0

英文合同怎么说热门20篇

浏览

389

范文

60

国际专利许可合同附英文[页18]_合同范本

范文类型:合同协议,全文共 1505 字

+ 加入清单

国际专利许可合同(附英文)

responsi-bilityfor keeping secret the part(s) or all of the technology already published.

10.3 after the termination of the contract, party a shall have the rigbt to use

theatents supplide by b, i. e. paryt a shall still have the right to design,

manufacture,use,and export contract products.

article 11 infringement

11.1 party b guarantees that it is the legitimate owner of the patent to the

stipulations of the contract, and that it is lawfully in a position to transfer the

patent to party a. of accusation of infringing the rights of a third party occurs,

party b shall be responsible for the matter and fully the legal and

economicresponsibilities trising therefrom

11.2 a complete list of party b’s patents and patent applications relevant to

contrarct product are specified in appendixl to the contract. within one month after the

contract has comeinto force party b shall despatch to party a two photostat copies of

the letters patentsand patent application(s).

article l2 taxes and duties

12.1 ail taxes, customs duties and other excises arising in connection with the

perfor-mance of the contract outside the territory of party a’s country shall be borne

by partyb.

12.2 in the execution of the contract, any income made by party b within the

territory of china shall be subject to taxation according to the tax laws of the people`s

republic of china.

article l3 force majeure

13.1 if either of the contracting parties is prevented from executing the contract

共21页,当前第18页123456789101112131415161718192021

展开阅读全文

更多相似范文

篇1:般货物出口合同格式附英文_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 20460 字

+ 加入清单

一般货物出口合同格式(附英文

合同号码: 签约日期: 买方: 卖方: 本合同由买卖双方缔结,用中、英文字写成,两种文体具有同等效力,按照下述条款,卖方同意售出买方同意购进以下商品: 「章名」 第一部分 1.商品名称及规格 2.生产国别及制造厂商 3.单价(包装费用包括在内) 4.数量 5.总值 6.包装(适合海洋运输) 7.保险(除非另有协议,保险均由买方负责) 8.装船时间 9.装运口岸 10.目的口岸 11.装运唛头,卖方负责在每件货物上用牢固的不褪色的颜料明显地刷印或标明下述唛头,以及目的口岸、件号、毛重和净重、尺码和其它买方要求的标记。如系危险及/或有毒货物,卖方负责保证在每件货物上明显地标明货物的性质说明及习惯上被接受的标记。 12.付款条件:买方于货物装船时间前一个月通过______银行开出以卖方为抬头的不可撤销信用证,卖方在货物装船启运后凭本合同交货条款第18条A款所列单据在开证银行议付贷款。上述信用证有效期将在装船后15天截止。 13.其它条件:除非经买方同意和接受,本合同其它一切有关事项均按第二部分交货条款之规定办理,该交货条款为本合同不可分的部分,本合同如有任何附加条款将自动地优先执行附加条款,如附加条款与本合同条款有抵触,则以附加条款为准。 「章名」 第二部分 「章名」 14.FOB/FAS条件 14.1.本合同项下货物的装运舱位由买方或买方的运输代理人___________租订。 14.2.在FOB条件下,卖方应负责将所订货物在本合同第8条所规定的装船期内按买方所通知的任何日期装上买方所指定的船只。 14.3.在FAS条件下,卖方应负责将所订货物在本合同第8条所规定的装船期内按买方所通知的任何日期交到买方所指定船只的吊杆下。 14.4.货物装运日前10-15天,买方应以电报或电传通知卖方合同号、船只预计到港日期、装运数量及船运代理人的名称。以便卖方经与该船运代理人联系及安排货物的装运。卖方应将联系结果通过电报或电传及时报告买方。如买方因故需要变更船只或者船只比预先通知卖方的日期提前或推迟到达装运港口,买方或其船运代理人应及时通知卖方。卖方亦应与买方的运输代理或买方保持密切联系。 14.5.如买方所订船只到达装运港后,卖方不能在买方所通知的装船时间内将货物装上船只或将货物交到吊杆之下,卖方应负担买方的一切费用和损失,如空舱费、滞期费及由此而引起的及/或遭受的买方的一切损失。 14.6.如船只撤换或延期或退关等而未及时通知卖方停止交货,在装港发生的栈租及保险费损失的计算,应以代理通知之装船日期(如货物晚于代理通知之装船日期抵达装港,应以货物抵港日期)为准,在港口免费堆存期满后第十六天起由买方负担,人力不可抗拒的情况除外。上述费用均凭原始单据经买方核实后支付。但卖方仍应在装载货船到达装港后立即将货物装船,交负担费用及风险。 「章名」 15.C&F条件 15.1.卖方在本合同第8条规定的时间之内应将货物装上由装运港到中国口岸的直达船。未经买方事先许可,不得转船。货物不得由悬挂中国港口当局所不能接受的国家旗帜的船装载。 15.2.卖方所租船只应适航和适货。卖方租船时应慎重和认真地选择承运人及船只。买方不接受非保赔协会成员的船只。 15.3.卖方所租载货船只应在正常合理时间内驶达目的港。不得无故绕行或迟延。 15.4.卖方所租载货船只船龄不得超过15年。对超过15年船龄的船只其超船龄额外保险费应由卖方负担。买方不接受船龄超过二十年的船只。 15.5.一次装运数量超过一千吨的货载或其它少于一千吨但买方指明的货载,卖方应在装船日前至少10天用电传或电报通知买方合同号、商品名称、数量、船名、船龄、船籍、船只主要规范、预计装货日、预计到达目的港时间、船公司名称、电传和电报挂号。 15.6.一次装运一千吨以上货载或其它少于一千吨但买方指明的货载,其船长应在该船抵达目的港前7天和24小时分别用电传或电报通知买方预计抵港时间、合同号、商品名称及数量。 15.7.如果货物由班轮装运,载货船只必须是______船级社最高船级或船级协会条款规定的相同级别的船级,船只状况应保持至提单有效期终了时止,以装船日为准船龄不得超过20年。超过20年船龄的船只,卖方应负担超船龄外保险费。买方绝不接受超过25年船龄的船只。 15.8.对于散件货,如果卖方未经买方事前同意而装入集装箱,卖方应负责向买方支付赔偿金,由双方在适当时间商定具体金额。 15.9.卖方应和载运货物的船只保持密切联系,并以最快的手段通知买方船只在途中发生的一切事故,如因卖方未及时通知买方而造成买方的一切损失卖方应负责赔偿。 「章名」 16.CIF条件 在CIF条件下,除本合同第15条C&F条件适用之外卖方负责货物的保险,但不允许有免赔率。 「章名」 17.装船通知 货物装船完毕后48小时内,卖方应即以电报或电传通知买方合同号、商品名称、所装重量(毛/净)或数量、发票价值、船名、装运口岸、开船日期及预计到达目的港时间。如因卖方未及时用电报或电传给买方以上述装船通知而使买方不能及时保险,卖方负责赔偿买方由此而引起的一切损害及/或损失。 「章名」 18.装船单据 18.A.卖方凭下列单据向付款银行议付货款: 18.A.1.填写通知目的口岸的__________运输公司的空白抬头、空白背书的全套已装运洋轮的清洁提单(如系C&F/CIF条款则注明“运费已付”,如系FOB/FAS条款则注明“运费待收”)。 18.A.2.由信用证受益人签名出具的发票5份,注明合同号、信用证号、商品名称、详细规格及装船唛头标记。 18.A.3.两份由信用证受益人出具的装箱单及/或重量单,注明每件货物的毛重和净重及/或尺码。 18.A.4.由制造商及/或装运口岸的合格、独立的公证行签发的品质检验证书及数量或重量证书各两份,必须注明货物的全部规格与信用证规定相符。 18.A.5.本交货条件第17条规定的装船通知电报或电传副本一份。 18.A.6.证明上述单据的副本已按合同要求寄出的书信一封。 18.A.7.运货船只的国籍已经买主批准的书信一封。 18.A.8.如系卖方保险需提供投保不少于发票价值110%的一切险和战争险的保险单。 18.B.不接受影印、自动或电脑处理、或复印的任何正本单据,除非这些单据印有清晰的“正本”字样,并经发证单位授权的领导人手签证明。 18.C.联运提单、迟期提单、简式提单不能接受。 18.D.受益人指定的第三者为装船者不能接受,除非该第三者提单由装船者背书转受益人,再由受赠人背书后方可接受。 18.E.信用证开立日期之前出具的单据不能接受。 18.F.对于C&F/CIF货载,不接受租船提单,除非受益人提供租船合同、船长或大副收据、装船命令、货物配载图及或买方在信用证内所要求提供的其它单据副本各一份。 18.G.卖方须将提单、发票及装箱单各两份副本随船带交目的口岸的买方收货代理人_______________。 18.H.载运货船启碇后,卖方须立即航空邮寄全套单据副本一份给买方,三份给目的口岸的对外贸易运输公司分公司。 18.I.卖方应负责赔偿买方因卖方失寄或迟寄上述单据而使买方遭受的一切损失。 18.J.中华人民共和国境外的银行费用由卖方负担。 「章名」 19.合同所订货物如用空运,则本合同有关海运的一切条款均按空运条款执行。 「章名」 20.危险品说明书 凡属危险品及/或有毒,卖方必须提供其危险或有毒性能、运输、仓储和装卸注意事项以及防治、急救、消防方法的说明书,卖方应将此项说明书各三份随同其他装船单据航空邮寄给买方及目的口岸的____________________运输公司。 「章名」 21.检验和索赔 货物在目的口岸卸毕60天内(如果用集装箱装运则在开箱后60天)经中国进出口商品检验局复验,如发现品质、数量或重量以及其它任何方面与本合同规定不符,除属于保险公司或船行负责者外,买方有权凭上述检验局出具的检验证书向卖方提出退货或索赔。因退货或索赔引起的一切费用包括检验费、利息及损失均由卖方负担。在此情况下,凡货物适于抽样及寄送时如卖方要求,买方可将样品寄交卖方。 「章名」 22.赔偿费 因“人力不可抗拒”而推迟或不能交货者除外,如果卖方不能交货或不能按合同规定的条件交货,卖方应负责向买方赔偿由此而引起的一切损失和遭受的损害,包括买价及/或买价的差价、空舱费、滞期费,以及由此而引起的直接或间接损失。买方有权撤销全部或部分合同,但并不妨碍买方向卖方提出索赔的权利。 「章名」 23.赔偿例外 由于一般公认的“人力不可抗拒”原因而不能交货或延迟交货,卖方或买方都不负责任。但卖方应在事故发生后立即用电报或电传告买方并在事故发生后15天内航空邮寄买方灾害发生地点之有关政府机关或商会所出具的证明,证实灾害存在。如果上述“人力不可抗拒”继续存在60天以上,买方有权撤销合同的全部或一部。 「章名」 24.仲裁 双方同意对一切因执行和解释本合同条款所发生的争议,努力通过友好协商解决。在争议发生之日起一个合理的时间内,最多不超过90天,协商不能取得对买卖双方都满意的结果时,如买方决定不向他认为合适的有管辖权的法院提出诉讼,则该争议应提交仲裁。除双方另有协议,仲裁应在中国北京举行,并按中国国际贸易促进委员会对外贸易仲裁委员会所制订的仲裁规则和程序进行仲裁,该仲裁为终局裁决,对双方均有约束力。仲裁费用除非另有决定,由败诉一方负担。 卖方: 买方: 「名称」 1. PURCHASE CONTRACT 「题注」 「章名」 Whole Doc. Contract No: Date: The Buyer: The Seller: The Contract, made out, in Chinese and English, both version being equally authentic, by and between the Seller and the Buyer whereby the Seller agrees to sell and the Buyer agrees to buy the undermentioned goods subject to terms and conditions set forth hereinafter as follows: 「章名」 SECTION 1 1 Name of Commodity and specification 2 Country of Origin & Manufacturer 3 Unit Price (packing charges included) 4 Quantity 5 Total Value 6 Packing (seaworthy) 7 Insurance (to be covered by the Buyer unless otherwise) 8 Time of Shipment 9 Port of Loading 10 Port of Destination mark shown as below in addition to the port of destination, package number, gross and net weights, measurements and other marks as the Buyer may require stencilled or marked conspicuously with fast and unfailing pigments on each package. In the case of dangerous and/or poisonous cargo (es), the Seller is obliged to take care to ensure that the nature and the generally adopted symbol shall be marked conspicuously on each package. 12 Terms of Payment: One month prior to the time of shipment the Buyer shall open with the Bank of _______an irrevocable Letter of Credit in favour of the Seller payable at the issuing bank against presentation of documents as stipulated under Clause 18. A. of SECTION II, the Terms of Delivery of this Contract after departure of the carrying vessel. The said Letter of Credit shall remain in force till the 15th day after shipment. 13 Other Terms: Unless otherwise agreed and accepted by the Buyer, all other matters related to this contract shall be governed by Section II, the Terms of Delivery which shall form an integral part of this Contract. Any supplementary terms and conditions that may be attached to this Contract shall automatically prevail over the terms and conditions of this Contract if such supplementary terms and conditions come in conflict with terms and conditions herein and shall be binding upon both parties. FOR THE SELLER FOR THE BUYER 「章名」 SECTION 2 「章名」 14 FOB/FAS TERMS 14.1 The shipping space for the contracted goods shall be booked by the Buyer or the Buyer‘s shipping agent __________. 14.2 Under FOB terms, the Seller shall undertake to load the contracted goods on board the vessel nominated by the Buyer on any date notified by the Buyer, within the time of shipment as stipulated in Clause 8 of this Contract. 14.3 Under FAS terms, the Seller shall undertake to deliver the contracted goods under the tackle of the vessel nominated by the Buyer on any date notified by the Buyer, within the time of shipment as stipulated in Clause 8 of this Contract. 14.4 10-15 days prior to the date of shipment, the Buyer shall inform the Seller by cable or telex of the contract number, name of vessel, ETA of vessel, quantity to be loaded and the name of shipping agent, so as to enable the Seller to contact the shipping agent direct and arrange the shipment of the goods. The Seller shall advise by cable or telex in time the Buyer of the result thereof. Should, for certain reasons, it become necessary for the Buyer to replace the named vessel with another one, or should the named vessel arrive at the port of shipment earlier or later than the date of arrival as previously notified to the Seller, the Buyer or its shipping agent shall advise the Seller to this effect in due time. The Seller shall also keep in close contact with the agent or the Buyer. 14.5 Should the Seller fail to load the goods on board or to deliver the goods under the tackle of the vessel booked by the Buyer. Within the time as notified by the Buyer, after its arrival at the port of shipment the Seller shall be fully liable to the Buyer and responsible for all losses and expenses such as dead freight, demurrage. Consequential losses incurred upon and/or suffered by the Buyer. 14.6 Should the vessel be withdrawn or replaced or delayed eventually or the cargo be shutout etc., and the Seller be not informed in good time to stop delivery of the cargo, the calculation of the loss in storage expenses and insurance premium thus sustained at the loading port shall be based on the loading date notified by the agent to the Seller (or based on the date of the arrival of the cargo at the loading port in case the cargo should arrive there later than the notified loading date)。 The abovementioned loss to be calculated from the 16th day after expiry of the free storage time at the port should be borne by the Buyer with the exception of Force Majeure. However, the Seller shall still undertake to load the cargo immediately upon the carrying vessel‘s arrival at the loading port at its own risk and expenses. The payment of the afore-said expenses shall be effected against presentation of the original vouchers after the Buyer’s verification. 「章名」 15 C&F Terms 15.1 The Seller shall ship the goods within the time as stipulated in clause 8 of this Contract by a direct vessel sailing from the port of loading to China port. Transhipment on route is not allowed without the Buyer‘s prior consent. The goods shall not be carried by vessels flying flags of countries not acceptable to the Port Authorities of China. 15.2 The carrying vessel chartered by the Seller shall be seaworthy and cargoworthy. The Seller shall be obliged to act prudently and conscientiously when selecting the vessel and the carrier when chartering such vessel. The Buyer is justified in not accepting vessels chartered by the Seller that are not members of the PICLUB. 15.3 The carrying vessel chartered by the Seller shall sail and arrive at the port of destination within the normal and reasonable period of time. Any unreasonable aviation or delay is not allowed. 15.4 The age of the carrying vessel chartered by the Seller shall not exceed 15 years. In case her age exceeds 15 years, the extra average insurance premium thus incurred shall be borne by the Seller. Vessel over 20 years of age shall in no event be acceptable to the Buyer. 15.5 For cargo lots over 1,000 M/T each, or any other lots less than 1,000 metric tons but identified by the Buyer, the Seller shall, at least 10 days prior to the date of shipment, inform the Buyer by telex or cable of the following information: the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name, telex and cable address of the carrier. 15.6 For cargo lots over 1,000 M/T each, or any other lots less than 1,000 metric tons but identified by the Buyer, the Master of the carrying vessel shall notify the Buyer respectively 7 (seven) days and 24 (twenty-four) hours prior to the arrival of the vessel at the port of destination, by telex or cable about its ETA (expected time of arrival), contract number, the name of commodity, and quantity. 15.7 If goods are to be shipped per liner vessel under liner Bill of Lading, the carrying vessel must be classified as the highest ____________ or equivalent class as per the Institute Classification Clause and shall be so maintained throughout the duration of the relevant Bill of Lading. Nevertheless, the maximum age of the vessel shall not exceed 20 years at the date of loading. The seller shall bear the average insurance premium for liner vessel older than 20 years. Under no circum -stances shall the Buyer accept vessel over 25 years of age. 15.8 For break bulk cargoes, if goods are shipped in containers by the Seller without prior consent of the Buyer, a compensation of a certain amount to be agreed upon by both parties shall be payable to the Buyer by the Seller. 15.9 The Seller shall maintain close contact with the carrying vessel and shall notify the Buyer by fastest means of communication about any and all accidents that may occur while the carrying vessel is on route. The Seller shall assume full responsibility and shall compensate the Buyer for all losses incurred for its failure to give timely advice or notification to the Buyer. 「章名」 16 CIF Terms: Under CIF terms, besides Clause 15 C&F Terms of this contract which shall be applied the Seller shall be responsible for covering the cargo with relevant insurance with irrespective percentage. 「章名」 17 Advice of Shipment: Within 48 hours immediately after completion of loading of goods on board the vessel the Seller shall advise the Buyer by cable or telex of the contract number, the name of goods, weight (net/gross) or quantity loaded, invoice value, name of vessel, port of loading, sailing date and expected time of arrival (ETA) at the port of destination. Should the Buyer be unable to arrange insurance in time owing to the Seller‘s failure to give the above mentioned advice of shipment by cable or telex, the Seller shall be held responsible for any and all damages and/or losses attributable to such failure. 「章名」 18 Shipping Documents 18.A The Seller shall present the following documents to the paying bank for negotiation of payment: 18.A.1 Full set of clean on board, “freight prepaid” for C&F/CIF Terms or “Freight to collect” for FOB/FAS Terms, Ocean Bills of Lading, made out to order and blank endorsed, notifying ___________at the port of destination. 18.A.2 Five copies of signed invoice, indicating contract number, L/C number, name of commodity, full specifications, and shipping mark, signed and issued by the Beneficiary of Letter of Credit. 18.A.3 Two copies of packing list and/or weight memo with indication of gross and net weight of each package and/or measurements issued by beneficiary of Letter of Credit. 18.A.4 Two copies each of the certificates of quality and quantity or weight issued by the manufacturer and/or a qualified independent surveyor at the loading port and must indicate full specifications of goods conforming to stipulations in Letter of Credit. 18.A.5 One duplicate copy of the cable or telex advice of shipment as stipulated in Clause 17 of the Terms of Delivery. 18.A.6 A letter attesting that extra copies of abovementioned documents have been dispatched according to the Contract. 18.A.7 A letter attesting that the nationality of the carrying vessel has been approved by the Buyer. 18.A.8 The relevant insurance policy covering, but not limited to at least 110% of the invoice value against all and war risks if the insurance is covered by the Buyer. 18.B Any original document(s) made by rephotographic system, automated or computerized system or carbon copies shall not be acceptable unless they are clearly marked as “ORIGINAL.” and certified with signatures in hand writing by authorised officers of the issuing company or corporation. 18.C Through Bill of Lading, Stale Bill of Lading, Short Form Bill of Lading, shall not be acceptable. 18.D Third Party appointed by the Beneficiary as shipper shall not be acceptable unless such Third Party Bill of Lading is made out to the order of shipper and endorsed to the Beneficiary and blank endorsed by the Beneficiary. 18.E Documents issued earlier than the opening date of Letter of Credit shall not be acceptable. 18.F In the case of C&F/CIF shipments, Charter Party Bill of Lading shall not be acceptable unless Beneficiary provides one copy each of the Charter Party, Master‘s of Mate’s receipt, shipping order and cargo or stowage plan and/or other documents called for in the Letter of Credit by the Buyer. 18.G The seller shall dispatch, in care of the carrying vessel, two copies each of the duplicates of Bill of Lading. Invoice and Packing List to the Buyer‘s receiving agent, _______________at the port of destination. 18.H Immediately after the departure of the carrying vessel, the Seller shall airmail one set of the duplicate documents to the Buyer and three sets of the same to ______________________________ Transportation Corporation at the port of destination. 18.I The Seller shall assume full responsibility and be liable to the Buyer and shall compensate the Buyer for all losses arising from going astray of and/or the delay in the dispatch of the above mentioned documents. 18.J Banking charges outside the People‘s Republic of China shall be for the Seller’s account. 「章名」 19 If the goods under this Contract are to be dispatched by air, all the terms and conditions of this Contract in connection with ocean transportation shall be governed by relevant air terms. 「章名」 20 Instruction leaflets on dangerous cargo: For dangerous and/or poisonous cargo, the Seller must provide instruction leaflets stating the hazardous or poisonous properties, transportation, storage and handling remarks, as well as precautionary and first-air measures and measures against fire. The Seller shall airmail, together with other shipping documents, three copies each of the same to the Buyer and___________________ Transportation Corporation at the port of destination. 「章名」 21 Inspection & claims: In case the quality, quantity or weight of the goods be found not in conformity with those as stipulated in this Contract upon re-inspection by the China Commodity Import and Export inspection Bureau within 60 days after completion of the discharge of the goods at the port of destination or, if goods are shipped in containers, 60 days after the opening of such containers, the Buyer shall have the right to request the Seller to take back the goods or lodge claims against the Seller for compensation for losses upon the strength of the Inspection Certificate issued by the said Bureau, with the exception of those claims for which the insurers or owners of the carrying vessel are liable, all expenses including but not limited to inspection fees, interest, losses arising from the return of the goods or claims shall be borne by the Seller. In such a case, the Buyer may, if so requested, send a sample of the goods in question to the Seller, provided that sampling and sending of such sample is feasible. 「章名」 22 Damages: With the exception of late delivery or non-delivery due to “Force Majeure” causes, if the Seller fails to make delivery of the goods in accordance with the terms and conditions, jointly or severally, of this Contract, the Seller shall be liable to the Buyer and indemnify the Buyer for all losses, damages, including but not limited to, purchase price and/or purchase price differentials, deadfreight, demurrage, and all consequential direct or indirect losses. The Buyer shall nevertheless have the right to cancel in part or in whole of the contract without prejudice to the Buyer‘s right to claim compensations. 「章名」 23 Force Majeure: Neither the Seller or the Buyer shall be held responsible for late delivery or non-delivery owing to generally recognized “Force Majeure”causes. However in such a case, the Seller shall immediately advise by cable or telex the Buyer of the accident and airmail to the Buyer within 15 days after the accident, a certificate of the accident issued by the competent government authority or the chamber of commerce which is located at the place where the accident occurs as evidence thereof. If the said “Force Majeure” cause lasts over 60 days, the Buyer shall have the right to cancel the whole or the undelivered part of the order for the goods as stipulated in Contract. 「章名」 24 Arbitration: Both parties agree to attempt to resolve all disputes between the parties with respect to the application or interpretation of any term hereof of transaction hereunder, through amicable negotiation. If a dispute cannot be resolved in this manner to the satisfaction of the Seller and the Buyer within a reasonable period of time, maximum not exceeding 90 days after the date of the notification of such dispute, the case under dispute shall be submitted to arbitration if the Buyer should decide not to take the case to court at a place of jurisdiction that the Buyer may deem appropriate. Unless otherwise agreed upon by both parties, such arbitration shall be held in ________, and shall be governed by the rules and procedures of arbitration stipulated by the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade. The decision by such arbitration shall be accepted as final and binding upon both parties. The arbitration fees shall be borne by the losing party unless otherwise awarded.

展开阅读全文

篇2:英文补充协议_合同范本

范文类型:合同协议,全文共 2306 字

+ 加入清单

英文补充协议

Supplementary agreement

In order to guarantee the interests of the school and the foreign teacher and facilitate the smooth development of teaching and the foreign teacher’s safe and orderly life, we clarify our respective responsibility further and add additional terms listed as follows: Party a:Party b:

1, the rented accommodation is only for the teacher. The foreign

teacher shouldn’t allow others to live in the apartment in order to avoid accidents.

2, during the work, the foreign teacher should have the civilized words and deeds and won’t develop any improper friendship or relationship (such as love, etc.) with students.

3, the foreign teacher will bear the cost of utilities (such as water bill) and Internet flow fee (90yuan per month). The school is only

responsible for the accommodation expenses, not including other living expenses.

As the foreign teacher first comes to Beijing, he is not familiar with a lot of things. To show humanistic care, the school has paid the power bill (600 yuan for 1200 degrees). By November 30, if the actual

consumption power number is more than 1200 degrees, the foreign teacher should pay the rest. If the foreign teacher continues to teach in CuiWei middle school, the school will bear the cost of 200 degrees per month, but the excess part is borne by the foreign teacher. The school has installed the broadband network and the foreign

teacher should burden Internet flow fee (about 90 yuan ) every month. So the foreign teacher will pay 270 yuan for the cost of 3 months.

4, the foreign teacher shall observe the school’s work system and regulations concerning administration of subject teachers such as job duties, classroom norms, work discipline, school group activities. Also, the foreign teacher shall complete the tasks agreed on schedule and guarantee the quality of work. At the same time, the school will also ensure his corresponding welfare.

Party a: Party b:

Signature: Signature:

In September of 20xx

补充协议范本

合同编号:项目名称:合同名称:甲 方:乙 方:签订时间:签订地点:合同补充协议 河北达辉建筑工程有限公司 年 月日

上述金额包括运输费、保险费、税金等一切费用;本合同单价为固定单价,最终按实际发生量结算。

2、其他合同条款调整。 3、其它事项说明。

三、本协议生效后,即成为《原协议》不可分割的组成部分,与《原协议》具有同等的法律效力。

四、本协议与原合同发生冲突时以本协议为准。

五、除本协议中明确所作修改的条款之外,原协议的其余部分应完全继续有效。

本协议一式四份,甲方执三份,乙方一份,具有同等法律效力,自双方签字盖章之日起生效。

以下无合同正文。

甲方:乙方: 委托代理人:委托代理人: 代表人: 代表人: 开户行: 开户行: 账号: 账号: 电话: 电话:

地址: 地址: 日期:日期:

展开阅读全文

篇3:国际专利许可合同附英文译本_合同范本

范文类型:合同协议,全文共 1380 字

+ 加入清单

国际专利许可合同(附英文译本)

甲方:_________ 乙方:_________

鉴于

乙方拥有合同所述专利技术;

乙方有权,并且也同意将专利技术的使用权、制造权和合同产品的销售权授予甲方;

甲方希望利用乙方的专利技术制造并销售合同的产品;

双方授权代表经友好协商,同意就以下条款签订本合同。

第一条 定义

本合同下列词语的含义:

1.1 专利技术,系指乙方目前拥有的或未来获得的和/或有权或可能有权控制的,或在本合同有效期间在世界任何国家许可转让的,适用于或可能适用于制造本合同产品的专利和专利申请。

1.2 合同产品,系指本合同附件二中规定的产品及其改进发展的产品。

1.3 甲方系指_________,或者该公司的法人代表、代理或财产继承者;

1.4 乙方系指_________,或者该公司的法人代表、代理或财产继承者;

1.5 合同工厂系指生产合同产品的场所,即_________;

1.6 备件,系指用以代替合同产品或其任何部分的备用件;

1.7 部件,系指乙方随时书面允许甲方生产和销售的合同产品的构件及零配件;

1.8 技术资料,系指列于附件一与制造和维修合同产品有关的工程、制造及原始资料,包括与制造设备、工具和装置有关的图纸、蓝本、设计图表、材料规格、照片、影印资料和一般资料,设计及其说明书等。但上述资料仅限于乙方拥有的资料和甲方用于本合同业务活动的资料;

1.9 净销售价,是指在扣除合同产品的包装费、安装费、运输费、商业和数量折扣、佣金、保险旨和税费之后的发票金额;

1.10 合同生效日,系指本合同双方管理机构和有关权力机关中最后一方批准合同的日期。

第二条 合同的内容和范围

2.1 甲方同意从乙方获得,乙方同意向甲方转让合同产品的专利技术。这种技术应与乙方最新产品的技术完全一致。

2.2 乙方以非独占方式许可甲方在中国设计和制造合同产品,以及销售和出口产品的权利。

2.3 乙方须向甲方提供与合同产品有关的专利技术资料和样机所需的配件,其具体内容和支付时间,详见本合同附件二。

2.4 本合同产品不包括乙方外购件的专利技术,但乙方必须问甲方提供外购件的样本和技术说明资料与制造厂商的名称。

2.5 乙方有责任接收、安排甲方赴乙方培训的技术人员,乙方应设法使其掌握上述合同产品专利技术。(详见本合同附件五)

2.6 乙方负责自费派遣技术人员赴甲方进行技术服务。(详见本合同附件六)

2.7 如甲方需要,乙方同意以最优惠的价格向甲方提供合同产品的零件、材料和配件等。具体内容双方另行协商

2.8 乙方同意甲方有权使用其商标,在合同产品上亦可以采取双方的联合商标、或者标明根据售证方的许可制造字样。

第三条 合同价格

3.1 按照第二条规定的内容和范围。本合同采用提成方式计算价格,计价的货币为_________。

3.2 本合同提成费的计算时间从合同生效之日后的第_________个月开始,按日历年度计算,每年的十二月三十一日为提成费的结算日。

3.3 提成费按当年度合同产口销售后的净销售价格计算,提成率为_________%,合同产品未销售出去的不应计算提成费。

3.4 在提成费结算日后10天之内甲方应以书面通知的形式向乙方提交上一年度合同产品的销售数量、净销售额和应支付的提成费,净销售额和提成费的具体计算方法详见本合同附件三。

共13页,当前第1页12345678910111213

展开阅读全文

篇4:国际专利许可合同附英文[页4]_合同范本

范文类型:合同协议,全文共 1303 字

+ 加入清单

国际专利许可合同(附英文)

9.3.如果乙方提供的技术资料不符合第六条规定,乙方必须在收到甲方书面通知后30天内免费将所缺的技术资料,或清晰、正确的资料寄给甲方。

9.4.如乙方的技术资料不能按本合同附件二规定的时间交付,乙方则须按下列比例支付罚款给甲方:

(1)迟交1至4周,罚款为合同总价的x%;

(2)迟交5至8周,罚款为合同总价的x%;

(3)迟交超过8周,罚款为合同总价的x%;

9.5.乙方按本条规定被罚款时,并不解除其继续交付技术资料的义务。

9.6.如果动方迟交技术资料6个月以上,甲方有权终止合同。乙方须将甲方已给交付的全部金额,并加年利x%的利息,一并退还甲方。

9.7.由于乙方责任,验收不合格,造成甲方有能正常投产而终止合同时,乙方应退还甲方已经支付给乙方的全部金额,并加年利x%的利息。

9.8.如因乙原因,产品部分性能指标没能达到合同产品的规定时,机具体情况,乙方须按合同总价x%予以赔偿,但是,若因甲方原因产品没能达到性能指标时,甲方应按合同规定支付金部金额。

第十条 保密

10.1.乙方根据本协议所提供的一切图纸、设计、说明书及其他技术资料,甲方均须严格保密;未得到乙方的书面同意,不得以任何方式出售、转让或泄露给任何人,但不包括甲方为生产合同而使用技术资料的雇员。但是,甲方可以向分包合同人提供生产合同产品部件所必须的技术资料,分包人须书面保证对其所得到产技术资料承担严格的保密义务。

10.2.若上述技术资料由乙方或任何第三方部分或全部公开,则甲方对已公开的技术不再承担保密义务。

10.3.本合同终止后,甲方有权使用乙方所提供的专利,即甲方可以继续设计、制造、使用、销售和出口合同产品。

第十一条 侵权

11.1.乙方保证,它是依本合同条款转让给甲方的专利权的合法所有人,在法律上享有向甲方转让专利权的权利。若发生侵犯任何第三者权利的事件,则乙方应对侵权事件负责,并承担由此而产生的全部法律和经济责任。

11.2.本合同附件一列明乙方关于合同产品的专利和专利申清。合同生效后一个月内,乙方将向甲方提供2份专利证书和专利申请的影印本。

第十二条 税费

12.1.凡因履行本合同而发生在甲方国家以外的一切税费,均由乙方负担。

12.2.乙方因履行本合同而在中国境内获得的收入,必须按中国税法纳税。

第十三条 不可抗力

13.1.签约的任何一方,由于战争、严重水灾、火灾、台风、地震以及双方同意的其他不可抗力事故而无法按期执行合同时,则可延长合同的期限,延长期相当于事故所影响的时间。

13.2.受影响的一方应尽快将发生不可抗力事故的情况以电传或电报通知对方,并于此天内以航空挂号邮件将有关当局出具的证明文件提交另一方确认。

13.3如不可抗力事故延续到120天以上,双方应通过友好协商尽快解决合同继续执行的问题。

第十四条 仲裁

14.1.因执行本合同所发生的或与本合同有的一切争议,双方应通过友好协商解决。如经协商仍达不成协议时,则应提交仲裁解决。

14.2.仲裁将在瑞典斯德哥尔摩进行,由斯德哥尔摩商会仲裁院根据该院的章程进行仲裁。

共21页,当前第4页123456789101112131415161718192021

展开阅读全文

篇5:英文借贷合同实例[涉外文书]

范文类型:合同协议,全文共 2771 字

+ 加入清单

LOAN CONTRACT

Contract Number:

BORROWER:

Address:

LENDER:

Address:

In accordance with provisions of Contract Law of the Peoples Republic of China and Bank of China, after reviewing the status and the request of the Borrower, the Lender agrees to grant the Borrower a line of credit on . The Borrower, Lender and Guarantor, through friendly negotiation, have executed this Contract as follows:

ARTICLE 1 CURRENCY, AMOUNT AND TERM OF THE LOAN:

1. The Currency under this loan is Reiminbi.

2. The Line of the loan is yuan.

3. The period of this loan is 12 months from the date of effectiveness of this contract.

ARTICLE 2 THE PURPOSE OF THE LOAN:

1. The purpose of this loan is used for working capital turnover.

2. Without written approval of the Lender, the Borrower could not use the loan out of the scope of the purpose.

ARTICLE 3 INTEREST RATE AND CALCULATION OF INTEREST:

1. Interest rate: The interest rate shall be [*] During the loan term, if the countrys related authority adjusted the interest rate or the manner of calculation of interest, the interest of this contract shall be adjusted accordingly after one year from the date of execution of this contract.

The adjustment shall be conducted when the interest rate are executed one year.It is not obliged to inform the Borrower when the adjustment of interest.

2. The interest shall be calculated from the date of first drawdown and the actual days the borrower use. One year shall be calculated as 360 days.

3. The payment of interests: The Borrower shall pay the interests per quarter. The payment date shall be , and. If the payment for the last installment is not on the payment date,the interests shall deduct the interest from the bank account of the Borrower. In the event that the Borrower fails to pay the interests on time and the balance of the account of the Borrower is not enough for the payment of interest, the Lender shall have rights to collect a penalty being [*] of the outstanding amount per day for the Borrowers breach of contract.

ARTICLE 4 OVERDUE INTERESTS AND MISUSING INTERESTS

1. If the Borrower fails to repay the loan and can not reach a agreement with the Lender regarding the extension, the Lender shall collect an overdue penalty for [*] of the overdue amount per day.

2. If the Borrower fails to uses the loan in accordance with the provisions set forth in this contract, the Lender shall have right to charge a interests for the misusing part at a rate of [*] per day.

ARTICLE 5 ACCOUNT

The Borrower shall open Reiminbi basic account and/or foreign currency account at the Lender or Lenders branch for the use of draw-down, repayment,payment of interests and fees.

ARTICLE 6 DRAW-DOWN

1. The loan under this contract is revolving, the balance of this contract shall not more than the line of credit.

展开阅读全文

篇6:国际专利许可合同附英文译本[页2]_合同范本

范文类型:合同协议,全文共 1362 字

+ 加入清单

国际专利许可合同(附英文译本)

3.5 甲方依据本合同的专利许可,销售的合同产品一经付款则视为货已售出。

3.6 若在交付专利权使用费后,已售合同产品被退回或折价,甲方有权在以后支付的专利权使用费中扣除因此而多支付的专利权使用费。

3.7 乙方如需查核甲方的帐目时,应在接到甲方依上述第3.4款规定开出的书面通知后10天内通知甲方、其具体的查帐内容和程序详见本合同附件四。

第四条 支付条件

4.1 本合同第三条中规定的提成费,甲方将通过_________银行(此处为甲方的业务银行)和_________银行(此处为乙方的业务银行)支付给乙方,支付中使用的货币为_________。

4.2 乙方在收到甲方按第3.4条的规定发出的书面通知后应立即开具有关的单据,甲方在收到乙方出具的下列单据后三十天内。经审核无误,即支付提成费给乙方:

(1)提成费计算单一式四份;

(2)商业发票一式四份;

(3)即期汇票一式一份。

4.3 按本合同规定,如乙方需要向甲方支付罚款或赔偿时,甲方有权从上述支付中直接扣除。

第五条 技术服务和培训

5.1 技术服务

(1)乙方在合同有效期内派遣一名技术专家到甲方,对合同产品的图纸和技术资料进行解释,并就产品设计、制造、调试和检验,以及维修等方面进行技术指导,以使甲方在保证合同产品性能的情况下,能尽快采用国产的材料和元器件,实现合同产品的生产。

(2)乙方在合同有效期内分两次派遣技术人员赴甲方进行技术服务,共_________人日。

(3)第一次技术服务在合同生效后第六个月,乙方派遣技术人员1人赴甲方工厂,提供技术指导_________日。

(4)第二次技术服务在合同产品验收期间。乙方派技术人员1人赴甲方工厂,提供技术服务,时间为_________日。

(5)乙方负担其人员的旅差费。甲方负担由驻地到工厂的交通工具和膳宿费。

5.2 技术培训。

(1)乙方负责对甲方技术人员进行培训,使甲方受训人员掌握合同产品设计,性能测试,加工工艺,装配工艺和质量检查等技能,使甲方能用乙方提供的资料和专门知识,在合同工厂制造出与乙方产品质量相同的产品。乙方应设法安排甲方受训人员参观制造合同产品外购件的生产过程和合同产品的主要用户。

(2)甲方受训人员在协议期间分两批,_________人日以内(翻译除外)赴乙方接受培训。

(3)首批培训时间为合同生效后的第三至第四个月,甲方派技术人员_________人,翻译_________人到乙方工厂接受为期_________人日(每周5天工作日)的培训。内容为合同产品的设计和制造工艺。

(4)第二批培训人员的培训时间为合同生效后的第八至第九个月。甲方派技术人员_________人,翻译_________人到乙方工厂接受为期_________人日(每周5天工作日)的培训,培训内容为合同产品的设计、加工工艺、装配工艺和机器的调试。

(5)甲方负担受训人员的旅费。在乙方受训期间的膳宿费及驻地和工厂之间的交通工具由乙方负责提供。

第六条 技术资料

6.1 以乙方应按本合同附件二规定的内容和时间,在_________交付技术资料。

6.2 _________的邮戳日期,为技术资料的实际交付日期。甲方将带有到达印戳日期的空运提单影印本1份寄给乙方。

共13页,当前第2页12345678910111213

展开阅读全文

篇7:国际专利许可合同附英文[页3]_合同范本

范文类型:合同协议,全文共 1318 字

+ 加入清单

国际专利许可合同(附英文)

5.2.2.甲方受训人员在协议期间分两批,320人日以内〔翻译除外)赴乙方接受培训。

5.2.3.首批培训时间为合同生效后的第三至第四个月,甲方派技术人员4人,翻译1人到乙方工厂接受为期160人日(每周5天工作日)的培训。内容为合同产品的设计和制造工艺。

5.2.4.第二批培训人员的培训时间为合同生效后的第八至第九个月。甲方派技术人员4人,翻译1人到乙方工厂接受为期160人日(每周5天工作日)的培训,培训内容为合同产品的设计、加工工艺、装配工艺和机器的调试。

5.2.5.甲方负担受训人员的旅费。在乙方受训期间的膳宿费及驻地和工厂之间的交通工具由乙方负责提供。

第六条 技术资料

6.以乙方应按本合同附件二规定的内容和时间,在____交付技术资料。

6.2.____的邮戳日期,为技术资料的实际交付日期。甲方将带有到达印戳日期的空运提单影印本1份寄给乙方。

6.3在每批技术资料发运后24小时内,乙方应将合同号、空运提单号、空运报单日期、资料项目、件数、重量、航班号和预计抵达日期用电报或电传通知甲方。同时将空运提单和技术资料详细清单各一式2份寄给甲方。

6.4.若技术资料在空运中丢失、损坏、短缺,乙方应在收到甲方书面通知后30天内,免费外寄或重寄给甲方。在甲方收到技术资料后60天内,如果没有以书面形式提出资料不全或增补要求,则视为甲方验收。

6.5.技术资料采用英文,计量单位以公制表示。

第七条 考核与验收

7.1.合同产品的第一台样机,由甲、乙双方组成的联合考核小组,按附件七规定的时间和内容进行考核。如果符合附件一规定的技术要求,即可验收,并由双方代表签署合同产品考核 验收合格证书一式4份,双方各执两份。

7.2.如果合同产品的技术性能达不到规定的技术标准,双方应友好协商,共同研究,分析原因,采取措施,消除缺陷,进行第二次性能考核。考核合格后,双方签署考核合格证书。

7.3.如果第一次考核不合格是乙方责任,乙方应自费再次派遣技术人员进特第二次考核。

7.4.经过第二次考核仍不能合格验收,若责任在于乙方,刚乙方须赔偿甲方遭受的直接损失。并采取措施艄除缺陷,进行第三次考核。

7.5.经过第三次考核仍不合格,如系乙方责任,则甲方有权终止合同,并接第九条的规定处理。若系甲方责任,则由双方协商合同进一步执行的问题。

第八条 技术改进

8.1.乙方提供的技术资料,如有不适合甲方生产条件的(如设计标准、原材料、外购配件及共他生产设备等一,乙方有责任帮助甲方修改技术资料,闪加以确认。在不影响合同产品性能情况下,应采用中国产的原材料、配套元器件和设备。

8.2.在合同有效期内,双方对合同产品的任何改进和创新,都免费将改进或创新的技术资料提供给对方。

8.3.改进或创新的技术所有权属于改进或创新一方,另一方不得对其申请专利或将其转让给第三者。

第九条 保证和索赔

9.1.乙方保证所提供的技术资料是乙方经过实际使用的最新技术资料,并保证向甲方及时提供任何改进和发明的技术资料。

9.2.乙方保证所提供的技术资料是完整的、正确的、清晰的,并保证按时交付。

共21页,当前第3页123456789101112131415161718192021

展开阅读全文

篇8:英文销售合同

范文类型:合同协议,适用行业岗位:销售,全文共 755 字

+ 加入清单

编号:no:

日期:date:

签约地点:signedat:

卖方:sellers:

地址:address:邮政编码:postalcode:

电话:tel:传真:fax:

买方:buyers:

地址:address:邮政编码:postalcode:

电话:tel:传真:fax:

买卖双方同意按下列条款由卖方出售,买方购进下列货物:

1货号articleno.

2品名及规格description&specification

3数量quantity

4单价unitprice

5总值:

数量及总值均有_____%的增减,由卖方决定。

6生产国和制造厂家countryoforiginandmanufacturer

7包装:packing:

8唛头:shippingmarks:

9装运期限:timeofshipment:

10装运口岸:portofloading:

11目的口岸:portofdestination:

12保险:由卖方按发票全额110%投保至_____为止的_____险。

13付款条件:

买方须于_____年_____月_____日将保兑的,不可撤销的,可转让可分割的即期信用证开到卖方。信用证议付有效期延至上列装运期后15天在中国到期,该信用证中必须注明允许分运及转运。

14单据:documents:

15装运条件:termsofshipment:

16品质与数量、重量的异义与索赔:quality/quantitydiscrepancyandclaim:17人力不可抗拒因素:

由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。

展开阅读全文

篇9:货物进口合同附英文_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 12161 字

+ 加入清单

货物进口合同(附英文

合同编号(contract no.) :_______

签订日期(date) :___________

签订地点(signed at) :_________

买方:__________________________

the buyer:________________________

地址: __________________________

address: _________________________

电话(tel):___________ 传真(fax):__________

电子邮箱(e-mail):______________________

卖方:___________________________

the seller:_________________________

地址:___________________________

address: __________________________

电话(tel):_________ 传真(fax):___________

电子邮箱(e-mail):______________________

买卖双方同意按照下列条款签订本合同:

the seller and the buyer agree to conclude this contract subject to the terms and conditions stated below:

1.货物名称、规格和质量(name, specifications and quality of commodity):

2. 数量(quantity):

允许____的溢短装(___% more or less allowed)

3. 单价(unit price):

4. 总值(total amount):

5. 交货条件(terms of delivery) fob/cfr/cif_______

6. 原产地国与制造商 (country of origin and manufacturers):

7. 包装及标准(packing):

货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。

the packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. the seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. the measurement, gross weight, net weight and the cautions such as “do not stack up side down”, “keep away from moisture”, “handle with care” shall be stenciled on the surface of each package with fadeless pigment.

8. 唛头(shipping marks):

9. 装运期限(time of shipment):

10. 装运口岸(port of loading):

11. 目的口岸(port of destination):

12. 保险(insurance):

由____按发票金额110%投保_____险和_____附加险。

insurance shall be covered by the ________ for 110% of the invoice value against _______ risks and __________ additional risks.

13. 付款条件(terms of payment):

(1) 信用证方式:买方应在装运期前/合同生效后__日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。

letter of credit: the buyer shall, ______ days prior to the time of shipment /after this contract comes into effect, open an irrevocable letter of credit in favor of the seller. the letter of credit shall expire ____ days after the completion of loading of the shipment as stipulated.

(2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(d/p)方式,通过卖方银行及_____银行向买方转交单证,换取货物。

documents against payment: after shipment, the seller shall draw a sight bill of exchange on the buyer and deliver the documents through sellers bank and ______ bank to the buyer against payment, i.e d/p. the buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

(3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(d/a__日)方式,通过卖方银行及______银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。

documents against acceptance: after shipment, the seller shall draw a sight bill of exchange, payable_____ days after the buyers delivers the document through sellers,ank and _________bank to the buyer against acceptance (d/a___ days)。 the buyer shall make the payment on date of the bill of exchange.

(4) 货到付款:买方在收到货物后__天内将全部货款支付卖方(不适用于 fob、crf、cif术语)。

cash on delivery (cod): the buyer shall pay to the seller total amount within ______ days after the receipt of the goods (this clause is not applied to the terms of fob, cfr, cif)。

14. 单据(documents required):

卖方应将下列单据提交银行议付/托收:

the seller shall present the following documents required to the bank for negotiation/collection:

(1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。

full set of clean on board ocean/combined transportation/land bills of lading and blank endorsed marked freight prepaid/ to collect;

(2) 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份;

signed commercial invoice in ______copies indicating contract no., l/c no. (terms of l/c) and shipping marks;

(3) 由______出具的装箱或重量单一式__份;

packing list/weight memo in ______ copies issued by__;

(4) 由______出具的质量证明书一式__份;

certificate of quality in _______ copies issued by____;

(5) 由______出具的数量证明书一式__份;

certificate of quantity in ___ copies issued by____;

(6) 保险单正本一式__份(cif 交货条件);

insurance policy/certificate in ___ copies (terms of cif);

(7)____签发的产地证一式__份;

certificate of origin in ___ copies issued by____;

(8) 装运通知(shipping advice): 卖方应在交运后_____ 小时内以特快专递方式邮寄给买方上述第__项单据副本一式一套。

the seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents no. __。

15. 装运条款(terms of shipment):

(1) fob交货方式

卖方应在合同规定的装运日期前30天,以____方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

the seller shall, 30 days before the shipment date specified in the contract, advise the buyer by _______ of the contract no., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the buyer can charter a vessel/book shipping space. in the event of the seller‘s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the seller’s account.

(2) cif或cfr交货方式

卖方须按时在装运期限内将货物由装运港装船至目的港。在cfr术语下,卖方应在装船前2天以____方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。

the seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. under cfr terms, the seller shall advise the buyer by _________ of the contract no., commodity, invoice value and the date of dispatch two days before the shipment for the buyer to arrange insurance in time.

16. 装运通知(shipping advice):

一俟装载完毕,卖方应在__小时内以____方式通知买方合同编号、品名、已发运数量、发票总金额、毛重、船名/车/机号及启程日期等。

the seller shall, immediately upon the completion of the loading of the goods, advise the buyer of the contract no., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by_________ within________hours.

17. 质量保证(quality guarantee):

货物品质规格必须符合本合同及质量保证书之规定,品质保证期为货到目的港__个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。

the seller shall guarantee that the commodity must be in conformity with the quatity, specifications and quantity specified in this contract and letter of quality guarantee. the guarantee period shall be______months after the arrival of the goods at the port of destination, and during the period the seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.

18. 检验(inspection)(以下两项任选一项):

(1)卖方须在装运前__日委托______检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托________检验机构进 行检验。

the seller shall have the goods inspected by ______ days before the shipment and have the inspection certificate issued by____. the buyer may have the goods reinspected by ________ after the goods,rrival at the destination.

(2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面 的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。

the manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. after arrival of the goods at the port of destination, the buyer shall apply to china commodity inspection bureau (hereinafter referred to as ccib) for a further inspection as to the specifications and quantity/weight of the goods. if damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this contract, except when the responsibilities lies with insurance company or shipping company, the buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the seller, or reject the goods according to the inspection certificate issued by ccib. in case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the contract, the buyer shall, during the guarantee period, request ccib to make a survey.

19. 索赔(claim):

买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。

the buyer shall make a claim against the seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred therefrom shall be borne by the seller. the claims mentioned above shall be regarded as being accepted if the seller fail to reply within ______days after the seller received the buyer‘s claim.

20. 迟交货与罚款(late delivery and penalty):

除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交 货物总价的____ %.如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。

买方有权对因此遭受的其它损失向卖方提出索赔。

should the seller fail to make delivery on time as stipulated in the contract, with the exception of force majeure causes specified in clause 21 of this contract, the buyer shall agree to postpone the delivery on the condition that the seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. the rate of penalty is charged at______% for every ______ days, odd days less than _____days should be counted as ______ days. but the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. in case the seller fail to make delivery ______ days later than the time of shipment stipulated in the contract, the buyer shall have the right to cancel the contract and the seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the buyer without delay.

the buyer shall have the right to lodge a claim against the seller for the losses sustained if any.

21. 不可抗力(force majeure):

凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由当地民间商会签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。

the seller shall not be responsible for the delay of shipment or non-delivery of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the seller shall advise the buyer immediately of the occurrence mentioned above and within_____ days thereafter the seller shall send a notice by courier to the buyer for their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. under such circumstances the seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. in case the accident lasts for more than _____ days the buyer shall have the right to cancel the contract.

22. 争议的解决 (arbitration):

凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会深圳分会,按照申请时该会当时施行的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。

any dispute arising from or in connection with the contract shall be settled through friendly negotiation. in case no settlement is reached, the dispute shall be submitted to china international economic and trade arbitration commission (cietac),shenzhen commission, for arbitration in accordance with its rules in effect at the time of applying for arbitration. the arbitral award is final and binding upon both parties.

23. 通知(notices):

所有通知用____文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。

all notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. if any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.

24.本合同使用的fob、cfr、cif术语系根据国际商会《XX年国际贸易术语解释通则》。

the terms fob、cfr、cif in the contract are based on incoterms of the international chamber of commerce.

25. 附加条款 (additional clause):

本合同上述条款与本附加条款抵触时,以本附加条款为准。

conflicts between contract clause hereabove and this additional clause, if any, it is subject to this additional clause.

26. 本合同用中英文两种文字写成,两种文字具有同等效力。本合同共__份,自双方代表签字(盖章)之日起生效。

this contract is executed in two counterparts each in chinese and english, each of which shall deemed equally authentic. this contract is in ______ copies, effective since being signed/sealed by both parties.

买方代表(签字):________________________

representative of the buyer

(authorized signature):___________________

卖方代表(签字):_________________________

representative of the seller

(authorized signature):____________________

展开阅读全文

篇10:国际专利许可合同附英文译本[页8]_合同范本

范文类型:合同协议,全文共 2506 字

+ 加入清单

国际专利许可合同(附英文译本)

(2)party b shall twice send its specialists to party as factory to provldetechnicalservice for a total of 30 working days man.

(3)the first technical service sha1l start in the sixth month after the contraytcomesinto effect. party b shall send a specialist to party as factory to providetechnical service for 12 working days/man.

(4)the second technical service shall start during the verification of thecortractedproduets.parth b shall send a specialist to party as factory to providetechnical servicefor18 working days/man.

(5)party b shall, for its specialists, bear their travelling expensee. parthashall be responsible for boarding and lodging and affording the means of conveyance fromthe lodgingplace to the factoty.

5.2 technical training

(1)party b shall train party as technical personnel so as to enable them tomasterparty bs design, performance test and technology in machining, erection andinspection of the contracted products, so that party a can use the technical documentsand know-how supplied by p arty b toproducethe same products in the contract factory. party b shall do its best to arrange for party as personnel to visit the majorusersand the manufacturing process of the components from other countries of the contractedproducts.

(2)party a shall send twice its technical personnel to party bs factory fortraining, andthe total number of the participants shall not exceed 320 days/man (excluding the inter-preter).

(3)the first training shall be from the third to the fourth month after thecontract comes into effect. there shall be 4 technical persons and an interpreterto besent to party b for training for 16o working days/man (5 days week). the training shallcover the design of the contracted products and manufacturing technology.

(4)the second training shall be from the eighth to the nineth month. party a shallsent 4 technical persons and an interpreter to party bs factory for training for 160working days/man (5 days per week). the training shall cover the designing, themanufacturing technology,erection and adjustment of the contracted products.

(5)party a shall bear the travelling expenses of its trainees; party b shallprovide party as trainees free of charge with boarding, lodging and means ofconveyance for travel- ling between the lodging place and the factory.article 6 technical documents

6.1 party b shall, according to the delivery schedule and details stpulated inappendix 2to the contract, deliver the documents at_________.

共13页,当前第8页12345678910111213

展开阅读全文

篇11:国际专利许可合同附英文[页10]_合同范本

范文类型:合同协议,全文共 1504 字

+ 加入清单

国际专利许可合同(附英文)

granted shall be deemed to have been sold when paid for.

3.6 if the contract products are returned or allowances made thereon after the royalty

thereon has  been paid party a shall be entitled to take ppropriate erdit for such

overpay-mentagainst royalties thereafter accruing.

3.7 if party b demand to audit the accounts of party a,it shall notice party a within

l0(ten) days after receiving the written notice of party a in accordance with article

3.4 of the contract.the speeific content and procedure of auditing accounts are

detailed in appendix 4 tothe contract.

article 4 couditions of payment

4.1 royalty stipulated in section 3 to the contract shall be effected by party a to

arty bthrough the bank____________(here it is the business bank of party a, and the bank

_________(here it is the busines bank of party b), payrnent shall be settled in________.

4.2 party b shall immediately issue the related documents ofter receiving the written

notieesubmitted by party a in accordance with artiele 3.4 of the contract, the royalty

shall be paid by party a to party b within 30(thirty) days after party a has received the

fol-lowing documents whichare provided by party b and found them in confoumity with the

stipulations of thcontract.

a. four copies of the statement on calculation of the royalty;

b. four copies of the commercial invoice;

c. two copies of the sight draft.

4.3 party a shall have the right to deduct from any of the above mentioned payment the

共21页,当前第10页123456789101112131415161718192021

展开阅读全文

篇12:国际专利许可合同附英文[页13]_合同范本

范文类型:合同协议,全文共 1475 字

+ 加入清单

国际专利许可合同(附英文)

article 6 technical documents

6.1 party b shall, according to the delivery schedule and details stpulated in

appendix 2to the contract, deliver the documents at________________.

6.2 the date stamped by the air transportation ageney at____________,shll be taken

as the actual date of delivery paryt a shall send to party b a photostat copy of the

airconsignment note shwing the stampde date of arrival.

6.3 within twenty-four hours after the despatch of each lot of the technical documente,

party b shal1 notify party a by cable or telex of the contract number, number and date

of the air consignment note, items of the documents, number of pieces, airmail to

party a two copies of each of the air consignment note and detaikled list of the

technical documents.

6.4 if the technical documents are foumd lost, damaged or mutilated during air

trans-portation, party b shall supply party a free of charge with a second lot of

documents within thechortest possible time but not later than thirty days after it has

received from party a the writtennotice. within sixty days after party a has received

the documents from party b,if party a does not declare the shortage and request to

cover the same, it is considered asa-cepted.

6.5 the technical documents shall be in english and based on metric system of

measure-ments.

article 7 verification and acceptance

7.1 the verification test on the first samplemachine of the contracted product shall

共21页,当前第13页123456789101112131415161718192021

展开阅读全文

篇13:英文建筑合同

范文类型:合同协议,适用行业岗位:建筑,全文共 213 字

+ 加入清单

Party A:Party B:Contract NoDate:Signed at:Witnesses that the Party A for considerations hereinafter named, contracts and agrees with the Party B that Party A will, within_____ days, next following the date hereof,

展开阅读全文

篇14:国际专利许可合同附英文译本[页13]_合同范本

范文类型:合同协议,全文共 2282 字

+ 加入清单

国际专利许可合同(附英文译本)

16.1 the contrant os signed on may _________, _________, by authorized represenatives of botbpar-ties.after the contract has been signed, the two parties shall apply to their respectivethe managing onstructure of the parties or government authorities for apprval. the dateof ap-proval last obtained shall be taken as the date of effectiveness of the contract. both partfies shallexert their best efforts to obtain the approval within sixty (60)says and inform the oth-er party by telex and thereafter confirm the same by letter. ifthe contract can not come into affect within six (6) months after the date of signing,both parties are entitlid to consider themselves absolved from the contract.

16.2 tbe contract shall be valid for ten (10) years beginning from the date of itsbe-comingeffective, and shall become null and void automatically upon the expiry of thevalidity period of the contract.

16.3 the termination of this contract shall not affect in any way the outstandingclaims and the liabilities existing between the two parties upon the expiry of the validity of the contractandthe debtor shall be kept liable until he fully pays up his debts to the creditor.the contract is made out in chinese and in englsh. in case of doubt as totheinterpreta-tion of any provisions gerof, the chinese version shall be controlling.party a (signature):_________ party b(signature):_________conclusion place:_________ conclusion place:_________conclusion date:_________ conclusion date:_________appendis 1 name, content of patent documents and application of the patentsappendix 2 models, specifications and technical lndices of the contract productappendix 3 the starting date and counting methods of royaltyappendix 4 the content and method of licensors auditingappendix 5 training of party as personnelappendix 6 technical service or specialist send by party bappendix 7 verification and acceptance of the contract product this contract madeon_________ day of_________,by and be-tween ,organized and existingunder the laws of the peoples republic of china. with rehistered office at (hereinafterreferred to as party a) of the first part and ,organized and existing underthe laws of _________,with its principal office at_________.

共13页,当前第13页12345678910111213

展开阅读全文

篇15:国际专利许可合同附英文[页8]_合同范本

范文类型:合同协议,全文共 1499 字

+ 加入清单

国际专利许可合同(附英文)

authorities ofboth parties, whichever comes later.

article2 scope of the contract

2.1. party a agrees to acquire from party b and party b agrees to transfer to party a

the patented technology for contract products. such patented technology shall be in exact

accordance with the technologyof party b’s latest products.

2.2 party b grants party a the non-exclusive right to design and manufacture

contractproducts in china and to markdt the said products in china and abroad.

2.3 party b shall be responsible to provide party a with documents relevant to the

saidpaptents and with special fittings of the samplemachine their concrete details and

schedule ofdelivary being set out in appendix 2 to the contract.

2.4 the contract does not cover the patented technology for the parts from other

coun-tres.

but party b shall provide party a with the specimens and the tecincal specifications and

the name of the manufacturers of the parts.

2.5 party b shall be responsible for the training of party a’s technicl personnel

in party b’s relevant facilities and also do its best to enable party a’s technical

personnel to masterthe patented technplogy of the aforesaid contract product (details as

per appendix 5 to the contract).

2.6 party b is obliged to send at its own expense technical personnel to party a’s

facto-ry for technical service (details as per appendix 6 to the contract).

2.7 if it is required by party a. pafrty b shall be under an obligation to provide

共21页,当前第8页123456789101112131415161718192021

展开阅读全文

篇16:国际专利许可合同附英文[页7]_合同范本

范文类型:合同协议,全文共 1539 字

+ 加入清单

国际专利许可合同(附英文)

to theproperty of the company.

1.4. ‘party b’ means___________,or his legal representative,agent and inheritor,

to the property of the company.

1.5. ‘the contraet factory’ means the place which party party a manufactures the

contract products. that is_______________.

1.6.‘spare p`menas replacement parts for contract products or for any part there-of.

1.7. ‘components’means those components and parts of contruct produets which par-ty

b has agreed or may from time to time agree in writing to permit party a to manufacture

or sell.

1.8. ‘technical documents’meane engineering, manufacturing and originating

inforna-tion relatiog to the manufacture and servicing of contract products, including

drawings, blueprints,design sheets, material specifications,

photographs, photostats and general da-ta, and designs and pecifications relating

to manufacturing contract producdts, tools and fix-tures, but includes,however, only

such information as is available to party b and applicable to the operations of party a

under this contract which detaile as per appendis 1 to the con-tract.

1.9 ‘net selling price’ menans remaining amount of invoice value of the

contractprod-ucts, after deduction of packahing, installation and freight charges,

trade and discount,commission,insurance and taxes and duties. if any, directly

applicable to the prdduct.

1.l0 ‘the date of coming into effect of the contract’means the date of raification

ofthe contract by the managing constructure of the parties or by the competent

共21页,当前第7页123456789101112131415161718192021

展开阅读全文

篇17:国际专利许可合同附英文[页12]_合同范本

范文类型:合同协议,全文共 1469 字

+ 加入清单

国际专利许可合同(附英文)

inspection of the contracted products, so that party a can use the technical documents

and know-how supplied by party b toproducethe same products in the contract factory.

party b shall do its best to arrange for party a’s personnel to visit the majorusers

and the manufacturing process of the components from other countries of the contracted

products.

5.2.2 party a shall send twice its technical personnel to party b’s factory for

training, andthe total number of the participants shall not exceed 320 days/man

(excluding the inter-preter).

5.2.3 the first training shall be from the third to the fourth month after the

contract comes into effect. there shall be 4 technical persons and an interpreterto be

sent to party b for training for 16o working days/man (5 days week). the training shall

cover the design of the contracted products and manufacturing technology.

5.2.4 the second training shall be from the eighth to the nineth month. party a shall

sent 4 technical persons and an interpreter to party b’s factory for training for 160

working days/man  (5 days per week). the training shall cover the designing, the

manufacturing technology,erection and adjustment of the contracted products.

5.2.5 party a shall bear the travelling expenses of its trainees; party b shall

provide party a’s trainees free of charge with boarding, lodging and means of

conveyance for travel- ling between the lodging place and the factory.

共21页,当前第12页123456789101112131415161718192021

展开阅读全文

篇18:英文合同

范文类型:合同协议,全文共 3150 字

+ 加入清单

合 同 Contract No.BTGL-HITACHI 20xx-01

CONTRACT Date: March 20, 20xx

Revised date:July 14, 20xx

卖 方: 地址

THE SELLER: TEL: FAX:

买 方: 地址

THE BUYER: TEL: FAX:

兹双方同意按下列条款由卖方出售,买方购进下列货物:

(5)装运条款和交货期:于合同生效后8月30日前以海运形式送货到达MOJI港口。

Delivery time(CIF MOJI): After the order in effect via seafreight direct to MOJI seaport in JAPAN, and arriving at MOJI seaport on or before: 30th August 20xx. 最终目的地:

Final destination of Products: 794, Higashitoyoi, Kudamatsu City, Yamaguchi Pref., 744-8061 Japan (6)付款条件: 凭证结算,30天内(以提单日期为准)付清货款。 Term of payment: By D/P within 30 days after the B/L date. The seller’s bank information

Beneficiary: Bank Name: ACCOUNT: SWIFT NO.: ADD.:

Contract No.BTGL-HITACHI 20xx-001 Date: March 20, 20xx The revised date:July 14, 20xx

(7) 保险: 按发票金额110%保一切险及战争险(中国人民保险公司条款)。

Insurance : To be covered by the seller for 110% of invoice value against all risks and war risk as per the clause of

the People’ Insurance Co. of China.

(8) 品质与数量,重量的异议与索赔: 货到最终目的地后, 买方如发现货物品质及/货数量/重量与合同规定不符,除属于 保险公司货船公司的责任外,买方可以凭双方同意的检验机构出具的检验证明向卖方提出异议,品质异议须于货 到最终目的地起60天内提出,数量/重量异议须于货到最终目的地起30天内提出。

Quality /Quantity/Weight Discrepancy and Claim: In case the quality and /or quantity/weight are found by the Buyer not to

conform with the contract after arrival of the goods at the final destination, the Buyer may lodge a claim against the seller supported by a survey report issued by an inspection organization agreed upon by both parties with the exception of those claims for which the insurance company and /or the shipping company are to be held responsible. Claim for quality discrepancy should be filed by the Buyer within 60 days after arrival of the goods at the final destination while for quantity

/ weight discrepancy claim should be filed by the Buyer within 30 days after arrival of the goods at the final destination.

(9) 人力不可抗拒: 本合同内所述全部或部分商品,如因人力不可抗拒原因,使卖方不能履约或延期交货,卖方不负

任何责任。

Force Majeure: The Seller shall not be held responsible for failure or delay in delivery of the entire or portion of the goods

under this contract in consequence of any Force Majeure incidents.

(10) 仲裁:凡执行本合同或与合同有关事项所发生的一切争执,应由双方通过友好方式协商解决。如果不能取得协 议时,应提交中国国际贸易促进会委员会对外贸易仲裁委员会,根据该仲裁委员会的仲裁程序暂行规定进行仲 裁,仲裁裁决是终局的,对双方都有约束力。仲裁费用除非仲裁另有决定外,均由败诉一方承担。

Arbitration: All disputes in connection with this Contract or the execution thereof shall be settled through friendly

negotiations. If no settlement can be reached, the case shall then be submitted to the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade, Beijing, for settlement by arbitration in accordance with the Commission’s Provisional Rules of Procedure. The award rendered by the Commission shall be final and binding on both parties. The arbitration expenses shall be borne by the losing party unless otherwise award by the arbitration organization.

(11) Other requirements:

1, Dimensions and marks as per the drawing respectively.

2, How to take test sample as per manufactory way..

3, Additional requirements as per requirements in each drawing.

4,Other conditions to IP-5403& LOI No.DVD-83005-001

(12) The buyer’s bank information:

THE SELLER: THE BUYER:

DROUP CO.,LTD EAST ASIA LIMITED

TO BE CONTINUED

展开阅读全文

篇19:国际专利许可合同附英文译本[页7]_合同范本

范文类型:合同协议,全文共 2722 字

+ 加入清单

国际专利许可合同(附英文译本)

3.3 royalty at the rate of_________% (_________percent ) shall be calcuated interms ofnet selling price after the contract products are sold in this year,the contractproducts which not sold shall not be included.

3.4 the report of the selling quantity, net selling amount of the contract productsandroyalty which should be paid in last year shall be submitted to party b in writtenform by party a within 10 (ten) days after the date of settling accounts to royalty. thespecific methods which calculatenet selling amountand royalty are detailed in appendix 3to the contract.

3.5 the contract products sold by party a pursuant to the patent license hereingranted shall be deemed to have been sold when paid for.

3.6 if the contract products are returned or allowances made thereon after the royaltythereon has been paid party a shall be entitled to take ppropriate erdit for suchoverpay-mentagainst royalties thereafter accruing.

3.7 if party b demand to audit the accounts of party a,it shall no tice party a withinl0(ten) days after receiving the written notice of party a in accordance with article

3.4 of the contract.the speeific content and procedure of auditing accounts aredetailed in appendix 4 tothe contract.article 4 couditions of payment

4.1 royalty stipulated in section 3 to the contract shall be effected by party a toarty bthrough the bank_________(here it is the business bank of party a, and the bank_________(here it is the busines bank of party b), payrnent shall be settled in_________.

4.2 party b shall immediately issue the related documents ofter receiving the writtennotieesubmitted by party a in accordance with artiele 3.4 of the contract, the royaltyshall be paid by party a to party b within 30(thirty) days after party a has received thefol-lowing documents whichare provided by party b and found them in confoumity with thestipulations of thcontract.

(1)four copies of the statement on calculation of the royalty;

(2)four copies of the commercial invoice;

(3)two copies of the sight draft.

4.3 party a shall have the right to deduct from any of the above mentioned payment theppenalties and/or compensations which party b shall pay in accordance with thestipulations ofthe contract.article 5 technical service and training

5.1 technicgl service

(1)during the validity period of the contract, party b shall send a specialist topartya`s factory to explain the drawings and technical documents and to provide teehnicalservise indesigning.manufacturing, adjustment,inspection and maintenance of thecontracted pro-duet so to eheble party a to use, as fast as possible, home materialsand raw components without affeeting the properties of the products so manufactured.

共13页,当前第7页12345678910111213

展开阅读全文

篇20:中外合作经营合同格式附英文_合同范本

范文类型:合同协议,全文共 5659 字

+ 加入清单

中外合作经营合同格式(附英文)

第一章 总 则

中国________公司和________国(或地区)________公司,根据中华人民共和国有关法律、法规的规定,本着平等互利的原则,通过友好协商,同意在中华人民共和国________省________市,共同举办合作经营企业,特订立本合同。

第二章 合 作 各 方

第一条 本合同的各方为:

中国________公司(以下简称甲方),在中国________省________市登记注册,其法定地址在________省_________市________区________路_________号。法定代表:姓名________职务_______

_国籍_______。

________国(或地区)________公司(以下简称乙方)在________国(或地区)登记注册,其法定地址在________。法定代表:姓名________职务________国籍________。

(注:若有两个以上合作者,依次称丙、丁……方)

第三章 成立合作经营公司

第二条 甲、乙方根据中华人民共和国有关法律、法规的有关规定,同意在________省________市建立合作经营的________有限责任公司(以下简称合作公司)。

第三条 合作公司的名称为________合作有限责任公司。

外文名称为________。

合作公司的法定地址为________省________市________区________路________号。

第四条 合作公司的一切活动必须遵守中华人民共和国有关法律、法规的规定。

第五条 合作公司是由甲方提供土地使用权、资源开发权、建筑物等合作条件;乙方提供资金、设备、技术等合作条件。各方不折算投资比例,按各自向公司提供的合作条件,确定利润分享办法,并各自承担风险。合作公司实行统一管理,独立经营,统一核算。合作期限届满,公司的

财产不作价归甲方所有。

(注:应根据双方的约定具体写明)

第四章 生产经营目的、范围和规模

第六条 甲、乙方合作经营的目的是:本着加强经济合作和技术交流的愿望,采用先进而适用的技术和科学的经营管理方法,提高产品质量,发展新产品,并在质量、价格等方面具有国际市场的竞争能力,提高经济效益,使合作各方获得满意的经济利益。(注:在具体合同中要根据具

体情况写)

第七条 合作公司生产经营范围是:生产和销售_______产品;对销售后的产品进行维修服务;研究和发展新产品。(注:要根据具体情况写)

第八条 生产经营规模如下:

(一)合作公司投产后的生产能力为:_____。

(二)随着生产经营的发展,生产规模可增加到年产________。产品品种将发展________。(注:要根据具体情况写)

第五章 投资总额和注册资本

第九条 合作公司投资总额为人民币________元。(或双方商定的一种货币)

第十条 合作公司的注册资本为人民币________元。(注:甲方所提供的土地使用权或资源开发权和建筑物不计入注册资本)

第十一条 甲、乙方分别提供如下合作条件:

甲方:提供总面积为________平方米的土地使用权,负责征用土地费和缴纳土地使用费;(注:土地开发费的负担方法,根据双方约定写)其中:

厂房(上盖)面积________平方米;

商场(上盖)面积________平方米;

维修部(上盖)面积________平方米。

乙方:投资总额为________元,其中:现金________元;机器设备和交通运输工具________元;工业产权________元;其他________元。

第十二条 甲方提供的土地使用权,应在合同批准之日起________天内办完征拨手续,交付合作公司使用;厂房和商场(上盖)应在合同批准之日起________天内交付合作公司装修;维修部(上盖)的交付时间,由合作公司董事会另行决定。

乙方提供的现金投资分两期汇入合作公司在银行开立的帐户内。第一期应汇入_______元,须在合同批准之日起________天内汇出,作为首期生产、生活设施的建筑费和流动资金等;第二期必须汇足投资总额减去第一期汇出后的差额,汇出的时间为_______,用

途由公司董事会确定。(注:应根据具体情况写)

第十三条 乙方作为投资的机器设备,必须符合合作公司的生产需要,并在厂房装修完工前________天内运至中国港口。

(注:乙方以工业产权作为投资时,甲、乙方必须另订立合同,作为本合同的组成部分。)

第六章 合作各方应负责完成的事项

第十四条 甲方应负责完成的事项:

(一)办理为设立合作公司向中国有关主管部门申请批准、登记注册、领取营业执照等事宜;

(二)依照本合同第十一条第一款规定,向土地主管部门办理申请取得土地使用权的手续;

(三)协助办理乙方作为出资而提供的机械设备、物资的进口报关手续和在中国境内的运输;

(四)协助合作公司在中国境内购置或租赁设备、材料、原料、办公用品、交通工具、通讯设备等;

(五)协助合作公司落实水、电、交通等基础设施;

(六)协助合作公司对厂房和其他工程设施的设计和施工;

(七)协助合作公司在当地招聘中国的经营管理人员、技术人员、工人和其他人员;

(八)协助合作公司为外籍工作人员办理所需的入境签证手续等;

(九)办理合作公司委托的其他事宜。

第十五条 乙方应负责完成的事项:

(一)依照本合同第十一条第二款、第十三条的规定,提供现金、机器设备、工业产权……并负责将其作为出资的机械设备等运至中国港口;

(二)办理合作公司委托在中国境外选购的机器设备、材料等有关事宜;

(三)提供需要的设备安装、调试以及试产的技术人员、生产和检验技术人员;

(四)培训公司的技术人员和工人;

(五)如乙方同时是技术转让方,则应负责合作公司在规定的期限内按设计能力稳定地生产合格产品;

(六)负责办理合作公司委托的其他事宜。

(注:要根据具体情况写)

第七章 合作经营期限

第十六条 合作公司的经营期限为________年,公司营业执照签发之日,为该合作公司的成立日期。

合作公司在经营过程中,如有一方提出,经双方协商同意,可以延长合作期限。但必须在合作期满六个月前,向中华人民共和国对外经济贸易部(或其委托的审批机构)提出申请批准。

第八章 利润分配和偿还乙方投资

第十七条 合作公司缴纳所得税后的利润,按下列顺序使用和分配:

(一)提取______%作为合作公司的储备基金、职工奖励及福利基金、发展基金;

(二)以______%偿还乙方的投资,预计______年还清乙方的全部投资;(注:根据双方的约定具体写)

(三)其余部分按甲方______%,乙方_______%分配。

第九章 产品的销售

第十八条 合作公司的产品,大部分在中国境外市场销售(或全部外销),其中:

(一)向外销售________%;

(二)经向主管部门申请批准内销________%。

(注:销售办法可灵活多样,可由公司或乙方负责向外销售,也可由公司与外贸公司订立销售合同,委托代销;对内销部分也可由公司或甲方经销。)

第十章 董 事 会

第十九条 合作公司设董事会。公司注册登记之日,为董事会正式成立之日。

第二十条 董事会是合作公司的最高权力机构,决定合作公司章程的制订和修改;决定公司转让、合并、停业和解散;决定公司经营决策、财务预算和决算;决定公司利润分配和亏损弥补办法;聘请总经理、副总经理和高级管理人员;决定公司职工工资和制定职工奖惩办法等一切重大事宜。

第二十一条 董事会由董事________名组成,其中甲方委派________名,乙方委派________名。董事长由甲方委派,副董事长________名,由乙方委派。

董事长、副董事长和董事任期四年,经各方继续委派可以连任。

第二十二条 董事会会议每年至少召开一次,由董事长召集并主持。董事长因故不能召集董事会议时,可委托副董事长或其他董事召集并主持。经三分之一以上的董事提议,董事长可召开董事会临时会议。会议记录应归档保存。

第二十三条 召开董事会须有三分之二以上的董事出席方有效。董事不能出席时,可以出具委托书委托他人代为出席和举行表决。

第二十四条 董事长是合作公司的法定代表。董事长因故不能履行其职责时,可临时授权副董事长或其他董事代理。

第十一章 经营管理机构

第二十五条 合作公司设经理部,负责公司的日常经营管理。

经理部设总经理一人,副总经理__人。总经理由__方推荐;副总经理由__方推荐__人,另一方推荐__人,均由董事会聘请,任期__年。

第二十六条 总经理的职责是执行董事会会议的决议,组织领导合作公司的日常经营管理工作。副总经理协助总经理工作。

第二十七条 总经理必须每季度向董事会报告公司的经营情况,半年向董事会作一次财务结算报告。

第二十八条 总经理、副总经理及其他管理人员有营私舞弊或严重失职行为时,经董事会会议作出决议,给予应得的处分直至解聘,对公司造成的经济损失,应负赔偿责任。

第十二章 劳 动 管 理

第二十九条 合作公司员工的招聘、解雇或辞职一律实行合同制。员工的聘请由公司做出计划,报当地劳动部门核准后,由公司自行招聘,经考核择优录用。

第三十条 合作公司员工的劳动工资、劳动保险、生活福利和奖惩等事项,依照《中华人民共和国中外合作经营企业法》的有关规定,经董事会制订施行方案,由公司、公司工会与员工集体或个人订立劳动合同,按合同的规定执行。

第十三章 财务会计和审计

第三十一条 合作公司设总会计师和总出纳员各一人,负责公司总的会计工作;厂部、商场和维修服务部分别建立帐目,每个部门分别设会计师和出纳员各一个,负责各个部门的财务会计工作。

前款所列会计和出纳员的人选,均由甲、乙方协商推荐,董事会聘请。

第三十二条 合作公司的财务会计制度,根据有关规定,结合本合作公司的实际情况制定。并报当地财政部门和税务部门备案。

第三十三条 合作公司设审计师一人,由甲方推荐,董事会聘请。

审计师负责审查、稽核公司的财务收支和会计帐目,并向董事会报告。

第十四章 纳税与保险

第三十四条 合作公司应按中华人民共和国有关税法缴纳各种税款。

第三十五条 合作公司的各项保险均应向中国的保险公司投保。投保办法、投保险别、保险价值、保期等均按中国人民保险公司的规定由合作公司董事会决定。

第十五章 合同的修改、补充、变更与解除

第三十六条 本合同及其附件的修改或补充,必须经甲、乙方协商一致、签署书面协议,并报经对外经济贸易部(或其委托的审批机构)批准方能生效。

第三十七条 在合同有效期内由于本合同第四十二条规定的不可抗力,造成公司严重损失,或因公司连续亏损,致使合同不能继续履行,经合作公司董事会特别决议,并报原审批机关批准,可以提前终止合同或解除合同。

第十六章 违 约 责 任

第三十八条 由于一方不履行合同、章程规定的义务,或严重违反合同、章程规定,造成合作公司无法经营或无法达到合同规定的经营目的,视作违约方片面终止合同,对方除有权向违约的一方索赔外,并有权按合同规定报原审批机关批准终止合同。如甲、乙方同意继续经营,违约方仍应赔偿履约一方的经济损失。

第三十九条 甲、乙任何一方如未按本合同第十一条、第十二条以及第十三条的规定提供合作条件时,以逾期的第一个月算起,每逾期一个月,违约方应缴付____元违约金给守约的一方。(注:或按出资额的百分比计算)如逾期__个月仍未提供,除累计缴付违约金外,守约一方有权按照本合同第三十八条规定终止合同,并要求违约方赔偿损失。

第四十条 由于一方的过失,造成本合同及其附件不能履行或不能完全履行时,由过失的一方承担违约责任;如属双方的过失,根据实际情况,由双方分别承担各自应负的违约责任。

第四十一条 为保证本合同及其附件的履行,甲、乙方在合同生效后__天内相互提供履约的银行担保书。

第十七章 不 可 抗 力

第四十二条 在合作期间,由于地震、台风、水灾、火灾、战争或其他不能预见并且对其发生和后果不能防止和避免的不可抗力事故,致使直接影响合同的履行或者不能按约定的条件履行时,遇有上述不可抗力事故的一方,应立即将事故情况电报通知对方,并应在十五天内提供事故的详细情况及合同不能履行,或者部分不能履行,或者需要延期履行的理由的有效证明文件。此项证明文件应由事故发生地区的公证机构出具。按照事故对履行合同影响的程度,由双方协商决定是否解除合同,或者部分免除履行合同的责任,或者延期履行合同。

第十八章 争议的解决

第四十三条 凡因执行本合同所发生的或与本合同有关的一切争议,双方应首先通过友好协商解决,如果协商不能解决,应提请中国国际贸易促进委员会对外经济贸易仲裁委员会仲裁。仲裁的裁决是终局的,对双方都有约束力。

第四十四条 本合同的订立、效力、解释、履行和争议的解决均受中华人民共和国法律的保护和管辖。

第十九章 文 字

第四十五条 本合同用中文和__文写成,两种文字具有同等效力。上述两种文本如解释有矛盾,以中文本为准。

第二十章 合同生效及其他

第四十六条 按照本合同规定的各项原则所订立的合作公司章程、工程协议、技术转让协议、销售协议等,均为本合同的附属文件。

第四十七条 本合同及其附属文件,均须经中国对外经济贸易部(或其委托的审批机关)批准,并自批准之日起生效。

第四十八条 合作公司对甲、乙双方或甲、乙双方互送通知的方法,如果采用电报或电传时,凡涉及各方权利、义务的,应随之发出书面信件通知。合同中所列的甲、乙双方的法定地址,即为甲、乙方的收件地址。

第四十九条 本合同正本一式__份,甲、乙方各__份,合作公司一份,报中国对外经济贸易部__份,具有同等效力;影印本__份,分报有关机关。

第五十条 本合同于一九__年__月__日由甲、乙双方的授权代表在中国__省__市签字。

甲方:__公司 乙方:__公司

(加盖公章) (加盖公章)

法定代表__(签字) 法定代表__(签字)

8. the contract for sino-foreign cooperative joint venture

展开阅读全文