,我还从中学到了很多课本上所没有提及的知识,还有就是在就业心态上我也有很大的改变,以前我总想找一份适合自己爱好,并且专业对口的工作。

可现在我们都知道找工作很难,要专业对口更难,很多东西我们初到社会才接触、才学习。所以我现在要建立起先就业再择业的就业观。应尽快学会在社会上独立,敢于参加与社会竞争,敢于承受社会压力,使自己能够在社会上快速成长。总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,实习都将成为我人生中一笔重要的资本。

展开阅读全文

篇10:外贸专业实习自我鉴定

范文类型:鉴定书,适用行业岗位:外贸,全文共 344 字

+ 加入清单

在这四年的生活学习中,通过我的不断尽力,不断学习,和老师的教导使我在各个方面都有了很大的进步。

在学习上,我始终严厉请求自己,勤恳学习,立场端正,目表明确,基础上控制了专业方面的知识和技巧,把所学的理论常识利用到实际中去,做到实践与实践相联合同一。

在生活上,我养成了良好的生涯习惯和谨严的生活风格,与同窗老师和气相处,积极加入各项运动,不断丰盛自己经历,心理上时刻保留的阳光健康,以适应社会的发展。

在思惟上,建立了准确的人生观,价值观,和道德观,踊跃拥戴党的引导方针,与时俱进,一直完美自我,意识到自己的社会义务,对本人有了成熟的认识跟定位,树破了时刻为国民服务的思维。

这四年的培育和锤炼,使我人生途径上有了较大奔腾,这都是我人活路上的可贵教训,我将持续坚持我的作风,争夺今后获得更大成就。

展开阅读全文

篇11:出口合同样本_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1149 字

+ 加入清单

出口合同样本

卖 方:____________________________________

地 址:____________ 邮码:____________ 电话:____________

法定代表人:____________ 职务:____________

买 方:____________________________________

地 址:____________ 邮码:____________ 电话:____________

法定代表人:____________ 职务:____________

卖方与买方在平等、互利基础上,经双方协商一致同意按下列条款履行,并严格信守。

第一条 货物名称、规格、包装及唛头:

第二条 数量、单价、总值:

卖方有权在3%以内多装或少装。

上述价格内包括给买方佣金____%按fob值计算。

第三条 装运期限:

第四条 装运口岸:

第五条 目的口岸:

第六条 保险:由卖方按发票金额110%投保。

第七条 付款条件:买方应通过买卖双方同意的银行,开立以卖方为受益人的、不可撤销的、可转让和可分割的、允许分批装运和转船的信用证。该信用证凭装运单据在________国的____ 银行见单即付。

该信用证必须在____前开出。信用证有效期为装船后15天在________国到期。

第八条 单据:卖方应向银行提供已装船清洁提单、发票、装箱单/重量单;如果本合同按cif条件,应再提供可转让的保险单或保险凭证。

第九条 装运条件:

1.载运船只由卖方安排,允许分批装运并允许转船。

2.卖方于货物装船后,应将合同号码、品名、数量、船只、装船日期以电报通知买方。

第十条 品质和数量/重量的异议与索赔:货到目的口岸后,买方如发现货物品质及/或数量/重量与合同规定不符,除属于

保险公司及/或船公司的责任外,买方可以凭双方同意的检验机构出具的检验证明向卖方提出异议。品质异议须于货到目的口岸之日起30天内提出,数量/重量异议须于货到目的口岸之日起15天内提出,卖方应于收到异议后30天内答复买方。

第十一条 不可抗力:由于不可抗力使卖方不能在本合同规定期限内交货或者不能交货,卖方不负责任。但卖方必须立即电报通知买方。如果买方提出要求,卖方应以挂号函向买方提供由有关机构出具的事故的证明文件。

第十二条 因执行本合同有关事项所发生的一切争执,应由双方通过友好方式协商解决。如果不能取得协议时,则在被告国家根据被告国家仲裁机构的仲裁程序规则进行仲裁。仲裁决定是终局的,对双方具有同等的约束力,仲裁费用除非仲裁机构另有决定外,均由败诉一方负担。

卖 方:____________(盖章)

代表人:____________

买 方:____________(盖章)

代表人:____________

____年__月__日订立

展开阅读全文

篇12:外贸工作自我评价

范文类型:自我评介,适用行业岗位:外贸,全文共 2770 字

+ 加入清单

经过半个月的出差,走访陕西省、甘肃省、宁夏省三个省份的省会城市为主,这些年来,国家一向支持和发展西部,陕甘宁地区各行各业得到了迅速的发展,建材、洁具、卫浴等等逐步构成了必须的规模,与发达的省缩短了差距,异常是西安和银川的规模和西南地区市场不相伯仲,以下就个人对各个地区市场进行简单的分析。

一、陕西省-西安。

1、市场特点和范围。

西安的建材市场分布在西安的东南西北,可是最有名最集中的在未央区,从北2、5环到北三环这个区域范围内,大大小小的市场不少于15个。北2、5环是早几年的建材批发市场,此刻剩下了3个大型的市场,走中高档的品牌零售为主,北二环大明宫、大明宫建材批发商贸城,大品牌有汉斯格雅、高仪、科勒、安华等等高档卫浴,太华北路至北三环沿路有贝雷、红旗、太华路装饰市场等建材市场,这些市场都是零售为主,批发为辅。几乎都从北三环大明宫建材市场出货或者调货。北三环大明宫建材市场是整个西安最大的市场,辐射范围陕西省各个地级市,前几年西宁、甘肃、宁夏大部分经销商从北三环大明宫进货,市场的容量大,窜货范围广。

2、西安北三环大明宫建材市场经销商分类。

北三环大明宫建材市场主要集中在潮州人、河北人、福建南安人在操作,挂件类潮州人比较成功,潮安聚源、维佳、卡贝、凯乐、浙江、温州等区域挂件市场占有率很高,广东挂件相对占有份额比较少,洁具配件在西安第一类:长江水暖配件中心、三鱼洁具,今年目标销售总额破亿,据三鱼洁具销售主管透露,去年销售额8000多万,主打帝富龙品牌,出奇展翔套装花洒,出奇展翔一年保守统计一年60万,三鱼洁具是市场配送车最多的,目前10多辆车配送,计划明年达20多辆。第二类,普新洁具(过江龙总代理、悍将、四维、在做雨希套装花洒)、安得巧洁具、丽驰(欧雷仕)在做福建套装花洒、金家园、朝阳卫浴老板王友强代理银龙花洒,其中安得巧和普新有好几台车在配送,销售总额达4000-5000万。整个市场的广告投放最多的是三鱼、安得巧、普新这几家大型水暖配件中心。

2、产品优势和劣势。

挂件类,喷砂工艺,西安市场喜爱率不高,哑光和亮光工艺市场占有份额十分高,浴巾架的设计风格和款式与西北地区有点格格不入,潮州曾老板谈话中得知,玻璃的挂件市场上还是很热门,我们挂件可能就两款凑合着能走,9255和9256,预计一年最多10万左右,他做挂件一年销售额达1000万左右。升价架套装在市场没能寻到踪迹,普新洁具店有两款哑光的四维品牌的升价架,也很难走得动,有一家浙江经销商在成都市场上看到升价架走得很好,以往从四川亲戚调货试走,最终没有走起来。套装花洒,市场上也存着萎缩趋势,市场上要么是走单喷头,要么是淋浴大花洒。即使是做得十分大的经销商,也很少做出印象来。贝驰卫浴的产品,凭借着过硬质量优势,经销商是十分肯定的,款式和厦门有点差距,电镀和保养还得加强。

3、应对措施。

西安建材市场,对于贝驰卫浴是一个机遇和挑战,市场上套装花洒没有一家经销商做出形象和推广,对于贝驰是一个十分好的机遇,当然前期的路可能有点难走,鉴于自身优势,已经和安得巧配件中心达成试销承诺,西安地区的套装花洒由安得巧独家试销,利用安得巧的广阔的销售网络,在西安几个大市场做出贝驰套装花洒的形象。

二、宝鸡建材市场分析。

宝鸡,建材市场有新建路建材市场、国艺、自然之家、大有联盟、冠森建材市场等等,这些市场几乎都零售为主,宝鸡离西安不到200公里,几乎很多西安配送下来,进货渠道西安。批发十分少,宝鸡仓库配送的批发有7、8家,其中最大的是河北人孙柱-柱子洁具,有4辆货车每一天配送县、镇,孙柱与西安普新是老乡,过江龙也是从西安进货,一年销售额达20__多万,孙老板对于贝驰套装花洒形象和质量比较认可,合作问题还在沟通中。

三、甘肃省-兰州建材市场分析。

甘肃省相比较其它省份,明显落后,消费水平相比较较低,建材市场主要有三森美家居、雁滩建材市场、西固陶瓷城、东部建材城、雁滩家具城批发城3号楼、兰海商贸城、兰东建材市场等建材市场,此刻在建比较大的两个,明年估计能够进驻,北拢口和毅德城。前些年由于物流各方面的不便,很多经销商从西安进货比较多,此刻很多厂家已经直接在兰州建立经销商合作关系,兰州的市场批发洁具、挂件比较集中的是西固陶瓷城和雁滩家具城3号楼,其它的建材市场零售为主,三森美家居以品牌为主,高仪、科勒、辉煌、九牧等等,雁滩家具城3号楼,洁具批发量大,集中了低、中、高品牌批发,苏泊尔洁具、维佳挂件等等,兰州市场也是处于低迷状态,不久将来,兰州的建材行业会迎来前所未有的发展,鉴于兰州这样的情景,贝驰卫浴进驻兰州是一个机遇,贝驰卫浴务必在兰州建立起其特有形象。广东朗淇卫浴是潮州人,做挂件出身,这两年逐步扩大范围,慢慢转型水暖,此刻有潮州、广东、浙江品牌为主,比较成功的是维佳品牌,10多年兰州的打拼,客户群体丰富,挂件在兰州市场批发影响比较大,套装花洒主要是维佳贴牌的,价位和贝驰相差不大,浙江喷头,看不上其质量,合作沟通期间,广东朗淇卫浴蔡老板已经与兰州几个大市场关于贝

驰形象与推广达成协议,前期试销期间4个市场都进驻贝驰品牌,满怀信心把贝驰品牌在兰州做稳做大。兰州爱迪雅套装花洒名气比较大。

四、宁夏-银川。

银川这几年的发展速度十分惊人,阿拉伯每年都投资几百个亿在银川这个城市,未来银川的建材行业是一个潜力股,整个宁夏人口大约600多万,水暖洁具的容量相对不算太大,可是大大小小建材市场也有7、8个,目前最大的路丰装饰建材市场在今年6月份已经进行了招商,暂时水暖洁具批发集中在了长城东路这个路段的市场,据了解,长城东路靠近路边一排经销商都是做工程和操作品牌为主,市场里面的销售低档的批发,其它建材市场基本是品牌专卖店,这些专卖店所需的配件都是从这个市场调过去,比如:三晓洁具的配件,给辉煌、九牧、鹰卫浴等调货,这帮都是福建人开的,关系异常好,在银川做得比较好花洒是银龙和爱得雅,其中银龙进入银川市场有10来年,已经构成了质量的代表,银龙给银川三个经销商发货,其中比较有名气的是银川沈国威在操作华艺和银龙,奇出花洒是三晓洁具的李文灿在操作,李文灿在银川做洁具配件批发14年,客户资源比较丰富,品牌意识强,主要工程有矿山、学校、医院、单位为主,其它的就批发卫浴店和五金店,大约400-500客户,在店里聊天,人气比较好,平均每一天营销额淡季3、4万左右,估计一年1000多万,花洒有福建、厦门、广东出奇,大约一年70、80万,出奇合作了2、3年,他感到市场上做套装花

洒的没有做出形象,出奇一样没有形象,接触贝驰后,对贝驰的形象和包装十分满意,鉴于几个方案,李文灿在价格和贝驰质量还是不太满意,后续我继续跟进和沟通,把贝驰卫浴在银川市场快速打开。

以上是我陕甘宁的一下见解,不足之处,请原谅。

展开阅读全文

篇13:技术出口合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,外贸,全文共 49001 字

+ 加入清单

技术出口合同范本

Contract for Equipment Sales and Technology Licensing

Contract No. ____________________

This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

Article 1 Definitions

1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

1.5 “Destination Airport” refers to _____________Airport.

1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

Article 2 Scope of the Contract

2.1 The Seller’s Obligation

2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

2.2 The Buyer’s Obligation

2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

Article 3 Grant of License

3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

3.4 Territory

3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

Article 4 Price

4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

The breakdown price is as follows:

The price for Equipment is __________(say _______________________ only).

Fee for design is __________(say _______________________ only).

Fee for Technical Documentations is __________(say _______________________ only).

License fee is __________________(Say: _________________ only)

4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 2019, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

4.2.3 The above price is fixed and firm.

4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

Article 5 Payment

5.1 Down Payment

Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

5.2 [Option One: Payment by Sight L/C]

The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) Bill of Lading in one (1) original and ___ ( ) copies;

(b) Commercial Invoice in one (1) original and ___ ( ) copies;

(c) Packing list in one (1) original and ___ ( ) copies;

(d) Certificate of Origin in one (1) original and ___ ( ) copies;

(e) Insurance Policy in one (1) original and ___ ( ) copies;

5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

(b)One ( 1 ) copy of commercial invoice.

5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

b) One (1) copy of Commercial Invoice.

5.2 [Option Two: Payment under a L/G]

The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

Article 6 Delivery of Equipment and Technical Documentation

6.1 The Delivery of the Equipment

6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

6.1.3 The port of shipment is ____, while the port of destination is ____.

6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

(a) Contract number

(b) Name of the vessel and loading port

(c) Name of the Equipment shipped

(d) Number and date of Bill of Lading

(e) Total volume

(f) Total gross and net weight

(g) Total number of packages/cases

6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

(a) Bill of Lading

(b) Commercial Invoice

(c) Packing List

(d) Certificate of Origin

(e) Insurance Policy.

6.2 The Late Delivery of the Equipment

6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

(a) From the first week to the fourth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per

week

(b) From the fifth week to the eighth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per week

(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

the value of the delayed portion of the Equipment per week

6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

6.3 The Delivery of the Technical Documentation

6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

6.3.4 In case of shortage, loss of or damage to the Technical Documentation due to the Seller’s reason, the Seller shall make supplement to the Buyer within ____ ( ) days after receiving the Buyer’s written notification without any further charge.

Article 7 Packing and Marking

7.1 The Equipment shall be packed to withstand long distance transportation, multiple handling.

7.2 The Seller shall mark the following on two opposite sides of each package with indelible painted English words:

(a) Destination

(b) Consignee

(c) Contract number

(d) Shipping mark

(e) Gross/net weight (kg)

(f) Case/ bale number

(g) Dimensions: L x W x H (cm)

7.3 Each package shall contain one (1) copy of packing list.

7.4 The Seller shall mark on the package, if necessary, “Handle with Care", “Right Side Up", “Fragile" or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods.

7.5 If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facilitate loading, unloading and handing.

(a) Destination

(b) Consignee

(c) Contract number

(d) Gross/net weight (kg)

(e) Item number

(f) Dimensions: L x W x H (cm)

Article 8 Technical Service and Technical Training

8.1 The Seller shall dispatch technical personnel to Job Site to render Technical Service in accordance with Contract according to a time schedule agreed upon between both parties. The number, specialty, rank, treatment of the personnel, and payment as well as the contents, and requirements of Technical Service are specified in Appendix 6.

8.2 The Buyer shall have the right to send its technical personnel to the relevant factory selected by the Seller for training. The number, speciality, treatment of the personnel, and payment as well as the contents, time schedule, and requirement of training, are specified in Appendix 7.

8.3 Either party shall provide assistance to the other party’s technical personnel in their application for visa, working permit, and/or other necessary formalities for rendering Technical Service or training under the Contract in the other party’s factory.

8.4 Either Party’s technical personnel shall abide by the laws of the other party’s country and the regulations of the other party during their stay in the other party’s country.

Article 9 Standards and Inspection

9.1 The Seller shall carry out the design, manufacture, inspection and test of the Equipment according to the existing standards of the People’s Republic of China, namely GB.

9.2 The Seller or the manufacturer shall, at his own costs and expenses, inspect the Equipment and issue the ex-work quality certificate.

9.3 The open-case inspection of the Equipment shall be performed by the Buyer in the presence of the Seller’s representatives on the Job Site in days after the arrival of the Equipment at the Job Site. The open-case inspection fee shall be borne by the Buyer.

The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s representatives in their inspection work.

9.4 During the joint open-case inspection, a detailed inspection record shall be made and signed by the representatives of both parties.

In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. Any of such claims shall be lodged by the Buyer within month(s) after the arrival of the Equipment at the Job Site.

9.5 If any shortage, defect of or damage to the Equipment is found in open-case inspection not attributable to the Seller’s responsibility, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties.

9.6 The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent.

If there is no joint open case inspection due to the reasons not attributable to the Seller, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition.

Article 10 Design and Design Liaison

10.1 The Buyer shall provide to the Seller within ____ ( ) days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. The Seller shall not be liable to the Buyer for, and the Buyer shall indemnify the Seller and hold the Seller harmless from any damages or failure caused by the incompleteness, incorrectness and/or inaccuracy of any such information and data.

10.2 A design liaison meeting shall be held in the ____ ( ) month after receiving above mentioned design data, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details.

10.3 During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively.

Article 11 Erection, Test Run, Commissioning, Performance Test and Acceptance

11.1 The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer.

11.2 Chief Representatives

11.2.1 Each party shall nominate one (1) Chief Representative to deal with the technical matters during the period from the start of the Erection to Acceptance of the Equipment.

11.2.2 Detailed arrangements shall be made through friendly discussions by the Chief Representatives of both parties. The Chief Representatives of both parties shall fully cooperate to carry out their duties stipulated in the Contract, however they have no right to revise, alter or amend the Contract without the written authorization of both parties.

11.2.3 The Chief Representatives of both parties shall communicate through Linking Sheet for the matters relative to opinions, suggestions and information. The linking sheet shall be countersigned by the other party.

11.3 Erection and Test Run

11.3.1 The Erection shall be completed by the Buyer in ____ ( ) days from the effective date of the Contract. The Seller’s Chief Representative shall arrive at the Job Site ____ ( ) days prior to the beginning of the Erection.

11.3.2 When Erection is completed and in full conformity with requirements of the Technical Documentation, a Certificate of Completion for Erection of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing said Certificate shall be deemed as the date of completion of Erection.

11.3.3 As soon as the completion of Erection, Test Run for single machine and the whole system of the Equipment shall be started.

11.3.4 When Test Run has been successfully performed, a Certificate of Completion for Test Run of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing the said Certificates shall be deemed as the date of completion of Test Run of the Equipment.

11.4 Commissioning and Performance Test

11.4.1 Within ____ ( ) days after the completion of the Test Run, the Buyer shall make available qualified operation and maintenance personnel, raw materials, spare parts, utilities and other matters required for the Commissioning. Detailed procedures such as instrument calibrating, items of recording, sampling methods and analyzing methods, which are necessary for the Commissioning shall be discussed and agreed upon by the Chief Representatives of both parties.

If in the opinion of both parties, the Equipment is ready for the Commissioning, both parties shall confirm the readiness for the Commissioning in writing.

11.4.2 The Commissioning of the Equipment shall be started immediately after the confirmation of the readiness for the Commissioning. The Commissioning period shall ____ ( ) days after commencement of the Commissioning.

11.4.3 When the Seller and the Buyer consider that stable operation of the Equipment has been achieved, the date of Performance Test shall be fixed by Chief Representatives of both parties.

11.4.4 The Seller shall have the right to access to the laboratory and testing facilities in order to take samples and make analytical tests. The sample taking and analytical test during the Commissioning period will be done in the presence of the Chief Representatives of both parties.

11.4.5 During the period of Commissioning until Acceptance of the Equipment, the Seller may use the Buyer’s stored spare parts. Should the Buyer’s stored spare parts be used by the Seller due to the Seller’s responsibility, the Seller shall replenish the stores with the same in time at Job Site; otherwise the Seller shall provide the same at the Buyer’s costs upon the Buyer’s timely request.

11.4.6 If the result of Performance Test has reached the guarantee figures as per Appendix 1, the Acceptance Certificate of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days.

11.4.7 If the Performance Test cannot meet guarantee figures specified in Appendix 1, both parties shall jointly make investigations so as to find out the reason for clarifying the responsibility.

11.4.8 If the guarantee figures are not met due to the Seller’s reason, the Buyer shall agree to give an extension of ____ ( ) months so that the Seller can make improvement or adjustment to the Equipment and conduct further Performance Test. All the costs and expenses for making improvement or adjustment to the Equipment shall be borne by the Seller.

11.4.9 During the extension period, if the guarantee figures are still not met due to the Seller’s reason, the Seller shall pay the liquidated damages as per Appendix 1 to the Buyer against the Acceptance Certificate signed by both parties.

The Seller’s aggregate liability to pay liquidated damages for failure to attain the performance guarantees shall not exceed ____ ( ) percent of the Equipment price. The Seller shall have no further liability whatsoever to the Buyer in respect of such failure after payment of the liquidated damages.

11.4.10 If the non-achievement of the guarantee figures is due to the reasons not attributable to the Seller, the Seller shall agree to give an extension of ____ ( ) months. During the extension period all costs thereto incurred for the adjustment of the Equipment, as well as the costs and expenses for the Seller’s technical personnel shall be borne by the Buyer. In case the guarantee figures still can not be achieved due to the reasons not attributable to the Seller in the extension period, the Equipment shall be accepted by the Buyer. Both parties shall sign the Acceptance Certificate.

11.5 Acceptance

11.5.1 Acceptance shall occur in respect of the Equipment when :

(a) Performance Test has been successfully completed as per the Article 11.4.6.; or

(b) The Performance Test has not been completed due to the reasons not attributable to the Seller such as delayed civil construction, lack of and/or any other inconformity of raw materials, spare parts of the Buyer’s scope of supply under Appendix 2, and utilities with the requirements of the Contract in the ____ ( ) months from the date of Bill of Lading of the Last Shipment; or

(c) The Seller has paid the liquidated damages as per Article 11.4.9; or

(d) The guarantee figures still can not be reached due to reasons not attributable to the Seller’s reason in the extension period as specified in Article 11.4.10; or

(e) The Buyer takes the single machine and the whole system of the Equipment into use without the Seller’s approval.

11.5.2 At any time after any of the events set out in Article 11.5.1 has occurred, the Seller may give a notice to the Buyer requesting the issuance of the Acceptance Certificate.

11.5.3 The Buyer shall within seven (7) days after receipt of the Seller’s notice, issue such Acceptance Certificate.

11.5.4 If within seven (7) days after receipt of the Seller’s notice, the Buyer fails to issue the Acceptance Certificate or fails to inform the Seller in writing, with convincing evidence, of the reason why the Buyer has not issued the Acceptance Certificate, the Equipment shall be deemed having been accepted on the seventh day of the Seller’s said notice.

11.5.5 After the Acceptance, the Seller’s responsibilities and obligations under the Contract shall be deemed having been fulfilled except those as stipulated in Article 12 and 14.

Article 12 Guarantee and Warranty

12.1 The Seller guarantees that:

(a) The Equipment supplied by the Seller shall be new and made of adequate materials, and in conformity with the technical requirements of the Contract;

(b) The Technical Documentation shall be complete, clear and correct.

12.2 The period of warranty given by the Seller under Article 12.1 shall be ____ ( ) months from the date of Acceptance or ____ ( ) months from the date of Last Shipment, whichever comes earlier.

12.3 Defect of the Equipment

12.3.1 During the Warranty Period, should any defect due to inferior materials or bad workmanship of the Equipment be found under normal operation, the Buyer shall give the Seller a notice stating the details, together with all available evidence.

The Seller shall take immediate action to eliminate the defect at the Seller’s expenses within the period agreed by both parties.

12.3.2 If certain defect can not be eliminated despite of several attempts, the Seller shall replace the defective parts with non-defective parts at the Seller’s costs and expenses.

12.3.3 If the defect is eliminated by the Buyer himself, subject to the Seller’s prior written consent, all the direct costs and expenses thus incurred shall be borne by the Seller.

12.3.4 The Seller may reduce the price of the defective Equipment according to the degree of inferiority or extent of damage as agreed by both parties. After the reduction the Seller shall be released from its obligations and liabilities.

12.3.5 During the Warranty Period, should any defect due to the Buyer’s improper operation or maintenance be found, the Seller will provide technical assistance to eliminate the defect or replace the defected parts upon Buyer’s requests. All the costs and expenses thus occurred shall be borne by the Buyer.

12.3.6 Subject to Article 12.3.1, The Seller shall not be responsible for any defect or damage to the Equipment arising out of any circumstances including but not limited to the following causes:

(a) Combination of the Equipment with any machinery, and/or component other than those supplied by the Seller; or

(b) Alteration, modification or repair without the Seller’s prior written consent; or

(c) Failure of the Buyer to follow the Technical Documentation and instructions of the Seller, including the Buyer’s improper operation and maintenance; or

(d) Normal wear and tear.

12.4 During the Warranty Period, should the Technical Documentation supplied by the Seller be found incomplete, unclear or incorrect due to the Seller’s reason, the Seller shall be liable to supplement, replace or correct the Technical Documentation free of charge.

12.5 The Seller shall in no respect be understood or interpreted as liable for the commercial development of the Contract Products. The Buyer shall undertake the risk of the commercial development of the Contract Products.

12.6 In no circumstances, whether as a result of breach of contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, shall the Seller or its subcontractors or suppliers be liable for loss of profit or revenues, loss of production, loss of use, loss of information or data, cost of capital, cost of substitute equipment, facilities, services or replacement power, downtime costs, claims of the Buyer’s customers for such damages, or for any special, consequential, incidental, indirect or exemplary damages.

12.7 Notwithstanding anything to the contrary provided in the Contract, the aggregate liability of the Seller to the Buyer , on all claims of any kind, whether in contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, arising out of the performance or breach of the Contract or use of any Equipment or exploration of the Patent and/or Know-how shall not exceed ____ ( ) percent of the total Contract price.

12.8 All Contractual obligations of the Seller shall be deemed as having been fulfilled upon the expiry date of the Warranty Period.

Article 13 Intellectual Property Right

13.1 The Seller represents that it is entitled or authorized to grant the license to the Buyer to use the Patent and/or Know-how for the purpose as specified in Article 3.

13.2 The Buyer shall not use such Patent and/or know-how received from the Seller for any purpose other than that as specified in this Contract.

13.3 Any intellectual property right or other technical information granted by the Seller to the Buyer shall remain the property of the Seller. In no circumstances shall any terms and conditions in this Contract be construed, deemed, or interpreted as transfer of title to the Buyer of any information which may be delivered to or accessed by the Buyer.

13.4 Registration of the Contract and Maintenance of Patent

13.4.1 The Buyer shall, after the Contract is signed between both parties, make sure that the Contract is registered with or filed to the competent authorities in the Buyer’s country if it is required by law.

13.4.2 The Seller shall, during the validity period of the Contract, make all reasonable efforts to maintain Patent in force in the territory as stipulated in Article 3.4.1 and bear the costs thus incurred. The Buyer shall not make any action or inaction which may lead to invalidation or compulsory licensing of the Patent.

13.5 Improvement and Grant-back

13.5.1 Should any Improvement be made by the Seller on Patent and/or Know-how within the validity period of the Contract, which shall be the exclusive property of the Seller, the Seller shall grant the Buyer a non-exclusive license to exploit such Improvement at latest __________months from its improving, provided that the license fee is agreed upon between both parties.

13.5.2 The Buyer shall be entitled to make Improvement on Patent and/or Know-how within the validity period of the Contract. The Seller shall have the right to obtain and make use of the Improvement. The license fee shall be discussed between both parties in due time.

13.5.3 Both parties shall keep Improvement confidential. Neither party shall be entitled to grant any third party a sub-license on Improvement made and provided by the other party without previous written consent of the other party.

Article 14 Confidentiality

14.1 After signing of the Contract, both parties shall keep secret all the contents, terms, conditions of the Contract.

14.2 The Buyer shall take proper measures to keep strictly confidential of Know-how, Technical Documentation, Improvement and any other secret information obtained or accessible to from the Seller. The Buyer shall not disclose any of them to any third party, and shall not make use of them without prior written consent of the Seller except otherwise stipulated in the Contract.

14.3 The Buyer may disclose the secret information as described in Article 14.2 to the personnel of its own, or of any related parties engaged in the performance of the Contract subject to Article 14.2, strictly to the extent as essential for the implementation of the Contract, provided that the individuals and/or parties accessing or may access such secret information are engaged to undertake in written form the same confidential liability of the Buyer to the Seller. Any breach of confidentiality obligations by any personnel from the Buyer or the Buyer’s related parties shall be deemed as breach of the Contract by the Buyer.

14.4 Notwithstanding this Article 14, the Seller may furnish to its sub-contractor such documents, data, and other information received from the Buyer to the extent required for performing the Contract, in which event the Seller shall obtain from such sub-contractor an undertaking of confidentiality similar to that imposed on the Seller under the Article 14.

14.5 This Article 14 shall survive the expiration or termination of the Contract.

14.6 The confidential obligation shall not apply to the information which:

A. now or hereafter enters the public domain; or

B. can be proved to have been in the possession of the Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto; or

C. otherwise lawfully becomes available to either party from a third party under no obligation of confidentiality.

Article 15 Taxes and Duties

15.1 All taxes and duties in connection with the signing and performance of the Contract, levied by Governments of the People’s Republic of China, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Seller.

15.2. All taxes and duties in connection with the signing and performance of the Contract levied on the Buyer and Seller by the Buyer’s Governments, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Buyer. The Buyer shall pay in due time and full amount and hold the Seller harmless from any taxes and duties in case incurred to the Seller in the signing and performance of the Contract.

15.3 All import taxes and duties for tools and/or instruments, which the Seller or the Seller’s personnel may bring to the Buyer’s country for the execution of the Contract, shall be borne and paid by the Buyer.

15.4 Any and all taxes and duties in connection with the signing and performance of the Contract levied in any place except the cases as specified in Article 15.1 are not included in the Contract price. Should the Seller make the relevant payment directly as the case may be, both Parties agree to amend the Contract price to fully compensate the Seller for the payment, and the Buyer shall fully refund the Seller for the relevant amount within_______( ) days from the Seller’s payment.

Article 16 Force Majeure

16.1 If either of the Contract parties is prevented from executing the Contract due to the event of Force Majeure such as war, riot, coup, embargo, flood, typhoon, tornado, snowstorm, earthquake and other events which could not be foreseen, avoided and overcome, the affected party shall notify the other party by fax within the shortest possible time of occurrences of the Force Majeure and send a certificate issued by competent authorities or agency certifying the event of the Force Majeure by registered or express mail within fourteen (14) days following its occurrence.

16.2 The affected party shall not be liable for any delay or failure in performing any of its obligations due to the event of Force Majeure. However the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure as soon as possible.

16.3 Both parties shall proceed with their obligations immediately upon the cease of the event of Force Majeure or the removal of the effects and the term of the Contract shall be extended correspondingly. Should the effect of the event of Force Majeure last for more than one hundred and twenty (120) days, either party shall have the right to terminate the Contract by a written notice.

Article 17 Applicable Law and Settlement of Disputes

17.1 The applicable law of the Contract shall be the laws of the People’s Republic of China.

17.2 All disputes arising from or in connection with the Contract shall be settled through friendly consultation between both parties. In case no agreement can be reached, the dispute shall be submitted for arbitration.

17.3 The arbitration shall be conducted by China International Economic and Trade Arbitration Commission (CIETAC) in Beijing in accordance with Arbitration Rules of the Commission in effect at the time of applying for arbitration. The tribunal shall be composed of three arbitrators.

17.4 The arbitral award shall be final and binding upon both parties.

17.5 During proceedings of arbitration, the undisputed part of the Contract shall be performed continuously by both parties regardless of such arbitration proceedings.

Article 18 Effectiveness, Term and Termination of the Contract

(a) The Seller and the Buyer sign the Contract;

(b) The Contract shall be approved by the competent authorities and/or banks of both parties (if applicable);

(c) The Seller receives the Down Payment;

(d) The Seller duly receives the L/C (or L/G ) issued by the Buyers Bank.

18.2 Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.

18.3 If the Contract has not become effective pursuant to Article 18.1 within ____ ( ) months after the date of signing this Contract, the Seller has the right to make an equitable adjustment to the total Contract price and the time for delivery and/or other relevant conditions of the Contract. Should no agreement is reached for the above mentioned adjustment within ____ ( ) days from the Seller’s request of adjustment, the Seller shall be entitled to cancel the Contract.

18.4 The Contract shall be valid and remain in force for_____ (_____) years from the Date of Effectiveness, during which period the Buyer shall be entitled to manufacture the Contract Products with Patent and/or Know-how and sell the Contract Products within the licensed territory as specified in Article 3.4.

(Option 1) The Buyer shall not be entitled to manufacture with patent and/or know-how or sell the contract products after the aforesaid period unless the Buyer agrees to pay additional license fees in the amount and with the payment schedules and methods as agreed upon between both Parties in due time.

(Option 2) The Buyer shall be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after expiration of the Contract term specified above, provided that the Buyer shall not be released from its confidential obligations under the Contract.

(Option 3) The Buyer shall not be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after the expiration of the Contract term specified above, and shall return to the Seller all the Technical Documentations specified in Appendix 4 without remaining any duplicate copies. Nevertheless the confidential obligations of the Buyer under Article 14 shall survive the Contract term.

18.5 Either party may, without prejudice to any other remedy for the other party’s following breach of the Contract, terminate the Contract in whole or in part by a written notice send to the other party, if the other party

A. fails to perform its payment obligation under the Contract and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

B. fails to perform its confidentiality obligation under the Contract; or

C. fails to perform any other obligations under the Contract except minor parts thereof, and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

D. becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or dissolves, or ceases to do business, or be ordered to close down / to cease to do business / to dissolve, or has its business license revoked, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events.

18.6 Either party may, without prejudice to any other remedy, terminate the Contract in whole or in part by a written notice send to the other party, if

A. The other party is prevented by the laws, statutes, rules or regulations of either country from performing its obligations under the Contract; or

B. The Seller is prevented by the relevant authority of the Buyer’s country from being paid in accordance with the Contract; or

C. The other party is prevented from performing its contractual obligations by any event of Force Majeure for more than one hundred and twenty (120) days.

18.7 In the event of termination of the Contract, without prejudice to any other remedies available according to the Contract and/or applicable laws,

The Buyer shall cease all its further exploitation of the Patent and/or Know-how and any acceptance of further orders from third parties for the Contract Products.

All the delivered literatures, drawings, samples, instruments, equipment, and other documents including the interpretations related to Patent and/or Know-how shall be returned to the Seller as the Seller’s requests.

All the contracts on sales of the Contract Products signed between the Buyer and third parties shall be terminated by the Buyer, otherwise the Seller shall be paid accordingly.

In case the termination is due to the Seller’s default, the Buyer shall be entitled to complete the performance of the contracts on sales of the Contract Products already signed between the Buyer and third parties before the termination.

The Seller shall be paid by the Buyer for all the contractual obligations performed by the Seller till the date of termination within _______days from receipt of the termination notice.

E. Termination of the Contract shall not release either party from its confidential obligations under the Contract

Article 19 Miscellaneous

19.1 The Contract is signed by the authorized representatives of both parties in ____ ( ) originals. Each party shall keep ____ ( ).

19.2 The Contract supersedes all communications, negotiations and agreements between the parties prior to the signing date of this Contract.

19.3 All amendments, supplements and alternations to terms of the Contract shall be made in written form and signed by the authorized representatives of both parties. These amendments, supplements and alternations shall form integral parts of the Contract.

If any costs occur or delivery delay due to amendment or explanation of the new law or statute or regulations enacted by the Buyer’s country after the effectiveness of the Contract,the Seller shall have the right to ask for necessary adjustment in relation to the Contract price and the delivery schedule.

19.4 No assignment, cession, novation, or transfer of any right or obligation under this Contract shall be made by either party to a third party without the prior written consent of the other party.

19.5 All communications between both parties in the course of implementation of the Contract should be in English language in written form at the address set forth below. The faxes concerning the important matters shall be confirmed in due time by registered or express mail or letter delivered by hand.

The Buyer:

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

The Seller :

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be duly executed.

The Buyer:

The Seller:

By:______________________[Signature]

Name: [printed name]

By:_______________________ [Signature]

Name: [printed name]

Title:

Title:

Appendices

Appendix 1 Specifications and Guarantee Indices (Omitted)

展开阅读全文

篇14:公司生产需要借款保证合同

范文类型:合同协议,适用行业岗位:企业,生产,全文共 1493 字

+ 加入清单

债权人(甲方):

保证人(乙方):

第一条 为确保甲方与__________(以下简称借款人)签订的_______年________字_______号借款合同(以下称借款合同)的履行,乙方愿意向甲方提供保证,甲、乙双方根据有关法律规定,协商订立本合同。

第二条 乙方保证范围为借款人根据借款合同向甲方借用的贷款本金为人民币(大写)__________及其利息(包括因借款人违约或逾期还款所计收的复利和加收的利息)、借款人违约金和实现债权的费用(包括诉讼费和律师费)。

第三条 本合同保证的借款合同的履行期限自_______年_____月_____日至,________年_____月____日。

__________本保证合同的保证期间为两年,自借款人不履行债务之日起计算。

第四条 本保证合同独立于借款合同,乙方在本合同项下的保证责任不因借款合同无效而免除。

第五条 乙方承诺对借款人的还款义务承担连带责任,并在甲方开立的账户上始终保留相当于借款人借款余额的_______%的款项作为履行保证义务的保证金。如借款人未按合同的约定履行还款义务,乙方保证在接到甲方书面索款通知后________日内履行还款义务。如乙方未主动履行,即表示乙方授权甲方从其开立的账户中扣收。

第六条 乙方同意甲方在借款人逾期未偿还贷款本息时,有权依第五条规定的方式直接要求乙方履行义务。

第七条 乙方保证如发生借款合同项下借款合同提前到期的情况时,借款人又不及时还款的,乙方立即开始履行保证义务。

第八条 乙方保证有足够的能力承担上述保证责任,并不因乙方受到的任何指令、乙方财力状况的改变、乙方与任何单位签订任何协议而免除其所承担的责任。

第九条 本合同生效后,乙方接受甲方对其资金和财产状况的调查了解,乙方应按甲方要求及时提供其资产状况的有关资料。

第十条 在本合同有效期间,乙方如再向第三方提供担保,不得损害甲方的利益。

第十一条 任何一方不得擅自变更或解除本合同。一方需变更合同时,应经双方协商同意,达成书面协议。

第十二条 借款人与甲方协议变更借款合同的,应征得乙方同意;未经乙方同意的,乙方只在本合同规定的保证范围和期限内承担责任。但甲方由于国家政策调整而执行新利率的,无须征得乙方的同意。

第十三条 任何一方未按本合同的约定履行义务,给对方造成经济损失的,应向对方支付担保余额的_______%违约金,违约金不足以弥补对方损失的,还应就不足部分予以补偿。

第十四条 甲、乙双方商定的其他事项:

(一)______________________________________________________________________;

(二)______________________________________________________________________;

(三)______________________________________________________________________。

第十五条 甲乙双方在履行本合同中发生的争议,由双方协商解决,协商不成,由甲、乙双方共同选择下列方式之一:

1.提交__________所在地人民法院诉讼解决;

2.提交__________仲裁委员会仲裁。

第十六条 本合同一式__________份,具有同等效力,双方各执一份。

第十七条 本合同由甲乙双方签字盖章后生效。

债权人住所: 证人住所:

电话: 基本账户开户行:

传真: 账号:

邮政编码: 电话:

传真:

邮政编码:

甲方(公章) 乙方(盖章)

负责人(签字) 法定代表人(签字)

年 月 日 年 月 日

展开阅读全文

篇15:外贸公司实习总结

范文类型:工作总结,适用行业岗位:外贸,企业,全文共 5051 字

+ 加入清单

一、实习的目的与好处

1、透过本次实习使我能够从理论高度上升到实践高度,更好的实现理论和实践的结合,为我以后工作和学习奠定初步的知识。

2、透过本次实习使我能够亲身感受到有一个学生转变一个职业人的过程。

在本科教育中,实习是一个重要的实践性教学环节。透过实习,能够使我们熟悉自己将要从事行业的具体操作流程,增强感性认识,并可从中进一步了解、巩固与深化已经学过的理论和方法,提高发现问题、分析问题以及解决问题的潜力。在公司具体实习过程中,能够接触国际货物买卖实务的具体操作,进出口的成本核算、询盘、发盘与还盘等各种基本技巧,还能对某一行业更深入的了解,并能切身体会到服装贸易中不同当事人面临的具体工作与他们之间的互动关系,接触公司制定的各种战略以实现跨国经营和良好的市场运作;认识供求平衡、竞争等宏观经济现象,能够接触真实的商务实战,了解自身存在的不足,并积累必须的经验,为将来走上工作岗位打下良好基础。

二、实习资料

1、公司简介

张家港市梵地亚贸易有限公司是一家服装外贸类公司,常年从事服装外贸相关业务,与新加坡和澳洲有长期合作。公司设有行政部,财务部,业务部,采购部,船务部等等,还有一个相对独立的技术/生产部即苏州市宝嘉丽服装公司。

2、实习项目

我初到公司被安排进采购部。对于采购部,一开始并不是很了解,甚至仅仅肤浅的认为只是对于公司所需物品的购第一范文网什么都有任你选买和置办。之后,慢慢接触了解下来,才发现原先采购部拥有一系列规范的体系和流程。采购是个繁琐又复杂的合作过程,涉及到生产部、市场部、品质部等多个部门的多个环节。首先市场部接到客户订单,有个需求的动作,将这一动作反馈给生产部,生产部根据实际需求再将定料计划回到给市场部,随后做定料计划,确定来料数量,进行叫料,最后采购部根据叫料计划写请购单,联系相关供应商并制定来料计划。之后,供应商送料暂放采购部原料仓库,有品质部进行来料检验,合格就入库,不合格就通知相应采购担当与供应商进行确认和制定解决方案。每月月中,仓库会进行盘点,目的在于确保账物相符。而月末,采购则会与财务进行对账,这一块相比较较重要也比较麻烦。此外,每隔三个月,部门内审员会配合采购担当与品质部主任去审核供应商,对供应商进行评分,并确认是否贴合公司及客户要求来决定是否继续使用此供应商带给的材料。而完整的采购流程也并非如此,也让我认识到我就应学的,就应做的还很多很多,最后更深的体会到那句常说的老话:活到老,学到老。

对于公司的基本规章制度及采购的工作资料及工作流程都有了基本的解。觉得做好采购工作就像买一件称心得体的衣服一样。争取用最低的价格买到的品质。虽然工作中有一些不当之处,但我都用心改正,并做好记录,避免再犯,争取尽快融入这个团队。以十分的热情投入到工作中,我主要采购衣服的原材料。上一批同学都很热情,只要我有需要,都会给予热情的指导,让我感觉很温暖,从而会给自己制造压力,必须要把工作做好。

有人认为采购工作很简单,有人说这个职业这是个肥差,在企业里它是保证生产的命脉,对外采购员手中真的富有必须的选取权利……

不可否认,花钱买东西确实应比推销产品在多数状况下更富有主动性。但是,做为采购员,你如何规划好自己的人生,如何做好采购工作,这都是我们自己要好好思考的事。相信真正干过采购的人员都明白,采购工作的重要性,需在合理的时间内,争取用惠的价格买到最适合使用部门使用的物资,也就是说采购时,首先你要采购及时,第二你要采购准确,第三你要尽量为公司节约成本,这就需要采购员对具有运筹帷幄、不急不躁、头脑清晰的潜力。采购决不是一份很简单、简单的工作,手里握着钱的使用方向,外人眼中的“肥差”,采购员很容易被推倒风头浪尖,所以想做这行:

(1)你需要对采购相关专业知识比较熟悉

采购员必备潜力:成本意识与价值分析潜力、预测潜力、表达潜力、良好的人际沟通与协调潜力、专业知识。

采购流程:收集信息,询价,比价、议价,评估,索样,决定,请购,订购,协调与沟通,催交,进货检收,整理付款。

采购数量计算:本期应采购数量=本期生产需用量+本期末预定库存量—前期预估库存量—前期已购未入库数量

怎样合理降低采购成本:事先制定合理的采购计划,查询当前市场行情,掌握影响成本的因素和事件。事中寻找多家合格厂商的报价,制作底价或预算,运用议价技巧。事后选取价格适当的厂商签订合约,利用数量或现金折扣。

采购价格构成:供应商成本的高低,规格与品质,采购物料的供需关系,生产季节和采购时机,交货条件,付款条件。

采购商品成本构成:工程或制造的方法,所需的特殊工具、设备,直接及间接材料成本,直接及间接人工成本,制造费用或外包费用,营销费及税捐、利润。

什么是适宜的价格:采购价格应以到达适当价格为目标,采购员务必以采购要求,根据市场行情,分析物料的质量状况和价格变动状况,选取物美价廉的物料进行购买。

怎样样决定采购价格是否合理:进行成本分析,价格分析,市场调研,多家厂商报价。

怎样找供应商:利用现有的资料,公开征求的方式,透过同业介绍,阅读专业刊物,协会或采购专业顾问公司,参加产品展示会。

供应商分类:原材料供应商,小额服务性供应商,临时性供应商。合格供应商的标准:优秀的企业领导人,高素质的管理人员,稳定的员工群体,良好的机器设备,良好的技术,良好的管理制度。

怎样对供应商进行分析:价格,品质,服务,位置,存货政策,柔性。专业知识。决定力。职责感。时间观。口才。

(2)你需要认真、负责,尊重自己、尊重公司、更应尊重每一位参与竞标的客户

采购员的工作职责主要有:1。订购单的下达。2。物料交期的控制。3。材料市场行情的调查。4。查证进料的品质和数量。5。进料品质和数量异常的处理。6。与供应商有关交期、交量等方面的沟通协调。

采购员须承担的职责:采购计划与需求确认、供应商选取与管理、采购数量控制、采购品质控制、采购价格控制、交货期控制、采购成本控制、采购合同管理、采购记录管理。

(3)你要具有很强的抗压潜力,在压力下能够冷静、清晰的处理手里的一堆堆工作,能抽丝剥茧,更不要在意风言风语,认为对的就不要在意别人的想法和看法。

这段时间来,我更加明白了总成本优先原则,和灵活运用各种采购技巧的重要性。对与价格影响因素要有敏锐的感觉,并且能够及时的做好预警及防范措施,切忌“从一而终”。一个优秀的采购比须拥有较强的沟通协调潜力和采购经验,我明白自己距离一个优秀的采购还有很远的差距,因为采购经验是靠长期不断积累经验和自我启发,到达熟练程度后才能掌握的一种技术,要做到这一点是十分困难的。

但是,我会更加努力的学习,不断地积累丰富采购经验,跟上公司的发展的脚步!这是今后改善的方向,工作还有很多不足。努力的目标。感谢公司给我这次工作机会,将尽职尽责做好本职工作,全心配合大家的工作,喜欢那里,并且很愿意把那里当作发展自己的平台,和公司共同发展,做出自己的努力。

时间过的真快,透过这两周的工作,使我对采购工作有了更全面更深层次的解,询价、议价、比价只是采购工作的开始,对于所购物品的质量追踪、货期的跟催、供应商的开发与考核、帐款的核对等等都是一名采购所要做好的工作;还有就是要有很强的职责心,认为采购是一项比较神圣的工作,因为公司对你信任,才把这项工作交给你要做的就是为公司节省每一分钱,花出去的每一笔钱都应做到无可挑剔。

三、实习感受

1、实习经验与教训

(1)不能只依靠于供货商的报价。对于自己所分管的业务要透过一切办法了解其市场行情。

(2)不能草率马虎,工作必须要认真仔细。对于不明白的事必须要问清楚,不要领导追问时无言以对。因为自己的粗心被领导退回几次单子,这样的事今后必须不能再犯。

(3)由于采购事项多,要养成记笔记的习惯。请购部门问题多,不记笔记会很快忙晕忘掉,准备个小本随时记下问题,这样就不会遗漏。

(4)多方考量查证,从供应商听来的消息要辨别真伪。确保信息的正确性。

2、实习并不同于我们在校学习的一些课程,它少了些理论化的知识,多了些实践的乐趣。让我们在结合理论知识以外,有了更深的社会实践,这对日后接触有关物流采购行业工作有更好的帮忙。透过知识与实践的结合,渐渐提前运用知识的潜力,及实践动手潜力。接下来我总结一下我个人的感受:

我们到公司去实习,由于我们不是正式职员,所以公司多数是把我们当见习生看待。公司在这个期间一般不会给我们什么重要的工作去做,可又不想让我们闲着,因此,他们会交给我们一些比较简单的工作。与此同时,我们就应自己主动找一些事情来做,从小事做起,刚开始也只有这样。

在工作过程中,我们肯定会碰到很多的问题,有很多是我们所不懂的,不懂的东西我们就要虚心向同事请教,当别人教我们知识的时候,我们也就应虚心地理解。同时,我们也不要怕犯错。每一个人都有犯错的时候,工作中第一次做错了不要紧,重要的是知错能改。

平时,我们不管做什么事,都要明确自己的目标,就像我们到公司工作以后,要明白自己能否胜任这份工作,关键是看你自己对待工作的态度,态度对了,即使自己以前没学过的知识也能够在工作中逐渐的掌握。因此,要树立正确的目标,在实现目标的过程中必须要多看别人怎样做,多听别人怎样说,多想自己就应怎样做,然后自己亲自动手去多做。只有这样我们才能把事情做好。

透过本次的实习,我还发现自己以前学习中所出现的一些薄弱环节,并为今后的学习指明了方向,同时也会为将来的工作打下一个良好的基础。,但这次的实习为我们带给了一个很好的锻炼机会,使我们及早了解一些相关知识以便以后运用到以后的业务中去。透过这次的实习,我认识到务必要熟练地掌握英语口语,这样才能够自如地与外国人交流,同时让我懂得英语真的很重要,我明白只有透过刻苦的学习,加强对业务知识的熟练掌握程度,在现实的工作中才会得心应手,应对自如。

四、感想与总结

两星期的实习,让我能够对外贸业务有初步的了解,很庆幸有机会能够接触到客户,这对于我以后的工作和继续深造都是一个很好的平台。仔细总结,发现不同于前几次实习,这次校外实习充分认识了从校园走向社会我们存在的不足和缺少工作经验。自身定位,加强外语学习。在所有的工作和活动中无一例外的涉及到外语,外语是我们对外交流的桥梁,因此在以后的学习中务必加强对外语的学习,同时加强口语的练习,这是我们搞外贸业务的基础,因此务必掌握好这门工具。不断强化自身,并充分认识自己,避免眼高手低,增加实际动手潜力,在社会这个大校园里,不断完善和学习工作总结,认识自身不足。外贸看中的还是经验,经验的累积对以后是一笔丰富的财富。虽然开始很辛苦,但是前景很好。实习中同事和经理的对我的帮忙很大,告诉我做人做事。以后的路还很长,要学的还很多,我期望能够走好每一步。经过这次实习,我不仅仅从中学到了很多课本上所没有提及的知识,更重要的是,这是我踏入社会的第一步。虽然只工作了两个星期的时间,但是也让我看到了自己的很多不足,让我深知出身社会,还需要很多校园里学不到的潜力,年少的我们,还就应更加努力,尽快学会在社会上独立,敢于参加与社会竞争,敢于承受社会压力,使自己能够在社会上快速成长。这段时间给了我一次成长的机会,让我受益匪浅。总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,这次实习都将成为我人生中一笔重要的财富。

在成功结束实习后,透过实习我发现服装贸易是门实践性很强的专业领域,它不光要求我们有扎实的理论知识而且务必具有很强的动手操作潜力,更重要的是学会如何与人沟通,怎样建立商业关系,这些是课本中学不到的,只有融入社会的大舞台并不断的历练才能得到提高,还有加强各方面素质的提高。贸易工作同时是一个涉外行业,因此对各方面的要求都很高,对外代表的不仅仅仅是个人形象,甚至是国家形象,因此务必加强自己各方面素质的修炼,如礼仪等。熟练掌握好本专业的知识。专业知识是我们从事贸易工作的基础,贸易工作的高风险要求我们务必熟练地掌握好专业知识。在这次实习过程中,我深刻体会到,走出校门,只是万里长征的第一步,我们在工作经验,社会历练,人际交往上体现出来的稚嫩,在这一次的实习中完全表露出来,而且我们所缺乏的还不仅仅仅如此,所以在以后的生活和工作中,我要不断的充实和丰富自己,不放弃任何能够锻炼自己的机会,使自己能迅速的成长为一名优秀的商务人士。

总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,这次实习都将成为我人生中一笔重要的资本。

展开阅读全文

篇16:2024外贸销售工作计划

范文类型:工作计划,适用行业岗位:外贸,销售,全文共 919 字

+ 加入清单

一、顺利处理美国客户订单,70%余款收回,这样7月份至少能够完成3万多美金。当然不能只盯着一个客户。墨西哥客户太阳能电池板样品测试已成功,客户也比较满意,目前正在谈一个小柜的订单,根据和客户的联系状况,以及私人关系,目标7月份拿下订单。对于这样的客户,当然是要像猫盯着老鼠那样,抓紧,不放松,有望7月中旬收到定金。所以给自我7月份的目标是5万美金。

二、其余每个月的任务,很难细分,因为和客户的进展是在变化的。期望每月的任务能提前一个月定下来。

三、还有一个主要的任务,帮忙新业务员适应公司,尽早做出业务。目前,只有郑蓉是我负责,我会耐心为她解答工作中遇到的困难,并给予适当的指导,帮忙她早日为我们公司外贸业务作出成绩。

我明白,对于工作的计划也许还不让人满意,在我个人的便签纸上方,每一天的计划,都一条条写下来了,每一天的计划我相信是为我大的目标服务的,所以会脚踏实地做好。在公司这半年时光,我有不足的地方,期望同事领导给我提出,我会虚心理解,并改正,争取做得更好。每个公司都有自我的制度,以及管理方式,在努力工作的同时,我也会配合公司的各项制度。

四、对待资源资源。在上方的工作总结中,我提到,网络平台是一个很好的资源,有了平台,业务上有了明显的进步,客户积累量也突飞猛进。所以期望公司在资源分配上,尽量做到公平公正,因为这个对每个业务员都狠重要!

五、对待样品。因为前半年,我出的大都是样品,所以对这一点体会比较深刻,如果样品单客户能培养成定期下单的长期客户,那目标是很容易实现,也为公司的长期客户做出贡献。我提出这一点并不是说我的样品出了问题,相反,我出的样品,客户都比较满意,测试也很不错,所以我期望能继续持续下去。因为样品是客户对我们产品的初步审核,是我们取得订单的关键。

六、对待来访客户。这一点只是细节,但是期望能引起注意。据我所知,我公司到访客户的下单率,并不理想。相比,我明白的一家工厂,他们公司硬件设备及各方面条件并不如我们公司,而对方到访客户的下单率几乎是100%。探其究竟,工厂对待客户细节等都十分注意。客户到访,无论客户是否下单,都十分尊重。我也期望我们公司对远道而来的客人,表现出东道主的热情,并展示公司良好的企业形象。

展开阅读全文

篇17:出口合同范本英文版_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 4313 字

+ 加入清单

出口合同范本英文版

出口合同一般都包括货物的详尽描述、数量、价格、总值、交货日期和运输方式。 对于其它条款比如“不可抗力”、“手工制作与样版有出入”也予以列明。

货物出口合同【中英文】(Sales Contract)

卖方(Seller) :________________________

地址(Address) :_______________________

电话(Tel) :__________传真(Fax) :__________

电子邮箱(E-mail) :_____________________

买方(Buyer) : ______________________

地址(Address) : ______________________

电话(Tel) ::_________传真(Fax) :_____________

电子邮箱(E-mail) : ______________________

买卖双方经协商同意按下列条款成交:

The undersigned Seller and Buyer have agreed to close the following transactions according to the terms and conditions set forth as below:

1. 货物名称、规格和质量 (Name, Specifications and Quality of Commodity):

2. 数量(Quantity):

3. 单价及价格条款 (Unit Price and Terms of Delivery) ::

(除非另有规定,"FOB"、"CFR"和" CIF"均应依照国际商会制定的《2019年国际贸易术语解释通则》(INCOTERMS 2019)办理。)

The terms FOB,CFR,or CIF shall be subject to the International Rules for the Interpretation of Trade Terms (INCOTERMS 2019) provided by International Chamber of Commerce (ICC) unless otherwise stipulated herein.)

4. 总价 (Total Amount):

5. 允许溢短装(More or Less): ___%。

6. 装运期限(Time of Shipment):

收到可以转船及分批装运之信用证___天内装运。

Within _____ days after receipt of L/C allowing transhipment and partial shipment.

7. 付款条件(Terms of Payment):

买方须于____ 前将保兑的、不可撤销的、可转让的、可分割的即期付款信用证开到卖方,该信用证的有效期延至装运期后_____天在中国到期,并必 须注明允许分批装运和转船。

By Confirmed, Irrevocable, Transferable and Divisible L/C to be available by sight draft to reach the Seller before ______ and to remain valid for negotiation in China until ______after the Time of Shipment. The L/C must specify that transshipment and partial shipments are allowed.

买方未在规定的时间内开出信用证,卖方有权发出通知取消本合同,或接受 买方对本合同未执行的全部或部份,或对因此遭受的损失提出索赔。

The Buyer shall establish a Letter of Credit before the above-stipulated time, failing which, the Seller shall have the right to rescind this Contract upon the arrival of the notice at Buyer or to accept whole or part of this Contract non fulfilled by the Buyer, or to lodge a claim for the direct losses sustained, if any.

8. 包装(Packing):

9. 保险(Insurance):

按发票金额的___%投保_____险,由____负责投保。

Covering _____ Risks for______110% of Invoice Value to be effected by the ____________.

10. 品质/数量异议 (Quality/Quantity discrepancy):

如买方提出索赔,凡属品质异议须于货到目的口岸之日起30天内提出,凡属 数量异议须于货到目的口岸之日起15天内提出,对所装货物所提任何异议于保险 公司、轮船公司、其他有关运输机构或邮递机构所负责者,卖方不负任何责任。

In case of quality discrepancy, claim should be filed by the Buyer within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy, claim should be filed by the Buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable for any discrepancy of the goods shipped due to causes for which the Insurance Company, Shipping Company, other Transportation Organization /or Post Office are liable.

11. 由于发生人力不可抗拒的原因,致使本合约不能履行,部分或全部商品 延误交货,卖方概不负责。本合同所指的不可抗力系指不可干预、不能避免且不 能克服的客观情况。

The Seller shall not be held responsible for failure or delay in delivery of the entire lot or a portion of the goods under this Sales Contract in consequence of any Force Majeure incidents which might occur. Force Majeure as referred to in this contract means unforeseeable, unavoidable and insurmountable objective conditions.

12. 仲裁(Arbitration):

因凡本合同引起的或与本合同有关的任何争议,如果协商不能解决,应提 交中国国际经济贸易仲裁委员会深圳分会。按照申请仲裁时该会当时施行的仲裁 规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。

Any dispute arising from or in connection with the Sales Contract shall be settled through friendly negotiation. In case no settlement can be reached, the dispute shall then be submitted to China International Economic and Trade Arbitration Commission (CIETAC) ,Shenzhe Commission for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.

13. 通知(Notices):

所有通知用___文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后___日内书面通知另一方。

All notice shall be written in _____ and served to both parties by fax/e-mail /courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within ____ days after the change.

14. 本合同为中英文两种文本,两种文本具有同等效力。本合同一式 _____ 份。自双方签字(盖章)之日起生效。

This Contract is executed in two counterparts each in Chinese and English, each of which shall be deemed equally authentic. This Contract is in _____ copies effective since being signed/sealed by both parties.

The Seller: The Buyer:

展开阅读全文

篇18:外贸企业跟单员实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,企业,跟单,全文共 1736 字

+ 加入清单

外贸企业跟单实习报告范文

外贸企业跟单员实习报告

在xx公司做实习的跟单员已两个星期有余,对于xx公司的毛巾出口业务也有了些基本的了解。实习期间的工作也使自己有不少的体会,从中也懂得了许多知识,现略作陈述。

一、对于工作流程的认识

纺织是一家以出口毛巾为主要业务的有限责任公司,其毛巾出口多达20个国家和地区,以日本和印度为主要出口国。销售经理接单分配给跟单员任务后,跟单员要及时的跟进,同生产车间沟通,安排机台的生产。样品生产出来之后,负责样品检测。由于生产一直在进行,所以有问题应及时的同生产主任沟通,保证生产出符合客户要求的产品。跟单员的另一项主要工作就是与外协加工厂的沟通,负责订购包装毛巾所需要的各种辅料,如纸箱、包装袋、卡头纸、腰封、不干胶等等。要求在生产车间将印染合格的毛巾运往整理车间之前将这些辅料送到仓库,以备及时的包装。确认产品的包装后,分配给整理车间包装职工任务,保证毛巾的按时装柜。

作为实习生,我的主要任务是认识各种产品,了解其所需要的各种辅料。从整理车间开始工作,学习产品的规格,包装方式以及所需要的各种辅料和相关外加工厂的基本情况。目前我已认识了车间的各种产品,对于生产车间和整理车间的基本运作也有所了解。

二、实习体会

首先是工作一定要从打杂开始。两个多星期的跟单员实习生活与我想象中的工作有些差距,但是我已认识到,如果不能够将车间的运作流程、了解产品的基本规格、了解纺织包装职工的工作情况有所了解,如果不能够将车间的一些基本工作做得顺利完满,我其实没有资格做为正式的跟单员的。作为xx公司的一份子,我就应该努力为谋福利;作为经理放在车间的眼睛,我就要能够为经理提供真实准确的基层信息。我当前的职责就是了解产品,了解车间,了解职工。我需要去了解每种产品从毛线到最后的产品装柜的过程,我需要去了解什么是保证整个公司顺利运转的关键,我需要去了解每个职工对于工作的真实想法。只有做好了这些,我才能够为xx公司的发展提出自己的建议。工作从打杂开始做起,借用革命先辈们的(转载自,请保留此标记。)一句话:基层工作尚未做好,年轻同志仍需磨炼!

其次是工作无处不是沟通。跟单员的主要工作其实一句话可以概括:保证按时交货!这就需要跟单员不断的与产品流经的各个部门相沟通。从线纱到毛巾,从辅料到包装,跟单员需要接触多个部门,并需要亲自到车间考察了解产品的生产进度,及时的跟进产品。这就需要具备灵活的沟通能力。作为尚在整理车间的实习生,当前的工作对象还仅限于车间主任,车间包装职工及我的两位上司。对待上司要恭敬服从,对待车间主任要认真严肃,对待包装职工要勤快可亲。我不确定这样的准则是否可以让我的工作变得更加的轻松流畅,这需要时间的检验。当然没有什么是绝对的真理,一切准则都随着时间环境的变化而改变,我会争取不断的进步。我已认识到沟通能力对于工作的重要性,希望自己可以在这方面一直提高吧!

三、工作建议

实习两个多星期,或者说在整理车间的两个多星期,我最大的感受就是xx公司的企业凝聚力与xx公司规模的不相匹配,即职工对于xx公司的归属感还不足。没有归属感就不会有企业文化的认同,没有企业文化的认同就会导致企业结构的松散。对于车间的职工来说,她们只是xx公司的匆匆过客,可以随便的离开而没有留恋。我目前接触的仍只是整理车间的包装职工,尽管她们算不上严格意义上的技术工种,但我认为她们也是一部分,她们也为发展贡献自己的青春。但她们自己并不认为自己是在为xx公司工作,而是单纯的想着多挣钱。她们经常会抱怨功过时间过长,抱怨没有假期,抱怨没有任何的福利。坚持在工作是因为这比较自由,离开没有什么约束,她们也从不为发展着想。也许对于来说,她们走了再找人就行了,反正工作简单。但是她们离开后会去做什么呢?肯定是选择其他的毛巾公司,投奔竞争对手。资源永远都是有限的,人力资源也是如此。xx公司还需在企业文化建设上另辟蹊径。

《外贸企业跟单员实习报告》到此结束,由于文笔欠缺,如有错误还请张经理见谅;若有做的不对或不好的地方也请张经理指正,不胜感激!

XX年暑期跟单员实习总结、外贸专业跟单员实习报告、外贸跟单员实习日记、外贸出口企业跟单员实习报告范文、外贸业务跟单员实习报告、外贸跟单员实习报告

展开阅读全文

篇19:外贸实习报告

范文类型:汇报报告,适用行业岗位:外贸,全文共 1768 字

+ 加入清单

短短的实习期已经结束,静下心来回想这次实习真是感受颇深。我们知道实习是大学教育中一个极为重要的实践性环节,通过实习,可以使我们在实践中接触与本专业相关的一些实际工作,培养和锻炼我们综合运用所学的基础理论、基本技能和专业知识,去独立分析和解决实际问题的能力,把理论和实践结合起来,提高我们的实际动手能力,为将来我们毕业后走上工作岗位打下一定的基础。通过这段时间的学习,从无知到认知,到深入了解,渐渐地我喜欢上这个专业,让我深刻的体会到学习的过程是最美的,在整个实习过程中,我每天都有很多的新的体会,新的想法。

回顾我的实习生活,感触是很深的,收获也是丰硕的。这次的实习,主要是与非洲、中东、印度等地方的外国商人做生意,他们在我公司下订单,我们再把订单下到厂里,从中赚取差额。这次的实习经历我对外贸这个专业有了更加理性的认识和更深刻的体会。

通过这次的实习,我由第一天的拘谨,对什么事情都充满着好奇,转而逐渐适应了这样的生活,做事情按部就班,循序渐进。这次的实习,让我懂得了许多,知道了许多,大学文凭其实只是一块敲门砖。进入工作单位后,大家都是从头开始,凡事都要自己去摸索,没有人会手把手教你。所以,我们有必要培养主动学习能力和创新能力,必须努力提高自身的综合素质,适应时代的需要。虽说大学文凭只是一块敲门砖,但是个人的综合素质却仍是你就业时的重要筹码。首先是学习成绩,用人单位认为成绩的好坏从一定程度上说明了你学习能力的强弱,所以,学习成绩是他们非常看重的一点。因此,我们首先要学好自己的专业知识。其次,他们看重的就是就是我们的社会实践能力。这一点就要看我们平时的实际动手及操作能力。

经过这段时间的实习,我主要有以下几点感想:

第一,要有坚持不懈的精神

作为在校生,我们不管到哪家公司,一开始都不会立刻给工作我们做,一般都是先让我们熟悉公司的工作环境,时间短的要几天,时间长的要几周,或更长的时间,在这段时间里很多人会觉得很无聊,没事可做,便会产生离开的念头,在这个时候我们一定要坚持,不能轻易放弃。

第二,要勤劳,任劳任怨

我们到公司去实习,由于我们不是正式职员,所以公司多数是把我们当学生看待。公司在这个期间一般不会给我们什么重要的工作去做,可又不想让我们闲着,因此,他们会交给我们一些比较简单的工作。与此同时,我们应该自己主动找一些事情来做,从小事做起,刚开始也只有这样。

第三,要虚心学习,不耻下问

在工作过程中,我们肯定会碰到很多的问题,有很多是我们所不懂的,不懂的东西我们就要虚心向同事请教,当别人教我们知识的时候,我们也应该虚心地接受。同时,我们也不要怕犯错。每一个人都有犯错的时候,工作中第一次做错了不要紧,重要的是知错能改。

第四,要确立明确的目标,并端正自己的态度

平时,我们不管做什么事,都要明确自己的目标,就像我们到公司工作以后,要知道自己能否胜任这份工作,关键是看你自己对待工作的态度,态度对了,即使自己以前没学过的知识也可以在工作中逐渐的掌握。因此,要树立正确的目标,在实现目标的过程中一定要多看别人怎样做,多听别人怎样说,多想自己应该怎样做,然后自己亲自动手去多做。只有这样我们才能把事情做好。

通过本次的实习,我还发现自己以前学习中所出现的一些薄弱环节,并为今后的学习指明了方向,同时也会为将来的工作打下一个良好的基础。,但这次的实习为我们提供了一个很好的锻炼机会,使我们及早了解一些相关知识以便以后运用到以后的业务中去。通过这次的实习,我熟练地掌握英语口语,能够自如地与外国人交流,同时让我懂得英语真的很重要,我知道只有通过刻苦的学习,加强对业务知识的熟练掌握程度,在现实的工作中才会得心应手,应对自如。

总体来说,这次实习不仅仅是锻炼了我在贸易操作方面的一些技能,同时,经过这次实习,我还从中学到了很多课本上所没有提及的知识,还有就是在就业心态上我也有很大的改变,以前我总想找一份适合自己爱好,并且专业对口的工作。可现在我们都知道找工作很难,要专业对口更难,很多东西我们初到社会才接触、才学习。所以我现在要建立起先就业再择业的就业观。应尽快学会在社会上独立,敢于参加与社会竞争,敢于承受社会压力,使自己能够在社会上快速成长。总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,实习都将成为我人生中一笔重要的资本。

展开阅读全文

篇20:英文简历的种类_外贸信函_网

范文类型:求职应聘,适用行业岗位:外贸,全文共 502 字

+ 加入清单

英文简历的种类

1.中式。 如果中英文简历一起递交,建议中文不写政治面貌,因为如果去外企工作,背景中的政治色彩越少越好,起码没必要让老外知道。 性格是一个主观的东西,有经验的招聘人员从来不相信任何人自己写的性格,因为它不是一个硬性的东西,不象学历、技能。有些人如果认为要招聘一个比较活跃一点的,便会在简历中写性格开朗,有的是真相信自己性格开朗,有的是觉得写上开朗更好,其实没必要。 身高体重,向外资求职时,就不必写了,因为属于特别隐私性的内容,写了显得不了解国外文化。 2.港式。 香港出版的简历书写技巧书籍中都要求写年龄、婚否,报纸的招聘广告中还要求求职者写上工资现状及预期工资,这些都属于隐私问题,美式简历则不要求提供这些信息。 3.美式。 国际大公司中比较流行,一页纸,是我们重点参考的样式。美式简历书写格式也有十几种,有些书籍登载了上百种样本,但我们所介绍的式样是美国大公司中比较流行的,如华尔街的投资银行、大的咨询公司、工业公司、制造业公司、营销业公司等都采用这种式样;同时,我们也参考了三个名牌学校--哈佛商学院、沃顿商学院和哥伦比亚商学院的简历样本,式样大同小异,这里主要以哈佛商学院的为主。

展开阅读全文