0

供港农产品进出口流程如何操作(通用20篇)

浏览

7288

范文

1000

皮革进料加工制品出口代理协议书_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 694 字

+ 加入清单

皮革进料加工制品出口代理协议书

甲方:_________ 乙方:_________

甲乙双方经友好协商,就甲方委托乙方代理皮革进料加工,皮革制品出口业务达成如下协议:

一、甲方委托乙方代理皮革进料加工,皮革制品出口至_________业务,乙方接受甲方委托。

二、合同标的:_________

产品名称:_________

数量:_________

合同金额:_________

拟出运日期:_________

出运港:_________

到货港:_________

外方付款结算方式:_________

三、双方责任及义务:

(一)甲方职责:

1.负责与外商签订所有出口合同,并对合同的全部内容负责;

2.负责安排生产、出运、交货;

3.负责向乙方提供工厂开具的增值税发票、纳税缴款书及运费等正式发票;

4.承担业务的全部费用及风险,保证按合同条款(合同标的)的全部内容执行,并向乙方支付出口代理手续费(乙方收汇)。

(二)乙方职责:

1.负责按甲方提供的合同内容对外签订出口合同;

2.提供出口货物商检、报关、出运和结汇等工作所需的单据;

3.负责出口结汇;

4.结汇后一周内,将货款转付甲方帐户。

四、违约责任:

如因任何一方未履行本协议规定的责任而给对方造成的经济损失,由违约方承担。

五、甲方出具的担保函是本协议不可分割的一部分。

六、本协议一式两份,双方各执一份。自签字之日起生效,具有同等法律效力。

甲方(盖章):_________   乙方(盖章):_________

代表(签字):_________   代表(签字):_________

_________年____月____日   _________年____月____日

展开阅读全文

更多相似范文

篇1:出口信用证抵押外汇借贷合同

范文类型:合同协议,适用行业岗位:外贸,外汇,全文共 1428 字

+ 加入清单

贷款人:____________ 借款人:__________

法定地址:___________ 法定地址:_________

贷款人和借款就借款人以信用证为抵押向贷款人申请外汇贷款一事共同协商签订合同如下:

1.双方同意以下定义

1.1 信用证:由________银行开出通过_______通知编号为_______的_______信用证。

1.2 债务:指借款人在本合同项下应付的贷款本金、利息及与此有关费用。

2.贷款金额、币种和用途

2.1 本合同贷款金额的最高额为(大写)_________,(币种)_______。

2.2 本合同项下贷款限于借款人正常生产经营所需流动资金。

3.期限

3.1 本合同项下的贷款期限从合同签订日起_____个月。

4.利息与费用

4.1 本合同项下的贷款利率为_________。

4.2 贷款从第一笔提款日起息,利息以一年360天为基础,根据实际经过的天数计算。

4.3 贷款的结息日为每季第三个月的20日和贷款到期日。

4.4 借款人到期应付利息由贷款人主动从借款人开立在贷款人处的存款账户内扣收。

5.信用证的抵押和还款

5.1 本合同签订之日起,借款人将1.1条款下的信用证正本抵押给贷款人并由贷款人保管,作为贷款的还款保证。

5.2 在提交单据后,借款人保证叙做出口押汇并授权贷款人将押汇收入直接用于归还贷款。

6.陈述与保证

借款人在此作如下陈述与保证。

6.1 借款人是从事商务经营和有民事行为能力的经济法人,按中华人民共和国法律登记、注册,具有执行、履行所有民事行为的能力。

6.2 本合同的制定、签署、执行符合借款人所在地的法律、法规、条令、制度。

借款人已办妥所有签署本合同的合法有效的手续。

6.3 保证根据出口信用证条款的要求按时发运货物,履行信用证规定的各项义务。

6.4 保证及时将抵押信用证规定的出口单据向贷款人提交议付。

6.5 按时支付利息和归还贷款。

6.6 保证按本合同2.2条款规定的用途使用贷款。

7.违约

下列事件属于违约

7.1 借款人未按信用证规定的日期内运出商品。

7.2 借款人在本合同第6条中所做的陈述与保证不真实或不履行。

7.3 借款人将抵押信用证项下的单据向别的金融机构议付。

7.4 借款人擅自改变贷款用途,挪用贷款。

7.5 借款人发生或将要发生解体、重组破产。

7.6 借款人违反本合同其他条款。

8.违约的处理

8.1 在上述一项或数项违约事件发生后,借款人必须在收到贷款人发出的违约通知后的7天内采取积极有效的措施,消除和弥补因借款人违约所造成的或可能造成的损失。

8.2 在这种情况下,贷款人有权采取以下部分或全部措施:

A.对违约金额处以20%~50%的罚息。

B.宣布部分或全部贷款到期,主动从借款人账户中扣还贷款及其他费用。

C.冻结借款人在贷款人处的存款户,如借款人的债务没有得到全部清偿,贷款人保留进一步追偿的权利。

D.采取任何其他足以维持贷款人在本合同项下权益的措施。

上述措施的采取并不影响贷款人在本合同项下的任何权利,对此,借款人无条件放弃抗辩权。

9.其他

9.1 本合同在贷款人和借款人签字盖章后生效,有效期至借款人在本合同项下全部债务清偿后为止。

9.2 本合同受中华人民共和国法律管辖。

9.3 本合同中文正本一式2份,签约双方各执1份。

贷款人:________(公章) 借款人:_______(公章)

授权人:________(签字) 授权人:_______(签字)

签订日期:_______年____月___日

展开阅读全文

篇2:对外贸易加工装配合同

范文类型:合同协议,适用行业岗位:外贸,全文共 1197 字

+ 加入清单

甲方:

地址: 电话: 电传:

法定代表人: 职务:

乙方: 国 公司

地址: 电话: 电传:

法定代表人: 职务: 国籍:

双方为开展来件装配业务,本着平等互利原则,通过友好协商,签定本合同。

第一条 装配项目

乙方向甲方提供装配 (产品)____ 套(或件)所需的散件;甲方装配后将成品交付乙方。

第二条 交付来件与加工成品的数量和时间

乙方将于 年 月至 年 月 日,每月向甲方提供____散件____套,并负责运至____ 港口(或车站)交付甲方;在甲方收到散件后的____个月内(或自 年 月 日至 年 月 日)分批将装配后的成品负责运至 港口(或车站)交付乙方。

第三条 加工费

甲方为乙方进行装配的加工费,每件(或套)计 币 元。

第四条 付款办法

乙方将不作价的散件运交甲方,加工费由乙方给甲方开出即期付款信用证。

第五条 来厂专家和技术培训

根据实际需要,乙方有义务向甲方派遣专家并为甲方培训必要的技术人员,来厂专家和培训人员的数目、时间、任务、以及费用负担等,由双方另行商议。

第六条 运费、保险费

乙方将散件运交甲方的运费、保险费由乙方负责;甲方将成品运交乙方的运费、保险费由甲方负责。成品的运输保险,由甲方按散件成本加上运费、保险费、加工费之和的 %投保综合险、战争险(如陆上运输则投保陆上运输险)。在装配期间,由甲方负责投保火险。

第七条 质量检验

(1)甲方在收到散件后,应按乙方提供的技术标准,对其规格、品质进行验收,如发现乙方提供的散件的规格、质量不符合技术标准,或数量不足,由甲方向乙方提出检验报告后,乙方负责退换或补足。

(2)乙方在收到甲方装配的成品后,按双方议定的验收标准验货,如因甲方装备不当造成质量问题,由乙方向甲方提出检验报告,甲方负责返修或赔偿。

第八条 不可抗力

由于战争和严重的自然灾害以及双方同意的其他人力不可抗拒的事故,致使一方不能履行合同时,遇有上述事故的一方应尽快将事故情况通知对方,并与对方协商延长履行合同的期限。对方由此而产生的损失,不得提出赔偿要求。

第九条 违约责任

任何一方不履行合同条款,致使对方遭受经济损失时,必须承担赔偿责任,受损害方并拥有罚款 元的权利。

第十条 仲裁

本合同在执行过程中,如发生争议,双方应本着友好协商解决。如未能解决时,提请中国 仲裁机构进行仲裁。仲裁裁决为终局裁决。仲裁费用由败拆一方负担。

第十一条 担保

为了保证双方履行合同和及时按合同规定支付罚款或赔偿损失,双方应分别向对方提供各自银行所出具的保函。

第十二条 转让

本合同所载明的权利和义务,非经双方一致同意,一方不得转让给任何第三方。

第十三条 本合同一式两份,用____文签署,双方各持一份,具有同等效力。

甲方:____________ 乙方:____________

代表:____________ 代表:____________

____年____月____日 ____年____月____日

展开阅读全文

篇3:外贸新年计划_工作计划范文_网

范文类型:工作计划,适用行业岗位:外贸,全文共 1527 字

+ 加入清单

外贸新年计划

篇一

荣幸能有机会加入xx集团。虽入职时间较短,仍深深地感受到我司井然有序的管理秩序及我们部门充满朝气的团队氛围。在这个岗位上,我明*临的机遇和挑战都是巨大的,外贸业务知识及经验的积累都需要自身不断的努力和学习。

在新的一年里,我对自己的工作情况计划如下:

首先,学习外贸知识、产品知识。对一名刚从英语系毕业一年半的外贸新手来说,我的外贸知识还有待于加强,需要在往后的工作中进一步积累。此外,刚刚接触 这个行业,对产品的认知我几乎是一片空白。因此,学习是我新年计划中的首要环节和重要任务。我会以一种积极的态度虚心向领导及各位同事请教。在我的个人观念里,态度决定成败,希望自己的努力会得到大家的肯定。

其次,学习缮制单据。在熟悉整套外贸流程理论知识之余,锻炼自己的实际操作能力。因为此前一年多的工作经验都只是局限于业务方面,重点在与客户的沟通上。单据的制作以及出口流程中跟银行、商检、海关、贸促会等相关部门的接触,都是我面临的新的工作。由此,我也体会到自己以前掌握的工作环节并不全面、完整。现在能从最基本的出口单证做起,对我来说是一个不可多得的学习机会。

第三,如有机会接触公司业务,我希望能尽快熟悉自己跟的每一个客户,总结并分析他们的新特点,以一颗热忱的心为客户服务,为公司创利!

第四,积极开拓新业务,充分利用网络资源为公司寻找目标客户。及时更新我司在阿里巴巴等相关网站上发布的供求信息,并持之以恒地跟踪,相信长久的付出总会有一定的成效。

第五,协助领导及同事做好两届展会及其它国外展会的前期准备工作。在展会结束后,协助参展人员做好后续的客户跟踪服务,以此巩固展会成果。

另有几条小小的建议:

一、因经理在业务洽谈方面会经常与客户进行电话沟通。为此提议是否可在电脑上安装skype软件,申请一个skype帐号,并向客户积极推荐这一网上及时沟通工具。其通话质量与手机差不多,还可节省双方的国际长途电话费用。

二、部门内部多开展一些活动,在活动中增强整个团队的凝聚力。

三、对新人多开设外贸知识及业务知识的内部培训课程。

最后,再次感谢领导对我的信任。相信在这个优秀的团队中,我将受益不少。同时,我也期待自身的不断完善能为公司的发展贡献一份力量!

篇二

在公司这半年时间,我有不足的地方,希望同事领导给我提出,我会虚心接受,并改正,争取做得更好。每个公司都有自己的制度,以及管理方式,在努力工作的同时,我也会配合公司的各项制度。对于公司,我也有以下建议:

1. 对待资源。在上面的工作总结中,我提到,网络平台是一个很好的资源,有了平台,业务上有了明显的进步,客户积累量也突飞猛进。所以希望公司在资源分配上,尽量做到公平公正,因为这个对每个业务员都狠重要!

2. 对待样品。因为前半年,我出的大都是样品,所以对这一点体会比较深刻,如果样品单客户能培养成定期下单的长期客户,那目标是很容易实现,也为公司的长期客户做出贡献。我提出这一点并不是说我的样品出了问题,相反,我出的样品,客户都比较满意,测试也很不错,所以我希望能继续保持下去。因为样品是客户对我们产品的初步审核,是我们取得订单的关键。

3. 对待来访客户。这一点只是细节,但是希望能引起注意。据我所知,我公司到访客户的下单率,并不理想。相比,我知道的一家工厂,他们公司硬件设备及各方面条件并不如我们公司,而对方到访客户的下单率几乎是100%。探其究竟,工厂对待客户细节等都非常注意。

客户到访,无论客户是否下单,都非常尊重。我也希望我们公司对远道而来的客人,表现出东道主的热情,并展示公司良好的企业形象。

这些建议,只是我个人的看法,如果能改进的,希望公司尽力改进,为公司业务,塑造形象而努力。我需要做的就是—为我的目标而努力!

展开阅读全文

篇4:进口设备委托代理采购合同书

范文类型:委托书,合同协议,适用行业岗位:外贸,采购,全文共 2134 字

+ 加入清单

甲方(委托方):

法定代表人:

地址:

乙方(代理方):

法定代表人:

地址:

根据《中华人民共和国民法典》及其他有关法律、行政法规的规定,甲、乙双方遵循平等、自愿、公平和诚实信用的原则,就商品订购事宜协商订立本合同。

一、委托代理采购范围:

乙方委托代理采购范围为:

代理采购总信用额度为:

二、货款、代理费用、资金占用费及相关费用的计算方法:

1、货款:以乙方向供货商实际支付采购金额为准;

2、以乙方向供货方付款之日起计算,单笔支付金额账期最长不超过____天;

3、资金占用费及支付时间:为乙方向供应商实际支付采购金额的____% (按年计算),以乙方向供货方付款之日,按月计算利息(不足一月按实际占用天数计算),在甲方支付乙方货款时一并支付。

4、相关费用及支付时间:因代理采购所产生的相关费用(包括但不限于:货物进口税费、报关费、提货费、保险费、运输费、其他杂费)均由甲方承担,甲方应在发生相关费用前汇入乙方指定账户,如由乙方垫付的,甲方应在乙方垫付后___日内将相关款项汇入乙方指定账户。

三、支付要求和结算方法:

1、本合同签订后乙方应按甲方提供的采购合同要求,在___日内向甲方指定的供应商支付货款,进行采购;

2、甲方应向乙方提供支付货款所需的所有材料,包括购货合同、采购清单、发票等;

3、甲方应在账期到期前向乙方支付全额货款和资金利息;

4、发票开具:乙方每月根据甲方回款情况开具发票(发票金额含代理费用和资金占用费、资金利息及其他相关费用)。

四、货权

在甲方向乙方付清全部代付款项之前,相应金额的货物所有权归乙方所有;在甲方向乙方付清全部代付款项之后,货权自动转移给甲方。

五、双方权利义务:

乙方的权利义务:

1、 以乙方的名义与供应商签订产品购销合同,甲方接受该购销合同所有条款,乙方仅负责接收委托与供应商签订产品购销合同,并按合同约定在乙方给予甲方的信用额度内支付货款,以及按本合同约定向甲方转移货权,其他具体合同履行内容只对甲方负有协助义务,因本合同之外的第三方造成的后果与乙方无关。

2、在甲方未按协议向乙方付清货款及其他全部款项之前,乙方保留相应货物的所有权。

3、因甲方原因致使产品购销合同或本合同不能履行、不能完全履行或迟延履行的,乙方有权解除本代理合同,并享有对货物的处臵权,甲方应承担由此产生的一切费用和后果。

4、甲方自行处理供货方在品质、价格、运输、装卸、仓储方面存在的问题,并承担相应风险。

5、因供应商原因致使合同不能履行或不能完全履行,乙方应及时通知甲方采取补救措施。如甲方书面要求索赔的,乙方应根据其合同,积极协助甲方对外索赔,甲方承担由此产生的一切费用和后果,并应在索赔前,依据乙方书面通知将相关费用划至乙方账户。若甲方未支付有关索赔费用,则甲方丧失享有索赔产生的权利,但并不免除因索赔而产生的义务。上述义务包括但不限于承担乙方先行代垫的律师费、诉讼费、仲裁费、差旅费、通讯费。

6、若甲方发生未偿付所欠的款项等违约事项,乙方有权终止协议中的义务。

甲方的权利义务:

1、保证所委托采购的货物符合国家政策法律规定,并保证所委托采购的货物不侵犯他人的知识产权,否则应承担由此产生的一切经济和法律责任。

2、甲方应严格按本合同第二条、第三条约定向乙方支付货款及资金利息,或其它有关费用。

3、甲方自行与供应商商定品种、规格、质量、价格、运输、装卸等事宜,乙方根据甲方确定的内容与供应商签订产品购销合同。乙方与供应商签订的产品购销合同,甲方均承担相应后果,包括但不限于本合同约定的情形。

4、甲方有义务要求供应商按约供货,并承担供货商迟发、不发、错发、少发货物及货物质量问题、货物价格变化、货物交付甲方之前及之后的所有风险,其他非乙方原因致使乙方不能履行本合同或履行与本合同不符产生的责任后果与乙方无关,同时甲方不得以此拒绝向乙方支付全部货款和资金利息,如同时造成乙方直接、间接损失的,甲方在乙方发出书面通知后____日内无条件赔偿,否则即为甲方违约。

5、对供应商资信负责,承担因供应商原因致使合同不能履行、不能完全履行的一切责任。前述供方违约导致本合同不能履行或不能完全履行,不影响本合同项下代理方收取全部货款和资金利息的权利。

6、若乙方发现甲方或供货方有以合同形式套用乙方资金或有其他欺骗嫌疑的,乙方有权要求甲方立即付清全部货款、资金利息及相关费用,同时有权终止或解除合同,甲方自行承担合同终止或解除的后果及损失,并与供货方一起对乙方的损失承担连带赔偿责任。

六、违约责任

甲方在账期到期后未向乙方支付全部货款和资金利息,甲方每逾期一日支付乙方逾期金额___%的违约金。

七、争议解决方式

委托代理过程中发生纠纷,由双方协商解决,协商未果的,由__________法院管辖。

八、其他

1、本合同一式两份,甲乙双方执一份,经双方签章后生效,双方不得单方面解除或终止合同。如有未尽事宜须补充或修改的,应以书面提出并经双方签章后生效。

2、若本合同或其他合同下甲方有违约行为或应付款项未付,乙方有权将本合同下货物直接抵扣或处臵或暂停交付,并有权决定本合同是否履行、终止或解除,因此产生的责任由甲方承担。

甲方:

授权代表:

______年___月___日

乙方:

授权代表:

______年___月___日

展开阅读全文

篇5:外贸代理合同

范文类型:合同协议,适用行业岗位:外贸,全文共 1405 字

+ 加入清单

甲方:

乙方: (自然人)

一、甲方责任义务:

1. 甲方同意乙方以深圳市纪友隆进出口有限公司名义对外开展业务活动。

2. 甲方有义务根据乙方的要求对外签订外贸合同,对内与供应商签订购销合同。合同签订后,即时将合同副本送交乙方。

3. 甲方将无偿为乙方提供谈判场所;提供通讯便利,但其实际发生的费用应在乙方业务收入中扣减。无偿提供出口业务及法律法规咨询;按时提供全套公司单证;在乙方指定地点办理海关、商检备案手续。

4. 甲方在货物上船后与乙方再次確認提单资料,出正本提单后交给乙方,由乙方自行寄给收货人;(适用于走海运货物),如果乙方有特殊說明的除外.

5. 甲方保证维护乙方的商业秘密。并通过自己的渠道协助乙方扩大业务。

6. 甲方保证乙方运用资金的安全,承诺不挪用,不拖付乙方资金往来,并在安全收汇后2--3个工作日,按照当日牌价结算人民币货款给乙方或由乙方指定的生产厂商。甲方保证乙方的利润所得,并根据双方商定的时间方式,向乙方支付。

7.如果由于甲方的问题导致货物不能准时出口到港(目的地)所产生的费用由甲方负责(船公司的问题或由于不可抗力的因素影响除外)。

二、乙方责任义务:

1. 遵守法律和国家外贸、外汇、海关方面的政策。

2. 维护甲方的声誉和利益,遵守甲方及其它双方商定的工作程序。

3. 自行承担自身业务的所有费用。

4. 乙方提供给甲方的相关出货资料必需真实,有效,并具有合法性。

5. 如乙方指定货代以及需异地报关出口的货物,乙方应通知甲方其货代名称、地址、联系人、电话、传真等详细资料,并允许甲方与货代直接联系,在货物正式报关出口前,由货代将装箱单、发票传真给甲方确认

6. 单单结汇。乙方愿意支付甲方每笔转帐金额的 千分之三(RMB),但每票不低于(RMB) 贰佰元整 ,不高于(RMB) 壹仟元整 做为手续费,如在转帐过程中(非甲方操做失误)产生的银行费用由乙方自行承担。

三、法律责任:

1. 双方必需严格执行本协议,若因外商原因导致外销合同延迟履行、不能完全履行或不能履行时, 至使甲方不能履行本代理协议时, 甲方不承担任何责任。但在乙方提出书面请求并提供费用协助下, 代理人有义务向外商交涉索赔。

2. 在本合同项下,如一方违约,除依法依约承担违约责任,赔偿责任以及赔偿守约方的实际损失外,还应承担守约方为实现债权而支付的费用,该费用包括但不限于律师费用、诉讼费用、差旅费、通讯费。

3.自违约方违反本合同约定及法定义务之日起,其于后支付的任何款项按以下顺序清偿:(1)守约方为实现权利支付的费用;(2)利息或违约金、损失赔偿金;(3)货款本金。

四、争议解决方式:

1.本合同适用《民法典》及我国对外贸易代理的有关规定。

2.委托代理过程中发生纠纷,由双方协商解决,协商未果的,由合同签订地法院裁决。

五.其它事项:

1.本协议一式两份双方各执一份,具有同等的法律效力. 自双方签字盖章之日起生效,有效期壹年,协议到期停止执行. 但在双方帐务、事务未清之前,协议条款继续生效,如帐务、事务结付完毕此协议条款自行作废,如继续执行,协议重签才有效。

2.甲乙双方在执行过程中,若对本协议上述条款有不同的见解和异议,需经双方协商研究同意后方能够进行修改和补充。补充或修改的內容应以书面提出并经双方签章后生效,并与本代理出口合同具有同等的法律效力。

甲方: 乙方:

法人代表: 身份证号:

签订日期: 年 月 日 签订日期: 年 月 日

展开阅读全文

篇6:2024公司年会策划创意方案流程表

范文类型:方案措施,适用行业岗位:企业,全文共 628 字

+ 加入清单

一、年会主题:

融合梦想 赢在未来

二、年会时间:

20__年1月22日上午8:00-17:00 会议时间:8:00-11:30 午宴时间:11:30-14:00 抽奖、游戏时间:14:00-17:00

三、年会地点:

奥威国际(河北保定市容城服装工业城区奥威路100号)

四、年会目的及意义:

1、对20__年公司发展成绩总结,以及制定20__年公司总体规划;

2、加强员工之间的交流,增强团队协作意识,提升公司综合竞争力;

3、表彰优秀员工,通过奖励方式,调动员工工作积极性;

4、丰富员工生活,答谢全体员工一年以来付出的辛勤努力;

5、给员工提供展现自我的机会,增强企业归属意识。

五、年会与会人员:

公司领导及全体员工

六、年会流程与安排:

8:00全体参会人员到达会议指定地点按指定排座就位,各部门清点本部门实到人数,等待年会开始;

8:10-8:20主持人致辞;

8:20-9:00总经理针对2020__年度总结暨20__年战略部署讲话;

9:00-10:00各部门负责人20__年度工作总结及20__年工作部署;

10:00-11:00各部门致新年贺词;

11:00-14:00年会午宴;

14:10-16:00联欢文艺汇演;

16:00-16:20互动游戏;

16:20-16:40表彰优秀员工;

16:40-16:50主持人邀请总经理发言,宣布大会结束。

七、年会准备及相关注意事项

年会的通知与宣传:公司人事部门将本次年会活动进行公示和宣传(公司网站、海报),达到全员知悉,争取全员参加。

展开阅读全文

篇7:货物进口合同样本[页5]_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 595 字

+ 加入清单

货物进口合同样本

24.附加条款(本合同上述条款与本附加条款有抵触时,以本附加条款为准):

additional clauses : (conflicts between contract clause here above and this additional clause , if any , it is subject to this additional clause)

25.本合同共____份,自双方代表签字(盖章)之日起生效。

this contract is in copies , effective since being signed / sealed by both parties:

买方代表人:___________________________ 卖方代表人 :_________________________

representative of the buyers : _______ representative of the sellers :______

签字:_________________________________ 签字:________________________________

authorized signature :________________ authorized signature : ___

共5页,当前第5页12345

展开阅读全文

篇8:大学生农产品商业策划

范文类型:方案措施,适用行业岗位:大学,学生,全文共 1838 字

+ 加入清单

名称:顺安种业(蔬菜基地)

位置:__省__市

发展背景:国家目前重视三农,农业政策好,自身来说,自己对农业熟悉。

基地优势:位于平原地带,河流边.土壤肥沃,灌溉方面,水源清洁。网赚项目。大田多,租金低。离_溪不远,附近有冶炼厂。本地消费水平高,蔬菜价格高,市场大。小吃加盟。

发展模式:以种植业为主,养殖业为辅。以蔬菜为主,水产养殖为辅。以常规蔬菜为主,特种蔬菜为辅。以大棚蔬菜为主,露天栽培为辅。先期自身发展,慢慢地带动乡亲发展,建立合作社,打造下滩蔬菜基地。

发展理念: 以科学的思想去发展,以反季节蔬菜为优势,以绿色农业为导向。引进新品种,提高单位产量和品质。抵押贷款。

机械化操作程度提高,耕作机械化,灌溉机械化,育苗科学化,施肥科学化,喷药科学化。

主要技术:土壤的测量,肥力,ph值。灌溉用水要无污染,取水方便,大棚温湿度调节,防虫网,二氧化碳发生器。创业族。镀锌管棚架,无滴膜。不同作物,不同灌溉,西瓜等用滴灌。育苗和嫁接。品种的选择。采收,清洗(干净水,计划井水),包装

一、发展阶段

第一阶段:13亩镀锌管大棚蔬菜以及几亩露地蔬菜,总面积10000平方左右。池塘一个,养鱼和为蔬菜基地提供灌溉用水。池塘靠近蔬菜基地,面积700多平方。

第二阶段:时机成熟时,也许是在第二年。建立小型养猪场,为蔬菜基地提供肥料。发展几亩水系蔬菜,如,水空心菜,慈姑,水池种藕等。水产养殖,泥鳅,虾等。看市场,引进一个品种,成立农村合作社,打造下滩及周边蔬菜基地。

第三阶段:发展农家乐

二、行动规划

首先:

1、选址及规划。

2、挖池塘。

3、耕地,晒土。

其次:

1、选种,安排作物品种和时间。

2、镀锌管钢架,无滴膜,防虫网。

3、挖井(洗菜用)还有肥料坑(腐熟农家肥)

4、育苗室,空调(已有),温湿度计,排风扇。

5、包装设备。

6、肥料和农药。

投资预算:土地租金1500/年,年付,镀锌管(热镀锌)一亩8000元左右,总计110000。无滴膜10000元,防虫网13000元。微耕机4000,政府补贴1000多。化粪池3000元,静电喷雾器300元,生物杀虫灯300元,运输工具:小型货车加摩托车30000之内,记三万。灌溉设施:__元电脑已有。肥料加农药订购10000元。流动资金用政府补助的。总计在185000之内。以上为固定投资,一次性投入。每月开支有,员工工资,生活费。员工工资年尾结。

人员:数目5个,我和合伙人以及员工三个(两男一女)人员安排:员工日常种菜,采菜。我负责技术,信息,市场,以及管理。我们也要在菜地干活,五个人足够。

市场:零售以贵溪冶炼厂为主,批发以贵溪为主,贵溪菜市场及各饭店(特色菜),合伙人负责零售,我负责送批发。冶炼厂可以让我们一年挣十多万,贵溪市一年可以让我们挣五十万,那么卖到更远的地方就能让我们挣我不知道的数目,再说,等我们形成规模,产品可以卖的更远。

运输工具:小型货车及摩托车

销售技巧:我们菜的优势及特点:与当地农民等种的蔬菜相比,我们具有,喷药少,灌溉水无污染,重金属少,清洗水干净,包装好,菜的色泽和新鲜度较高等优点。菜的品质和质量优。

因此,我们必须采取差异化以及品牌化的销售模式。在差异化上,摆放,以及包装,宣传等要做到不一样。在品牌化上,传统农业是没有品牌的,在多年的销售总结下,品牌的作用非常重要。销售上必须注意信用,绝不能缺斤少两。只能多给,不能少给。

在宣传上,我们属于大学生创业,再者在电视台和报纸都有关系,可以免费给我们宣传。这种宣传比花钱的宣传作用更大更有效果。

风险:养殖业的风险比种植也高,蔬菜行业的风险低,最多是在自然风险,暴雨等。但是蔬菜具有年生产四次以上的特点,即使有风险也是一次没有,还有三次。据我所了解,也据我所经历的,我爸妈种了七亩露地蔬菜,一年挣七八万。露地蔬菜比大棚蔬菜的风险更大,大在哪,虫害,以及干旱,而我们采用的是生物杀虫灯以及防虫网双层防虫,几乎没有虫害,在干旱上,传统的是挑水浇菜,费时费力且不科学。我们采取的是科学的,随时的。故在干旱方面没有多少风险。

收入预计:十三亩大棚,每亩一年最少在一万以上,加上露地,一年的收益在15万左右。这是保守估计,不是随意空想。

蔬菜品种:常规蔬菜分类:蔬菜分类可分为:白菜类、甘蓝类、根菜类、绿叶菜类、葱蒜类、茄果类、豆类、瓜类、薯芋类、水生蔬菜、多年生蔬菜、野生蔬菜、食用菌类。

按食用器官分为:根类、叶类、茎类、花菜、果菜。

特种蔬菜:荠菜,樱桃番茄,黑美丽西葫芦,水芹,水果黄瓜,砍瓜等。

展开阅读全文

篇9:进出口集装箱费用确认协议书

范文类型:合同协议,适用行业岗位:外贸,全文共 1467 字

+ 加入清单

甲方:_______________(以下简称甲方)

乙方:_______________(以下简称乙方)

为加强铁路集装箱运输管理,发展铁路集装箱门到门运输,加速铁路集装箱周转,保证铁路集装箱货物运输安全,经甲方与乙方充分协商达成协议如下。

一、双方职责

1.甲方应提供状态良好的铁路集装箱空箱供乙方使用,乙方在使用前必须检查箱体状态,发现箱体状态不良时,甲方应予以更换。

对到达的铁路集装箱甲方应及时发出催领通知,并在货票(丁联)内记明通知方法和时间,必要时应再次催领。

2.乙方应由专人负责铁路集装箱门到门运输业务,并配备固定的能够保证集装箱运输安全的专用车辆。

3.乙方受托运人(收货人)委托办理铁路集装箱门到门运输业务时,必须与托运人(收货人)签订委托书,承担托运人(收货人)相应责任,未签订委托书的不得办理门到门运输业务,委托书在办理托运(领取)时向车站提交。

4.乙方应确保门到门运输集装箱在门到门运输途中的安全,做到爱箱爱货。

5.乙方对门到门运输的发送集装箱内所装货物真实性负责,甲方对乙方门到门运输的集装箱货物品名有疑问时,有权要求乙方开箱检查,乙方应主动开箱配合检查。

6.甲乙双方应加强对集装箱的交接检查,责任划分为交接前由交方负责,交接后由接方负责。

7.发送的集装箱应于甲方指定的进站日期当日进站完毕。到达集装箱应于甲方发出催领通知的次日起算,2日内领取集装箱货物,并于领取的当日内将箱内货物掏完或将集装箱搬出。

重去空回或空去重回的铁路集装箱,应于领取的次日送回;重去重回的铁路集装箱应于领取的3日内送回。

二、保证金管理

1.乙方在本协议签订后,铁路集装箱门到门运输前,将保证金人民币________万元汇入甲方指定的帐户,专用于支付由于乙方责任造成的铁路集装箱损坏、丢失的赔偿。保证金按预付款管理。

2.保证金因发生赔偿而不足时,乙方应于结算之日起两日内补足差额。双方互不清算利息,终止协议后保证金退还乙方。

三、违约处罚

1.集装箱货物(含空自备箱)在车站存放超过免费暂存期限,甲方按规定核收货物暂存费。铁路箱超过免费使用期限,自超过之日起核收集装箱延期使用费。

2.利用到达集装箱装运发送货物,未经甲方批准擅自装箱进站的,返回的集装箱按空箱接收,由此产生的经济损失由乙方负责。

3.甲方发现乙方有集装箱超重、夹带违禁品、危险品、匿报品名、装载状态不良危及集装箱箱体及运输安全等情况时,除按有关规定处理外,并处以_______元/箱的罚款。

4.由于乙方原因造成集装箱破损或丢失,应按有关规定进行赔偿,赔偿费在保证金中扣除。

四、协议的终止

1.乙方发生下列行为时,甲方有权终止协议:

①伪造具备门到门运输条件的;

②未按规定支付保证金的;

③发生集装箱匿报品名装运货物的;

④发生路风事件和社会投诉较多的;

⑤发生集装箱超载情节严重的;

⑥恶意修改箱号及相关标志标记的;

⑦门到门运输业务转包给其他单位(公司、个人);

⑧发生铁路箱责任被盗、丢失的;

⑨其它危及铁路运输安全的。

五、甲乙双方必须共同遵守本协议有关规定,如违反上述协议,双方终止协议。本协议一式两份,甲、乙双方各执一份,自签订之日起生效。

有效期自____年___月___日至____年___月___日止。期满后双方无异议时,协议续签。

甲方代表签字:___________ 乙方代表签字:___________

盖章:___________________ 盖章:___________________

_______年______月______日 _______年______月______日

展开阅读全文

篇10:技术出口合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,外贸,全文共 49001 字

+ 加入清单

技术出口合同范本

Contract for Equipment Sales and Technology Licensing

Contract No. ____________________

This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

Article 1 Definitions

1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

1.5 “Destination Airport” refers to _____________Airport.

1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

Article 2 Scope of the Contract

2.1 The Seller’s Obligation

2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

2.2 The Buyer’s Obligation

2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

Article 3 Grant of License

3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

3.4 Territory

3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

Article 4 Price

4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

The breakdown price is as follows:

The price for Equipment is __________(say _______________________ only).

Fee for design is __________(say _______________________ only).

Fee for Technical Documentations is __________(say _______________________ only).

License fee is __________________(Say: _________________ only)

4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 2019, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

4.2.3 The above price is fixed and firm.

4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

Article 5 Payment

5.1 Down Payment

Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

5.2 [Option One: Payment by Sight L/C]

The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) Bill of Lading in one (1) original and ___ ( ) copies;

(b) Commercial Invoice in one (1) original and ___ ( ) copies;

(c) Packing list in one (1) original and ___ ( ) copies;

(d) Certificate of Origin in one (1) original and ___ ( ) copies;

(e) Insurance Policy in one (1) original and ___ ( ) copies;

5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

(b)One ( 1 ) copy of commercial invoice.

5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

b) One (1) copy of Commercial Invoice.

5.2 [Option Two: Payment under a L/G]

The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

Article 6 Delivery of Equipment and Technical Documentation

6.1 The Delivery of the Equipment

6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

6.1.3 The port of shipment is ____, while the port of destination is ____.

6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

(a) Contract number

(b) Name of the vessel and loading port

(c) Name of the Equipment shipped

(d) Number and date of Bill of Lading

(e) Total volume

(f) Total gross and net weight

(g) Total number of packages/cases

6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

(a) Bill of Lading

(b) Commercial Invoice

(c) Packing List

(d) Certificate of Origin

(e) Insurance Policy.

6.2 The Late Delivery of the Equipment

6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

(a) From the first week to the fourth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per

week

(b) From the fifth week to the eighth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per week

(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

the value of the delayed portion of the Equipment per week

6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

6.3 The Delivery of the Technical Documentation

6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

6.3.4 In case of shortage, loss of or damage to the Technical Documentation due to the Seller’s reason, the Seller shall make supplement to the Buyer within ____ ( ) days after receiving the Buyer’s written notification without any further charge.

Article 7 Packing and Marking

7.1 The Equipment shall be packed to withstand long distance transportation, multiple handling.

7.2 The Seller shall mark the following on two opposite sides of each package with indelible painted English words:

(a) Destination

(b) Consignee

(c) Contract number

(d) Shipping mark

(e) Gross/net weight (kg)

(f) Case/ bale number

(g) Dimensions: L x W x H (cm)

7.3 Each package shall contain one (1) copy of packing list.

7.4 The Seller shall mark on the package, if necessary, “Handle with Care", “Right Side Up", “Fragile" or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods.

7.5 If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facilitate loading, unloading and handing.

(a) Destination

(b) Consignee

(c) Contract number

(d) Gross/net weight (kg)

(e) Item number

(f) Dimensions: L x W x H (cm)

Article 8 Technical Service and Technical Training

8.1 The Seller shall dispatch technical personnel to Job Site to render Technical Service in accordance with Contract according to a time schedule agreed upon between both parties. The number, specialty, rank, treatment of the personnel, and payment as well as the contents, and requirements of Technical Service are specified in Appendix 6.

8.2 The Buyer shall have the right to send its technical personnel to the relevant factory selected by the Seller for training. The number, speciality, treatment of the personnel, and payment as well as the contents, time schedule, and requirement of training, are specified in Appendix 7.

8.3 Either party shall provide assistance to the other party’s technical personnel in their application for visa, working permit, and/or other necessary formalities for rendering Technical Service or training under the Contract in the other party’s factory.

8.4 Either Party’s technical personnel shall abide by the laws of the other party’s country and the regulations of the other party during their stay in the other party’s country.

Article 9 Standards and Inspection

9.1 The Seller shall carry out the design, manufacture, inspection and test of the Equipment according to the existing standards of the People’s Republic of China, namely GB.

9.2 The Seller or the manufacturer shall, at his own costs and expenses, inspect the Equipment and issue the ex-work quality certificate.

9.3 The open-case inspection of the Equipment shall be performed by the Buyer in the presence of the Seller’s representatives on the Job Site in days after the arrival of the Equipment at the Job Site. The open-case inspection fee shall be borne by the Buyer.

The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s representatives in their inspection work.

9.4 During the joint open-case inspection, a detailed inspection record shall be made and signed by the representatives of both parties.

In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. Any of such claims shall be lodged by the Buyer within month(s) after the arrival of the Equipment at the Job Site.

9.5 If any shortage, defect of or damage to the Equipment is found in open-case inspection not attributable to the Seller’s responsibility, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties.

9.6 The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent.

If there is no joint open case inspection due to the reasons not attributable to the Seller, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition.

Article 10 Design and Design Liaison

10.1 The Buyer shall provide to the Seller within ____ ( ) days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. The Seller shall not be liable to the Buyer for, and the Buyer shall indemnify the Seller and hold the Seller harmless from any damages or failure caused by the incompleteness, incorrectness and/or inaccuracy of any such information and data.

10.2 A design liaison meeting shall be held in the ____ ( ) month after receiving above mentioned design data, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details.

10.3 During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively.

Article 11 Erection, Test Run, Commissioning, Performance Test and Acceptance

11.1 The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer.

11.2 Chief Representatives

11.2.1 Each party shall nominate one (1) Chief Representative to deal with the technical matters during the period from the start of the Erection to Acceptance of the Equipment.

11.2.2 Detailed arrangements shall be made through friendly discussions by the Chief Representatives of both parties. The Chief Representatives of both parties shall fully cooperate to carry out their duties stipulated in the Contract, however they have no right to revise, alter or amend the Contract without the written authorization of both parties.

11.2.3 The Chief Representatives of both parties shall communicate through Linking Sheet for the matters relative to opinions, suggestions and information. The linking sheet shall be countersigned by the other party.

11.3 Erection and Test Run

11.3.1 The Erection shall be completed by the Buyer in ____ ( ) days from the effective date of the Contract. The Seller’s Chief Representative shall arrive at the Job Site ____ ( ) days prior to the beginning of the Erection.

11.3.2 When Erection is completed and in full conformity with requirements of the Technical Documentation, a Certificate of Completion for Erection of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing said Certificate shall be deemed as the date of completion of Erection.

11.3.3 As soon as the completion of Erection, Test Run for single machine and the whole system of the Equipment shall be started.

11.3.4 When Test Run has been successfully performed, a Certificate of Completion for Test Run of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing the said Certificates shall be deemed as the date of completion of Test Run of the Equipment.

11.4 Commissioning and Performance Test

11.4.1 Within ____ ( ) days after the completion of the Test Run, the Buyer shall make available qualified operation and maintenance personnel, raw materials, spare parts, utilities and other matters required for the Commissioning. Detailed procedures such as instrument calibrating, items of recording, sampling methods and analyzing methods, which are necessary for the Commissioning shall be discussed and agreed upon by the Chief Representatives of both parties.

If in the opinion of both parties, the Equipment is ready for the Commissioning, both parties shall confirm the readiness for the Commissioning in writing.

11.4.2 The Commissioning of the Equipment shall be started immediately after the confirmation of the readiness for the Commissioning. The Commissioning period shall ____ ( ) days after commencement of the Commissioning.

11.4.3 When the Seller and the Buyer consider that stable operation of the Equipment has been achieved, the date of Performance Test shall be fixed by Chief Representatives of both parties.

11.4.4 The Seller shall have the right to access to the laboratory and testing facilities in order to take samples and make analytical tests. The sample taking and analytical test during the Commissioning period will be done in the presence of the Chief Representatives of both parties.

11.4.5 During the period of Commissioning until Acceptance of the Equipment, the Seller may use the Buyer’s stored spare parts. Should the Buyer’s stored spare parts be used by the Seller due to the Seller’s responsibility, the Seller shall replenish the stores with the same in time at Job Site; otherwise the Seller shall provide the same at the Buyer’s costs upon the Buyer’s timely request.

11.4.6 If the result of Performance Test has reached the guarantee figures as per Appendix 1, the Acceptance Certificate of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days.

11.4.7 If the Performance Test cannot meet guarantee figures specified in Appendix 1, both parties shall jointly make investigations so as to find out the reason for clarifying the responsibility.

11.4.8 If the guarantee figures are not met due to the Seller’s reason, the Buyer shall agree to give an extension of ____ ( ) months so that the Seller can make improvement or adjustment to the Equipment and conduct further Performance Test. All the costs and expenses for making improvement or adjustment to the Equipment shall be borne by the Seller.

11.4.9 During the extension period, if the guarantee figures are still not met due to the Seller’s reason, the Seller shall pay the liquidated damages as per Appendix 1 to the Buyer against the Acceptance Certificate signed by both parties.

The Seller’s aggregate liability to pay liquidated damages for failure to attain the performance guarantees shall not exceed ____ ( ) percent of the Equipment price. The Seller shall have no further liability whatsoever to the Buyer in respect of such failure after payment of the liquidated damages.

11.4.10 If the non-achievement of the guarantee figures is due to the reasons not attributable to the Seller, the Seller shall agree to give an extension of ____ ( ) months. During the extension period all costs thereto incurred for the adjustment of the Equipment, as well as the costs and expenses for the Seller’s technical personnel shall be borne by the Buyer. In case the guarantee figures still can not be achieved due to the reasons not attributable to the Seller in the extension period, the Equipment shall be accepted by the Buyer. Both parties shall sign the Acceptance Certificate.

11.5 Acceptance

11.5.1 Acceptance shall occur in respect of the Equipment when :

(a) Performance Test has been successfully completed as per the Article 11.4.6.; or

(b) The Performance Test has not been completed due to the reasons not attributable to the Seller such as delayed civil construction, lack of and/or any other inconformity of raw materials, spare parts of the Buyer’s scope of supply under Appendix 2, and utilities with the requirements of the Contract in the ____ ( ) months from the date of Bill of Lading of the Last Shipment; or

(c) The Seller has paid the liquidated damages as per Article 11.4.9; or

(d) The guarantee figures still can not be reached due to reasons not attributable to the Seller’s reason in the extension period as specified in Article 11.4.10; or

(e) The Buyer takes the single machine and the whole system of the Equipment into use without the Seller’s approval.

11.5.2 At any time after any of the events set out in Article 11.5.1 has occurred, the Seller may give a notice to the Buyer requesting the issuance of the Acceptance Certificate.

11.5.3 The Buyer shall within seven (7) days after receipt of the Seller’s notice, issue such Acceptance Certificate.

11.5.4 If within seven (7) days after receipt of the Seller’s notice, the Buyer fails to issue the Acceptance Certificate or fails to inform the Seller in writing, with convincing evidence, of the reason why the Buyer has not issued the Acceptance Certificate, the Equipment shall be deemed having been accepted on the seventh day of the Seller’s said notice.

11.5.5 After the Acceptance, the Seller’s responsibilities and obligations under the Contract shall be deemed having been fulfilled except those as stipulated in Article 12 and 14.

Article 12 Guarantee and Warranty

12.1 The Seller guarantees that:

(a) The Equipment supplied by the Seller shall be new and made of adequate materials, and in conformity with the technical requirements of the Contract;

(b) The Technical Documentation shall be complete, clear and correct.

12.2 The period of warranty given by the Seller under Article 12.1 shall be ____ ( ) months from the date of Acceptance or ____ ( ) months from the date of Last Shipment, whichever comes earlier.

12.3 Defect of the Equipment

12.3.1 During the Warranty Period, should any defect due to inferior materials or bad workmanship of the Equipment be found under normal operation, the Buyer shall give the Seller a notice stating the details, together with all available evidence.

The Seller shall take immediate action to eliminate the defect at the Seller’s expenses within the period agreed by both parties.

12.3.2 If certain defect can not be eliminated despite of several attempts, the Seller shall replace the defective parts with non-defective parts at the Seller’s costs and expenses.

12.3.3 If the defect is eliminated by the Buyer himself, subject to the Seller’s prior written consent, all the direct costs and expenses thus incurred shall be borne by the Seller.

12.3.4 The Seller may reduce the price of the defective Equipment according to the degree of inferiority or extent of damage as agreed by both parties. After the reduction the Seller shall be released from its obligations and liabilities.

12.3.5 During the Warranty Period, should any defect due to the Buyer’s improper operation or maintenance be found, the Seller will provide technical assistance to eliminate the defect or replace the defected parts upon Buyer’s requests. All the costs and expenses thus occurred shall be borne by the Buyer.

12.3.6 Subject to Article 12.3.1, The Seller shall not be responsible for any defect or damage to the Equipment arising out of any circumstances including but not limited to the following causes:

(a) Combination of the Equipment with any machinery, and/or component other than those supplied by the Seller; or

(b) Alteration, modification or repair without the Seller’s prior written consent; or

(c) Failure of the Buyer to follow the Technical Documentation and instructions of the Seller, including the Buyer’s improper operation and maintenance; or

(d) Normal wear and tear.

12.4 During the Warranty Period, should the Technical Documentation supplied by the Seller be found incomplete, unclear or incorrect due to the Seller’s reason, the Seller shall be liable to supplement, replace or correct the Technical Documentation free of charge.

12.5 The Seller shall in no respect be understood or interpreted as liable for the commercial development of the Contract Products. The Buyer shall undertake the risk of the commercial development of the Contract Products.

12.6 In no circumstances, whether as a result of breach of contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, shall the Seller or its subcontractors or suppliers be liable for loss of profit or revenues, loss of production, loss of use, loss of information or data, cost of capital, cost of substitute equipment, facilities, services or replacement power, downtime costs, claims of the Buyer’s customers for such damages, or for any special, consequential, incidental, indirect or exemplary damages.

12.7 Notwithstanding anything to the contrary provided in the Contract, the aggregate liability of the Seller to the Buyer , on all claims of any kind, whether in contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, arising out of the performance or breach of the Contract or use of any Equipment or exploration of the Patent and/or Know-how shall not exceed ____ ( ) percent of the total Contract price.

12.8 All Contractual obligations of the Seller shall be deemed as having been fulfilled upon the expiry date of the Warranty Period.

Article 13 Intellectual Property Right

13.1 The Seller represents that it is entitled or authorized to grant the license to the Buyer to use the Patent and/or Know-how for the purpose as specified in Article 3.

13.2 The Buyer shall not use such Patent and/or know-how received from the Seller for any purpose other than that as specified in this Contract.

13.3 Any intellectual property right or other technical information granted by the Seller to the Buyer shall remain the property of the Seller. In no circumstances shall any terms and conditions in this Contract be construed, deemed, or interpreted as transfer of title to the Buyer of any information which may be delivered to or accessed by the Buyer.

13.4 Registration of the Contract and Maintenance of Patent

13.4.1 The Buyer shall, after the Contract is signed between both parties, make sure that the Contract is registered with or filed to the competent authorities in the Buyer’s country if it is required by law.

13.4.2 The Seller shall, during the validity period of the Contract, make all reasonable efforts to maintain Patent in force in the territory as stipulated in Article 3.4.1 and bear the costs thus incurred. The Buyer shall not make any action or inaction which may lead to invalidation or compulsory licensing of the Patent.

13.5 Improvement and Grant-back

13.5.1 Should any Improvement be made by the Seller on Patent and/or Know-how within the validity period of the Contract, which shall be the exclusive property of the Seller, the Seller shall grant the Buyer a non-exclusive license to exploit such Improvement at latest __________months from its improving, provided that the license fee is agreed upon between both parties.

13.5.2 The Buyer shall be entitled to make Improvement on Patent and/or Know-how within the validity period of the Contract. The Seller shall have the right to obtain and make use of the Improvement. The license fee shall be discussed between both parties in due time.

13.5.3 Both parties shall keep Improvement confidential. Neither party shall be entitled to grant any third party a sub-license on Improvement made and provided by the other party without previous written consent of the other party.

Article 14 Confidentiality

14.1 After signing of the Contract, both parties shall keep secret all the contents, terms, conditions of the Contract.

14.2 The Buyer shall take proper measures to keep strictly confidential of Know-how, Technical Documentation, Improvement and any other secret information obtained or accessible to from the Seller. The Buyer shall not disclose any of them to any third party, and shall not make use of them without prior written consent of the Seller except otherwise stipulated in the Contract.

14.3 The Buyer may disclose the secret information as described in Article 14.2 to the personnel of its own, or of any related parties engaged in the performance of the Contract subject to Article 14.2, strictly to the extent as essential for the implementation of the Contract, provided that the individuals and/or parties accessing or may access such secret information are engaged to undertake in written form the same confidential liability of the Buyer to the Seller. Any breach of confidentiality obligations by any personnel from the Buyer or the Buyer’s related parties shall be deemed as breach of the Contract by the Buyer.

14.4 Notwithstanding this Article 14, the Seller may furnish to its sub-contractor such documents, data, and other information received from the Buyer to the extent required for performing the Contract, in which event the Seller shall obtain from such sub-contractor an undertaking of confidentiality similar to that imposed on the Seller under the Article 14.

14.5 This Article 14 shall survive the expiration or termination of the Contract.

14.6 The confidential obligation shall not apply to the information which:

A. now or hereafter enters the public domain; or

B. can be proved to have been in the possession of the Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto; or

C. otherwise lawfully becomes available to either party from a third party under no obligation of confidentiality.

Article 15 Taxes and Duties

15.1 All taxes and duties in connection with the signing and performance of the Contract, levied by Governments of the People’s Republic of China, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Seller.

15.2. All taxes and duties in connection with the signing and performance of the Contract levied on the Buyer and Seller by the Buyer’s Governments, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Buyer. The Buyer shall pay in due time and full amount and hold the Seller harmless from any taxes and duties in case incurred to the Seller in the signing and performance of the Contract.

15.3 All import taxes and duties for tools and/or instruments, which the Seller or the Seller’s personnel may bring to the Buyer’s country for the execution of the Contract, shall be borne and paid by the Buyer.

15.4 Any and all taxes and duties in connection with the signing and performance of the Contract levied in any place except the cases as specified in Article 15.1 are not included in the Contract price. Should the Seller make the relevant payment directly as the case may be, both Parties agree to amend the Contract price to fully compensate the Seller for the payment, and the Buyer shall fully refund the Seller for the relevant amount within_______( ) days from the Seller’s payment.

Article 16 Force Majeure

16.1 If either of the Contract parties is prevented from executing the Contract due to the event of Force Majeure such as war, riot, coup, embargo, flood, typhoon, tornado, snowstorm, earthquake and other events which could not be foreseen, avoided and overcome, the affected party shall notify the other party by fax within the shortest possible time of occurrences of the Force Majeure and send a certificate issued by competent authorities or agency certifying the event of the Force Majeure by registered or express mail within fourteen (14) days following its occurrence.

16.2 The affected party shall not be liable for any delay or failure in performing any of its obligations due to the event of Force Majeure. However the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure as soon as possible.

16.3 Both parties shall proceed with their obligations immediately upon the cease of the event of Force Majeure or the removal of the effects and the term of the Contract shall be extended correspondingly. Should the effect of the event of Force Majeure last for more than one hundred and twenty (120) days, either party shall have the right to terminate the Contract by a written notice.

Article 17 Applicable Law and Settlement of Disputes

17.1 The applicable law of the Contract shall be the laws of the People’s Republic of China.

17.2 All disputes arising from or in connection with the Contract shall be settled through friendly consultation between both parties. In case no agreement can be reached, the dispute shall be submitted for arbitration.

17.3 The arbitration shall be conducted by China International Economic and Trade Arbitration Commission (CIETAC) in Beijing in accordance with Arbitration Rules of the Commission in effect at the time of applying for arbitration. The tribunal shall be composed of three arbitrators.

17.4 The arbitral award shall be final and binding upon both parties.

17.5 During proceedings of arbitration, the undisputed part of the Contract shall be performed continuously by both parties regardless of such arbitration proceedings.

Article 18 Effectiveness, Term and Termination of the Contract

(a) The Seller and the Buyer sign the Contract;

(b) The Contract shall be approved by the competent authorities and/or banks of both parties (if applicable);

(c) The Seller receives the Down Payment;

(d) The Seller duly receives the L/C (or L/G ) issued by the Buyers Bank.

18.2 Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.

18.3 If the Contract has not become effective pursuant to Article 18.1 within ____ ( ) months after the date of signing this Contract, the Seller has the right to make an equitable adjustment to the total Contract price and the time for delivery and/or other relevant conditions of the Contract. Should no agreement is reached for the above mentioned adjustment within ____ ( ) days from the Seller’s request of adjustment, the Seller shall be entitled to cancel the Contract.

18.4 The Contract shall be valid and remain in force for_____ (_____) years from the Date of Effectiveness, during which period the Buyer shall be entitled to manufacture the Contract Products with Patent and/or Know-how and sell the Contract Products within the licensed territory as specified in Article 3.4.

(Option 1) The Buyer shall not be entitled to manufacture with patent and/or know-how or sell the contract products after the aforesaid period unless the Buyer agrees to pay additional license fees in the amount and with the payment schedules and methods as agreed upon between both Parties in due time.

(Option 2) The Buyer shall be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after expiration of the Contract term specified above, provided that the Buyer shall not be released from its confidential obligations under the Contract.

(Option 3) The Buyer shall not be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after the expiration of the Contract term specified above, and shall return to the Seller all the Technical Documentations specified in Appendix 4 without remaining any duplicate copies. Nevertheless the confidential obligations of the Buyer under Article 14 shall survive the Contract term.

18.5 Either party may, without prejudice to any other remedy for the other party’s following breach of the Contract, terminate the Contract in whole or in part by a written notice send to the other party, if the other party

A. fails to perform its payment obligation under the Contract and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

B. fails to perform its confidentiality obligation under the Contract; or

C. fails to perform any other obligations under the Contract except minor parts thereof, and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

D. becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or dissolves, or ceases to do business, or be ordered to close down / to cease to do business / to dissolve, or has its business license revoked, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events.

18.6 Either party may, without prejudice to any other remedy, terminate the Contract in whole or in part by a written notice send to the other party, if

A. The other party is prevented by the laws, statutes, rules or regulations of either country from performing its obligations under the Contract; or

B. The Seller is prevented by the relevant authority of the Buyer’s country from being paid in accordance with the Contract; or

C. The other party is prevented from performing its contractual obligations by any event of Force Majeure for more than one hundred and twenty (120) days.

18.7 In the event of termination of the Contract, without prejudice to any other remedies available according to the Contract and/or applicable laws,

The Buyer shall cease all its further exploitation of the Patent and/or Know-how and any acceptance of further orders from third parties for the Contract Products.

All the delivered literatures, drawings, samples, instruments, equipment, and other documents including the interpretations related to Patent and/or Know-how shall be returned to the Seller as the Seller’s requests.

All the contracts on sales of the Contract Products signed between the Buyer and third parties shall be terminated by the Buyer, otherwise the Seller shall be paid accordingly.

In case the termination is due to the Seller’s default, the Buyer shall be entitled to complete the performance of the contracts on sales of the Contract Products already signed between the Buyer and third parties before the termination.

The Seller shall be paid by the Buyer for all the contractual obligations performed by the Seller till the date of termination within _______days from receipt of the termination notice.

E. Termination of the Contract shall not release either party from its confidential obligations under the Contract

Article 19 Miscellaneous

19.1 The Contract is signed by the authorized representatives of both parties in ____ ( ) originals. Each party shall keep ____ ( ).

19.2 The Contract supersedes all communications, negotiations and agreements between the parties prior to the signing date of this Contract.

19.3 All amendments, supplements and alternations to terms of the Contract shall be made in written form and signed by the authorized representatives of both parties. These amendments, supplements and alternations shall form integral parts of the Contract.

If any costs occur or delivery delay due to amendment or explanation of the new law or statute or regulations enacted by the Buyer’s country after the effectiveness of the Contract,the Seller shall have the right to ask for necessary adjustment in relation to the Contract price and the delivery schedule.

19.4 No assignment, cession, novation, or transfer of any right or obligation under this Contract shall be made by either party to a third party without the prior written consent of the other party.

19.5 All communications between both parties in the course of implementation of the Contract should be in English language in written form at the address set forth below. The faxes concerning the important matters shall be confirmed in due time by registered or express mail or letter delivered by hand.

The Buyer:

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

The Seller :

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be duly executed.

The Buyer:

The Seller:

By:______________________[Signature]

Name: [printed name]

By:_______________________ [Signature]

Name: [printed name]

Title:

Title:

Appendices

Appendix 1 Specifications and Guarantee Indices (Omitted)

展开阅读全文

篇11:外贸业务员个人工作计划精选范本_销售工作计划_网

范文类型:工作计划,适用行业岗位:外贸,销售,个人,全文共 8204 字

+ 加入清单

外贸业务员个人工作计划精选范本

销售员需要维护和开拓新的销售渠道和新客户,自主开发及拓展上下游用户,尤其是终端用户。下面是第一范文网小编为您精心整理的外贸业务员个人工作计划精选范本。

外贸业务员个人工作计划精选范本1

回顾过去一年来的工作与成效,我们几个做外贸工作的同志都深深地体会到,我们是在xx公司领导的亲自关怀指导下成长起来的,是在各部门同事们的积极帮助配合下进步的。受外贸组其他同志的委托,在这里我要代表他们感谢领导、感谢同事们。

下面我分两个方面向大家汇报自己过去一年来在外贸这个全新的工作岗位上的收获和体会。

一、克服困难,在工作中边学习边摸索,做到从内贸到外贸的成功跨越。

我不是外贸专业出身,最初转到外贸岗位时,以为自己有从事内贸业务的基础,外贸业务不会难到哪去,没想到工作一上手后,其中的感觉完全不一样,除了外语要过关,专业知识更是至关重要的。国际贸易实际上是由贸易洽谈、签约审证、备货订仓、制单结汇几个部分组成,而每一个部分都具有很强的专业性。所以我一上岗,就感受了不小的压力。知道要想胜任这项工作,首要任务就是学习。但由于我们人手少,任务在身,不可能是先学习再上岗,只能是一手托书本,一手干工作。所以在xx年中,我把大部份业余时间都用在了强化外语、学习外贸专业知识上了。从一开始我就给自己制定了雷打不动的学习计划,不管工作再忙、家务事再多、都必须抽出一些时间学习。在家里,经常是孩子睡下了,就是我最踏实的学习机会,时间长了,孩子问我:妈妈又上大学了?在工作中为了弄懂一个概念,我一定要多问几个为什么,工作中碰到难题,有经验的同志帮助解答了,我都会仔细记在本子上,班后再找时间细细消化,逐步提高。学以致用,让我增长了知识,练就了本领,提高了技能,在工作中的自信心也在不断增强。

例如,外贸业务中的审证工作,是一项很重要的内容,如果有问题我们不能及时发现,就直接导致我们公司结汇的风险。所以用户往往会为了保护自己的利益设法打擦边球,我们收到的每一份信用证都会存在一些开证行或申请人提出的特殊要求,这其中就会隐藏着对我们的不利条款,这种情况碰到的多了,我们外贸组的几个人也就习惯了对信用证中自己拿不准的条款,都会提出来相互之间进行切磋,经验不够用了,就查找相关书籍寻找依据,请教银行也是家常便饭。年,我共经手处理了16份信用证,在自己的审证过程中发现有些条款不利于我们安全结汇,每一次我都会坚持要求外商修改,虽然要求外商改正信用证是一件特别麻烦的工作,有时外商为了自己的利益经常会坚持自己的意见,甚至很不客气地同我们发脾气,但为了公司利益,我都会在耐心的商谈之中,坚持不放弃原则。16份信用证中曾经有40多处都是在审证中发现于我公司结汇不利,我都坚持据理力争,直到信用证修改满足我们的要求为止,从而确保了资金正常回收。

外贸合同的履行是以单证的往来为基础的,专业人士通常称其为单据买卖。我们制作的单据和交单时间如果与信用要求存在不符点,就无法保证货款及时、全额的收回,单据的作用和其重要性是可想而知的。所以单据制作同样是我工作中,重点学习和把握的内容。起初因为业务生疏,总是越着急越抓不住重点,屡屡出错,当辛辛苦苦加班加点赶制出来的一大堆单据,被银行挑出毛病退回来重做时,心里真不是滋味。记得有一次中板合同交单,由于外商要求将几个合同交叉发货,又在一个信用证下,分出多套单据议付,经过反复调整,离交单的时间只剩一天,这个时候我只能抱着所有单据,在银行与审单员一块过单,直到银行快关门了,单据才终于寄出去了。为了抢时间,银行工作人员陪着我饿了一天肚子。

经过近半年的实践积累和不断摸索,到下半年,制单工作对我已不是太大的难题了。年我共制单套,每一套都是数拾页的单据和数不清的数据,按时、如数收回货款余万美元。在制单中我体会到不仅需要娴熟的专业知识和清醒的头脑,更需要是对工作的高度责任心。

二、精心尽力做事,努力为公司多创效益。

年月份以后,总公司出于业务分工的考虑,出口业务只能在首钢以外的市场寻求发展,只能通过外采的方式组织出口资源。这种方式对于我们这种冠以首钢头衔的公司来讲是很艰难的,因为外商知道你隶属于首钢,他就希望从你这儿拿到首钢的产品,规模大一点的钢铁企业都有外贸经营权力和能力,而我们拿不到稳定的出口资源,这对于我们都是不利因素。

可是xx公司的特点就是要变不利条件为有利条件,用自身的努力,开创出一条自我发展之路。

在大家的帮助配合下,我从江阴西城钢厂采购欧标圆钢965吨,江苏溧阳扁钢厂采购美标扁钢吨,包钢采购欧标圆钢吨。分别出口到墨西哥和欧洲。加上上半年出口的首钢产中板吨,年,由我经办出口钢材合计吨。这些成绩的取得,与自己坚持不懈的努力和精心尽力的工作是分不开的。

年月份,从包钢友谊轧钢厂采购吨圆钢的事给我留下很深的印象。

当时我公司与包钢友谊轧钢厂签订了圆钢采购合同吨。因为要赶在国家退税调整之前发运,所以我们要求他一定要在月日前将全部圆钢运抵天津港,具备装船条件。

因为此批圆钢是首次出口欧洲,所以在外包装、挂牌、材质证明等方面都有特殊要求,保证产品质量和履约信誉很重要。尽管我们在与包钢的采购合同中作了明确的约定,包钢也紧赶慢赶,终于在12月4日将我们所需要的货物运到了天津港,但当货代理货时却发现了许多与合同规定不相符的小问题,如包装、刷色不规范等。接到货代的信息时已是周五的下班时间,可如果不去现场验货就有可能出现问题,造成外商索赔,不及时处理,错过船期,就有可能造成退税损失。想到这些,我只能把孩子交给生病的婆婆照看,周六一早赶往港,与货代一起按工厂的明细一一理货,对于出现的问题反复与工厂沟通、确认,最终得到了厂方的理解和支持,问题部分很快得到处理,保证了此批货物在12月14日前具备报关条件。

通过年的工作总结,我的确有很多感受和体会,但让我感受最深的是:自己很幸运,虽然在外贸工作中吃了不少苦,受了不少累,但我有一个领导关心、同事支持、蓬勃向上的集体,有老同志的传帮带,我从中学到了很多东西。最突出的体会是:外贸比起首钢国贸,比起其他专业外贸公司,的确面临许多困难,但我们相信,只要大家共同努力,这个“难”字也会造就出能吃苦、敢打硬仗的外贸队伍,敢于战胜困难,就能创建出具有特点的外贸事业。

xx年是我公司外贸业务的攻坚年,我们要总结年的经验,重点在产品开发上和市场拓展上下功夫,在队伍建设初见成效的基础上,以更加饱满的热情,为我公司外贸事业做大做强而努力工作。

外贸业务员个人工作计划精选范本2

新的一年,制定良好且有效的工作计划对于今后的发展起着很重要的作用,既不浪费时光和精力,同时也能改善自身的一些不足,提高自我对客户的沟通潜力,促使工作开展顺利。

增强职责感,增强服务意识,增强团队意识。用心主动把工作做到点上,落到实处。明确自我的工作职责,遇到问题要及时分析问题,解决问题,服从上级的安排。

在此我订立了工作计划,以便自我在新的一年里有更大的进步和成绩。

一.产品市场分析

1。广告光源一向是外贸的主推方向,灯帘、灯条、灯管、模组、超薄灯箱都比较有优势,很多的产品的价格已经比之前的低了很多。今后还需要多做一些产品优势的比较文档,产品案例分许与应用,让客户更加了解我们的产品。

2。商业照明灯具由于价格比较高,很多国外客户基本不能理解。但还是需要更多的了解产品,多做优势比较文档,寻找优质高端客户。

3。高端产品就需要寻找优质客户。目标客户定位在美国、迪拜、日本等国家。用心运用不一样的搜索引擎寻找客户,不能只依靠阿里巴巴,。

二.对日后工作的安排

1。在开发客户这方面,可适当的改变策略,增加在免费平台上和商业网站上发布供应信息;参加一些展会;尝试用国外的本地搜索引擎。以寻找目标市场的商业网站、行业协会网站、商会网站及产品专业网站为方向,了解并联系目标市场知名度高销售网络庞大的进口商。

2。在和客户沟通这方面,很重要的一点是确保带给给客户的信息是正确并能到达的的。当客户没下单前,了解客户的性质(是中间商还是最终使用者),到达知己知彼。在客户下单后,需及时向客户汇报交期,询问是否仍有询价。

3。发货后,可在客户收到货一周后追踪产品的质量反馈,如有问题,首先要明确自我对于这个事件的态度,同时要及时帮客户解决问题,

4。在追踪客户这方面,适时发邮件向客户问候并询问是否有采购计划,每次追踪问候都需不一样,换个方式问。备忘客户的一些重大节日和生日,在这些有纪念好处的日子里送上自我的一份祝福,给客户心底留下一个亲切的印象。

三.20xx销售目标

明年的销售目标最基本的是做到月月有进帐的单子,争取2~3个大订单,向年销售额60万进军。根据自我制定的任务,把任务根据具体状况分解到每个季度、每月、每周、每日,在不断归纳总结吸取教训的基础上提高销售业绩。

1。年销售目标:60万。

2。月销售目标:5万。

①现有已成交客户8个,争取明年争取更多的订单,保证成交量在10万以上;

②优化网站,收更多的询盘,用心跟进客户,争取成交量在10万以上;

③搜索引擎营销,比如,等国际搜索引擎上的搜索,争取成交量在10万以上;④国际展会、交流会,提前做好宣传资料及产品报价资料的详尽文件图片,寻找更多的客户;⑤重点参考之前成功案例分析有效的营销途径和方式方法。

四.明年对自我有以下要求

1。做好每一天的工作记录,避免遗忘重要事项。做好客户的跟踪,对客户的联系进度及时记录,对以往与客户相互间发送的技术及报价资料要归类整理好,以便随时联系。与外贸的同事一齐总结,周一小结,每月一大结,看看有哪些工作上的失误,及时改正下次不要再犯。2。接触客户之前要多查、了解顾客所在的公司的主要产品,不要千篇一律的回复邮件。以便决定客户的需要和问题,然后针对顾客的需要和问题,提出建设性的意见。如提出能够增加顾客销售量或能够使顾客节省费用、增加利润的方法。向客户做出建设性意见,会更有利于赢得客户的好感,这样能够给客户留下良好的印象,有利于长期接触。了解市场需求,客户需求,争取“按照客户需要带给定制服务”

3。对客户不能有隐瞒和欺骗,这样才会有长远的客户。在有些问题上你和客户是一致的。对所有客户的工作态度都要一样,但不能太低三下气。给客户一好印象,为公司树立更好的形象。客户遇到问题,不能置之不理必须要尽全力帮忙他们解决。要先做人再做生意,先卖信誉后卖产品,让客户相信我们的工作实力,才能更好的完成任务。

以上就是我这一年的工作计划,工作中总会有各种各样的困难,我会向领导请示,向同事探讨,共同努力克服。要有好业绩就得加强业务学习,开拓视野,丰富知识,不断学习行业新知识,新产品,为客户带来实用的资讯,更好为客户服务。

现在我已经在公司担任业务员有四年的时间了。可以说我是公司数得着的老业务员之一,也是对公司的发展有一定贡献了。现在20xx年将结束,我想在岁末的时候就我一年的工作做一下总结,也对自己的工作提前写下了20xx年业务员工作计划范文,让自己在假期中能够安稳的度过,也让自己能够及时的认识到当前的形势,希望不会让自己失望!

外贸业务员个人工作计划精选范本3

转眼间又要进入新的一年20xx年了,新的一年是一个充满挑战、机遇与压力开始的一年,也是我十分重要的一年。出来工作已过个年头,家庭、生活和工作压力驱使我要努力工作和认真学习。在此,我订立了本年度工作计划,以便使自我在新的一年里有更大的进步和成绩。

一、熟悉公司新的规章制度和业务开展工作。公司在不断改革,订立了新的规定,个性在诉讼业务方面安排了专业法律事务人员协助。作为公司一名老业务人员,务必以身作责,在遵守公司规定的同时全力开展业务工作。

在第一季度,以诉讼业务开拓为主。针对现有的老客户资源做诉讼业务开发,把可能有诉讼需求的客户全部开发一遍,有意向合作的客户安排法律事务专员见面洽谈。期间,至少促成两件诉讼业务,代理费用达万元以上(每件万元)。做诉讼业务开发的同时,不能丢掉该等客户交办的各类业务,与该等客户持续经常性联系,及时报告该等客户交办业务的进展状况。[由整理]

在第二季度的时候,以商标、专利业务为主。透过到专业市场、参加专业展销会、上网、电话、陌生人拜访等多种业务开发方式开发客户,加紧联络老客户感情,组成一个循环有业务作的客户群体。以至于到达4。万元以上代理费(每月不低于1。万元代理费)。在大力开拓市场的同时,不能丢掉该等客户交办的各类业务,与该等客户持续经常性联系,及时报告该等客户交办业务的进展状况。

第三季度的十一中秋双节,带来的无限商机,给后半年带来一个良好的开端。并且,随着我对高端业务专业知识与综合潜力的相对提高,对规模较大的企业贴合了《中国驰名商标》或者《广东省著名商标》条件的客户,做一次有针对性的开发,有意向合作的客户能够安排业务经理见面洽谈,争取签订一件《广东省著名商标》,承办费用达7。万元以上。做驰名商标与著名商标业务开发的同时,不能丢掉该等客户交办的各类业务,与该等客户持续经常性联系,及时报告该等交办业务的进展状况。

第四季度就是年底了,这个时候要全力维护老客户交办的业务状况。首先,要逐步了解老客户中有潜力开发的客户资源,找出有漏洞的地方,有针对性的做可行性推荐,力争为客户公司的知识产权保护做到最全面,代理费用每月至少达万元以上。

二、制订学习计划。学习,对于业务人员来说至关重要,因为它直接关系到一个业务人员与时俱进的步伐和业务方面的生命力。我会适时的根据需要调整我的学习方向来补充新的能量。专业知识、综合潜力、都是我要掌握的资料。知己知彼,方能百战不殆,在这方面还期望业务经理给与我支持。

三、增强职责感、增强服务意识、增强团队意识。用心主动地把工作做到点上、落到实处。我将尽我最大的潜力减轻领导的压力。

以上,是我对20xx年的个人工作计划,可能还很不成熟,期望领导指正。火车跑的快还靠车头带,我期望得到公司领导、部门领导的正确引导和帮忙。展望20xx年,我会更加努力、认真负责的去对待每一个业务,也力争赢的机会去寻求的客户,争取的单,完善业务开展工作。相信自我会完成新的任务,能迎接20xx年新的挑战。

20xx年,我有着的期盼,相信自我必须能够在20xx年取得更大的进步,自我就是这样一年一年的走过来的,从一个什么都不懂的毛头小伙到此刻很有深度的资深公司业务员,我的成长充满了曲折,但是在今后的工作中,我还是需要继续不断的努力,相信自我在20xx年必须走的更远!

外贸业务员个人工作计划精选范本4

在公司这半年时光,我有不足的地方,期望同事领导给我提出,我会虚心理解,并改正,争取做得更好。每个公司都有自我的制度,以及管理方式,在努力工作的同时,我也会配合公司的各项制度。对于公司,我也有以下推荐:

1、对待资源资源。

在上月的工作总结中,我提到,网络平台是一个很好的资源,有了平台,业务上有了明显的进步,客户积累量也突飞猛进。所以期望公司在资源分配上,尽量做到公平公正,因为这个对每个业务员都狠重要!

2、对待样品。

因为前半年,我出的大都是样品,所以对这一点体会比较深刻,如果样品单客户能培养成定期下单的长期客户,那目标是很容易实现,也为公司的长期客户做出贡献。我提出这一点并不是说我的样品出了问题,相反,我出的样品,客户都比较满意,测试也很不错,所以我期望能继续持续下去。

因为样品是客户对我们产品的初步审核,是我们取得订单的关键。

3、对待来访客户。

这一点只是细节,但是期望能引起注意。据我所知,我公司到访客户的下单率,并不理想。相比,我明白的一家工厂,他们公司硬件设备及各方面条件并不如我们公司,而对方到访客户的下单率几乎是100%。探其究竟,工厂对待客户细节等都十分注意。

客户到访,无论客户是否下单,都十分尊重。我也期望我们公司对远道而来的客人,表现出东道主的热情,并展示公司良好的企业形象。

这些推荐,只是我个人的看法,如果能改善的,期望公司尽力改善,为公司业务,塑造形象而努力。我需要做的就是:为我的目标而努力!!

在五月里,我应该从以下几方面来完成:

首先,认真负责地完成小组里自我的分担的每一份工作。

与小组的成员齐心协力,从客户的需求出发,在电话,在邮件,或拜访中,了解客户的需求,从而带给满足客户需求的产品和服务。

与小组成员一齐,集思广益,一点一点共同解决我方的合作过程中引起对方不满意的问题,实现更顺畅更愉快的长期合作。

第二,在平台拥有自我的业务账号。

作为小组的一员,在确保完成小组业务的同时,能够发展自我的个人业务。在实习期,我也曾尝试透过搜索引擎和其它国家B2B平台上寻找买家,发过无数封开发信,但回复者甚少。相信,透过公司付费的平台,若有机会参加平台的相关培训,我会学习的更快、更专业。

第三,全面的了解公司和产品,培养自我的业务潜力。

透过了解公司和产品,进而了解目标市场和竞争对手,做到能够专业的回答客户提出的问题,用自我的专业知识留住客户。丰富与产品相关的原材料、包装等相关知识。

第四,至少拥有一个自我的业务,培养自我的业务技巧。

没有实战的话,只能是纸上谈兵。透过一个自我独立操守的业务,就能将理论与实践相结合,培养自我的业务技巧,熟悉一整套外贸流程。从开发客户、签订单、下生产通知、报关、发运到最后收款结束,一边学习一边实践。

然后,透过一次一次地总结经验教训,使自我的业务潜力逐渐趋于成熟。

第五,提高自我的业务素质。

做一个诚实、热情、有耐心、有自信心的外贸业务员。做朋友做业务要诚实。对待自我的职业要有热情,有激情。在开发客户的过程中要有耐心。在与客户洽谈和沟通时要有自信心。

第六,业余时光多加练习英语口语,接待客户时做到完全无障碍的沟通和交流。

多朗读、多背诵,立志实现向E哥那样任何对话,随听随翻。

第七,重新学习日语,掌握日语的基本对话和交流。

制定日语学习计划,从词汇和句型开始,重新学习、重新掌握,让日语成为自我名副其实的第二外语,以备不时之需。

外贸业务员个人工作计划精选范本5

随着岗前培训的结束,也意味着进入下一步的实质性工作阶段,回顾这短短四天的培训学习过程,非常感谢公司领导和各位同事的顶力相助,使我顺利完成培训并基本掌握相关业务知识。基于本人是第一次接触外贸业务务和销售行业,面临困难和压力较大,为了能顺利完成公司所规定的指标和达到个人预期目标,针对行业特点、现状,结合本人这几天对“销售服务”的理解和感悟,特对第一个月工作制定以下计划。

本计划包括宗旨、目标、工作开展计划和计划评估总结等四部分。

一、宗旨

本计划是第一个月工作开展的指导,是完成销售指标和达到个人预期目标的保证。制定本计划的宗旨是确保完成指标、实现目标。

二、目标

1. 全面、较深入地掌握我们“产品”的功能、特色和优势并做到应用自如。

2. 根据自己以前所了解的和从其他途径搜索到的信息,录入客户资料150家。

3. 锁定有意向客户20家。

4. 力争完成销售指标。

三、工作开展计划

众所周知,现代销售的竞争就是服务的竞争。服务分为售前服务、售中服务和售后服务,而我们有恰恰是销售“服务”的,所以前期工作即就是售前服务更是我们工作的重中之重。正是因为如此,我的工作开展计划也是围绕“售前服务”来进行。

1.多渠道广泛地收集客户资料,并做初步分析后录入,在持续的信息录入过程中不断地提高自己的业务知识,使自己在对“”的功能、操作和特点掌握的基础上进一步的深入体会,做到在客户面前应用自如、对答如流。

2.对录入完的客户尽可能多地提供免费的服务(比如根据其需要给它发各种商务信息、技术指导等),目的让客户了解“”,在此基础上,与客户进行互动沟通。

3.在用电话、E-mail等方式与客户互动的过程中,实时掌握其心理动态,并可根据这些将客户分类。

4.在互动的过程中,锁定有意向的客户,并保持不间断的联系沟通,在客户对我们的“服务”有感兴趣或希望进一步了解的情况下,可以安排面谈。

5.在面谈之前要做好各种充分准备,做到“知己知彼”,克服心理障碍。

6..对每次面谈后的结果进行总结分析,并向领导汇报,听取领导的看法。克服困难、调整心态、继续战斗。

7.在总结和摸索中前进。

四、计划评估总结

在一个月后,要对该月的工作成果、计划执行情况做一次评估,总结得失,为下个月的工作开展做准备。

展开阅读全文

篇12:2024年外贸业务员个人工作计划_业务员工作计划_网

范文类型:工作计划,适用行业岗位:外贸,销售,个人,职员,全文共 4298 字

+ 加入清单

2020年外贸业务员个人工作计划

工作计划是我们工作的重要组成部分,一份好的工作计划会有事半功倍的效果。下面是小编整理的关于外贸业务员的个人工作计划,欢迎阅读。

个人的工作计划(一)

作为一名外贸业务员,在5月里,我对自我的工作状况计划如下:

首先,学习外贸知识、产品知识。

对一名刚从英语系毕业一年半的外贸新手来说,我的外贸知识还有待于加强,需要在往后的工作中进一步积累。

此外,刚刚接触这个行业,对产品的认知我几乎是一片空白。因此,学习是我5月工作计划中的首要环节和重要任务。我会以一种用心的态度虚心向领导及各位同事请教。在我的个人观念里,态度决定成败,期望自我的努力会得到大家的肯定。

其次,学习缮制单据。

在熟悉整套外贸流程理论知识之余,锻炼自我的实际操作潜力。因为此前一年多的工作经验都只是局限于业务方面,重点在与客户的沟通上。

单据的制作以及出口流程中跟银行、商检、海关、贸促会等相关部门的接触,都是我面临的新的工作。由此,我也体会到自我以前掌握的工作环节并不全面、完整。此刻能从最基本的出口单证做起,对我来说是一个不可多得的学习机会。

第三,如有机会接触公司业务,我期望能尽快熟悉自我跟的每一个客户,总结并分析他们的新特点,以一颗热忱的心为客户服务,为公司创利!

第四,用心开拓新业务,充分利用网络资源为公司寻找目标客户。

及时更新我司在等相关网站上发布的供求信息,并持之以恒地跟踪,相信长久的付出总会有必须的成效。

第五,协助领导及同事做好两届展会及其它国外展会的前期准备工作。

在展会结束后,协助参展人员做好后续的客户跟踪服务,以此巩固展会成果。

个人的工作计划(二)

1、顺利处理美国客户订单,70%余款收回,这样7月份至少能够完成3万多美金。

当然不能只盯着一个客户。墨西哥客户太阳能电池板样品测试已成功,客户也比较满意,目前正在谈一个小柜的订单,根据和客户的联系状况,以及私人关系,目标5月份拿下订单。对于这样的客户,当然是要像猫盯着老鼠那样,抓紧,不放松,有望5月中旬收到定金。所以给自我5月份的目标是5万美金。

2、其余每个月的任务,很难细分,因为和客户的进展是在变化的。

期望每月的任务能提前一个月定下来。

3、还有一个主要的任务,帮忙新业务员适应公司,尽早做出业务。

目前,只有是我负责,我会耐心为她解答工作中遇到的困难,并给予适当的指导,帮忙她早日为我们公司外贸业务作出成绩。

我明白,对于工作的计划也许还不让人满意,在我个人的便签纸上方,每一天的计划,都一条条写下来了,每一天的计划我相信是为我大的目标服务的,所以会脚踏实地做好。

在公司这半年时光,我有不足的地方,期望同事领导给我提出,我会虚心理解,并改正,争取做得更好。每个公司都有自我的制度,以及管理方式,在努力工作的同时,我也会配合公司的各项制度。对于公司,我也有以下推荐:

1、对待资源资源。

在上月的工作总结中,我提到,网络平台是一个很好的资源,有了平台,业务上有了明显的进步,客户积累量也突飞猛进。所以期望公司在资源分配上,尽量做到公平公正,因为这个对每个业务员都狠重要!

2、对待样品。

因为前半年,我出的大都是样品,所以对这一点体会比较深刻,如果样品单客户能培养成定期下单的长期客户,那目标是很容易实现,也为公司的长期客户做出贡献。我提出这一点并不是说我的样品出了问题,相反,我出的样品,客户都比较满意,测试也很不错,所以我期望能继续持续下去。

因为样品是客户对我们产品的初步审核,是我们取得订单的关键。

3、对待来访客户。

这一点只是细节,但是期望能引起注意。据我所知,我公司到访客户的下单率,并不理想。相比,我明白的一家工厂,他们公司硬件设备及各方面条件并不如我们公司,而对方到访客户的下单率几乎是100%。探其究竟,工厂对待客户细节等都十分注意。

客户到访,无论客户是否下单,都十分尊重。我也期望我们公司对远道而来的客人,表现出东道主的热情,并展示公司良好的企业形象。

这些推荐,只是我个人的看法,如果能改善的,期望公司尽力改善,为公司业务,塑造形象而努力。我需要做的就是:为我的目标而努力!!

个人的工作计划(三)

在五月里,我应该从以下几方面来完成:

首先,认真负责地完成小组里自我的分担的每一份工作。

与小组的成员齐心协力,从客户的需求出发,在电话,在邮件,或拜访中,了解客户的需求,从而带给满足客户需求的产品和服务。

与小组成员一齐,集思广益,一点一点共同解决我方的合作过程中引起对方不满意的问题,实现更顺畅更愉快的长期合作。

第二,在平台拥有自我的业务账号。

作为小组的一员,在确保完成小组业务的同时,能够发展自我的个人业务。在实习期,我也曾尝试透过搜索引擎和其它国家B2B平台上寻找买家,发过无数封开发信,但回复者甚少。相信,透过公司付费的平台,若有机会参加平台的相关培训,我会学习的更快、更专业。

第三,全面的了解公司和产品,培养自我的业务潜力。

透过了解公司和产品,进而了解目标市场和竞争对手,做到能够专业的回答客户提出的问题,用自我的专业知识留住客户。丰富与产品相关的原材料、包装等相关知识。

第四,至少拥有一个自我的业务,培养自我的业务技巧。

没有实战的话,只能是纸上谈兵。透过一个自我独立操守的业务,就能将理论与实践相结合,培养自我的业务技巧,熟悉一整套外贸流程。从开发客户、签订单、下生产通知、报关、发运到最后收款结束,一边学习一边实践。

然后,透过一次一次地总结经验教训,使自我的业务潜力逐渐趋于成熟。

第五,提高自我的业务素质。

做一个诚实、热情、有耐心、有自信心的外贸业务员。做朋友做业务要诚实。对待自我的职业要有热情,有激情。在开发客户的过程中要有耐心。在与客户洽谈和沟通时要有自信心。

第六,业余时光多加练习英语口语,接待客户时做到完全无障碍的沟通和交流。

多朗读、多背诵,立志实现向E哥那样任何对话,随听随翻。

第七,重新学习日语,掌握日语的基本对话和交流。

制定日语学习计划,从词汇和句型开始,重新学习、重新掌握,让日语成为自我名副其实的第二外语,以备不时之需。

个人的工作计划(四)

随着岗前培训的结束,也意味着进入下一步的实质性工作阶段,回顾这短短四天的培训学习过程,非常感谢公司领导和各位同事的顶力相助,使我顺利完成培训并基本掌握相关业务知识。基于本人是第一次接触外贸业务务和销售行业,面临困难和压力较大,为了能顺利完成公司所规定的指标和达到个人预期目标,针对行业特点、现状,结合本人这几天对“销售服务”的理解和感悟,特对第一个月工作制定以下计划。

本计划包括宗旨、目标、工作开展计划和计划评估总结等四部分。

一、宗旨

本计划是第一个月工作开展的指导,是完成销售指标和达到个人预期目标的保证。制定本计划的宗旨是确保完成指标、实现目标。

二、目标

1. 全面、较深入地掌握我们“产品”的功能、特色和优势并做到应用自如。

2. 根据自己以前所了解的和从其他途径搜索到的信息,录入客户资料150家。

3. 锁定有意向客户20家。

4. 力争完成销售指标。

三、工作开展计划

众所周知,现代销售的竞争就是服务的竞争。服务分为售前服务、售中服务和售后服务,而我们有恰恰是销售“服务”的,所以前期工作即就是售前服务更是我们工作的重中之重。正是因为如此,我的工作开展计划也是围绕“售前服务”来进行。

1.多渠道广泛地收集客户资料,并做初步分析后录入,在持续的信息录入过程中不断地提高自己的业务知识,使自己在对“”的功能、操作和特点掌握的基础上进一步的深入体会,做到在客户面前应用自如、对答如流。

2.对录入完的客户尽可能多地提供免费的服务(比如根据其需要给它发各种商务信息、技术指导等),目的让客户了解“”,在此基础上,与客户进行互动沟通。

3.在用电话、E-mail等方式与客户互动的过程中,实时掌握其心理动态,并可根据这些将客户分类。

4.在互动的过程中,锁定有意向的客户,并保持不间断的联系沟通,在客户对我们的“服务”有感兴趣或希望进一步了解的情况下,可以安排面谈。

5.在面谈之前要做好各种充分准备,做到“知己知彼”,克服心理障碍。

6..对每次面谈后的结果进行总结分析,并向领导汇报,听取领导的看法。克服困难、调整心态、继续战斗。

7.在总结和摸索中前进。

四、计划评估总结

在一个月后,要对该月的工作成果、计划执行情况做一次评估,总结得失,为下个月的工作开展做准备。

个人的工作计划(五)

很荣幸能有机会加入xx集团。虽入职时间较短,仍深深地感受到我司井然有序的管理秩序及我们部门充满朝气的团队氛围。在这个岗位上,我面临的机遇和挑战都是巨大的,外贸业务知识及经验的积累都需要自身不断的努力和学习。

在下个月里,我对自己的工作情况计划如下:

首先,学习外贸知识、产品知识。

对一名刚从英语系毕业一年半的外贸新手来说,我的外贸知识还有待于加强,需要在往后的工作中进一步积累。此外,刚刚接触这个行业,对产品的认知我几乎是一片空白。因此,学习是我计划中的首要环节和重要任务。我会以一种积极的态度虚心向领导及各位同事请教。在我的个人观念里,态度决定成败,希望自己的努力会得到大家的肯定。

其次,学习缮制单据。

在熟悉整套外贸流程理论知识之余,锻炼自己的实际操作能力。因为此前一年多的工作经验都只是局限于业务方面,重点在与客户的沟通上。单据的制作以及出口流程中跟银行、商检、海关、贸促会等相关部门的接触,都是我面临的新的工作。由此,我也体会到自己以前掌握的工作环节并不全面、完整。现在能从最基本的出口单证做起,对我来说是一个不可多得的学习机会。

第三,如有机会接触公司业务,我希望能尽快熟悉自己跟的每一个客户,总结并分析他们的新特点,以一颗热忱的心为客户服务,为公司创利!

第四,积极开拓新业务,充分利用网络资源为公司寻找目标客户。及时更新我司在等相关网站上发布的供求信息,并持之以恒地跟踪,相信长久的付出总会有一定的成效。

第五,协助领导及同事做好两届展会及其它国外展会的前期准备工作。在展会结束后,协助参展人员做好后续的客户跟踪服务,以此巩固展会成果。

另有几条小小的建议:

一、因经理在业务洽谈方面会经常与客户进行电话沟通。

为此提议是否可在电脑上安装Skype软件,申请一个Skype帐号,并向客户积极推荐这一网上及时沟通工具。其通话质量与手机差不多,还可节省双方的国际长途电话费用。

二、部门内部多开展一些活动,在活动中增强整个团队的凝聚力。

三、对新人多开设外贸知识及业务知识的内部培训课程。

最后,再次感谢领导对我的信任。相信在这个优秀的团队中,我将受益不少。同时,我也期待自身的不断完善能为公司的发展贡献一份力量!

展开阅读全文

篇13:农副产品行纪合同综合农产品类

范文类型:合同协议,全文共 2789 字

+ 加入清单

合同编号:

签订地点:

签订时间:

行纪人:

委托人:

根据《中华人民共和国民法典》和其他有关法律法规的规定,行纪人(经纪人的一种)接受委托人委托,以自己的名义,为委托人卖出(买入)下列农副产品,双方在平等、自愿、公平、诚实信用的基础上,经协商一致,订立本合同。

第一条 委托人委托行纪人卖出(买入)的农副产品名称、数量和价格:

货物名称

商标或品牌

规格型号

生产厂家

计量单位

数量

最低销价

金 额(元)

质量标准

最高购价

包装要求

合计人民币金额(大写):

(注:空格如不够,可以另接)

第二条 双方的权利和义务:

(一)行纪人的权利和义务:

1. 行纪人临时占有委托物的,应当妥善保管委托物;

2. 委托人将委托物交付给行纪人时有瑕疵或者容易腐烂、变质的,经委托人同意,行纪人可以处分该物;与委托人不能及时取得联系的,乙方可以合理处分;

3. 行纪人低于委托人指定的价格卖出或者高于委托人指定的价格买入的,应当经委托人同意。未经委托人同意,行纪人补偿其差额的,该买卖对委托人发生效力;

4. 行纪人高于委托人指定的价格卖出或者低于委托人指定的价格买入的,可以按照约定增加报酬。没有约定或者约定不明确、依照《中华人民共和国民法典》第六十一条的规定仍不能确定的,该利益属于委托人;

5. 行纪人处理委托事务支出的费用,由行纪人自己负担,但双方另有约定的除外;

6. 行纪人卖出或者买入具有市场定价的商品,除委托人有相反的意思表示以外,行纪人自己可以作为买受人或者出卖人,且可以要求委托人支付报酬;

7. 委托物不能卖出或者委托人撤回出卖,经行纪人催告,委托人不取回或者不处分该物的,行纪人依照《中华人民共和国民法典》第一百零一条的规定可以提存委托物;

8. 行纪人与第三人订立转委托合同的须经委托人同意,行纪人对该合同直接享有权利、承担义务;

9. 第三人不履行义务致使委托人受到损害的,行纪人应当承担损害赔偿责任,但行纪人与委托人另有约定的除外。

(二)委托人的权利义务:

1. 委托人应当在行纪人完成或者部分完成委托事务时,向其支付相应的报酬。委托人逾期不支付报酬的,行纪人对委托物享有留置权,但双方另有约定的除外;

2. 委托人应当与行纪人明确约定是否允许把委托事务转委托给第三人处理;

3. 对委托货物的价格确定,委托人有权要求行纪人不得违背该指示卖出或者买入;

4. 委托人应当及时受领行纪人按照约定买入的委托物。经行纪人催告,委托人无正当理由拒绝受领的,行纪人依照《中华人民共和国民法典》第一百零一条的规定可以提存委托物;

5. 委托人要积极配合行纪人的工作,及时处理本合同履行过程中的有关事务。

第三条 委托人将委托卖出的货物交付行纪人的时间、地点、方式及费用负担:                                                                                                 。

第四条 行纪人将委托买入的货物交付委托人的时间、地点、方式及费用负担:                                                                                                。

第五条 委托人与行纪人结算货款的方式、地点及期限:                                                                                                。

第六条 行纪人获得酬金的计算方式及支付期限:                                                                                                。

第七条 行纪人以高于委托人指定的价格卖出货物时,报酬的计算方法:                                                                                                。

行纪人以低于委托人指定的价格卖出货物时,报酬的计算方法:                                                                                                。

第八条 行纪人以低于委托人指定的价格买入货物时,报酬的计算方法:                                                                                                。

行纪人以高于委托人指定的价格买入货物时,报酬的计算方法:                                                                                                。

第九条 委托人委托行纪人处理委托事务的期限为:                                                                                                。

第十条 委托人(是/否)允许行纪人把委托事务转委托给第三人处理。

第十一条 委托人未向行纪人支付报酬的,行纪人(是/否)可以留置委托货物。

第十二条 违约责任:

(一)双方的任何一方无正当理由擅自终止履行或单方变更、解除合同的,应赔偿由此给对方该份签约合同所造成的一切经济损失;

(二)双方的任何一方因拖延交款、货时间而导致损失的,由过错方承担损失;

(三)行纪人对临时占有的委托物,应当妥善保管委托物,保管不善造成损失的,由行纪人承担损失。

第十三条 合同的变更和解除:

(一)一方需变更合同时,应提前         日以书面形式通知对方,征得对方同

意后另行签订变更协议。

(二)一方需解除合同时,应提前 日以书面形式通知对方并征得对方同意,但发生《民法典》第94条规定情形的,一方有权单方解除合同。合同解除后,双方应按《民法典》第97条的规定办理后续事宜。

第十四条 合同争议的解决方式:

本合同在履行过程中发生争议,由双方协商解决,也可由当地工商行政管理部门调解;协商或调解不成的,按下列第 种方式解决:

(一)提交 仲裁委员会仲裁;

(二)依法向 人民法院起诉。

第十五条 其他约定:

第十六条 本合同未作约定的,按《中华人民共和国民法典》的有关规定执行。

第十七条 本合同一式      份,双方各持      份。

本合同自双方签字盖章之日起生效。

展开阅读全文

篇14:工商局行政复议申请流程

范文类型:申请书,适用行业岗位:行政,全文共 456 字

+ 加入清单

立合同者:_________________*百货商店(以下简称甲方),向*纺厂(以下简称乙方)。

为了繁荣市场,保证*的供应,经双方协商,签订本合同,以资共同遵守。

一、由甲方向乙方订购一等品毛华达呢20__米,每米单价45元。

二、分两批于八、九月的每月15日前交货,由乙方运至甲方所在地,运费由乙方负责。

三、付款办法采取银行托付。货款在签合同时预付40%,其余60%待交货完毕后一周内付清,均通过银行转帐付款。

四、质量标准。如果质量不合议定标准,按部颁标准验后重新估价,乙方除赔偿损失外,还应付给甲方损失总值的千分之三的罚金。

五、双方按规定日期交付货物或货款,逾期不履行合同。且每延期一天,违约方须按货款总额的千分之一计算罚金付给对方。

六、合同由向阳市工商行政管理局鉴证后生效,一式三份,甲乙双方和鉴证机关各执一份。

甲方(盖章):_______________乙方(签字):_______________

________年________月________日________年________月________日

展开阅读全文

篇15:外贸实习报告_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,全文共 3200 字

+ 加入清单

外贸实习报告

在大三的学习生活中,实习是不可缺少的一部分。在实习期间可以把在学校学到的外贸知识应用到实际当中。在理论与实践相结合的时候,能够更快更好的体会到理论的精髓所在,体会到理论与实践的区别。从而巩固自己所学的知识,增强发现问题、分析问题、解决问题的能力。从而做到理论与实际的融会贯通。

2008年元旦,正式开始了我梦寐以求的实习生活。在老师的引荐下,我来到了青岛*公司实习。这是一家专门出口针织品的外贸公司,成立于2007年,由最初简单的针织服装发展到现在的浴巾、毛巾、婴儿爬服、内衣等多种产品为一体的产品模式,客户也由最初的单一客户发展成现在遍布法国、日本、克罗地亚、意大利等欧、亚国家的客户规模。公司成立时间虽然很短,但不论是从产品生产的规模还是从客户数量上来看,公司都有着突飞猛进的进步。我虽然来公司的时间不长,但是在公司领导的领导下和同事的感染下,自己对工作都始终抱着极大的热情,深深的体会到自己责任的重大。在自己积极投入工作的过程中,不管是为人处事方面,还是工作方面,自己都是受益匪浅!

我所实习的这家公司是一家小公司,员工不超过20个人。麻雀虽小,可是五脏俱全。公司员工各司其职,竭尽全力为公司效力。现在回想一下,我还是很庆幸自己在一家小公司实习的。因为在小公司我才能做更多的工作,承担更多的责任,才能更好的锻炼自己的能力学到更多的东西。

我和师傅主要负责法国客户。这个法国公司比较大,经营产品的种类很多,包括针织服装、梭织服装、珠宝。青岛代表处主要负责服装的采购,我们和客人主要在针织服装这方面有合作。在我们正式合作以前,会就付款方式、贸易术语、违约等各个方面的条款先签订一份协议。在以后的合作中,我们只需对产品报价,只要我们的价格与客人的目标价相近,就可以接到客人的订单(PO)所以对于这个客人来说,对于客人每一季产品的报价是至关重要的。客人会在新一季开始的时候陆续通过邮件发来几十个款的报价,同时会通知我们到客人的办公室去拿用在这几款衣服上特殊面料。这就意味着我们的报价不仅要低,还要找到这种面料,才可以拿到这份订单。由于今年汇率变化很多,而且汇率不断的降低,同时国内也存在通货膨胀。用句通俗的话来形容现在的形式,就是人民币在国内不值钱,在国外很值钱。这就给我们报价加大了难度,如果汇率估算错误,就会带来损失。

订单确定以后,我们就会与工厂联系,给工厂下订单、签订国内的购货合同。接下来就会提供色样、布样、产前样、确认样等样品。很多样品都要经过一次次的修改才能满足客人的要求。每一次提供样品以前都要认真体会客人关于样品的要求,这样才能保证样品一次通过。收到样品意见以后要准确无误的翻译并且传达给工厂。有时会因为错误理解客人的意见,错误的传达给工厂,都会给工厂和自己造成很大的损失。

这个客户的交货时间很分散,几乎每个周都会出货。我每周四都会为了报关辗转于工厂,货代,场站之间,也是我最忙的时候,恰恰也是我学到东西最多的时候。记得有一个周我们出了两个大柜的货。这些衣服并不是一个款式,有婴儿的,有大童的,还有女大人的。海关对于不同的服装种类有不同的监管要求,所以这些衣服一共要申请7个出口许可证。每周四上午是报关时间,为了保证货物顺利通关,我周三就早早的把报关所需的箱单、发票、合同都做好了,也通知报关行过来取单据。本来以为这次可以很顺利的报关。可是报关行收到单据没多久就打电话告诉我一票报关单里只能包含一个许可证。没有办法我又急急忙忙把单据一式七份。可刚刚把修改后的单据传给报关行,他又打电话告诉我说,许可证上的价格是最低限价,发票和合同上的价格必须低于许可证上的价格。我当时一听就有点慌,货代要求我们必须周四报上关,否则就给我们甩货。没办法我又急匆匆的该好价格,还好这次没有什么问题顺利通关了。这个周四过的是我实习生活中最最紧张的一个了。但是我也从中吸取了很多教训,也学到了很多知识。首先,一个报关单只能包含一个出口许可证。其次,出口许可证的价格是最低限价,发票和合同的价格不能低于出口许可证的价格。因为我们和客人签订合同的价格包含客人的佣金,所以我们在保管的时候就会把这部分佣金扣除。但是我们在申请出口许可证的时候是用含佣价申请的。既然出口许可证是最低限价,以后自己再申请出口许可证的时候就应该注意这个问题,给自己减少不必要的麻烦。俗话说吃一堑长一智,经过这次,自己以后要学的更加仔细更加认真。如果遇到不确定的问题,一定要提前咨询有关部门,给公司减少不必要的花费,给自己减少不必要的麻烦。再次,粗心和浮躁在工作中都是要不得的,自己一个小小的失误有时会造成客户的索赔,有时造成单证不符,导致已经报上关的货物删单。看似不经意的马虎,造成的后果都是严重的。虽然在学校里已经学了很多关于报关和制单的知识,但是真正应用起来发现自己学到的知识和实际应用有很大的差别。在公司里虽然有的人学历没有自己高,但是也不应该轻视他们,他们的经验是我们多少年的学校生活所学不到的。时时刻刻都应该保持谦虚谨慎的态度。

作为公司的新人,出差是让我最兴奋的事情。在我看来,出差是一件很好的差事,既可以到外面欣赏风景,见到很多平时都不曾见过的新鲜事物,又可以不用整天闷在办公室里。所以一有出差的机会,我就会特别高兴。出了几次差以后发现事实并非如此。我们出差主要是带着客人的验货员到工厂验货,验货的结果如何直接关系到我们能不能按时出货。碰到没有问题的货还好说,可是有时候工厂的货做的很急,就会出现油污、断线、忘记缝洗标的问题,这些问题都还是小问题,让工厂的师傅修补一下就可以出货了。可是有的工厂大货生产时擅自更改扣子的颜色或者领子的颜色,即使他们这样做是为了衣服的美观,是出于好意,可是并没有经过客人的确认也是不允许的,是要遭到客人索赔的。出现这种严重的情况,让工厂重新修改是不可能的。这就要靠我们对衣服的生产和质量了如指掌,能够当场作出判断这样的货出口以后不会遭到索赔。在以后的出差中我也不敢再抱着出去玩玩的心态了,在客人验货的时候我也会在旁边认真的看着。看客人是怎样验货,主要检查衣服的哪些方面,认真的记在心里,在检查工厂送来的样品是也注重看这些方面,确保每一次出货都万无一失。师傅带我验过几次货,我了解了大体流程以后,现在就是我自己带着客人验货了。得到了师傅的认可,肩负起这么重要的责任让我十分兴奋。有一次我自己带着客人验货就出现过一次状况。那次我带客人去验一批小童的T恤,衣服后面的领开口处扣子的定位需要用消失笔,这个消失笔的笔迹在7天以后就会消失。可是由于这批货赶得太急,我们验货的时候才过了一天,消失笔的笔迹自然不会消失。当时验货员就问我怎么这里还有消失笔的笔迹呢?我从来都没有听说过消失笔,对于这个问题我也无从下手去回答。只好把那几件带着消失笔笔迹的衣服甩掉了。我回公司问了师傅才知道消失笔笔迹会在7天之后就自动消失。如果我早知道这个问题的话,就不会出现这种问题了。为了防止以后在出现这种问题,自己也在不断的积累关于服装的知识。

五个月的实习生活,看似很长,可是一眨眼的功夫就过去了。从刚开始的不谙世事,到现在的得心应手。刚入公司,一切都显得那么陌生,做什么事情心里都没有底气,不能放开去做。有很多新的东西需要自己去学习和适应。现在想想人在社会上就是需要适应不断的变化,适者生存,自己只有去适应社会,社会却不会去适应你。只有适应了这种高节奏的生活才能做出效率,作出成绩。作为公司肯定不会需要一个不会创造效益的人。经过几个月的磨练和适应,现在的我对工作已经得心应手。每天都会实现安排好当天的工作,把工作按照轻重缓急分配好,能把一天的工作完美的结束就是我这一天最大的成功了。完美的结束一天的工作只是我现在的目标,以后我会给自己树立更高的目标,只有在不断追求完美的过程中,自己才能变得更加完美。

共2页,当前第1页12

展开阅读全文

篇16:气垫船操作培训专项协议书_合同范本

范文类型:合同协议,适用行业岗位:培训,全文共 1274 字

+ 加入清单

气垫船操作培训专项协议书

根据甲方_________和乙方_________签订的_________号合同第_________条规定,以_________代表(以下简称甲方)和_________代表(以下简称乙方)经友好协商就在气垫船上培训操作人员,签订本专项协议书。

1.甲方同意对乙方操船人员进行气垫船操作使用方面的培训,通过培训,使受训人员能了解气垫船的设备、仪器、器材的基本结构性能并掌握对上述设备、仪器、器材的操作、使用和维护保养的方法。

2.应乙方要求,甲方同意为乙方分两批在_________培训_________名工程师、技术员。每期培训为_________天,交船前在陆上训练_________天,交船后在乙方接收的气垫船上进行_________天的海上训练。每期培训计划另行制定,并在受训前两个月通知乙方。每批受训人员具体来_________地的时间,将由双方根据交船进度和培训计划予以商定。

3.为了便于甲方作好培训的准备工作,在每批培训人员受训前_________天内乙方向甲方提供受训人员的姓名、专业、职务、出生年月、文化程度等。上述受训人员应具备一定的专业基础和实际操作能力并能懂_________文。

4.培训费由乙方承担,每人每天_________元(包括训练、食、住、医疗和市交通费),培训费总额为_________元(大写_________元)。培训费以可兑换的_________元支付。乙方在每批受训人员抵达_________地时,应将该受训人员费用一次付给甲方,支付时间及金额见附件。

5.本协议书用_________文书写,正本两份,双方各执一份。本协议书自签字之日起生效。

6.如有未尽事宜,双方将通过友好协商并以书面确认。

甲方(公章):_________ 乙方(公章):_________

代表人(签字):_________ 代表人(签字):_________

_________年____月____日 _________年____月____日

签订地点:_________ 签订地点:_________

附件

培训批次、人数、费用、支付时间一览表

┌────┬────┬──────────┬───┬──────┬──┐

│ │ │ 受 训 人 数 │培训费│支付时间(即│备注│

│培训批 │培训名称├───┬───┬──┤用(元│开始培训时间│ │

│ │ │工程师│技术员│合计│ ) │ │ │

├────┼────┼───┼───┼──┼───┼──────┼──┤

│第一批 │ │ │ │ │ │ │ │

│第二批 │ │ │ │ │ │ │ │

│总 计 │ │ │ │ │ │ │ │

│ │ │ │ │ │ │ │ │

└────┴────┴───┴───┴──┴───┴──────┴──┘

展开阅读全文

篇17:外贸公司实习总结

范文类型:工作总结,适用行业岗位:外贸,企业,全文共 2559 字

+ 加入清单

一、实习的目的与意义

通过本次实习使我能够从理论高度上升到实践高度,更好的实现理论和实践的结合,为我以后工作和学习奠定初步的知识。

在本科专业教育中,实习是一个重要的实践性教学环节。通过实习,可以使我们熟悉自己将要从事行业的具体操作流程,增强感性认识,并可从中进一步了解、巩固与深化已经学过的理论和方法,提高发现问题、分析问题以及解决问题的能力。

二、实习内容

时间过的飞快,在__外贸有限公司为期两个月的实习结束了,在这段时间里,实习充实了我的学习生活,我学到了许多书本上无法体验的知识。通过实习,我感触颇多,得到许多新的认识,对许多问题多了深一层次的思考。实习,顾名思义,在实践中学习。在经过一段时间的学习之后,或者说当学习告一段落的时候,我们需要了解,自己的所学需要或应当如何应用在实践之中, 因为任何知识都源于实践,归于实践,所以,要将所学付诸实践,来检验所学。 然而,我们当然不希望实习仅止于此,那就太狭隘了。

首先我介绍一下我在公司所要做的事情:

1.客户询盘:一般在客户下订单之前,都会有相关的 order inquiry 给我们业务部,做一些细节上的了解。

2.报价:我们业务部及时回复客人查询,确定货物品名,型号,生产厂家, 数量,交货期,付款方式,包装规格及柜型等,并做好 performa invoice 给客户做正式报价。

3.得到订单:经过洽谈,收到客户正式的订单 purchase order。

4.下生产订单:得到客人的订单确认后,把订单转做成内部订单给采购部 让她给工厂下订单,安排工作计划。

5. 业务审批。

6.下达生产通知:业务部在确定交货期后,满足下列情况可下达生产通知,通知工厂按时生产:如果是 t/t 付款的客户,要确认定金已经到账。如果是西联付款的客户,要先确定付款是否已经到达本地的西联。

7.验货:在工厂把货物生产好,并发货到公司之后,要对所定货物进行查验,是否能用,质量是否过关,这些是必须要进行验证的,是基本原则,因为 要想稳定客户资源,这一部分就一定要做好的。

8.制备基本文件。工厂提供的装箱资料,制作出口合同,出口商业发票, 装箱单等文件。

9. 发货:通知货代来公司收货。并且把所以必备的单据叫给货代。

信念,坚持到底是获得成功的最主要条件。成功的业务员是先和客户当朋友再谈生意。 开始的一段时间我都主动在电话里以及网上和客户打招呼问好,后来慢慢的我的客户都会开始主动跟我打招呼。有时还会有客户主动打电话过来问候聊天,这样就增进了我与客户之间的交谈及友谊,让客户对我有个好的印象,对业务员来说,这些客户资源是日后最大的潜在力。 棘手的客户是业务员最好的老师。客户的抱怨应当被视为神圣的语言,任何 批评意见都应当乐于接受。正确处理客户的抱怨 :

一)、提高客户的满意度,

二)、 增加客户认牌购买倾向,

三)、丰厚的利润。

成交并非是销售工作的结束,而是下次销售活动的开始。销售工作不会有完结篇,它只会一再“从头开始”。成功的 人是那些从失败上汲取教训,而不为失败所吓倒的人,有一点业务员不可忘记,那就是从失败中获得的教训,远比从成功中获得的经验更容易牢记在心。不能命中靶子决不归咎于靶子。买卖不成也决不是客户的过错。问一问任何一个专业业务员成功的秘诀,他一定回答:坚持到底。世界上什么也不能代替执着。天分不能--有天分但一事无成的人到处都是: 聪明不能--人们对一贫如洗的聪明人司空见惯,教育不能--世界上有教养但到处碰壁的人多的是。唯有执着和决心才是最重要的。记住:最先亮的灯最先灭。不要做一日之星。执着才能长久。一个人到了年老的时候,又穷又苦,那并不是那个人以前做错了什么,而是他什么都没有做。业务员一定要有强硬的心理承受能力。被客户无理轰骂,无理挂掉电话是常有的事情。有次和一客户明明一直谈的好好的,突然就来一句,那就不要谈了,挂掉了电话。但是下次再打电话给他时,一样要记住保持满脸笑容,声音愉快,好像上次不愉快的事情根本没发生。在学校的象牙塔里待了十几年,一夕之间身份由学生变成了社会人,刚开始真的很难适应,所有的角色和职责都转变了,出来工作,不再有人告诉你,什么你该做什么不该做,也没有老师在旁教你错误如何改正,一旦犯了,就要去承担,这就是社会人的责任。

三、收获与感想

八个星期的实习,让我能够对外贸业务有初步的了解,很庆幸有机会可以接触到客户,这对于我以后的工作和继续深造都是一个很好的平台。仔细总结,发现不同于前几次实习,这次校外实习充分认识了从学校走向社会我们存在的不足和缺少工作经验。自身定位,加强外语学习。在所有的工作和活动中无一例外的涉及到外语,外语是我们对外交流的桥梁,因此在以后的学习中必须加强对外语的学习,同时加强口语的练习,这是我们搞外贸的基础,因此必须掌握好这门工具。不断强化自身,并充分认识自己,避免眼高手低,增加实际动手能力,在社会这个大学校 里,不断完善和学习 工作总结,认识自身不足。外贸看中的还是经验,经验的累积对以后是一笔丰富的财富。虽然开始很辛苦,但是前景很好。实习中同事和老总的对我的帮助很大,告诉我做人做事。以后的路还很长,要学的还很多,我希望能够走好每一步。经过这次实习,我不仅从中学到了很多课本上所没有提及的知识,更重要的是,这是我踏入社会的第一步。虽然只工作了两个多月的时间,但是也让我看到了自己的很多不足,让我深知出身社会,还需要很多学校里学不到的能力,年少的我们,还应该更加努力,尽快学会在社会上独立,敢于参加与社会竞争,敢 于承受社会压力,使自己能够在社会上快速成长。这段时间给了我一次成长的机 会,让我受益匪浅。

在成功结束实习后,通过实习我发现贸易这专业是门实践性很强的专业,它不光要求我们有扎实的理论知识而且必须具有很强的动手操作能力,更重要的是学会如何与人沟通,怎么建立商业关系,这些是课本中学不到的,只有融入社会的大舞台并不断的历练才能得到提高,还有加强各方面素质的提高。贸易工作同时是一个涉外行业,因此对各方面的要求都很高,对外代表的不仅仅是个人形象,甚至是国家形象,因此必须加强自己各方面素质的修炼,如礼仪等。熟 练掌握好本专业的知识。专业知识是我们从事贸易工作的基础,贸易工作的高风 险要求我们必须熟练地掌握好专业知识。

展开阅读全文

篇18:进口新能源车辆转让协议书

范文类型:合同协议,适用行业岗位:外贸,全文共 762 字

+ 加入清单

甲方: 住址:

乙方: 住址: 担保人: 地址:

甲方将富迪牌皮卡车转让于乙方。现订立车辆转让协议如下:

第一条:因双方交易车辆为旧机动车车辆,故双方签定协议时均对车身及发动机工作状况表示认同。

第二条: 价格:经双方协商该车的转让价为人民币¥48000元(大写:肆万捌仟圆整。

第三条: 权利义务:

1.甲方向乙方转让车辆时提供车辆证件;说明该车的现状。

2.乙方在购车时应认真检查甲方所提供的车辆证件、手续是否齐全。并且应对所购车辆的功能及外观进行认真检查、确认。乙方在购买该车后甲方概不负责车辆的维修以及相关规费的缴纳(注:该车辆登记证乙方付清款后方可拿证,该证乙方向甲方买车所欠的费用作抵押)。

第四条: 车辆过户:车辆必须在 年 月 日前过户,过户费用由 方承担。由甲、乙双方到车管所办理车辆过户手续,甲方协助办理。如果不过户,乙方要承担一切法律责任及后果。从卖车之日起发生的所有的一切责任由乙方负责。

第五条:售后责任:自合同签定之日起,车辆发生的一切纠纷均由乙方负责,甲方概不负责。在此之前甲方的所有债权、债务由甲方负责。

第六条 结算方式及期限:乙方将车辆验收合格后,按照第二条规定车辆价格,乙方首付甲方叁万圆人民币(¥:30000元),剩余壹万捌仟圆(¥18000元)在农历20xx年12月15日前一次性付清给甲方。如有违约由担保人负责(或甲方有权扣押甲方所出售给乙方的车辆)。

第七条: 合同文本:本合同一式二份,双方各执一份。

第八条: 合同效力:本合同经买卖双方签字盖章后生效。

第九条: 违约责任:按(民法典)参照执行;解决合同纠纷的方式:双方友好协商,协商不成时任何一方可向所在地仲裁或向所在地人民法院起诉。

甲方: 乙方:

身份证号码: 身份证号码:

联系电话: 联系电话:

担保人:

身份证号码:

联系电话:

签定时间: 年 月 日

展开阅读全文

篇19:业务操作知识培训心得

范文类型:心得体会,适用行业岗位:培训,全文共 671 字

+ 加入清单

物业管理经理需要丰富的工作经验和深厚的工程知识背景,他们主持设施的日常运行操作、维修和保养的技术管理,安排客户报修的接待、报修,管理物业的保安、消防、保安、清洁、绿化,检查与指导维修人员等相关工作。经历越多就越能胜任,工作起来也会越发的游刃有余。

为进一步打造学习型企业,培养复合型的高素质物业管理人员,公司组织我们进行了《职业经理培训》和光华管理材料的学习,我通过网络学习和相关资料的查阅,了解和掌握了现代物业管理企业管理的有关知识,不但提高了个人的综合素质,也使我对物业管理工作的管理协调有了进一步的认识。以下就个人心得谈一些看法: 物业管理职业经理应当是具备物业管理行业注册资质可以全面地承担一个物业管理企业或一个物业管理项目的运作,能够有效地组织人、财、物各项资源,独挡一面地带动组织为客户提供专业的物业经营、管理服务。

基本内容编辑

1、工作内容:

主持设施的日常运行操作、维修和保养的技术管理工作;

安排客户报修的接待、报修工作;

管理物业的保安、消防、保安、清洁、绿化等工作;

检查与指导维修人员工作;

核算及监督房屋、大厦的水电费和管理费。

2、职业要求

教育培训:

物业管理或相关专业大专以上学历。

工作经验:

3年以上物业管理从业经验;有较强的责任心、服务意识及团队合作精神,善于与人沟通;工作踏实,能承担较大的工作压力。

3、薪资行情

全国平均年薪为4.7万元;上海市平均年薪为6.1万元。

4、职业发展路径

物业管理经理需要物业管理或相关专业大专以上学历,以及一定年限的管理从业经验,如果是持有物业管理师证的则更受欢迎。其一般是由物业管理专员晋升而来。

展开阅读全文

篇20:委托代理货物出口配舱合同

范文类型:委托书,合同协议,适用行业岗位:外贸,全文共 357 字

+ 加入清单

甲方:_________________

乙方:_________________

地址:_________________

甲乙双方于年月日签订第(01602)号委托代理合同,现经甲乙双方协商一致,双方自愿解除合同,并达成以下合意:

1.乙方终止代理甲方与的纠纷,乙方不再承担原委托合同中的代理义务;

2.乙方应当退还甲方所签署的授权委托书;

3.乙方应配合退还甲方已支付的代理费;

4.甲方应当出具收到诉讼费退款的收据;

5.甲方自收到诉讼费用之日终止与乙方之间的委托代理关系,乙方不再因委托合同而对乙方承担任何义务;

6.本合同自双方当事人签字盖章之日起生效;

7.本合同一式两份,甲乙双方各执一份。

甲方:_________________

乙方律师:_________________

乙方主管:_________________

展开阅读全文