0

科学技术转移合集20篇

浏览

2018

范文

1000

购房合同权利和义务转移合同

范文类型:合同协议,全文共 1038 字

+ 加入清单

甲方与乙方对所购期房的善后事宜,经过充分的协商,根据权利义务相一致的原则,达成如下协议:

一、双方确认______年_____月_____日与_________公司签订的《_________》,是甲乙双方与_________ 公司之间真实的意思表示;该《_________》约定双方购买位于_________路_________弄_________家园_________ 号_________层_________室的商品住宅;该房为期房,_________公司承诺于______年_____月_____日前将该房屋交付于甲乙双方。

二、双方确认该房屋首付款总额为人民币_________元(_________元),其中人民币_________(_________ 元),系乙方______个人支付,余额全部由甲方______个人支付;另为购此房,甲方______个人又向银行贷款人民币 ____________________(_________元),从______年_____月_____日起,该贷款系甲方_________个人逐月偿还。

三、现乙方_________自愿放弃购房人的权利,自愿将上述购房合同中的权利和义务全部转移给甲方_________。乙方 _________承诺协助甲方_________将该房小产证办在何的名下,可向有关单位和政府部门出具放弃产权的书面声明;若该房小产证只有办在甲乙双方名下,乙方_________承诺将通过转让、更名、赠与等手续放弃该房屋的产权,不向甲方_________主张任何房款并协助甲方 _________办理房地产管理部门需要的过户手续。

四、双方商定,在该房屋的小产证办在甲方_________一人名下且甲方______________正式从房地产管理部门拿到房地产证书之日,甲方_________将乙方_________个人支付的人民币_______________(_________元)一次返还给 _________。

五、以上协议双方必须严格遵守,不得违反。若一方违约,则应向守约方每日支付房屋总价款额千分之十的违约金。

六、本协议一式三份,甲乙双方及见证律师各执一份; 甲乙双方及见证律师三方签字后即生效。

甲方(签字):_________乙方(签字):_________

_________年____月____日_________年____月____日

见证人(签字):_______

_________年____月____日

展开阅读全文

更多相似范文

篇1:技术出口合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,外贸,全文共 49001 字

+ 加入清单

技术出口合同范本

Contract for Equipment Sales and Technology Licensing

Contract No. ____________________

This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

Article 1 Definitions

1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

1.5 “Destination Airport” refers to _____________Airport.

1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

Article 2 Scope of the Contract

2.1 The Seller’s Obligation

2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

2.2 The Buyer’s Obligation

2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

Article 3 Grant of License

3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

3.4 Territory

3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

Article 4 Price

4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

The breakdown price is as follows:

The price for Equipment is __________(say _______________________ only).

Fee for design is __________(say _______________________ only).

Fee for Technical Documentations is __________(say _______________________ only).

License fee is __________________(Say: _________________ only)

4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 2019, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

4.2.3 The above price is fixed and firm.

4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

Article 5 Payment

5.1 Down Payment

Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

5.2 [Option One: Payment by Sight L/C]

The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) Bill of Lading in one (1) original and ___ ( ) copies;

(b) Commercial Invoice in one (1) original and ___ ( ) copies;

(c) Packing list in one (1) original and ___ ( ) copies;

(d) Certificate of Origin in one (1) original and ___ ( ) copies;

(e) Insurance Policy in one (1) original and ___ ( ) copies;

5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

(b)One ( 1 ) copy of commercial invoice.

5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

b) One (1) copy of Commercial Invoice.

5.2 [Option Two: Payment under a L/G]

The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

Article 6 Delivery of Equipment and Technical Documentation

6.1 The Delivery of the Equipment

6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

6.1.3 The port of shipment is ____, while the port of destination is ____.

6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

(a) Contract number

(b) Name of the vessel and loading port

(c) Name of the Equipment shipped

(d) Number and date of Bill of Lading

(e) Total volume

(f) Total gross and net weight

(g) Total number of packages/cases

6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

(a) Bill of Lading

(b) Commercial Invoice

(c) Packing List

(d) Certificate of Origin

(e) Insurance Policy.

6.2 The Late Delivery of the Equipment

6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

(a) From the first week to the fourth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per

week

(b) From the fifth week to the eighth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per week

(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

the value of the delayed portion of the Equipment per week

6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

6.3 The Delivery of the Technical Documentation

6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

6.3.4 In case of shortage, loss of or damage to the Technical Documentation due to the Seller’s reason, the Seller shall make supplement to the Buyer within ____ ( ) days after receiving the Buyer’s written notification without any further charge.

Article 7 Packing and Marking

7.1 The Equipment shall be packed to withstand long distance transportation, multiple handling.

7.2 The Seller shall mark the following on two opposite sides of each package with indelible painted English words:

(a) Destination

(b) Consignee

(c) Contract number

(d) Shipping mark

(e) Gross/net weight (kg)

(f) Case/ bale number

(g) Dimensions: L x W x H (cm)

7.3 Each package shall contain one (1) copy of packing list.

7.4 The Seller shall mark on the package, if necessary, “Handle with Care", “Right Side Up", “Fragile" or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods.

7.5 If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facilitate loading, unloading and handing.

(a) Destination

(b) Consignee

(c) Contract number

(d) Gross/net weight (kg)

(e) Item number

(f) Dimensions: L x W x H (cm)

Article 8 Technical Service and Technical Training

8.1 The Seller shall dispatch technical personnel to Job Site to render Technical Service in accordance with Contract according to a time schedule agreed upon between both parties. The number, specialty, rank, treatment of the personnel, and payment as well as the contents, and requirements of Technical Service are specified in Appendix 6.

8.2 The Buyer shall have the right to send its technical personnel to the relevant factory selected by the Seller for training. The number, speciality, treatment of the personnel, and payment as well as the contents, time schedule, and requirement of training, are specified in Appendix 7.

8.3 Either party shall provide assistance to the other party’s technical personnel in their application for visa, working permit, and/or other necessary formalities for rendering Technical Service or training under the Contract in the other party’s factory.

8.4 Either Party’s technical personnel shall abide by the laws of the other party’s country and the regulations of the other party during their stay in the other party’s country.

Article 9 Standards and Inspection

9.1 The Seller shall carry out the design, manufacture, inspection and test of the Equipment according to the existing standards of the People’s Republic of China, namely GB.

9.2 The Seller or the manufacturer shall, at his own costs and expenses, inspect the Equipment and issue the ex-work quality certificate.

9.3 The open-case inspection of the Equipment shall be performed by the Buyer in the presence of the Seller’s representatives on the Job Site in days after the arrival of the Equipment at the Job Site. The open-case inspection fee shall be borne by the Buyer.

The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s representatives in their inspection work.

9.4 During the joint open-case inspection, a detailed inspection record shall be made and signed by the representatives of both parties.

In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. Any of such claims shall be lodged by the Buyer within month(s) after the arrival of the Equipment at the Job Site.

9.5 If any shortage, defect of or damage to the Equipment is found in open-case inspection not attributable to the Seller’s responsibility, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties.

9.6 The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent.

If there is no joint open case inspection due to the reasons not attributable to the Seller, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition.

Article 10 Design and Design Liaison

10.1 The Buyer shall provide to the Seller within ____ ( ) days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. The Seller shall not be liable to the Buyer for, and the Buyer shall indemnify the Seller and hold the Seller harmless from any damages or failure caused by the incompleteness, incorrectness and/or inaccuracy of any such information and data.

10.2 A design liaison meeting shall be held in the ____ ( ) month after receiving above mentioned design data, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details.

10.3 During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively.

Article 11 Erection, Test Run, Commissioning, Performance Test and Acceptance

11.1 The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer.

11.2 Chief Representatives

11.2.1 Each party shall nominate one (1) Chief Representative to deal with the technical matters during the period from the start of the Erection to Acceptance of the Equipment.

11.2.2 Detailed arrangements shall be made through friendly discussions by the Chief Representatives of both parties. The Chief Representatives of both parties shall fully cooperate to carry out their duties stipulated in the Contract, however they have no right to revise, alter or amend the Contract without the written authorization of both parties.

11.2.3 The Chief Representatives of both parties shall communicate through Linking Sheet for the matters relative to opinions, suggestions and information. The linking sheet shall be countersigned by the other party.

11.3 Erection and Test Run

11.3.1 The Erection shall be completed by the Buyer in ____ ( ) days from the effective date of the Contract. The Seller’s Chief Representative shall arrive at the Job Site ____ ( ) days prior to the beginning of the Erection.

11.3.2 When Erection is completed and in full conformity with requirements of the Technical Documentation, a Certificate of Completion for Erection of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing said Certificate shall be deemed as the date of completion of Erection.

11.3.3 As soon as the completion of Erection, Test Run for single machine and the whole system of the Equipment shall be started.

11.3.4 When Test Run has been successfully performed, a Certificate of Completion for Test Run of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing the said Certificates shall be deemed as the date of completion of Test Run of the Equipment.

11.4 Commissioning and Performance Test

11.4.1 Within ____ ( ) days after the completion of the Test Run, the Buyer shall make available qualified operation and maintenance personnel, raw materials, spare parts, utilities and other matters required for the Commissioning. Detailed procedures such as instrument calibrating, items of recording, sampling methods and analyzing methods, which are necessary for the Commissioning shall be discussed and agreed upon by the Chief Representatives of both parties.

If in the opinion of both parties, the Equipment is ready for the Commissioning, both parties shall confirm the readiness for the Commissioning in writing.

11.4.2 The Commissioning of the Equipment shall be started immediately after the confirmation of the readiness for the Commissioning. The Commissioning period shall ____ ( ) days after commencement of the Commissioning.

11.4.3 When the Seller and the Buyer consider that stable operation of the Equipment has been achieved, the date of Performance Test shall be fixed by Chief Representatives of both parties.

11.4.4 The Seller shall have the right to access to the laboratory and testing facilities in order to take samples and make analytical tests. The sample taking and analytical test during the Commissioning period will be done in the presence of the Chief Representatives of both parties.

11.4.5 During the period of Commissioning until Acceptance of the Equipment, the Seller may use the Buyer’s stored spare parts. Should the Buyer’s stored spare parts be used by the Seller due to the Seller’s responsibility, the Seller shall replenish the stores with the same in time at Job Site; otherwise the Seller shall provide the same at the Buyer’s costs upon the Buyer’s timely request.

11.4.6 If the result of Performance Test has reached the guarantee figures as per Appendix 1, the Acceptance Certificate of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days.

11.4.7 If the Performance Test cannot meet guarantee figures specified in Appendix 1, both parties shall jointly make investigations so as to find out the reason for clarifying the responsibility.

11.4.8 If the guarantee figures are not met due to the Seller’s reason, the Buyer shall agree to give an extension of ____ ( ) months so that the Seller can make improvement or adjustment to the Equipment and conduct further Performance Test. All the costs and expenses for making improvement or adjustment to the Equipment shall be borne by the Seller.

11.4.9 During the extension period, if the guarantee figures are still not met due to the Seller’s reason, the Seller shall pay the liquidated damages as per Appendix 1 to the Buyer against the Acceptance Certificate signed by both parties.

The Seller’s aggregate liability to pay liquidated damages for failure to attain the performance guarantees shall not exceed ____ ( ) percent of the Equipment price. The Seller shall have no further liability whatsoever to the Buyer in respect of such failure after payment of the liquidated damages.

11.4.10 If the non-achievement of the guarantee figures is due to the reasons not attributable to the Seller, the Seller shall agree to give an extension of ____ ( ) months. During the extension period all costs thereto incurred for the adjustment of the Equipment, as well as the costs and expenses for the Seller’s technical personnel shall be borne by the Buyer. In case the guarantee figures still can not be achieved due to the reasons not attributable to the Seller in the extension period, the Equipment shall be accepted by the Buyer. Both parties shall sign the Acceptance Certificate.

11.5 Acceptance

11.5.1 Acceptance shall occur in respect of the Equipment when :

(a) Performance Test has been successfully completed as per the Article 11.4.6.; or

(b) The Performance Test has not been completed due to the reasons not attributable to the Seller such as delayed civil construction, lack of and/or any other inconformity of raw materials, spare parts of the Buyer’s scope of supply under Appendix 2, and utilities with the requirements of the Contract in the ____ ( ) months from the date of Bill of Lading of the Last Shipment; or

(c) The Seller has paid the liquidated damages as per Article 11.4.9; or

(d) The guarantee figures still can not be reached due to reasons not attributable to the Seller’s reason in the extension period as specified in Article 11.4.10; or

(e) The Buyer takes the single machine and the whole system of the Equipment into use without the Seller’s approval.

11.5.2 At any time after any of the events set out in Article 11.5.1 has occurred, the Seller may give a notice to the Buyer requesting the issuance of the Acceptance Certificate.

11.5.3 The Buyer shall within seven (7) days after receipt of the Seller’s notice, issue such Acceptance Certificate.

11.5.4 If within seven (7) days after receipt of the Seller’s notice, the Buyer fails to issue the Acceptance Certificate or fails to inform the Seller in writing, with convincing evidence, of the reason why the Buyer has not issued the Acceptance Certificate, the Equipment shall be deemed having been accepted on the seventh day of the Seller’s said notice.

11.5.5 After the Acceptance, the Seller’s responsibilities and obligations under the Contract shall be deemed having been fulfilled except those as stipulated in Article 12 and 14.

Article 12 Guarantee and Warranty

12.1 The Seller guarantees that:

(a) The Equipment supplied by the Seller shall be new and made of adequate materials, and in conformity with the technical requirements of the Contract;

(b) The Technical Documentation shall be complete, clear and correct.

12.2 The period of warranty given by the Seller under Article 12.1 shall be ____ ( ) months from the date of Acceptance or ____ ( ) months from the date of Last Shipment, whichever comes earlier.

12.3 Defect of the Equipment

12.3.1 During the Warranty Period, should any defect due to inferior materials or bad workmanship of the Equipment be found under normal operation, the Buyer shall give the Seller a notice stating the details, together with all available evidence.

The Seller shall take immediate action to eliminate the defect at the Seller’s expenses within the period agreed by both parties.

12.3.2 If certain defect can not be eliminated despite of several attempts, the Seller shall replace the defective parts with non-defective parts at the Seller’s costs and expenses.

12.3.3 If the defect is eliminated by the Buyer himself, subject to the Seller’s prior written consent, all the direct costs and expenses thus incurred shall be borne by the Seller.

12.3.4 The Seller may reduce the price of the defective Equipment according to the degree of inferiority or extent of damage as agreed by both parties. After the reduction the Seller shall be released from its obligations and liabilities.

12.3.5 During the Warranty Period, should any defect due to the Buyer’s improper operation or maintenance be found, the Seller will provide technical assistance to eliminate the defect or replace the defected parts upon Buyer’s requests. All the costs and expenses thus occurred shall be borne by the Buyer.

12.3.6 Subject to Article 12.3.1, The Seller shall not be responsible for any defect or damage to the Equipment arising out of any circumstances including but not limited to the following causes:

(a) Combination of the Equipment with any machinery, and/or component other than those supplied by the Seller; or

(b) Alteration, modification or repair without the Seller’s prior written consent; or

(c) Failure of the Buyer to follow the Technical Documentation and instructions of the Seller, including the Buyer’s improper operation and maintenance; or

(d) Normal wear and tear.

12.4 During the Warranty Period, should the Technical Documentation supplied by the Seller be found incomplete, unclear or incorrect due to the Seller’s reason, the Seller shall be liable to supplement, replace or correct the Technical Documentation free of charge.

12.5 The Seller shall in no respect be understood or interpreted as liable for the commercial development of the Contract Products. The Buyer shall undertake the risk of the commercial development of the Contract Products.

12.6 In no circumstances, whether as a result of breach of contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, shall the Seller or its subcontractors or suppliers be liable for loss of profit or revenues, loss of production, loss of use, loss of information or data, cost of capital, cost of substitute equipment, facilities, services or replacement power, downtime costs, claims of the Buyer’s customers for such damages, or for any special, consequential, incidental, indirect or exemplary damages.

12.7 Notwithstanding anything to the contrary provided in the Contract, the aggregate liability of the Seller to the Buyer , on all claims of any kind, whether in contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, arising out of the performance or breach of the Contract or use of any Equipment or exploration of the Patent and/or Know-how shall not exceed ____ ( ) percent of the total Contract price.

12.8 All Contractual obligations of the Seller shall be deemed as having been fulfilled upon the expiry date of the Warranty Period.

Article 13 Intellectual Property Right

13.1 The Seller represents that it is entitled or authorized to grant the license to the Buyer to use the Patent and/or Know-how for the purpose as specified in Article 3.

13.2 The Buyer shall not use such Patent and/or know-how received from the Seller for any purpose other than that as specified in this Contract.

13.3 Any intellectual property right or other technical information granted by the Seller to the Buyer shall remain the property of the Seller. In no circumstances shall any terms and conditions in this Contract be construed, deemed, or interpreted as transfer of title to the Buyer of any information which may be delivered to or accessed by the Buyer.

13.4 Registration of the Contract and Maintenance of Patent

13.4.1 The Buyer shall, after the Contract is signed between both parties, make sure that the Contract is registered with or filed to the competent authorities in the Buyer’s country if it is required by law.

13.4.2 The Seller shall, during the validity period of the Contract, make all reasonable efforts to maintain Patent in force in the territory as stipulated in Article 3.4.1 and bear the costs thus incurred. The Buyer shall not make any action or inaction which may lead to invalidation or compulsory licensing of the Patent.

13.5 Improvement and Grant-back

13.5.1 Should any Improvement be made by the Seller on Patent and/or Know-how within the validity period of the Contract, which shall be the exclusive property of the Seller, the Seller shall grant the Buyer a non-exclusive license to exploit such Improvement at latest __________months from its improving, provided that the license fee is agreed upon between both parties.

13.5.2 The Buyer shall be entitled to make Improvement on Patent and/or Know-how within the validity period of the Contract. The Seller shall have the right to obtain and make use of the Improvement. The license fee shall be discussed between both parties in due time.

13.5.3 Both parties shall keep Improvement confidential. Neither party shall be entitled to grant any third party a sub-license on Improvement made and provided by the other party without previous written consent of the other party.

Article 14 Confidentiality

14.1 After signing of the Contract, both parties shall keep secret all the contents, terms, conditions of the Contract.

14.2 The Buyer shall take proper measures to keep strictly confidential of Know-how, Technical Documentation, Improvement and any other secret information obtained or accessible to from the Seller. The Buyer shall not disclose any of them to any third party, and shall not make use of them without prior written consent of the Seller except otherwise stipulated in the Contract.

14.3 The Buyer may disclose the secret information as described in Article 14.2 to the personnel of its own, or of any related parties engaged in the performance of the Contract subject to Article 14.2, strictly to the extent as essential for the implementation of the Contract, provided that the individuals and/or parties accessing or may access such secret information are engaged to undertake in written form the same confidential liability of the Buyer to the Seller. Any breach of confidentiality obligations by any personnel from the Buyer or the Buyer’s related parties shall be deemed as breach of the Contract by the Buyer.

14.4 Notwithstanding this Article 14, the Seller may furnish to its sub-contractor such documents, data, and other information received from the Buyer to the extent required for performing the Contract, in which event the Seller shall obtain from such sub-contractor an undertaking of confidentiality similar to that imposed on the Seller under the Article 14.

14.5 This Article 14 shall survive the expiration or termination of the Contract.

14.6 The confidential obligation shall not apply to the information which:

A. now or hereafter enters the public domain; or

B. can be proved to have been in the possession of the Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto; or

C. otherwise lawfully becomes available to either party from a third party under no obligation of confidentiality.

Article 15 Taxes and Duties

15.1 All taxes and duties in connection with the signing and performance of the Contract, levied by Governments of the People’s Republic of China, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Seller.

15.2. All taxes and duties in connection with the signing and performance of the Contract levied on the Buyer and Seller by the Buyer’s Governments, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Buyer. The Buyer shall pay in due time and full amount and hold the Seller harmless from any taxes and duties in case incurred to the Seller in the signing and performance of the Contract.

15.3 All import taxes and duties for tools and/or instruments, which the Seller or the Seller’s personnel may bring to the Buyer’s country for the execution of the Contract, shall be borne and paid by the Buyer.

15.4 Any and all taxes and duties in connection with the signing and performance of the Contract levied in any place except the cases as specified in Article 15.1 are not included in the Contract price. Should the Seller make the relevant payment directly as the case may be, both Parties agree to amend the Contract price to fully compensate the Seller for the payment, and the Buyer shall fully refund the Seller for the relevant amount within_______( ) days from the Seller’s payment.

Article 16 Force Majeure

16.1 If either of the Contract parties is prevented from executing the Contract due to the event of Force Majeure such as war, riot, coup, embargo, flood, typhoon, tornado, snowstorm, earthquake and other events which could not be foreseen, avoided and overcome, the affected party shall notify the other party by fax within the shortest possible time of occurrences of the Force Majeure and send a certificate issued by competent authorities or agency certifying the event of the Force Majeure by registered or express mail within fourteen (14) days following its occurrence.

16.2 The affected party shall not be liable for any delay or failure in performing any of its obligations due to the event of Force Majeure. However the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure as soon as possible.

16.3 Both parties shall proceed with their obligations immediately upon the cease of the event of Force Majeure or the removal of the effects and the term of the Contract shall be extended correspondingly. Should the effect of the event of Force Majeure last for more than one hundred and twenty (120) days, either party shall have the right to terminate the Contract by a written notice.

Article 17 Applicable Law and Settlement of Disputes

17.1 The applicable law of the Contract shall be the laws of the People’s Republic of China.

17.2 All disputes arising from or in connection with the Contract shall be settled through friendly consultation between both parties. In case no agreement can be reached, the dispute shall be submitted for arbitration.

17.3 The arbitration shall be conducted by China International Economic and Trade Arbitration Commission (CIETAC) in Beijing in accordance with Arbitration Rules of the Commission in effect at the time of applying for arbitration. The tribunal shall be composed of three arbitrators.

17.4 The arbitral award shall be final and binding upon both parties.

17.5 During proceedings of arbitration, the undisputed part of the Contract shall be performed continuously by both parties regardless of such arbitration proceedings.

Article 18 Effectiveness, Term and Termination of the Contract

(a) The Seller and the Buyer sign the Contract;

(b) The Contract shall be approved by the competent authorities and/or banks of both parties (if applicable);

(c) The Seller receives the Down Payment;

(d) The Seller duly receives the L/C (or L/G ) issued by the Buyers Bank.

18.2 Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.

18.3 If the Contract has not become effective pursuant to Article 18.1 within ____ ( ) months after the date of signing this Contract, the Seller has the right to make an equitable adjustment to the total Contract price and the time for delivery and/or other relevant conditions of the Contract. Should no agreement is reached for the above mentioned adjustment within ____ ( ) days from the Seller’s request of adjustment, the Seller shall be entitled to cancel the Contract.

18.4 The Contract shall be valid and remain in force for_____ (_____) years from the Date of Effectiveness, during which period the Buyer shall be entitled to manufacture the Contract Products with Patent and/or Know-how and sell the Contract Products within the licensed territory as specified in Article 3.4.

(Option 1) The Buyer shall not be entitled to manufacture with patent and/or know-how or sell the contract products after the aforesaid period unless the Buyer agrees to pay additional license fees in the amount and with the payment schedules and methods as agreed upon between both Parties in due time.

(Option 2) The Buyer shall be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after expiration of the Contract term specified above, provided that the Buyer shall not be released from its confidential obligations under the Contract.

(Option 3) The Buyer shall not be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after the expiration of the Contract term specified above, and shall return to the Seller all the Technical Documentations specified in Appendix 4 without remaining any duplicate copies. Nevertheless the confidential obligations of the Buyer under Article 14 shall survive the Contract term.

18.5 Either party may, without prejudice to any other remedy for the other party’s following breach of the Contract, terminate the Contract in whole or in part by a written notice send to the other party, if the other party

A. fails to perform its payment obligation under the Contract and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

B. fails to perform its confidentiality obligation under the Contract; or

C. fails to perform any other obligations under the Contract except minor parts thereof, and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

D. becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or dissolves, or ceases to do business, or be ordered to close down / to cease to do business / to dissolve, or has its business license revoked, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events.

18.6 Either party may, without prejudice to any other remedy, terminate the Contract in whole or in part by a written notice send to the other party, if

A. The other party is prevented by the laws, statutes, rules or regulations of either country from performing its obligations under the Contract; or

B. The Seller is prevented by the relevant authority of the Buyer’s country from being paid in accordance with the Contract; or

C. The other party is prevented from performing its contractual obligations by any event of Force Majeure for more than one hundred and twenty (120) days.

18.7 In the event of termination of the Contract, without prejudice to any other remedies available according to the Contract and/or applicable laws,

The Buyer shall cease all its further exploitation of the Patent and/or Know-how and any acceptance of further orders from third parties for the Contract Products.

All the delivered literatures, drawings, samples, instruments, equipment, and other documents including the interpretations related to Patent and/or Know-how shall be returned to the Seller as the Seller’s requests.

All the contracts on sales of the Contract Products signed between the Buyer and third parties shall be terminated by the Buyer, otherwise the Seller shall be paid accordingly.

In case the termination is due to the Seller’s default, the Buyer shall be entitled to complete the performance of the contracts on sales of the Contract Products already signed between the Buyer and third parties before the termination.

The Seller shall be paid by the Buyer for all the contractual obligations performed by the Seller till the date of termination within _______days from receipt of the termination notice.

E. Termination of the Contract shall not release either party from its confidential obligations under the Contract

Article 19 Miscellaneous

19.1 The Contract is signed by the authorized representatives of both parties in ____ ( ) originals. Each party shall keep ____ ( ).

19.2 The Contract supersedes all communications, negotiations and agreements between the parties prior to the signing date of this Contract.

19.3 All amendments, supplements and alternations to terms of the Contract shall be made in written form and signed by the authorized representatives of both parties. These amendments, supplements and alternations shall form integral parts of the Contract.

If any costs occur or delivery delay due to amendment or explanation of the new law or statute or regulations enacted by the Buyer’s country after the effectiveness of the Contract,the Seller shall have the right to ask for necessary adjustment in relation to the Contract price and the delivery schedule.

19.4 No assignment, cession, novation, or transfer of any right or obligation under this Contract shall be made by either party to a third party without the prior written consent of the other party.

19.5 All communications between both parties in the course of implementation of the Contract should be in English language in written form at the address set forth below. The faxes concerning the important matters shall be confirmed in due time by registered or express mail or letter delivered by hand.

The Buyer:

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

The Seller :

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be duly executed.

The Buyer:

The Seller:

By:______________________[Signature]

Name: [printed name]

By:_______________________ [Signature]

Name: [printed name]

Title:

Title:

Appendices

Appendix 1 Specifications and Guarantee Indices (Omitted)

展开阅读全文

篇2:网站建设技术咨询合同

范文类型:合同协议,适用行业岗位:技术,全文共 1080 字

+ 加入清单

甲方:

乙方:

依据《中华人民共和国民法典》的规定,甲、乙双方就网站建设服务、软件技术服务事项的内容,经双方协商一致,本着平等互利的原则,特订立以下合同条款,以兹遵守。

一、服务内容

乙方向甲方提供网站建设服务、软件技术咨询、指导服务。

二、协议期限

本合同有效期为一年,自年月日至年月日。

三、甲方的权利和义务

1、提供专人与乙方联络;

2、提供服务所需的资料给乙方,并保证资料的合法性和正确性;

3、按照合同要求及时、足额支付服务费用;

4、甲方将在著作版权法的范围内使用本合同标的及相关作品、程序、文件源码,不得将其复制、传播、出售或许可给其它第三方;

5、甲方对合同中的网站建设的网页、图像享有排它的使用权;

6、应向乙方提供详细的软件使用环境说明、发现问题时的程序报错信息,并将这些信息及时提交给乙方。

四、乙方的权利和义务

1、提供专人与甲方联络;

2、在合同要求的期限内,完成甲方网站的建设维护和软件技术服务,并及时通知甲方进行验收;

3、在验收期内甲方要求下,对不合格的地方进行修改;

4、向甲方提供软件安装、使用、模板制作等各类咨询服务,对服务范围内的问题通过电子邮件、电话、传真等方式及时(两天之内)答复;

5、对甲方公司的商业机密进行保密。

五、费用的支付

1、费用以乙方每次提供服务实际发生费用为准,于服务工作结束后以服务确认单的形式进行确认;

2、甲方于双方共同签署服务确认单7日内以现金、转账支票或者汇款的方式向乙方支付费用;

3、乙方账户信息:

开户行:

账号:

六、违约责任

1、任何一方有证据表明对方已经、正在或将要违约,可以中止履行本合同,但应及时通知对方,若对方继续不履行、履行不当或者违反本合同,该方可以解除本合同并要求对方赔偿损失。

2、因不可抗力而无法承担责任的一方,应在不可抗力发生的3天内,及时通知另一方;

3、一方因不可抗力确实无法承担责任,而造成损失的,不负赔偿责任;本合同所称不可抗力是指不能预见、不能克服并不能避免且对一方当事人造成重大影响的客观事件,包括但不限于自然灾害如洪水、地震、火灾和风暴等以及社会事件如战争、动乱、政府行为等。

七、其它

1、如果本合同任何条款根据现行法律被确定为无效或无法实施,本合同的其它所有条款将继续有效;此种情况下,双方将以有效的约定替换该约定,且该有效约定应尽可能接近原约定和本合同相应的精神和宗旨;

2、甲乙双方发生争议应先协商解决,协商不成的,任意一方均有权向合同签署地的人民法院提起诉讼;

3、本合同经双方授权代表盖章之日起生效;

4、本合同一式两份,双方当事人各执一份,具有同等法律效力。

甲方:乙方:

代表人:代表人:

日期:日期:

展开阅读全文

篇3:技术传授合协议书

范文类型:合同协议,适用行业岗位:技术,全文共 659 字

+ 加入清单

甲方(签章):_________

乙方(签章):_________

1.甲方委托乙方研制_________装置,特商定如下合同:

2.技术要求:_________。

3.试制经费:

甲方向乙方提供研制经费_________元。乙方按协议、技术指标及进度要求完成,甲方另支付科研奖励费_________元。甲方并同意按每提前一个月另支付协作奖励费_________元,提前二个月为_________元。

乙方如不能按期完成,每推迟一个月,倒扣乙方项目费的_________%。

甲方在协议生效后先预付试制经费_________%,其余部分待项目验收后付清。

4.协作方式:

乙方在研制过程中,甲方派员参加共同协作试验。甲方负责提供工艺流程和工艺参数。乙方在控制台研制完成后到甲方生产现场调试。

5.试制进度:

控制台_______20__年底完成,接着前往生产现场调试,总进度于_________年_________月结束。

6.违约责任

乙方不履行合同,应退回甲方预付的试制经费,甲方不履行合同,不得追回预付乙方的试制经费,并赔偿乙方因此造成的损失。

7.争议及解决争议的方法:_________。

8.双方负有下列保密义务:_________。

9.研制成果归_________方所有。

10.研制工作因无法克服的技术原因而失败或部分失败时,责任由_________方承担。

甲方(签章):_________ 乙方(签章):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇4:最新技术服务合同样本_合同范本

范文类型:合同协议,适用行业岗位:技术,服务,全文共 3868 字

+ 加入清单

最新技术服务合同样本

托方(以下称甲方):_________

法定代表人或负责人:_________

服务方(以下称乙方):_________

法定代表人或负责人:_________

甲乙双方为携手合作,促进发展,满足利益,明确责任,依据中华人民共和国有关法律之相关规定,本着诚实信用、互惠互利原则,结合双方实际,协商一致,特签订本合同,以求共同恪守:

第一条 项目名称

_________。

第二条 服务内容、方式和要求

1.服务内容:

_________。

2.方式:

_________。

3.要求:

_________。

第三条 工作条件:

_________。

第四条 报酬及其支付方式:

1.本项目报酬(服务费或培训费):_________元。

服务方完成专业技术工作,解决技术问题需要的经费,由_________方负担。

2.本项目中介方活动经费为:_________元,由_________方负担。中介方的报酬为:_________元,由_________方支付。

3.支付方式为如下第_________种:

(1)合同生效后_________日内向乙方支付报酬总额的_________%;

(2)合同履行完成后(验收合格之日起)_________日内甲方向乙方支付全部报酬余额。

(3)其它方式:_________。

第五条 声明及保证

甲方:

1.甲方为一家依法设立并合法存续的企业,有权签署并有能力履行本合同。

2.甲方签署和履行本合同所需的一切手续均已办妥并合法有效。

3.在签署本合同时,任何法院、仲裁机构、行政机关或监管机构均未作出任何足以对甲方履行本合同产生重大不利影响的判决、裁定、裁决或具体行政行为。

4.甲方为签署本合同所需的内部授权程序均已完成,本合同的签署人是甲方的法定代表人或授权代表人。本合同生效后即对合同双方具有法律约束力。

乙方:

1.乙方为一家依法设立并合法存续的企业,有权签署并有能力履行本合同。

2.乙方签署和履行本合同所需的一切手续均已办妥并合法有效。

3.在签署本合同时,任何法院、仲裁机构、行政机关或监管机构均未作出任何足以对乙方履行本合同产生重大不利影响的判决、裁定、裁决或具体行政行为。

4.乙方为签署本合同所需的内部授权程序均已完成,本合同的签署人是乙方的法定代表人或授权代表人。本合同生效后即对合同双方具有法律约束力。

第六条 甲方的主要义务

1.在合同生效后_________日内向乙方提供下列技术资料、数据、材料、样品:

_________。

2.在接到乙方关于要求改进或更换不符合合同约定的技术资料、数据、材料、样品的通知后_________天内及时做出答复;

3.按约向乙方支付报酬,乙方开户银行帐户为_________。

4.协助乙方完成下列配合事项:

_________。

第七条 乙方的主要义务

1.在_________年_________月_________日前完成技术服务工作;

2.依照下列技术经济指标完成技术服务工作:_________;

3.发现甲方提供的技术资料、数据、样品、材料或工作条件不符合合同约定时,应在合同生效后_________天内通知委托方改进或者更换;

4.应对甲方交给的技术资料、样品等妥善保管;在合同履行过程中,如发现继续工作对材料、样品或设备等有损坏危险时,应中止工作,并及时通知委托方;工作完成后应归还上述技术资料、样品,不得擅自存留复制品。

第八条 保密条款

双方保证对从另一方取得且无法自公开渠道获得的商业秘密(技术信息、经营信息及其他商业秘密)予以保密。未经该商业秘密的原提供方同意,一方不得向任何第三方泄露该商业秘密的全部或部分内容。但法律、法规另有规定或双方另有约定的除外。保密期限为_________年。

一方违反上述保密义务的,应承担相应的违约责任并赔偿由此造成的损失。

第九条 技术成果收益归属

在履行本合同中,乙方利用甲方提供的技术资料和工作条件完成的新的技术成果,属于乙方所有。(注:当事人还可以有其他不同的约定)

第十条 甲方的违约责任

1.甲方未按照合同约定提供有关技术资料、数据、样品和工作条件,影响工作质量和进度的,应当如数支付报酬。逾期二个月不提供约定的物质技术条件,乙方有权解除合同,甲方应当支付数额为报酬总额_________%的违约金。

2.甲方迟延支付报酬,应当支付数额为报酬总额_________%的违约金,逾期二个月不支付报酬或者违约金的,应当交还工作成果,补交报酬,支付数额为报酬总额_________%的违约金。

3.甲方迟延接受工作成果的,应支付数额为报酬总额_________%的违约金和保管费。逾期二个月不领取工作成果的,乙方有权变卖、处理工作成果,从获得的收益中扣除报酬、违约金和保管费后,剩余部分返还甲方,所获得的收益不足抵偿报酬、违约金和保管费的,有权请求甲方赔偿损失。

第十一条 乙方的违约责任

1.擅自不履行合同,应当免收报酬并支付数额为报酬总额_________%的违约金。

2.未按约定的期限完成工作的,应支付数额为报酬总额_________的违约金。

3.未按质按量完成工作的,应当负责返工改进或如数补。如果给甲方造成损失的,应赔偿损失;

4.在工作时间,发现对方提供的技术资料、数据、样品、材料或工作条件等不符合合同规定,未按约定期限通知委托方,造成技术服务工作停滞、延误或不能履行的,应酌减或免收报酬;

5.在工作期间,发现委托方提供的物品有受损的危险,未按约定期限通知委托方,应对由此造成的损失承担责任。

6.违反合同约定、擅自将有关技术资料、数据、样品或工作成果引用,发表或提供给第三人,应支付数额为报酬总额_________%的违约金。

7.对甲方交付的样品,材料及技术资料保管不善,造成灭失、短少、变质、污染或者损坏的,应赔偿损失。

第十二条 验收标准和方法

1.验收时间:_________;

2.验收地点:_________;

3.验收标准:本合同约定的各项技术指标;

4.验收方法:由甲方组织有关同行业专业技术人员验收,写出验收报告;

5.验收费用由_________方负担。

第十三条 保证期为_________(年/月)。在保证期内发现服务质量缺陷的,乙方应当负责返工或者采取补救措施。但因甲方使用、保管不当引起的问题除外。

第十四条 不可抗力

本合同所称不可抗力是指不能预见、不能克服、不能避免并对一方当事人造成重大影响的客观事件,包括但不限于自然灾害如洪水、地震、火灾和风暴等以及社会事件如战争、动乱、政府行为等。

如因不可抗力事件的发生导致合同无法履行时,遇不可抗力的一方应立即将事故情况书面告知另一方,并应在_________天内,提供事故详情及合同不能履行或者需要延期履行的书面资料,双方认可后协商终止合同或暂时延迟合同的履行。

第十五条 通知

1.根据本合同需要发出的全部通知以及双方的文件往来及与本合同有关的通知和要求等,必须用书面形式,可采用_________(书信、传真、电报、当面送交等方式)传递。以上方式无法送达的,方可采取公告送达的方式。

2.各方通讯地址如下:_________。

3.一方变更通知或通讯地址,应自变更之日起_________日内,以书面形式通知对方;否则,由未通知方承担由此而引起的相应责任。

第十六条 争议的处理

1.本合同受_________国法律管辖并按其进行解释。

2.本合同在履行过程中发生的争议,由双方当事人协商解决,也可由有关部门调解;协商或调解不成的,按下列第_________种方式解决:

(1)提交_________仲裁委员会仲裁;

(2)依法向人民法院起诉。

第十七条 解释

本合同的理解与解释应依据合同目的和文本原义进行,本合同的标题仅是为了阅读方便而设,不应影响本合同的解释。

第十八条 补充与附件

本合同未尽事宜,依照有关法律、法规执行,法律、法规未作规定的,甲乙双方可以达成书面补充协议。本合同的附件和补充协议均为本合同不可分割的组成部分,与本合同具有同等的法律效力。

第十九条 合同效力

本合同自双方或双方法定代表人或其授权代表人签字并加盖公章之日起生效。有效期为_________年,自_________年_________月_________日至_________年_________月_________日。本合同正本一式_________份,双方各执_________份,具有同等法律效力;合同副本_________份,送_________留存一份。

委托方(盖章):_________ 服务方(盖章):_________

负责人(签字):_________ 负责人(签字):_________

开户银行:_________ 开户银行:_________

帐号:_________ 帐号:_________

委托方担保人(盖章):_________ 服务方担保人(盖章):_________

地址:_________ 地址:_________

负责人(签字):_________ 负责人(签字):_________

开户银行:_________ 开户银行:_________

帐号:_________ 帐号:_________

_________年____月____日 _________年____月____日

签订地点:_________ 签订地点:_________

展开阅读全文

篇5:云南某级公路第合同段工程技术承包合同

范文类型:合同协议,适用行业岗位:工程,技术,全文共 2204 字

+ 加入清单

甲方: (身份证号 )(以下称甲方) 乙方: (身份证号 )(以下称乙方)

为优质、高效完成织纳高速公路房建项目合同段工程的施工任务,充分发挥各方优势,经甲乙双方平等协商,甲方将织纳高速公路房建项目合同段的工程技术资料编制工作交由乙方完成,双方达成以下协议:

一、 合作项目工程概况

1.1 项目名称:织纳高速公路房建项目

1.2 项目工程总造价: 元(大写: 元)

二、 协议范围

2.1 工程施工复测资料编制。

2.2 工程施工放样资料编制。

2.3 工程试验资料编制。

2.4 工程质检资料编制。

2.5 工程计量资料编制。

2.6 工程变更资料编制。

2.7 工程施工技术资料编制。

2.8 工程竣工资料编制。

三、 协议工期

3.1 从甲方通知乙方人员进场开始至工程交工为止。

3.2 双方拟定合作时间为 个月,即从20xx年5月6日至 年 月 日,工期共 个月,协议工期暂定总日历天数 天。

3.3 以上协议工期,包括施工复测时间、雨季及因建设方、甲方等原因造成工程停工的时间,不包括工程竣工资料编制时间。

3.4 若因建设方、甲方及雨季等原因工程无法完成,乙方不负任何责任。

3.5 如工期超出 个月,甲方应支付乙方超出工期的工程延期费用(详见4.2条)。

四、工程技术资料编制费用

4.1 工程技术资料编制费用:按织纳高速公路房建项目合同段工程实际工程总造价的1.2%(大写:百分之一点二)计算。

4.2 工程延期费:因乙方以外的原因造成乙方在该协议工期( 月)内无法完成协议范围的资料编制,从超出协议工期后第一个月起至该工程交工,甲方在该工程总造价的1.2%以外按平均每人每月8000元(大写:八千元)人民币支付给乙方作为超期费用(乙方技术人员暂定为八人)。

五、双方的一般责任

5.1 甲方的全权代表及甲方的责任

5.1.1 甲方全权代表姓名: (身份证号 )。

5.1.2 若甲方更换协议代表人,应提前15天以书面形式通知乙方,甲方后任代表人继续承担前任代表人应负的责任。

5.1.3 遵守该合同中包含的条款,对本工程履行甲方的义务和权利。 5.2 甲方的工作

5.2.1 向乙方免费提供食宿及办公场所。

5.2.2 甲方提供材料检验、试验产生的费用。

5.2.3 甲方现场施工人员必须配合乙方工作,隐蔽工程隐蔽之前甲方必须通知乙方到现场做记录,若甲方不能及时通知乙方,则甲方的现场管理人员必须做好隐蔽记录并转交给乙方,以保证乙方编制相关资料。若隐蔽前甲方未通知乙方且甲方现场人员未做隐蔽记录,造成的后果乙方不负任何责任。

5.2.4 甲方负责协调与监理、业主之间的关系,积极为乙方工作创造条件。

5.2.5 支付进度款:甲方按每期计量总额的1.2%支付给乙方。

5.2.6 负责工程变更的签证工作(乙方配合)。

5.2.7 负责协调参与竣工备案资料相关单位协调工作,并根据情况给予乙方补贴。

5.2.8 按照中华人民共和国《劳动法》的规定负责为乙方人员在中国人寿保险公司办理个人人身保险。

5.3 乙方的全权代表及乙方的工作

5.3.1 乙方全权代表姓名: (身份证号 )。

5.3.2 若乙方更换协议代表人,应提前15天以书面形式通知甲方,乙方后任代表人继续承担前任代表人应负的责任。

5.3.3 遵守该合同中包含的条款,对本工程履行乙方的义务和权利。

5.3.4 负责工程施工复测资料编制;工程施工放样资料编制;工程实验资料编制;工程质检资料编制;工程计量资料编制;工程变更资料编制;工程施工技术资料编制;工程竣工资料编制。

5.3.5 配合甲方负责隐蔽工程的验收并完成相关资料编制。

5.3.6 配合施工现场的文明施工管理资料的收集工作。

5.3.7 按照该协议完成协议范围内的资料编制及协助甲方完成工程变更的签证工作。

5.3.8 负责按工程进度及时做好计量工作。

5.3.9 负责该协议范围内的资料及变更资料的保管,待交工验收后统一移交给甲方。

5.3.10 乙方技术人员必须遵守执行甲方的一切规章制度。

六、资料编制费用的支付方式

6.1 乙方各专业人员进驻现场后,甲方即支付80000元(大写:八万元)人民币给乙方作为进场启动资金。

6.2 工程资料编制费用:甲方按每期计量总额的1.2%支付给乙方。甲方在该工程现场施工结束、资料编制完成后30天内付清剩余该工程技术资料编制费用给乙方。

七、双方违约责任

7.1 甲方在每期计量工作结束后 15 天内支付乙方进度款,如因甲方未按时支付乙方进度款造成乙方工作无法进行及乙方的一切损失,由甲方负责。

7.2 甲方在该工程交工验收后30天内付清剩余该工程技术资料编制费用。甲方可暂扣留乙方15万元待竣工备案资料完成后10天内支付给乙方。

7.3 乙方因自身原因未按时上交资料或经过反复修改仍不合格,将支付 元给甲方。

7.4 结算上报金额与审定金额之间的差额产生的审计费用及产生的处罚乙方不承担任何责任。

7.5 甲、乙双方按以上各条款执行,或双方协商解决,协商不成,双方约定交由有相应管辖权的人民法院处理。

7.6 该协议签定后甲、乙双方在其中一方不同意的情况下不得废除该协议,否则将赔偿对方一百万作为违约金。

本协议一式八份,甲、乙双方各执四份,自签定之日起生效,其中任何一份都具有法律效力。

甲方(章或手印): 乙方(章或手印):

法定代表人: 法定代表人:

联系电话: 联系电话:

合同签订地:

签订日期: 年 月 日 签订日期: 年 月 日

展开阅读全文

篇6:专利技术许可合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 2618 字

+ 加入清单

专利技术许可合同范本

xx公司(以下简称受让方)为一方,

yy公司(以下简称出让方)为另一方;

鉴于出让方是技术的专利权持有者;

鉴于出让方有权,并且也同意将专利技术的使用权、制造权和产品的销售权授予受让方;

鉴于受让方希望利用出让方的专利技术制造和销售产品;

双方授权代表通过友好协商,同意就以下条款签订本合同。

第一条 定义

1.1 专利技术--是指本合同附件一中所列的技术,该技术已于年×月×日经中国专利局批准,获得了专利权,其专利编号为。

1.2 出让方--是指国市公司,或者该公司的法人代表、代理和财产继承者。

1.3 受让方--是指中国公司,或者该公司的法人代表、代理和财产继承者。

1.4 合同产品--是指合同附件二中所列的产品。

1.5 合同工厂--是指生产合同产品的工厂,该工厂在省市,名叫工厂。

1.6 净销售价--是指合同产品的销售发票价格扣除包装费、运输费、保险费、佣金、商业折扣、税费、外购件等费用后的余额。

1.7 专利资料--是指本合同附件一中所列的有关资料。

1.8 合同生效日--是指本合同双方有关当局的最后一方的批准日期。

第二条 合同范围

2.1 受让方同意从出让方取得,出让方同意向受让方授予合同产品的设计、制造和销售的权利。合同产品的名称、型号、规格和技术参数详见本合同附件二。

2.2 出让方授予受让方在中国设计制造合同产品、使用、销售和出口合同产品的许可权,这种权利是非独占性的,是不可转让的权利。

2.3 出让方负责向受让方提供合同产品的专利资料,包括专利的名称、内容、申请情况和专利编号等,具体的资料详见本合同附件一。

2.4 在合同的执行中,如果受让方需要出让方提供技术服务或一部分生产所需的零部件或原材料时,出让方有义务以最优惠的价格向受让方提供,届时双方另行协商签订合同。

2.5 出让方同意受让方使用其商标的权利。在合同产品上可以采取双方的联合商标,或者标明根据出让方的许可制造的字样。

第三条 合同价格

3.1 按照第二条规定的内容和范围,本合同采用提成方式计算价格,计价的货币为美元。

3.2 本合同提成费的计算时间从合同生效之日后的第个月开始,按日历年度计算,每年的12月31日为提成费的结算日。

3.3 提成费按当年度合同产品销售后的净销售价格计算,提成率为%,合同产品未销售出去的不应计算提成费。

3.4 在提成费结算日后10天之内受让方应以书面通知的形式向出让方提交上一年度合同产品的销售数量、净销售额和应支付的提成费,净销售额和提成费的具体计算方法详见本合同附件三。

3.5 出让方如需查核受让方的帐目时,应在接到受让方根据第3.4条规定开出的书面通知后10天之内通知受让方,具体的查帐内容和程序详见本合同附件四。

第四条 支付条件

4.1 本合同第三条中规定的提成费,受让方将通过银行(此处为受让方的业务银行)和银行(此处为出让方的业务银行)支付给出让方,支付中使用的货币为美元。

4.2 出让方在收到受让方按第3.4条的规定发出的书面通知后应立即开具有关的单据,受让方在收到出让方出具的下列单据后30天内,经审核无误,即支付提成费给出让方:

a.提成费计算单一式4份;

b.商业发票一式4份;

c.即期汇票一式2份。

4.3 按本合同规定,如出让方需要向受让方支付罚款或赔偿时,受让方有权从上述支付中直接扣除。

第五条 资料的交付和改进

5.1 出让方应按本合同附件二的规定向受让方提供专利资料的名称、内容,以及出让方向中国专利局申请专利的有关情况。

5.2 出让方应在签订合同的同时,将第5.1条中规定的专利资料交付给受让方。(注:由于专利资料都是现成的,因此要求出让方在签约时提交。)

5.3 在合同有效期内,双方对合同产品涉及的技术如有改进和发展,应相互免费将改进和发展的技术资料提供给对方使用。

5.4 改进和发展的技术,其所有权属于改进和发展一方,另一方不得利用这些技术资料去申请专利或转让给第三方。

第六条 侵权和保证

6.1 出让方保证是本合同一切专利技术和专利资料的合法持有者,并且有权向受让方转让,如果在合同执行过程中一旦发生第三方指控侵权时,则由出让方负责与第三方交涉,并承担由此引起的一切法律和经济上的责任。

6.2 出让方保证本合同中涉及的专利在合同执行期间是有效的和合法的。如果由于出让方的原因导致专利提前失效时,出让方应将专利失效后受让方支付的费用偿还给受让方,并按%的年息加计利息,与本金一起偿付给受让方。

6.3 在合同有效期间,出让方应按照中国专利局的有关规定按时缴纳专利维持费,以保持专利的有效性。

6.4 在合同执行期间,如果本合同涉及的专利的法律性质发生了变化,出让方应立即将此情况以书面形式告之受让方,然后双方再协商本合同的执行问题。

第七条 税费

7.1 中华人民共和国政府根据其现行税法征收受让方有关执行本合同的一切税费由受让方负担。

7.2 中华人民共和国政府根据其现行税法征收出让方与执行本合同有关的一切税费由出让方负担。

第八条 合同生效和其他

9.1 本合同由双方授权代表于年×月×日在北京签字。各方应分别向其有关当局申请批准,以最后一方的批准日期为本合同的生效日期。双方应尽最大努力争取在90天内获得合同的批准,然后用电传通知对方,并用信件确认。

9.2 本合同自签字之日起六个月如仍不能生效,双方均有权取消合同,一理本合同被取消,受让方应将第5.2条中规定的专利资料退还给出让方。

9.3 本合同的有效期从合同生效日算起共×年,有效期满后本合同自动失效。

9.4 本合同失效后,如果合同中涉及的专利仍然有效时,受让方不得继续使用此专利,如需继续使用,则应与出让方续签合同,本合同失效后,如果合同中涉及的专利也随之失效时,受让方可以继续使用此专利而不需要向出让方支付任何费用。

9.5 本合同期满时,双方发生的未了债权和债务不受合同期满的影响,应继续履行各自的责任。

9.6 在合同执行中,对其条款的任何变更、修改和增减,都须经双方协商同意并签署书面文件,作为合同的组成部分,与合同具有同等效力。

9.7 本合同由第一条至第九条和附件一至附件四组成,合同的正文和附件是不可分割的部分,具有同等法律效力。

9.8 本合同用英文书就,一式4份,双方各持2份。在合同有效期内,双方通讯以英文进行,正式通知应以书面形式,航空挂号邮寄,一式2份。合同双方的法定地址如下:

a.受让方:公司

受让方代表:

b.出让方:公司

出让方代表:

展开阅读全文

篇7:技术持股干股合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 2078 字

+ 加入清单

技术持股(干股)合同范本

关于技术方面的合同范本,请大家@第一范文网站寻找更多精彩信息

甲方:__________________________

乙方:___________________(公司)

第一条 合作宗旨和目的:

为了促进高科技生物技术的推广应用,推动高技术农业产业化经营和上市工作,现甲方和乙方充分利用其科技优势、投资优势、融资优势和品牌优势,共同进行涉及良种牛的胚胎技术的开发和应用推广工作,共同成立生物技术研究所。

第二条 拟成立研究所的基本情况为:

1. 研究所名称:______________________

2. 组织形式:________________________

3. 注册资本:_______万元

4. 注册地:_______市______路_______大厦________楼

5. 法定代表人:________________________________

6. 职能和经营范围:为_______公司进行配套的_________牛和其他良种牛进行胚胎技术开发推广应用。

第三条 甲方出资条件及享有的权益条件约定如下:

1. 甲方无需进行实物、土地使用权、货币、有价证券的投入。

2. 甲方以其专有的技术投入研究所,如系专利或专利技术则需办理产权转移手续。

3. 乙方同意甲方技术折成研究所股份_______%,即乙方拥有研究所的________%的股权。

4. 甲方投入的技术必须达到以下条件:(1)________(2)_________(3)_________ 。

5. 如甲方的技术无法办理转移手续,则乙方需为研究所工作满3年以上才可以拥有本条第3款规定的完全股权,否则,依年份的长短计算,即甲方在研究所工作第一年为实现股权拥有率比例为研究所总股权的1/3,第二,第三年依此类推,未满1年以实际月份计算。

6. 甲方每满1年,于该年的会计年度末的最后珊瑚可以依据其拥有的_______%的股份权享有研究所的利润分成,如不参加研究工作或拒绝参加工作则不能享有。

第四条 如果甲方根据本协议第三条第5款项规定,乙方拥有甲方依约减少的股份。乙方_______元注册资金于______年_______月______日到位。

第五条 甲方根据勤勉原则以其拥有的技术为研究所工作。甲方到研究所工作的基本要求为:

1.组织胚胎技术的研究开发工作,以便能够适应甲方经营生产的_______;

2.组织乙方为研究所招聘的技术人员进行相关技术的培训工作,使其掌握相关技术3年;

3.甲方在经营生产中需积极配合乙方;

4.甲方拥有的技术描写为:(1)________(2)________(3)_________ 。

第六条 乙方拟将乙方公司上市,如乙方公司能够上市,乙方也同意将公司股份的10%送给甲方参股的研究所;如乙方公司未能申请上市,乙方也同意依前述比例赠送股份给研究所;甲方根据其在研究所持有有股权比例享有相关权。

乙主将本条规定10%的公司股权赠送给研究所,需甲方达到以下条件,否则,乙方无需承担上述义务:

1. 甲方必须为研究所工作满3年,实现乙方拥有总股权的5%,满6年后,有实现总股权的10%。

2. 甲方由乙方聘任为研究所的主任,副主任由乙方委托,主任缺位工作时,由副主任行使主任之职。前述工作的年限以聘书为准。聘任的工作为本协议第一条规定之内。

第七条 甲、乙双方同意研究所租用乙方的场地为工作场地,乙方以市场价格为准。

第八条 乙方负责研究所的成立注册事宜。研究所最迟到不得迟于______年______月______日成立。

第九条 研究所为营利性机构.甲、乙双方对研究所得分红根据《公司法》的会计制度执行。

第十条 研究所的会计由乙方委派,出纳由双方共同聘任。乙方有责任要求其委派的会计每月出一份研究所的会计报表供甲方查阅。

第十一条 当本协议第六条规定和条件满足之后,乙方必须依法对研究所进行分红和依法享有相关的股东权益(以整体的研究所作为股东)。

第十二条 研究所股份的转让需股东全体同意。乙方不能在5年内要求退股或转让研究所的股份。

第十三条 甲方不能以其技术干股要求研究所或甲方折成现金退出。

第十四条 甲方不得从事下列工作和进行其他同业竞争:

1. 不得利用其技术和其他机构进行合作或进行盈利性的工作;

2. 甲方不得免费为其他盈利性机构进行相关技术性工作。

第十五条 违约责任:任何一方违约将支付守约方10万元的违约金。

第十六条 纠纷的解决途径:出现纠纷,任何一方均可在_______市各级法院起诉。

第十七条 本协议于_______年_______月_______日生效。

甲方:_________(公章) 乙方:______________(公章)

地址:________________ 地址:______________________

代表:________________ 代表:______________________

联系电话:______________ 联系电话:__________________

_________年_______月_______日

展开阅读全文

篇8:项目技术咨询合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 1798 字

+ 加入清单

项目技术咨询合同范本

技术咨询合同具有以下特征:

1、技术咨询合同在技术领域内具有自己特定的调整对象,即合同当事人在完成一定的技术项目的可行性论证、技术预测、专题技术调查、分析评价报告等科学研究活动中产生的民事法律关系。

2、履行技术咨询合同的目的在于:受托方为委托方进行科学研究、技术开发、成果推广、技术改造、工程建设、科技管理等项目提出建议、意见和方案,供委托方在决策时参考,从而使用科学技术的决策和选择真正建立在科学化的基础之上。

3、技术咨询合同有其特殊的风险责任承担原则,即因实施咨询报告而造成的风险损失,除合同另有约定外,受托方不承担赔偿责任。

项目技术咨询合同范本

甲方:________

乙方:________

经上述双方当事人协商一致,签订本合同。

第一条 项目名称:_______

第二条 委托方的主要义务

⒈自本合同生效后____日内,向顾问方提供下列背景资料: __________

⒉向顾问方支付报酬共_____元;分期支付。具体方式如下_____________

第三条 顾问方的主要义务

⒈在____年__月__日前完成咨询报告或解答委托方提出的问题;

⒉保证提出咨询报告符合下列要求:________。

第四条 保密条款

本合同有效期内,双方当事人应对下列技术资料承担保密义务:_____。

本合同期满后____年内,双方当事人应对下列技术资料承担保密义务:______。

第五条 验收标准和方式条款

对顾问方提供的咨询报告,按以下标准验收:_________。

具体验收方式如下:__________.

第六条 委托方的违约责任

⒈委托方迟延提供合同约定的技术资料,或者所提供的数据,资料有严重缺陷,影响工作速度和质量的,应当如数支付报酬,并支付数额为_____的违约金。

⒉委托方逾期2个月不提供或者补充有关技术资料和数据,导致顾问无法开展工作的,顾问方有权解除合同。委托方应当支付数额为____的违约金。

⒊委托方迟延支付报酬,应支付数额为____的违约金委托方不支付报酬,应当退还咨询报告和意见,补交报酬,支付数额为_____的违约金。

第七条 顾问方的违约责任

⒈顾问方迟延提交咨询报告和意见的,应当支付数额为____的违约金;

⒉顾问方提交的咨询报告不符合合同约定条件的,应当减收或免收报酬;不提交咨询报告和意见,或者所提交的咨询报告和意见水平低劣,无参考价值的,应当返还报酬,支付数额为_____的违约金;

⒊顾问方在接到委托方提交的技术资料和数据之日起超过2个月不进行调查论证的,委托方有权解除合同,顾问方应当支付数额为____的违约金。

第八条 有关技术成果归属条款

在履行本合同过程中,顾问方利用委托方提供的技术资料和工作条件所完成的新的技术成果,除合同另有约定外,属于顾问方;委托方利用顾问方的工作成果所完成的新的技术成果,除合同另有约定外,属于委托方。对新的技术成果享有所有权(或者持有权)的一方当事人,可依法享有就该技术成果取得的精神权利(如获得奖金、奖章、荣誉证书的权利)、经济权利(如专利权、非专利技术的转让权,使用权等)和其他利益。

第九条 咨询报告的实施风险责任条款

委托方有实施顾问方提供的经过验收合格的咨询报告和意见过程中出现的不良后果和经济损失,由委托方承担责任。

第十条 本合同争议的解决办法:____________。

第十一条 名词和术语的解释:_________。

本合同自双方当事人签字、盖章后生效。

顾问方负责人(或授权代表) 委托方负责人(或授权代表)

签名:_________(盖章) 签名:_______(盖章)

签字时间:_________ 签字时间:________

签字地点:_________ 签字地点:________

开户银行:_________ 开户银行:________

帐号:___________ 帐号:__________

顾问方担保人(名称):___ 委托方担保人(名称):__

地址:___________ 地址:__________

负责人(或授权代表) 负责人(或授权代表)

签字:__________(盖章) 签字:_______(盖章)

签字时间:_________ 签字时间:________

签字地点:_________ 签字地点:________

开户银行:_________ 开户银行:________

帐号:___________ 帐号:__________

展开阅读全文

篇9:国际工程技术咨询服务合同_合同范本

范文类型:合同协议,适用行业岗位:工程,技术,服务,全文共 1553 字

+ 加入清单

国际工程技术咨询服务合同

编号:___________

中国________________公司(以下简称“甲方”)为一方,_________国________________公司(以下简称“乙方”)为一方,双方就工程的技术咨询服务,授权双方代表按下列条款签订本协议书:

一、甲方请乙方就工程提供技术咨询服务,乙方愿意提供这样的服务。

二、乙方向甲方提供的技术咨询服务范围如下

1.坝基岩体稳定、变形及基础处理措施。

2.大坝下游的防洪防冲和岸坡保护问题。

3.库岸滑坡涌浪问题及岸坡变形观测技术。

三、乙方的责任如下

1.乙方应于_______年______月内派遣_________名身体健康、能够胜任工作的专家来中国进行______天的技术咨询服务,派出技术咨询专家的名单应事先征得甲方同意。

2.乙方专家应到现场考察,并正确、全面地解答甲方人员提出的咨询问题,在离开中国前,向甲方提出咨询报告初稿,并在离开中国后一个月内提出正式咨询报告一式_______份,报告内容应包括附件一所列内容,并用英文书就。

3.乙方的专家在中国进行技术咨询服务的时间为_______个日历日(包括_______个旅途日和_______个周末日),每周工作六天,每天工作八小时。

4.专家在中国工作期间应遵守中国的法律和工作地区的有关规定。

5.乙方将正式的技术咨询报告给甲方寄出后,应以电传通知甲方如下内容:报告寄出日期、邮单号。

6.技术咨询报告如在邮寄途中丢失,乙方接到甲方通知后立即免费补寄。

四、甲方的责任范围

1.考虑到本协议第二、三条所规定的乙方所提供的咨询服务,甲方支付给乙方一笔总费用,其金额为______________________美元(大写________________________美元整)。国际工程技术咨询服务合同由精品信息网整理!

2.为乙方3名专家提供在中国境内食、宿及工作需要的交通。

3.提供工作必须的技术资料、图纸和技术文件。

4.提供在中国工作所需的翻译人员。

5.协助办理专家出入中国签证和在中国居留、旅行手续并提供方便。

五、费用的支付

1.本协议书的费用以美元支付。

2.本协议总金额25%,计_____________美元,在乙方派出的专家到_____________后,甲方凭收到下列单据,经审核无误后3天内通过___________银行和___________银行向乙方支付。

a.___________公司北京办事处出具的以甲方为受益人金额为协议总金额25%计_________(美元)不可撤销的保证函正副本各一份(保证函格式见本合同第二号附件)。

b.商业发票正本一份、复印本五份。

3.本协议总金额75%,计_________美元在乙方完成技术咨询服务并提交正式的技术咨询报告后,甲方凭收到下列单据,经审核无误后不迟于______天通过_________银行和_________银行向乙方支付。

a.商业发票正本一式六份。

b.即期汇票一式两份。

c.邮寄正式技术咨询报告的邮单或空运单一式两份。

六、凡在中国以外所发生的一切银行费用由乙方承担。在中国发生的一切银行费用由甲方承担。

七、双方应对互相提供的一切资料给予保密,未经对方书面同意不得向第三者透露。

八、税费

1.中国政府根据现行税法对甲方课征有关执行本协议的一切税费,由甲方支付。

2.中国政府根据现行《中华人民共和国个人所得税法》对乙方课征有关执行本协议的一切税费由乙方支付。

3.中国境外课征有关执行本协议所发生的一切税费将由乙方支付。

九、甲方和乙方在执行协议中发生的一切争执应通过双方友好协商解决。

十、执行本协议的一切文件与资料应以英文书写并采用公制。

十一、本协议书经双方签字后需经中国政府批准才能生效。本协议以英文写成一式两份,双方各执一份,具有同等效力。

展开阅读全文

篇10:建筑行业技术员聘用合同

范文类型:合同协议,适用行业岗位:建筑,技术,全文共 1704 字

+ 加入清单

甲方: (以下简称甲方)

乙方: (以下简称甲方)

甲方聘用乙方为建筑施工地现场项目经理,为确保建筑工程目标的顺利实施,明确责任,双方签约如下:

一、工作范围:

乙方在甲方授权负责的理,并有义务配合甲方竞争相应的工程项目,甲方可根据工程需要调配乙方的施工项目,

二、工程期限:

以甲方与建筑单位签订的建筑工程合同期限为准,聘用工作期限为一年,当工期超过一年时,本合同自动顺延至工程完工,超过聘用期限的薪酬按月平均工资乘以超过聘用期限的月数予以计算,或者双方对超过聘用期限的工资另签协议。

三、工作要求:

建筑工程的工程合格率、工程优秀率以甲方与建筑单位签订的建筑工程合同为准。重大伤亡事故为零。

四、工作形式:

1.甲方授权乙方,以甲方与建筑单位签订的建筑工程合同为依据,由乙方负责该项目工程的全部施工生产管理事宜。乙方无权向建筑单位提款及改变资金去向。乙方无权代表甲方购材料。

2.乙方的工资计算、发放:

乙方实行年薪____________,年薪为发放时间是与建筑单位签订的合同履行结束后。

五、风险抵押金:

介于甲、乙双方系有亲属关系的中间人介绍,甲方对乙方比较信赖,甲方不要求乙方直接缴纳风险抵押金,而是从工资中扣除合同终止时,如不发生违约事项,本金一次性发放给本人。

六、甲乙双方的权利、责任和义务:

1.甲方的权利、责任和义务:

1)要向乙方传达贯彻工程施工地的政策、法律、法规,引导和规范施工队走上规范化轨道,保证经营者合法权益,支持乙方依法在甲方授权范围内的经营自主权。

2)按规定交齐平帐票据后由甲方为乙方开据发货票。

3)设工程监督员参加乙方项目工程和施工生产的决策,并经常深入施工现场检查工程进度和质量。

4)督促检查乙方执行甲方各项规章年度情况。

5)甲方各部门要积极为乙方施工生产服务。乙方对甲方人员的推、拖、卡、要行为乙方有权予以抵制并向总经理报告。

2.乙方的权利、责任和义务:

1)为确保工程项目工期从 到 如期竣工各计划明细(进度计划、劳动力计划、用料计划、质量计划、安全目标)报公司及在办公室上墙;

2) 确保工程项目安全目标达到无隐患(随检随查,人身安全,电源设备,防火安全,高空作业)确保生产安全,人身安全事故控制值为零;

3) 确保对内与公司领导、对外与各有关单位沟通及时到位(“及时”是第一时间,“沟通到位”是重在解决问题);

4) 确保工程项目现场文明施工(不随地乱扔杂物、乱堆乱放,做到工完场清)树立公司形象;

5)工程施工中发生的增项增量及技术变更、签证,要及时收集、整理并向公司汇报。施工前,签证最迟时间不允许超过3天,超过3天视为工作不到位,在工程结束后要按其程度扣工资的10%;

6) 现场施工合理用料,减少用料损失率,根据使用材料不同,材料损耗率控制在2%~5%,超出部分由项目经理负责;

7)因项目经理个人失误和人为虚假论证造成的损失,项目经理负连带责任。

六、奖惩规定

1、采用新技术、新工艺、新方法施工,有创新或具有示范效应,视具体情况或创造的经济效益,给予项目经理奖励 元;

2、对超额完成计划,增加公司经济收益的项目经理,给予奖励________元人民币;

3、由于自身管理等原因,被建设单位投诉一次,给予项目经理________元的处罚;

4、出现的突发事件,项目经理未能及时果断处理,造成企业重大损失或因管理不善或决策失误,严重损害企业信誉度或造成企业巨大经济损失的,将给予项目经理元人民币的处罚;

七、违约责任。

违约一方给另一方造成的经济损失,应由违约一方赔偿另一方。双方都有责任的,各自责任范围内的承担。乙方在施工过程中违约甲方可以扣取风险抵押金、责令乙方整顿、停工直至解除合同。

八、争议的解决

1)甲乙双方本着友好的原则进行协商解决。

2)可直接向濮阳市华龙区人民法院进行诉讼。

九、本合同经双方签字后生效,合同未尽事宜双方可协商解决,也可签订补充协议,补充协议是本合同的组成部分,与本合同具有同等的法律效力。

八、本合同与上级文件有抵触时按上级文件执行。

九、其它事项。

本合同一式两份甲乙双方各一份。甲方与建筑单位的合同由甲方保存。乙方可留复印件以备查阅。

甲方:

乙方:

______年______月_____日

展开阅读全文

篇11:最新有关技术传授合同的样本_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 878 字

+ 加入清单

最新有关技术传授合同的样本

甲方:_________

乙方:_________

为了发展农村商品生产,提高_________生产的技术水平,提高经济效益,经甲乙双方充分协商,特签订本合同,以便双方共同遵守。

一、应乙方邀请,甲方到乙方居住地传授_________生产的技术。合同期限为_________年_________月,即从_________年_________月_________日起至_________年_________月_________日止。

二、至合同期满,甲方保证乙方达到如下技术水平:_________。

三、乙方负责提供甲方传授_________生产技术所必需的资金_________元,提供生产设备_________,保障_________原料的及时供应。乙方应严格服从甲方的技术指导。

四、在合同执行期间,乙方每月付给甲方报酬_________元,按月结算(或合同期届满统一结算)。甲方的食宿由乙方负责安排,费用由_________方负担。

五、合同期届满,如甲方的传授指导没有达到合同规定的技术要求,除退回乙方付给的报酬,赔偿乙方的一切损失外,还应向乙方偿付违约金_________元。如甲方中止执行合同,除应赔偿乙方的一切费用支出外,应向乙方偿付违约金_________元。如乙方不按合同规定的时间付给甲方报酬,迟付一日,应按迟付金额的_________%偿付给甲方违约金。如乙方中止执行合同,应付给甲方合同期内的全部报酬。

六、合同生效后,任何一方不得任意变更或解除合同。合同中如有未尽事宜,须经甲乙双方共同协商,作出补充规定,补充规定与本合同具有同等效力。

七、如遇人力不可抗拒的灾害造成合同无法履行时,由双方协商解决。

八、其他:_________。

九、本合同正本一式两份,甲乙双方各执一份。合同副本一式_________份,交_________等单位各留存一份。

甲方(签章):_________ 乙方(签章):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇12:技术合同:科技与资本对接项目合同_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 2096 字

+ 加入清单

技术合同:科技资本对接项目合同

甲方:_________

住所地:_________

法定代表人:_________项目联系人:_________

通讯地址:_________

电话:_________传真:_________

电子信箱:_________

乙方:_________

住所地:_________

法定代表人:_________项目联系人:_________

通讯地址:_________

电话:_________传真:_________

电子信箱:_________

丙方:_________

住所地:_________

法定代表人:_________项目联系人:_________

通讯地址:_________

电话:_________传真:_________

电子信箱:_________

本合同合作各方就_________项目事项,经过平等协商,在真实、充分地表达各自意愿的基础上,根据《中华人民共和国合同法》规定,达成如下协议,并由合作各方共同恪守。

第一条 本合同合作项目要求如下:

1.技术目标:_________

2.技术内容:_________

3.技术方法和路线:_________

4.规模及经济目标:_________

第二条 合作各方在本合同中,分工承担如下工作:

甲方:

1.内容:_________

2.工作进度:_________

3.期限:_________

4.地点:_________

乙方:

1.内容:_________

2.工作进度:_________

3.期限:_________

4.地点:_________

丙方:

1.内容:_________

2.工作进度:_________

3.期限:_________

4.地点:_________

第三条 为确保本合同的全面履行,合作各方确定,采取以下方式对合同完成进行组织管理和协调:_________

第四条 合作各方确定,各自为本合同的完成提供以下技术资料和条件:

甲方:_________

乙方:_________

丙方:_________

本合同履行完毕后,上述技术资料和条件按以下方式处理:_________

第五条 合作各方确定,按如下方式提供或支付本合同项目的经费及其他投资:

甲方:

1.提供或支付方式、时间:_________

2.支付或折算为投资金额:_________

3.使用方式:_________

乙方:

1.提供或支付方式、时间:_________

2.支付或折算为投资金额:_________

3.使用方式:_________

丙方:

1.提供或支付方式、时间:_________

2.支付或折算为投资金额:_________

3.使用方式:_________

第六条 以提供技术为投资的合作方应保证其所提供技术不侵犯任何第三人的合法权益。如发生第三人指控合作一方或多方因实施该项技术而侵权的,提供技术方应当:_________

第七条 本合同的变更必须由合作各方协商一致,并以书面形式确定。但有下列情形之一的,合作一方或多方可以向其他合作方提出变更合同权利与义务的请求,其他合作方应当在_________日内予以答复;逾期未予答复的,视为同意:

1._________

2._________

3._________

第八条 在本合同履行中,因出现在现有技术水平和条件下难以克服的技术困难,导致合作内容失败或部分失败,并造成合作一方或多方损失的,合作各方约定按以下方式承担风险损失:1._________

2._________

3._________

一方发现技术风险存在并有可能致使合同内容发生失败或部分失败的情形时,应当在_________日内通知其他合作方并采取适当措施减少损失。逾期未通知并未采取适当措施而致使损失扩大的,应当就扩大的损失承担赔偿责任。

第九条 合作各方确定因履行本合同应在保密内容(包括技术信息和经营信息),涉密人员范围,保密期限和泄密责任方面遵守保密义务:

甲方:_________

乙方:_________

丙方:_________

第十条 合作各方确定,按以下标准及方法对本合同内容最终完成进行验收:_________

第十一条 合作各方确定,因履行本合同所产生的最终技术成果及其相关知识产权权利归属,按下列方式处理:

1._________

2._________

3._________

第十二条 合作各方应以协商方式确定最终研究成果的完成人员名单。此完成人员享有在有关最终技术成果文件上写明技术成果完成者的权利和取得有关荣誉证书、奖励的权利。

第十三条 合作各方确定:任何一方或多方违反本合同约定义务,造成其他合作方工作停滞、延误或失败的,应当按以下约定承担违约责任:

甲方:_________

乙方:_________

丙方:_________

第十四条 合作各方确定,任何一方有权利用本合同项目的技术成果,进行后续改进。由此产生的具有实质性或创造性技术进步特征的新的技术成果,归(完成方、合作各方)方所有。具体相关利益的分配办法如下:_________

第十五条 为有效履行本合同,在本合同有效期内,合作各方确定各方项目联系人。项目联系人承担以下责任:

共2页,当前第1页12

展开阅读全文

篇13:劳动协议技术人员

范文类型:合同协议,适用行业岗位:技术,全文共 777 字

+ 加入清单

甲方:乙方:

甲方聘用乙方为______(东南、西南区)绿化景观工程养护工人,双方在平等自愿、协商一致的基础上订立本合同,建立劳动关系并承诺共同遵守。

一、合同期限:从年月日起到年月日止。

二、工作岗位和工作职责:甲方安排乙方在______绿化景观工程范围内从事花草树木的绿化养护工作,因工作或者业务的需要,甲方可调整乙方的工作岗位,具体内容和职责按甲方的岗位职责制和规章制度而定,乙方对此并无异议。

三、劳动报酬:乙方每月工资为元。调资、奖励及调动岗位、改变工作后的工资按照甲方有关规定执行。

四、劳动仅纪律:

1、乙方每天工作为8小时,每月无固定休息日,可根据天气情况适当调休;

2、乙方应自觉遵守国家法律法规和甲方制定的各项规章制度(如员工守则、绿化管养规划、职业道德等),服从管理,主动、积极、负责和保质保量做好本职工作。

3、甲方有权对乙方履行制度的情况进行检查、督促和考核,并有权依据检查、考核结果,参照公司相关制度对负责人或当事人加以处罚或奖励。如由于乙方工作不到位造成的苗木死亡,由乙方自行

4、乙方在养护时负责对苗木进行浇水、施肥、除草、补种及修剪等工作。并负责现场监察苗木情况,如苗木因各种遭人为破坏或出现异常,乙方应提前通知甲方做相关处理,如未提前通知由乙方自行负责。

五、合同的终止或解除条件

1、双方经协商一致同意提前终止本合同;

2、本合同满期后自然终止;

3、乙方严重违法劳动纪律或违法甲方规章制度的,符合辞退开除条件的;

4、故意或过失使甲方或第三方利益遭受较大损失的。

六、本合同一式贰份,甲乙双方各执一份,自签字盖章后生效。

甲方(公章):_________乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

展开阅读全文

篇14:图书馆系统技术支持服务协议书_合同范本

范文类型:合同协议,适用行业岗位:图书馆,技术,服务,全文共 747 字

+ 加入清单

图书馆系统技术支持服务协议书

一、协议双方

甲方:_________

乙方:_________

二、协议内容

经甲乙双方友好协商,应甲方要求乙方提供以下服务:

1.协助甲方进行图书馆系统维护并且建立系统维护记录。

2.上门进行软件的维护,及时发现问题并解决问题。

3.根据甲方的需要,修改系统的配置文件、帐户、打印输出格式、统计报表输出格式等。

4.根据甲方软件使用情况及设备情况制定科学的数据备份方案和方法,并协助甲方进行日常数据备份。

5.协助同一版本软件的升级工作。

6.根据甲方的要求,制作图书馆的主页。

7.乙方负责甲方操作员现场培训。

8.甲方免费参加乙方在_________或_________组织的操作员培训。

三、费用

其一年技术支持服务费用为所购软件的_________%。

四、服务方式

上门及电话服务,二十四小时内响应。

五、服务期限

自_________年_________月_________日至_________年_________月_________日,有效期为_________年。

六、付款方式

1.自签约之日起,甲方向乙方支付技术支持服务费。

2.乙方收到用户支付的技术支持服务费后,即开始为甲方提供服务。

七、违约责任

按经济法,合同双方友好协商解决。

八、本协议一式二份,有效期为_________年,甲乙双方各执一份,自签订之日起即生效,双方均应严格遵守。

甲方(盖章):_________         乙方(盖章):_________

代表(签字):_________         代表(签字):_________

_________年____月____日         _________年____月____日

签订地点:_________             签订地点:_________

展开阅读全文

篇15:技术学校喝酒保证书

范文类型:保证书,适用行业岗位:技术,学校,全文共 603 字

+ 加入清单

_____技术状况保证书

一、严格遵守《中华人民共和国道路交通安全法》、《中华人民共和国道路运输条例》等法律法规,保证所承包_____和所驾驶_____技术状况良好。

二、认真遵守集团“_____承包营运者和驾驶员为保证_____技术状况关良好的.第一责任人”的规定,保证严格落实出车前、行车中、收车后的_____三检制度,严守操作规程,做到检查到位、杜绝隐患。

三、严格按行业管理要求,进行_____年检、技术等级评定、二级维护、_____类型等级核定(复核)、日常例保检查以及春运检审等,保证不逾期、不漏项,保证检验不合格不参加营运。

四、严格按行业管理要求,保证所承包营运_____和所驾驶_____只到具有客运_____维修资质的修理厂进行_____维修保养。

五、在上岗出车前认真检查_____制动和转向等各系统技术状况是否良好,确保_____各部机件安全可靠,保证杜绝驾驶带病_____上路行驶,保证不出机械事故。

六、做好_____日常维修保养工作,凡发现_____安全性能不合格,立即停驶修复。

七、保证灭火器、故障牌、三角木等随车安全设施齐全有效。

八、如因违反以上保证内容导致交通事故或其它纠纷的,本人自愿承担一切法律和经济责任;并同意公司取消驾驶员内部准驾资格,自愿由公司收回承包营运资格。

营运线路(营运范围):

此致

敬礼

保证人

车牌号码:

20_________年_________月_________日

展开阅读全文

篇16:有关技术保密合同的范本_合同范本

范文类型:合同协议,适用行业岗位:技术,全文共 782 字

+ 加入清单

有关技术保密合同的范本

甲方:_________

乙方:_________

甲乙双方根据《中华人民共和国反不正当竞争法》和国家、地方有关规定,就企业技术秘密保护达成如下协议:

(一)保密内容和范围

1.乙方在合同期前所持有的科研成果和技术秘密已被甲方应用和生产的。

2.乙方在合同期内研究发明的科研成果。

3.甲方已有的科研成果和技术秘密。

4.甲方所有的技术资料。

(二)双方的权利和义务

1.甲方为乙方的科研成果提供良好的应用和生产条件,并根据创造的经济效益给予奖励。

2.乙方必须按甲方的要求从事项目的研究与开发,并将研究开发的所有资料交甲方保存。

3.乙方必须严格遵守甲方的保密制度,防止泄露企业的技术秘密。

4.未经甲方书面同意,乙方不得利用技术秘密进行新的研究与开发。

5.乙方在双方解除聘用合同后的三年内不得在生产同类且有竞争关系的产品的其它企业内任职。

(三)协议期限

1.聘用合同期内。

2.解除聘用合同后的三年内。

(四)保密费的数额及支付方式

甲方对乙方的技术成果给予的奖励,奖金中内含保密费,其奖金和其中保密费的数额,视技术成果的作用和其创造的经济效益而定。

(五)违约责任

1.乙方违反此协议,甲方有权无条件解除聘用合同,并取消收回有关待遇。

2.乙方部分违反此协议,造成一定经济损失,甲方视情节轻重处以乙方_________元罚款。

3.乙方违反此协议,造成甲方重大经济损失,应赔偿其甲方所受全部损失。

4.以上违约责任的执行,超过法律、法规、赋予双方权限的,申请仲裁机构仲裁或向法院提出上诉。

甲方(盖章):_________ 乙方(签章):_________

法定代表人(签字):_________

_________年____月____日 _________年____月____日

签订地点:_________ 签订地点:_________

展开阅读全文

篇17:技术服务合同式

范文类型:合同协议,适用行业岗位:技术,服务,全文共 733 字

+ 加入清单

甲方:_____________________ 乙方:_____________________

医疗技术开发有限公司是一家为会员提供医疗信息咨询、医疗服务中介的专业性公司,双方就服务项目达成以下协议:

1、自双方签订本协议之日起,乙方(或乙方指定的个人服务对象,下同)成为甲方的“健康俱乐部会员”,期限为_______年,自_______年_______月_______日至_______年_______月_______日,服务期满,合同自动终止。

2、乙方一次性交纳会费元人民币,服务对象为。

3、甲方在期限内为乙方提供如下服务:

1)为乙方进行一次全面的西医查体、心理测评、健康史调查(查体医院及项目详见附件1)

2)根据检查结果,由专家为乙方进行健康评定,制定保健方案

3)为乙方建立详尽、全面、动态的“健康档案”

4)指导乙方进行“亚健康”调理

5)为乙方提供健康俱乐部会员特约医院全程导医服务:急诊、门诊、会诊、住院、手术(医院发生费用自理,特约医院名单详见附件2)

6)为乙方安排保健医生提供健康咨询及全程健康跟踪

7)适时举办“健康知识讲座”及“保健心得沙龙 ”

8)为乙方适时提供相关医疗信息、保健知识

4、双方在合作的`过程中如有争议,本着真诚友好的态度进行协商。 不能协商解决的,任何一方有权将争议提交给 经济贸易仲裁委员会,按照该会仲裁规则在 进行仲裁。该仲裁裁定是终局的,对双方均有约束力。

甲方:_____________________ 乙方:_____________________

甲方代表:______________ 甲方代表:______________

_______年_______月_______日 _______年_______月_______日

展开阅读全文

篇18:项目技术咨询协议书

范文类型:合同协议,适用行业岗位:技术,全文共 810 字

+ 加入清单

项目技术咨询协议书

【协议书导语】为大家提供项目技术咨询协议书,如果你有这方面的写作需求,相信本文内容能为你起到参考作用。订立协议书,其目的是为了更好地从制度上乃至法律上,把双方协议所承担的责任固定下来。以下是由小编为大家收集整理出来的协议书范文,希望能够帮到大家。,希望能够帮助大家,欢迎阅读!

委 托 方:_________ (公章) (甲方)

顾 问 方:_________ (公章) (乙方)

中 介 方:_________ (公章)

合同登记机关:_________ (公章)

签订日期:_________ _________年 _________月 _________日

合同有效期限:_________ _________年 _________月 _________日至 _________年 _________月 _________日

一、具体咨询内容:_________

二、委托方应提供给顾问方的文件、提供文件的期限以及其他委托方应予协作的事项:_________

三、对顾问方完成的技术报告的具体要求:_________

四、技术情报和资料的保密:_________

五、顾问方完成技术报告的时间期限:_________

六、验收、评价方法:_________

七、报酬及其支付方式、支付时间:_________

八、违约责任:_________

九、争议的解决办法:_________

委托方(公章)

负责人:_________

地 址

电 话

帐 号

开户银行

_________年_________月_________日

顾问方(公章)

负责人:_________

地 址

电 话

帐 号

开户银行

_________年_________月_________日

中介(公章)

负责人:_________

地 址

电 话

帐 号

开户银行

鉴证单位意见:_________

(公章) 负责人:_________

_________年_________月_________日

展开阅读全文

篇19:技术专业石化毕业生实习报告_实习报告_网

范文类型:汇报报告,适用行业岗位:技术,全文共 15164 字

+ 加入清单

技术专业石化毕业生实习报告

前言

大学期间一直向往着去车间实习,想着去车间现场看看,熟悉一下自己以后的工作环境。大四这一学期,终于等到了机会。我们满怀着怀着向往与期待的心情来到了茂名石化炼油厂。我们小组分到焦化装置的内操和外操实习。在外操实习时,在外操和师傅一起去巡检,师傅带我们去参观了整个流程,给我们做了详细的介绍。同时学习掌握了一些有关加热炉的知识,例如加热炉的点火、除焦、炉温的控制等问题。在内操师傅介绍了焦化装置的工艺流程,参数是如何获得的等问题。在实习过程中也认识了自己的一些不足,当师傅拿了不同类型的垫片让我们看时,才发现自己学的知识太少了。

一、实习前的安全教育

石化行业具有“生产连续性强、易燃易爆、高温高压、有毒有害”等特点,稍有疏忽,就有可能发生火灾爆炸等事故。安全教育管理系统可以针对不同种类职工接受安全教育的情况进行管理,包括对外来人员安全培训、职工安全培训、特种设备操作人员培训情况和安全管理人员培训四部分,其目的就是将企业安全教育管理工作信息化。

各车间管理员可根据自己的权限,输入各类安全培训信息,根据检索条件查询所需资料,统计汇总有关数据,对生成报表进行输出打印,实时了解员工掌握安全知识的情况。

据统计资料显示由于人的不安全行为所导致的事故约占事故总数的百分之七十到百分之八十,因此对企业职工进行安全教育培训,提升职工的安全意识就是重中之重了。传统的管理模式工作效率较低,不利于信息的有效共享。

“安全第一,高效生产”是每一个企业的管理目标。作为实习的学生,我们必须要经历外来人员安全培训管理模块。我们也要下车间,走装置。所以,安全对于我们来说,也是重中之重。因此,在实习前,茂名石油化工厂对我们进行了安全按培训。让我们了解了安全生产的一些常识。

首先,在穿着方面。进入工厂,必须要佩戴安全帽。要穿棉制的工作服,不能穿其它类型的衣服和裤子。还有安全帽一定得系好安全带,如果不按相关规定的,必须接受相应的处罚。所以,为了大家的安全,进厂时大家必须按照相关规定办事。

其次,大家不能带打火机之类火源进入厂区,在厂区不能吸烟。进入厂区之后,在走装置下车间时,非防爆手机必须关机。还有在下车间的过程中,在没有师傅的允许下,为了大家的安全,我们不能乱动任何设备。除非师傅要求或者是允许我们操作。

再次,紧急事故的处理方法。在走装置期间,如果恰巧遇到紧急事故,我们首先得报警,打电话通知相关部门。在没有把握的前提下,我们最好不要随便乱动。我们所要做的就是想办法通知相关部门,然后离开危险装置区,疏散他人,避免不必要的伤亡。

再通过安全教育之后,接下来的就是安全教育考试。只有通过安全教育考试,并且考试分数在九十分以上,才有资格领取进厂证,才能进入茂名石化厂进行实习。在经过一系列的安全教育之后,大家都掌握了石化的安全教育知识。所以,考试对我们来说是小菜一碟,大家的考试成绩都在九十分以上,全部符合进厂实习的条件。

随着计算机技术的不断发展,对安全教育工作的管理不应再局限于表格记录和手工统计,借助于数据库的海量存储以及查询功能,充分利用现有的局域网及计算机设备,发挥内部网的作用,可建立基于网络的安全教育管理系统,逐步向计算机信息化管理转变。

二、实习任务

1、对延迟焦化的原理有个基本认识。

2、向师傅请教各个管道的功能和用处。

3、了解炼化的基本设备和构造。

4、适应倒班生活。

三、实习目的

1、通过生产实习使学生增加对石化生产企业的了解, 掌握工艺流程、工艺设备、控制系统、生产管理,检修等方面的知识。

2、生产实习是学生工程实践教育非常重要的环节,也是学生在进入工作单位之前接触现场设备、工艺等的一次全面性、系统性的学习机会。可以为毕业设计打下基础,熟悉未来的工作环境;

3、通过生产实习可以培养学生理论联系实际的能力,在实践中检验和发展所学理论,充实和巩固所学的专业知识,提高学生的动手能力,以及分析、解决问题的能力。

4、增加对工艺流程、机器与设备在化工生产中的地位、使用情况、制造工艺及过程等方面的感性认识,为今后工作打下良好基础。通过向工人及技术人员学习,使学生对生产劳动和祖国的建设事业有深刻的了解,并通过实习了解社会和石化企业对大学生的基本要求。

四、实习注意事项和要求

1、统一着装,配戴安全帽。

2、提前5分钟到指定地点侯车,过时不等,切勿迟到。

3、排队进油厂大门,预先出示入厂证或刷身份证进门。

4、听从所在装置的指挥和安排,不得违反车间纪律。

5、注意自己和他人的安全,进入装置切勿乱摸乱碰。

6、要求带笔记本和笔,随时作记录,积累实习资料。

7、实习指导教师每次入厂前和返回时,应清点人数。

五、茂石化联合装置简介

焦化联合装置由一焦化、二焦化、气体脱硫、液膜脱硫四套装置组成,采用一个班组管理四套装置的模式,人员得到有效减少,目前设有5个生产班组,两个清焦班,一个天车班,共115名操作工。

 一焦化装置设计加工能力为100万吨/年,于2019年12月在拆除旧焦化基础建成投产。

 二焦化装置设计加工能力为100万吨/年,于2019年6月建成投产。  气体脱硫装置设计为30万吨/年,于1977年5月建成投产,原设计能力为11万吨/年,2019年12月新增加塔-5瓦斯脱硫系统,2019年1月新增加塔-7液态烃脱硫系统。

 液膜脱硫醇装置设计能力15吨/小时,于2019年7月建成投产。

六、实习过程

在联合焦化四车间期间向师傅请教了焦化装置的基本原理,具体如下详解。 1 延迟焦化装置工艺原理

焦化联合装置简介

焦化联合装置由一焦化、二焦化、气体脱硫、液膜脱硫四套装置组成,采用一个班组管理四套装置的模式,人员得到有效减少,目前设有5个生产班组,两个清焦班,一个天车班,共115名操作工。

焦化联合装置简介

一焦化装置设计加工能力为100万吨/年,于2019年12月在拆除旧焦化基础建成投产。

二焦化装置设计加工能力为100万吨/年,于2019年6月建成投产。

气体脱硫装置设计为30万吨/年,于1977年5月建成投产,原设计能力为11万吨/年,2019年12月新增加塔-5瓦斯脱硫系统,2019年1月新增加塔-7液态烃脱硫系统。

液膜脱硫醇装置设计能力15吨/小时,于2019年7月建成投产。

1、延迟焦化装置工艺原理

1.1、 延迟焦化的定义

延迟焦化过程是重油加工的主要手段之一,是经深度热裂化将减压渣油、常压渣油、减粘渣油、重质原油、重质燃料油和煤焦油等重质油转化为液体和气体产品,同时生成浓缩的固体炭材料-石油焦,是炼油厂提高轻质油收率和生产石油焦的主要加工装置。在该过程中,通常使用水平管式加热炉在高流速、短停留时间的条件下加热反应物料至485oC~ 515oC的反应温度后进入焦炭塔,在焦炭塔内一定的温度、停留时间和压力条件下发生裂解、缩合反应,生成气体、石脑油、轻瓦斯油、重瓦斯油和焦炭。由于反应物料在加热炉管中停留时间很短,焦化原料仅发生浅度热裂化反应,利用重质油在热转化深度较低时不易结焦的特点,让重质油快速通过加热炉炉管并获得重质油轻质化所需要的能量,缩合生焦反应被“延迟”到加热炉下游的焦炭塔内发生,故该过程被称为“延迟焦化”。

1.2、延迟焦化工艺概况

延迟焦化过程是现代炼油厂中仅有的一种间歇-连续的加工工艺,通常采用一个加热炉对应两个焦炭塔,加热炉连续进料,两个焦炭塔并联间歇切换操作,一个在生焦,另一个则在除焦,通过焦炭塔底进料四通阀来回切换,一般18-24小时切换一次。当一个焦炭塔内的焦炭达到一定的高度后,需要把进料切换到另一个焦炭塔,这个焦炭塔需要冷焦和切焦操作。通常采用小吹汽、大吹汽、小给水、大给水的冷焦方式,小吹汽是把油气吹到分馏塔,大吹汽和给水时产生的油气和蒸汽到放空塔。大给水时塔顶的溢流水和冷焦结束塔底排放的水进到冷焦水处理部分。

待焦炭塔内的水排放完之后,打开塔顶、底法兰盖,采用高压水进行除焦,除焦完成后封闭塔顶、底法兰盖,采用蒸汽进行驱赶塔内空气和密封性试验,然后引正在生焦塔的高温油气对该塔进行预热,油气自上而下通过焦炭塔进入甩油罐,甩油罐分离出的气体进入分馏塔,凝缩油用泵抽送到分馏塔、原料罐或急冷管线回炼,也可以经冷却后送出装置。待焦炭塔预热达到一定的温度后,切换四通阀引渣油进入该焦炭塔进行裂解和缩合反应,另一个焦炭塔进行上述冷焦和切焦操作,两个焦炭塔循环交替。

1.3焦化装置的原料是什么?

答:延迟焦化原料大多数是重油、渣油、甚至是沥青。

1.4焦化装置在全厂加工总流程中的作用?

答:将高残碳的残油转化为轻质油。从重质渣油中获得较多的轻质油品和石油焦

1.5延迟焦化装置的工作过程

延迟焦化装置是以贫氢的重质油为原料,在高温下(约500℃左右)进行深度的热裂化和缩合反应,生产气体、汽油、柴油、蜡油和焦炭,它采用国内成熟的延迟焦化工艺,将焦化油(原料油和循环油)经加热炉加热迅速升温至焦化反应温度,进入焦炭塔进行焦化反应,生成的焦炭留于塔内,生成的油气从塔顶出来进入分馏塔进一步分离。

1.5 焦化反应的类型

焦化反应是在高温、低压、无催化剂条件下主要进行裂解反应,缩合反应,其次是脱氢反应,加氢反应,环化反应等。

渣油中的大分子的烷烃、环烷烃大部分裂解,生小分子烷烃、烯烃、氢气。 带侧链的芳烃,通常是侧链断开,生小分子烷烃、烯烃、氢气,而芳环自由基发生缩合反应,生成多环芳烃或稠环芳烃,最后生成焦炭。

渣油中芳烃、稠环芳烃、胶质、沥青质进行脱氢、缩合反应,转化成氢气、焦炭。

(1) 烷烃的热转化

①大烃分子的C-C键断裂生成两个自由基。C16H34→2C8H17·

②生成的大分子自由基在β位的C-C键再继续分裂成更小的自由基和烯

烃:C8H17→C4H8+C4H9·

③小的自由基(例如甲基自由基、氢自由基)与其他分子碰撞生成新的自由基和烃分子。CH3·+C16H34→CH4+C16H33·H·+C16H34→C2H4+C16H33· ④大的自由基不稳定,再分裂生成小的自由基和烯烃。C16H33·→C8H16+C8H17

⑤自由基结合生成烷烃终止连锁反应。H·+H·→H2CH3·+H·→CH4C8H17·+CH3·→C9H20

(2)异构烷烃的热转化

反应机理与正构烷烃基本相同。

(3)环烷烃的热转化

带侧链的环烷烃的热转化主要是在侧链上发生与烷烃相似的C—C键断裂反应,侧链越长,断裂的速度越快。只有在较高的反应温度下才可能发生环烷环断裂生成环烯烃、环二烯烃等化合物的反应。

(4)芳烃的热转化

在热转化过程中,带侧链芳烃中的烷基侧链会发生和烷烃相似的键断裂,但芳环不会断裂,只能形成稳定的芳环自由基。芳环自由基可以互相结合或发生缩合反应生成多环芳烃和稠环芳烃。①芳烃的大分子侧链分裂。C6H5C10H21→C6H5C2H4·+C8H17·②生成的自由基再分裂。C6H5C2H4·→C2H4+C6H5·③芳烃自由基缩合。2C6H5·→(C6H5)2

两个或多个苯环(萘环、蒽环)缩合物,逐步转化为稠环芳烃。

1.6 渣油热转化反应历程图

1.7 焦化装置原料及其指标

四套常减压蒸馏渣油、催化油浆、丙烷残脱油

渣油的组成十分复杂,除了烃类之外,还有胶质、沥青质以及碱金属、重金属、氮化物等

焦化产品:干气、液态烃、汽油、柴油、蜡油、石油焦、3号B延迟石油焦 1.8 焦化馏分油和直馏馏分油的区别?

焦化馏分油和直馏馏分油相比,其密度、干点和残炭相差不大,但是含硫、含氮量高,含有较多不饱和烃,所以,焦化馏分油不能单独作催化裂化原料,可以同直馏馏分油掺合作为催化裂化进料。 1.9 焦炭塔的生产工序

新塔试压→新塔油气预热、循环、升温→新塔甩油气凝缩油→老塔切换新塔

生焦→生焦24小时→老塔小吹汽、大吹汽→老塔冷焦→老塔放水→老塔除焦。 焦炭塔生焦到一定高度后停止进料切换到另一个焦炭塔进行生焦。焦炭塔在停止进料后,即进行小吹汽1小时,汽提油气到分馏塔,接着进行大吹汽2--3小时,汽提油气到放空系统,然后进行水冷却,约5小时,当塔内石油焦温度降到100℃以下时,放掉冷却水,放水需约1小时。然后,把焦炭塔顶、底盖打开,进行除焦。

1.10、延迟焦化装置除焦过程

水力除焦是利用高压水喷射的动能冲击塔内焦炭,使其破碎成小块而被清除出塔。启动高压水泵将循环水升压到28~31MPa,经高压水管线送到有井架除焦系统进行除焦。

除焦过程分为两个阶段:第一阶段为钻孔,由除焦器的一个底喷嘴和三个扩孔喷嘴喷出高压水流自上而下将焦层中间通道扩大;第二阶段为切焦,利用除焦器上四个水平喷嘴,上下往复喷出高压水流,自上而下地分层将焦炭全部除净。焦炭与水由塔底经卸盖机保护筒和溜焦槽流入贮焦场,贮焦场内焦炭由桥吊(16吨)按品种堆放。含焦污水经格栅自流入沉降池,经沉淀焦粉后去切焦水密闭系统被循环使用。成品焦炭由桥吊抓上火车厢运走。

1.11、水力除焦机械技术

除焦方式:我国水力除焦有无井架和有井架两种方式,由于无井架除焦高压胶管使用寿命短、水涡轮维修率高和安全事故多等因素,目前新建装置一般不采用无井架水力除焦方式。有井架除焦又分为全井架和单井架两种,单井架比全井架节省钢材,目前被普遍采用。

除焦方式

2.延迟焦化工艺流程说明

2.1 焦化工艺介绍

焦炭塔运行一定时间后,焦炭达到一定高度进行换塔,换塔后进行小吹汽,再大吹汽,大吹汽、冷焦产生的大量高温(≥200℃)蒸汽及少量油气进入接触冷却塔(C7103),从顶部打入蜡油馏分,洗涤下油气中的柴油以上馏分。塔底重油用接触冷却塔底泵(P7115/1-2)抽出,送经接触冷却塔底油及甩油冷却器(E7113/1-2)冷却后,一部分作为油洗段顶回流,控制顶部气相温度190℃左右,另一部分在液面控制下送出装置。放空塔顶油气及大量蒸汽直接进入接触冷却塔顶空冷器(A-7104/1-8)、后冷器(E-7112/1-4)冷到40℃进入塔顶气液分离罐(D-7103)。

焦化工艺介绍

除焦过程分为两个阶段:第一阶段为钻孔,由除焦器的一个底喷咀和三个扩孔喷咀喷出高压水流自上而下将焦层中间通道扩大;第二阶段为切焦,利用除焦器上四个水平喷咀,上下往复喷出高压水流,自上而下地分层将焦炭全部除净。焦炭与水由塔底经卸盖机保护筒和溜焦槽流入贮焦场,贮焦场内焦炭由桥吊(16吨)按品种堆放。含焦污水经格栅自流人沉降池,经沉淀焦粉后去切焦水密闭系统被循环使用。成品焦炭由桥吊抓上火车厢运走。

焦化工艺技术介绍

冷焦水系统:焦炭塔运行到冷焦时,开启冷焦水给水泵(P-7130/1,2),从冷焦水储水罐(D-7403)将冷焦水送入焦炭塔进行冷焦,冷却溢流及放空水排入冷焦水溢流水罐(D-7401)、冷焦水放空水罐(D-7402),浮油浮至水面,粉焦沉至罐底,两罐中的水经冷焦热水泵(P-7131/1,2)后进离心分离器(M-7402/1,

2),使油和水与焦粉分离,油和水进旋流分离器(M7401/1,2),分出的油进污油罐(D-7405),水则经过空气冷却器后回冷焦水储水罐(D-7403)重复使用。 焦化工艺切焦水系统介绍

切焦水系统:从焦炭塔排出的焦炭和切焦水入储焦池后,切焦水先进入一次沉淀池,经过自然沉淀,大颗粒粉焦沉淀后,水在池内通过三道格网拦截漂浮物,进入切水提升泵吸水池(V-7134),然后通过切焦排水提升泵(P-7132/1,2)将水送入离心分离器(M-7402/3,4),分离后的油水进入切焦水储水罐(D-7404),通过高压水泵(P-7120)将水提高压力至29MPA后送至焦炭塔除焦。而由离心分离器(M-7402/3,4)分离出的焦粉与切焦水储水罐(D-7404)的沉积焦粉一道进入粉焦池(V-7131)经由粉焦泵(P-7133/1,2)回到储焦池。此外,装置机泵冷却回水(新鲜水)可作为切焦水系统补充用水。

焦化工艺除焦系统介绍

除焦系统:焦炭塔生焦到一定高度后停止进料切换到另一个焦炭塔进行生焦。焦炭塔在停止进料后,即进行小吹汽1小时,汽提油气到分馏塔,接着进行大吹汽2.5小时,汽提油气到放空系统,然后进行水冷却,当塔内石油焦温度降到100℃以下时,放掉冷却水。

水力除焦是利用高压水喷射的动能冲击塔内焦炭,使其破碎成小块而被清除出塔。启动高压水泵将循环水升压到28—32Mpa,经高压水管线送到有井架除焦系统进行除焦。 3. 延迟焦化设备 3.1焦化装置主要设备

3.2焦化装置开工操作

3.2.1开工前的准备,作好思想、物质准备

开工前,做好开工前思想动员、人员培训、单位联系工作 、原材料及工具的准备等。

3.3.2搞好全面安全检查工作

装置的消防设施 、安全附件、安全隐患整改、安全措施落实。 3.3 引进公用介质

 引蒸汽

 引水(软化水、新鲜水、循环水)  引风(净化风、非净化风) 3.4吹扫贯通试压

 塔、容器、冷换设备及附属工艺管线吹扫、试压  氮气(或瓦斯)充压 3.5装置引蜡油、渣油开工 3.5.1蜡油引开工的目的:

 脱除设备、管线内水份;

 进一步检查管线及设备是否有泄漏现象;

 在一定温度下检查电机、机泵、仪表的运行状况;

 进一步检查工艺流程

3.5.2蜡油开工准备工作:

 对贯通吹扫试压、单机试运等步骤中发现问题均已处理完毕。

 水、电、汽、风、瓦斯系统全部畅通,能保证充足的供应。

 仪表全部核对无误。

3.5.3 收汽油:

目的:开工升温中作分馏塔顶回流

3.5.4收柴油:

目的:收柴油进柴油集油箱,开工过程中平衡分馏塔热量,使侧线泵尽快开起来

3.5.5 收蜡油循环升温

3.5.6 蜡油循环:

 目的:主要是液相脱水,脱除系统中存在的明水。

 步骤:按装油流程建立开路循环,按《加热炉点火操作》进行炉子点火,保持炉膛温度200℃左右。循环2小时后停止循环,静止0.5小时,然后各低点进行脱水,直到见油关闭。直到明水脱除。

3.5.7循环升温脱水

 各低点见油后,关闭低点放空阀,启动机泵建立循环,保持液面平稳,加热炉开始升温,升温速度20~25℃/h,保持加热炉进料分支流量25t/h左右,控制加热炉出口温度200℃。

 当焦炭塔底、分馏塔底听不到有水击的响声,D-7102脱水减少,加热炉以20~25℃/h速度升温至250℃,恒温6小时。

3.5.8 加热炉继续升温至320~350℃

 以20~25℃/h的速度升至300℃恒温约2小时,四通阀进行第一次试翻操作。同时对换热器、法兰、阀门等进行热紧。

 继续以20~25℃/h的速度升到320~350℃进行恒温脱水,四通阀给少量汽封并进行二次试翻操作。

 拉低D-7101、C-7102、D-7106液面,蜡油走出装置线出装置。

 联系调度引渣油,用以置换装置内的循环油,待C-7102底循环油用渣油置换净后,采样分析渣油组成,确认渣油中蜡油被置换干净,含水量分析小于0.5%,可改为闭路循环。

3.5.9继续升温至420℃

 3.5.9.1加热炉以20℃/h的速度升温到400℃恒温4小时。

炉出口380℃时,将3.5MPa蒸汽注入炉管,注意四通阀的汽封蒸汽并活动四通阀,控好渣油入装置量。

 3.5.9.2继续升温至420℃

 3.5.9.3加热炉以20℃/h的速度升温到420℃恒温2小时。此时做以下工作:

活动四通阀,控制好塔顶温度,同时控制D-7102压力、液面,建立顶循环回流、中段回流 ,控制蜡油抽出温度,建立C-7103循环。焦炭塔底加快甩油,保持塔内无剩油状态 。投运蒸汽发生器 ,气压机处于备用状态。

3.5.10 切换四通阀,炉出口温度迅速调整正常(495℃),以60℃/h的速度将炉出口温度升到460℃,此时要做以下工作:

(1)四通阀由开工线切换到焦炭塔底部进料线。

(2)加热炉进料量提到34t/h分支。注意与调度加强联系,控制好D-101的液面。

(3)切换正常后,将炉出口温度由460℃迅速升至495℃。

(4)启用柴油抽出线及柴油回流,建立吸收塔循环,柴油集油箱液面高时,柴油送出装置。

3.5.11投用吸收稳定系统

3.5.11.1投用吸收稳定系统,C7201吸收塔收汽油开工

从D7102往吸收塔装汽油,注意按工艺指标控制好D7102液面,建立吸收塔一中、二中循环,集油箱液控制50%。

当C7201底液面达50%后,启动P7201,D7202装汽油,控制C7201底液面50%;

3.5.11.2 C7202脱吸塔收汽油开工

当D7202液面达50%后,启动P7203,C7202装汽油,控制D7202液面50% 。

3.5.11.3 C7203稳定塔收汽油开工

当脱吸塔C7202底液面达50%后,启动P7204,稳定塔C7203装汽油,控制C7203底面50%。稳定吸收系统建立三塔循环,联系调度,安排好汽油出装置后路。

3.5.11.4 投用吸收稳定系统,将E7104换热后的柴油缓慢改进解吸塔底重沸器E7203/1。

按工艺卡片控制好解吸塔底温度、塔顶温度和塔顶压力,塔底升温要缓慢平稳进行;

3.5.11.5 投用吸收稳定系统,中段蜡油引入稳定塔底重沸器 E7212

建立分馏塔中段回流,中段蜡油先走稳定塔底重沸器E7212副线,再缓慢改入E7212,按工艺卡片控制稳定塔底、塔顶温度和稳定塔顶及D7208压力,稳定塔底升温要缓慢平稳进行。

3.5.11.6 按工艺卡片控制再吸收塔压力,在压缩开机过程中,注意控制好吸收塔、再吸收塔的压力和回流量,控制好稳定吸收系统各温度参数,根据生产需要投用空冷器和冷却器 。

当吸收塔压力到达0.6MPa后,启动P201,再吸收塔建立柴油回流,控制好塔底液面和吸收柴油回流量。

压缩机运行正常后,按工艺卡片控制好吸收塔、解吸塔和再吸收塔的工艺参数,控制好干气质量。

3.5.11.7 投用吸收稳定系统,定吸收系统进入正常生产,操作参数按工艺卡片指标控制。

当D7208液面达25%后,启动P7205,稳定塔顶建立回流,按工艺卡片控制好塔顶温度,联系调度,改通液态烃出装置流程,D7208液面高时,液态烃送出装置。

3.5.12.8 整正常

 根据工艺卡片指标对操作进行调整。

 各岗位加强配合,平稳操作后,联系化验室对产品进行质量分析。  加强现场检查,防止阀门泄漏。

 联系调度后,打开顶进料吹扫阀,先吹扫干净顶进料隔断阀后再关闭隔断阀,吹扫顶进料开工线。

3.6 焦化装置停工操作

装置停工操作主要步骤:

 停工前的准备工作

 焦化系统停工

 装置改开路循环,退净油。

加热炉以60℃/h的速度降温同时加热炉进料量降至34t/h分支。加热炉出口温度降至460℃ ,切换四通阀,从老塔底部进料切换到停工塔顶部进料线 ,先开路,同时收蜡油进原料缓冲罐(D-101),待渣油置换干净后,建立起装置闭路循环。炉出口温度降至300℃时,熄灭炉火,停注汽。

3.7吸收稳定系统的停工

富气减少后,瓦斯改放空,停压缩机,停吸收稳定系统

3.8蒸汽吹扫

3.9蒸塔、蒸容器

七、实习生活

实习的前一天,我们进行了入厂安全教育。接下来的时间,我们分组参观实习了焦化车间、常减压车间。我是第一次面对如此多得大型设备,感到非常新奇,很感兴趣地去学习。

在外操室,跟着师傅一起去巡检。在内操作室,看着内操人员通过电脑控制生产,更是好奇地上前询问详细的生产流程,查看工艺流程图。

实习期间,带我们参观实习的工程师们顶着炎炎烈日带着我们一边边地走生产流程,详细地讲解生产工艺,耐心回答我们的提问。即使不是负责讲解的师傅,只要我们向他提问,他也回很热情细心地回答讲解,让我收获良多。

跟着师傅去巡查,写实习交班日记,从中学习到不同的设备,工作原理,运行状况,维护,紧急应付方法或方案。有时也会在办公室浏览资料,这些资料写的都是关于各种仪表的原理、使用以及安装等。

这次实习给我留下深刻印象的,除了先进的生产设备,茂石化炼油厂严谨的企业文化,还有茂石化工人师傅的美好品质。

八、心得体会

大学生活学生生活,即将划上一个句号。在炼油厂实习的这段时间,我懂了不少东西。以前作为一名学生,主要的工作是学习;现在即将踏上社会,显然,自己的身份就有所变化,自然重心也随之而改变,现在我的主要任务应从学习逐步转移到工作上。这十天的上班时间,好比是一个过渡期——从学生过渡到上班族,是十分关键的阶段。

实习的时间一转眼就过去了。此次的实习相对来说很短暂,但是对我来说很有意义。让我了解到安全生产的部分流程,在各个车间中,大家都佩戴安全帽,都穿了工作服,而且我们严格遵守车间的生产纪律,遇到不懂不明白的地方都积极发问,以免造成安全事故。在车间里必须首先了解基本的生产流程,先是查看了每个仪器和设备,并了解他们的名称和用途,遇到不懂的地方车间师傅就跟我们耐心讲解。单讲实习能学到的东西也是有限的,不过在感性认识上我对化工厂的情况有了更细的认识。

实习期间,虽然只上了10天的班,但是在带队老师的精心安排下,师傅的带领下我们集中的熟悉学习了一个车间 ,又轮串的熟悉了其他的车间。 我们在自己的车间中,通过请教师傅,与同组同学讨论等方式,我对我自己所在的车间—联合四车间焦化车间有了深入的了解 ,同时也对等课堂上所学的书本知识有了更加实际的理解 ,把书本上的知识主动的应用到实际生产当中去,学习到了不少实际生产知识。也认识到了书本上所学的知识和实际生产是有差距的。

在企业的实习过程中,我发现了自己看问题的角度,思考问题的方式也逐渐开拓,这与实践密不可分,在实践过程中,我又一次感受充实,感受成长。从实习中,也发现了自己还有很多地方需要去学习和巩固,认识到理论与实践的差距,同时也找到自身情况和社会实践需要的差距。

在实习过程中,仅从感观上认识茂石化炼油厂,在操作现场,确实深有感触。在学校里的理论学习或许比较深刻或透彻,但缺乏动手实践的机会,可能就会显得有些枯燥无味,这次的生产实习让我体会到,实践出真知。唯有理论知识与生产实践相互结合起来,才会意识到学以所用的巨大魅力,这正如马克思主义哲学思想,理论与实践相联系。实践的观点是马克思主义哲学首要和基本的观点,实践的原则是马克思主义哲学的构建原则,所以,建立一套正确、完善的理论体系,就是建立在一次又一次的实践经历之上。

通过实习,知道自己的知识非常的欠缺,在以后的工作和生活中还得必须学习。正所谓:“活到老,学到老”。当今社会的知识更新周期短,为了不被社会所淘汰,就得养成终生学习的良好习惯。其次,作为即将毕业的大学毕业生,让我提前感受到工作的感觉,并且亲自体验了倒班的工作制度。意识到工作除了工作态度以外,还得需要有健康的体魄。毕竟身体是革命的本钱,没有健康的体魄,什么也办不成。

通过这次的生产实习,让我认识到理论与实践的确有一定的距离。在以后的工作和学习中,我会注重动手能力和理论知识的相结合。为以后的工作奠定了坚实的基础。把自己在学校学习的到理论知识运用到社会的实践中去。一方面巩固所学知识,提高处理实际问题的能力。为毕业设计做好准备,并为自己能顺利与社会接轨做好准备。

十天的上班时间,我们收获良多。在这里我要非常感谢学校给我们这次来之不易的实习机会,让我们有机会与化工厂亲自接触。感谢领导老师们的精心安排 ,感谢焦化车间师傅的耐心指导,感谢我同组的伙伴们的相互帮助。

回想自己在这期间的工作情况,不尽如意。对此我思考过,学习经验自然是一个因素,然而更重要的是心态的转变没有做到位。现在发现了这个不足之处,应该还算是及时吧,因为我明白了何谓工作。在接下来的日子里,我会朝这个方向努力。感谢老师以及师傅们在这段时间里对我的指导和教诲,我从中受益非浅。

实习是每一个大学毕业生必须拥有的一段宝贵经历,而这次实习的意义,对我来说已不再是完成学分、完成毕业实习的任务,而是我们真正在实践中开始接触社会、了解社会的一次重要机会,让我们学到了很多在课堂上根本就学不到的知识,增长了见识,开阔了视野,为我以后走上工作岗位打下了坚实的基础。

九、思考题

第三组,延迟焦化组,装控08-2班 1号至9号

1、焦化装置的原料是什么?

答:延迟焦化原料大多数是重油、渣油、甚至是沥青。

2、 焦化装置有哪些产品?

答:延迟焦化产物分为气体、汽油、柴油、蜡油和焦炭。焦化汽油和焦化柴油是延迟焦化的主要产品,但其质量较差。焦化汽油的辛烷值很低,但两种油品的烯烃含量高,硫、氮、氧等杂质含量高,安定性差,只能作半成品或中间产品,城经过精制处理后,才能作为汽油和柴油的调和组分。焦化蜡油由于含硫、氮化合物、胶质、残炭等含量高,是二次加工的劣质蜡油,目前通常掺炼到催化或加氢裂化作为原料。石油焦是延迟焦化过程的重要产品之一,根据质量不同可用做电极、冶金及燃料等。焦化气体经脱硫处理后可作为制氢原料或送燃料管网做燃料使用。

3、 焦化装置在全厂加工总流程中的作用?

答:将高残碳的残油转化为轻质油。从重质渣油中获得较多的轻质油品和石油焦

4、 装置有哪几种腐蚀?腐蚀机理是什么?如何进行防腐?

答:高温硫腐蚀和环烷酸腐蚀,腐蚀机理是此类腐蚀主要发生在加热炉炉管、分

馏塔的集油箱及底部、分馏塔的高温重油抽出线、输送泵以及连接上述设备的高温重油管线

等部位,表现为高温硫和环烷酸的协同腐蚀,以非均匀全面减薄和尖锐孔洞及锐边腐蚀沟槽 的形貌出现。由于该系统经历200℃~500℃的温度范围,防护:原料上控制S的含量,温度在适宜的范围内,在腐蚀沟槽中加缓蚀剂等等

磨损腐蚀,腐蚀性流体与金属以较高速度做相对运动而引起金属的腐蚀破坏,防腐:合理的选材,加大管径设计,流速降低。

缝隙腐蚀,腐蚀机理,当金属间或金属与非金属间存在很小的缝隙时,缝内介质不易流动而形成滞留状态,促使缝隙内金属加速腐蚀,发生场合一般在法兰垫片接合处,换热器与管板连接处等等,防护:主要从结构设计傻瓜避免形成缝隙和四区 5、 离心泵的工作原理?有哪些部件组成?有哪些性能参数?

离心泵的工作原理

离心泵主要由叶轮、轴、泵壳、轴封及密封环等组成。一般离心泵启动前泵壳内要灌满液体,当原动机带动泵轴和叶轮旋转时,液体一方面随叶轮作圆周运动,一方面在离心力的作用下自叶轮中心向外周抛出,液体从叶轮获得了压力能和速度能。当液体流经蜗壳到排液口时,部分速度能将转变为静压力能。在液体自叶轮抛出时,叶轮中心部分造成低压区,与吸入液面的压力形成压力差,于是液体不断地被吸入,并以一定的压力排出。

离心泵的主要零部件

(1) 泵壳

泵壳有轴向剖分式和径向剖分式两种。大多数单级泵的壳体都是蜗壳式的,多级泵径向剖分壳体一般为环形壳体或圆形壳体。

一般蜗壳式泵壳内腔呈螺旋型液道,用以收集从叶轮中甩出的液体,并引向扩散管至泵出口。泵壳承受全部的工作压力和液体的热负荷。

(2) 叶轮

叶轮是唯一的作功部件,泵通过叶轮对液体作功。叶轮型式有闭式、开式、半开式三种。闭式叶轮由叶片、前盖板、后盖板组成。半开式叶轮由叶片和后盖板组成。开式叶轮只有叶片,无前后盖板。闭式叶轮效率较高,开式叶轮效率较低。

(3) 密封环

密封环的作用是防止泵的内泄漏和外泄漏,由耐磨材料制成的密封环,镶于叶轮前后盖板和泵壳上,磨损后可以更换。

(4) 轴和轴承

泵轴一端固定叶轮,一端装联轴器。根据泵的大小,轴承可选用滚动轴承和滑动轴承。

(5) 轴封

轴封一般有机械密封和填料密封两种。一般泵均设计成既能装填料密封,又能装机械密封。 离心泵的性能参数

1、流量 离心泵的流量是指单位时间内排到管路系统的液体体积,一般用Q表示,常用单位为l/s、m3/s或m3/h等。离心泵的流量与泵的结构、尺寸和转速有关。 2、压头(扬程) 离心泵的压头是指离心泵对单位重量(1N)液体所提供的有效能量,一般用H表

示,单位为J/N或m。压头的影响因素在前节已作过介绍。 3、效率 离心泵在实际运转中,由于存在各种能量损失,致使泵的实际(有效)压头和流量均低于理论值,而输入泵的功率比理论值为高。反映能量损失大小的参数称为效率。 离心泵的能量损失包括以下三项,即 (1)容积损失 即泄漏造成的损失,无容积损失时泵的功率与有容积损失时泵的功率之比称为容积效率ηv。闭式叶轮的容积效率值在0.85~0.95。 (2)水力损失 由于液体流经叶片、蜗壳的沿程阻力,流道面积和方向变化的局部阻力,以及叶轮通道中的环流和旋涡等因素造成的能量损失。这种损失可用水力效率ηh来反映。额定流量下,液体的流动方向恰与叶片的入口角相一致,这时损失最小,水力效率最高,其值在0.8~0.9的范围。 (3)机械效率 由于高速旋转的叶轮表面与液体之间摩擦,泵轴在轴承、轴封等处的机械摩擦造成的能量损失。机械损失可用机械效率ηm来反映,其值在0.96~0.99之间。

6、 离心泵泵体和零件的材料如何选择?

泵体材料选择考虑因素:a 强度;b 耐腐蚀;c 耐磨粒磨损;d 铸造和机械加工性能;e 焊接修补性能;f成本。

对于大多数输送液体应用来说,灰铸铁是制造泵壳体的较好材料。对于单级泵,通常灰铸铁有足够的强度抵抗所产生的压力。在中等压力和温度范围内,球墨铸铁被广泛应用。在灰铸铁和球墨铸铁不能达到足够耐腐蚀性能应用场合,耐蚀高镍铸铁常被用做泵体材料。近年来开发出一种新型的,具有良好焊接性能的耐蚀高镍铸铁材料(命名为D2W),含有少量铌元素,以改善其焊接性能。典型的奥氏体铸铁含镍15%~20%,在盐水中广泛应用。对于腐蚀和有害的石油产品,或多级泵出口压力达13.8Mpa时,需要使用规定的铸钢或铸造不锈钢。在锅炉给水泵和许多烃类应用中,常选用马氏体不锈钢,马氏体不锈钢机械性能好,适用于高压的工况,但耐腐蚀性能不如其他类不锈钢。在化工应用和其他腐蚀性的环境下,奥氏体不锈钢(CF-8M,CF-3M等)常用来作泵壳体材料,另外,奥氏体不锈钢还能抵抗由于高速而产生的侵蚀,并且可以相对容易地进行现场焊接修补。高压浅海注水泵对耐腐蚀和机械性能有更高的要求,其泵壳体选双相不锈钢材料(50%铁素体+50%奥氏体)。在许多水泵应用中,也使用青铜材料作泵体。在小型低压泵中常用铅青铜,铅有助于泵体的密封性。锡青铜用作更大一些的离心泵的泵体材料。镍铝青铜虽具有最好的机械性能和耐腐蚀性能,但价格昂贵,没有竞争力。为了提高泵的耐化学腐蚀性能,可以在蜗壳内安装衬里,用作衬里的材料有聚四氟乙烯,橡胶等。整体陶瓷和石墨泵用于特别腐蚀性的液体中,如:氢氟酸。在造纸和纸浆工业,金属精加工工业,复合材料(如环氧树脂)被用于制造泵体。 泵零件的选择

由于泵的型式和工作条件不同,用的材料种类很多(见下表),表面加工处理的方法也很多。归纳起来,这里所考虑的因素有两方面:一是机械强度,二是抗蚀性能。在现有材料的基础上,为了充分发挥材料的内在潜力,可对材料进行热处理。例如,为了提高轴套、平衡环等零件的耐磨性,可对它们进行表面淬火处理,提高硬度;为了提高轴的承载能力和抗冲击性,可对泵轴进行正火或调质处理。

在选用泵材料时,要考虑许多因素,如泵输送的介质是否有腐蚀性,是否有颗粒杂质或含莎以及泵工作压力的高低等。下表介绍了几种常见泵的各零部件选材情况。

表 离心泵常用材料表

7、 换热设备在装置中的作用?

换热设备是一种实现物料之间热量传递的通用设备,在炼油、化工装置中,换热设备约占全部工艺设备的20%-40%,占总投资的30%-40%。换热设备应用广泛,日常生活中取暖用的暖气散热片、汽轮机装置中的凝汽器和航天火箭上的油冷却器等,都是换热设备。它还广泛应用于化工、石油、动力和原子能等工业部门。它的主要功能是保证工艺过程对介质所要求的特定温度,同时也是提高能源利用率的主要设备之一。

8、 装置节能主要从哪几方面着手?

1、开展能量平衡及能量监测工作,对新开工装置和部分老装置进行能量平衡测试,进一步找出节能薄弱环节,为节能改造提供依据。

2、开展低温余热氢气资源优化利用研究。3、调整装置结构降低能耗。4、加热炉节能技术改造。5、抓好装置节能改造。6、抓好装置低温余热利用和装置热联合,提高能量回收率。

7、抓好炼油系统蒸汽优化利用,优化蒸汽系统。8、抓好节电技术改造9、抓好节水减排技术改造

9、 保温在节能中的地位如何?

保温绝热事业在我国是六十年代中期开始, 随着工业的发展,近几年有着长足的进展。它与防腐业有着内在和密不可分的联系。保温绝热也象防腐一样遍及国民经济建设的各条战线。能源的转换和利用, 绝大部分是通过热的形式来实现, 因此,保温绝热的根本目的就是节约能源。工业窑炉、锅炉、各种燃烧器、反应器等散热损失是很大的。特别是地表散热很难回收,

既影响热设备磨损,又损失热量。只有采用保温绝热才能提高热量的效率。。如果供热设备不采取保温绝热措施,热能的损失将是严重的。例如长1 米、直径20 厘米, 输送温度为200 ℃ 的蒸气管道, 一年的热损失相当于2 吨标准煤的热量。一个不作保温处理的法兰, 热损失相当于长约。0.5-0.6米相同直径裸露管道的热损失1平方米200℃ 无保温的墙壁的热损失, 每小时可达12.54千焦, 相当于0.45吨标煤。根据有关部门对耗能最大的石油、化工、冶金、造纸、玻璃、食品六大工业进行测算认为,采取保温绝热之后可节约能源10%以上。可想而知, 保温绝热工作对工业的发展有十分重要意义。保温是新兴产业,有着广阔的发展前景, 因为防腐能促进生产、保温能节约能源, 有待我们进一步去开拓和进取, 运用新技术新工艺、新材料, 使保温业有一个大的飞跃,闯出国门跨入国际先进行列

展开阅读全文

篇20:使用许可合同专利和专有技术

范文类型:合同协议,适用行业岗位:技术,全文共 3228 字

+ 加入清单

签约时间:__________

签约地点:__________

合同编号:__________

____________________公司(以下简称"接受方"),

___________科技有限公司(以下简称"许可方")。

鉴于许可方和接受方已就接受方向许可方购买_________系统签订了购买合同;鉴于本合同所指明的若干计算机软件作为许可方按购买合同所提供的__________系统的一部分或者与之一起使用的情况下,许可方应将该软件许可接受方使用;鉴于许可方有权授予本合同所规定的许可;双方授权代表通过友好协商,同意就以下条款签订本合同。

第一条定义

1.1"购买合同"是指许可方与接受方于_____年_____月_____日就接受方向许可方购买___________系统签订的合同。

1.2"许可方"是指_______科技有限公司,或者该公司的法人代表、代理。

1.3"接受方"是指__________公司,或者该公司的法人代表、代理。

1.4"系统"是指购买合同规定的,接受方向许可方购买的___________系统。

1.5"程序"是指构成接受方购买的_______系统的_______控制系统的程序。

1.6"专有资料"是指由许可方提供的,与程序有关的文件、数据、技术指标。

1.7"合同生效日"是指双方签订本合同的日期。

第二条合同范围

2.1许可方按本合同所规定的条款向接受方授予使用__________系统程序的许可,而接受方按本合同的规定同意接受该许可。按本合同许可的程序如下:(应加入该程序的内容、运行的环境以及应具备的功能)

2.2许可方授予接受方使用该程序的许可权,这种权利是不可转让的权利。

2.3许可方负责向接受方提供该程序的专有资料,专有资料包括以下几项:a:份用户指南;b:份操作手册和安装指南。

第三条合同价格

3.1按照第二条规定的内容和范围,本合同生效之日起的___个工作日内接受方应向许可方支付合同价格_____%的预付金;其余_____%的货款在接受方收到许可方的商业发票后的_____个工作日内一次付清。

3.2合同金额共计为______________人民币。

第四条支付条件

4.1本合同第三条规定的金额,通过接受方开户行及账号____和许可方开户行及账号_______进行支付。

4.2按照合同规定,在__________系统验收合格后,许可方应立即开具商业发票并先行传真给接受方,接受方在收到许可方开具的商业发票后三个工作日内,应将尚未支付的合同金额支付给许可方。

第五条专有资料的交付改进

5.1许可方应按本合同第二条的规定在合同签订之日起____日内向接受方提供专有资料。交付方式为邮政特快专递或航空快递。目的地为________________________。

5.2如果许可方提供的专有资料有丢失、损坏和/或不完整,许可方在收到接受方的书面通知后____天内,免费将专有资料重寄或补发给接受方。

5.3在合同的有效期内,许可方对程序如有改进和发展,应免费向接受方提供与此相关的更新后的程序和专有资料。

第六条安装与验收

6.1许可方应协助接受方完成该程序的安装。

若接受方要求许可方派技术人员现场协助安装,则许可方应提供此项服务;接受方应负责许可方所派技术人员的往返交通及食宿费用。

6.2软件安装运行后,双方按说明书中所规定的技术指标对运行情况进行验收。

接受方应将签收的合格证明传真给许可方。

第七条使用、复制、转让及透露限制

7.1接受方只可将程序用于许可方按购买合同条款提供作为________系统一部分的计算机;如果___________系统计算机因为发生故障不能操作,或在进行保养性维修、工程设计变更、特制件或模型变换期间不能操作,则也可将程序用在接受方的备用计算机上,直到__________系统控制用计算机修复到操作状态为止。接受方只能将程序用于直接的内部操作方面,在任何情况下均不得将程序供给他人使用。

7.2接受方不得复制程序或其任何部分,但接受方只是为了备份、存档和将程序置于适宜执行状况,可以复制程序。

所有经允许的复制件,都要清楚地标上与原先供给接受方的程序相同的、关于许可方所有权或版权的限制说明。经允许的复制件应以安全的方式予以保存。

7.3除非经许可方事先以书面方式同意,接受方不得出售、转让或许可他人使用程序。

7.4接受方不得将程序或其任何部分透露或者以其他方式提供给第三方和接受方没有必要授权其在业务中使用程序从任何雇员。

接受方应采取一切合理、必要的步骤,保证不会将程序或其任何部分透露或者以其他方式提供给任何第三方。

第八条侵权和保证

8.1许可方保证其有权授予在本合同中所授予的许可。

如果在执行合同过程中一旦发生第三方指控侵权时,则由许可方负责与第三方交涉,并承担由此引起的一切法律和经济上的责任。

如果在诉讼或仲裁中被判为构成侵权,程序的使用被禁止,许可方可以自行承担费用承担以下任何一项:

a.替换或修改程序,使之不再构成侵权,并在实质上用同样的质量进行同样的服务;

b.在程序退还许可方之后退还接受方使用费,但要从中扣除使用、损坏和陈旧的折旧费。

许可方在采取上述措施后,不能免除其承担的其他赔偿责任。

但许可方对基于以下其中一项的任何版权侵权所提出的请求不负责任。

c.接受方自行修改程序,或程序没有在指定的工作环境中使用;

d.在____________系统之外的系统使用程序。

8.2许可方保证程序在规定的操作环境中的使用能够符合合同第二条的指标要求。

许可方不保证任何程序的不中断或无差错运行。

自系统验收之日起,保修期为____年。

许可方保证在该期间内免费修理、更换并重新安装程序中任何有瑕疵的部分。

第九条合同的终止

9.1在合同到期后,接受方可以书面通知许可方终止本合同,并免除其在合同项下的义务。

9.2如果任何一方违反合同条款,在给予了书面通知和合理的时间予以纠正,而仍不改正的,另一方有权终止合同。

9.3如果合同终止后,合同中的条款按其性质仍应有效的,许可方和接受方仍应遵守。

第十条不可抗力

10.1合同双方中的任何一方,由于战争或严重的水灾、火灾,台风和地震等自然灾害,以及双方同意的可作为不可抗力的其他事故而影响合同执行时,则延长履行合同的期限,延长的期限相当于事故所影响的时间。

10.2受不可抗力影响的一方应尽快将发生不可抗力事故的情况以电传或电报通知对方,并于____天内以航空挂号信件将有权证明的机构出具的证明文件提交给另一方进行确认。

10.3如果不可抗力事故的影响延续到________天以上时,合同双方应通过友好协商解决合同的执行问题。

第十一条争议的解决

11.1因执行本合同所发生的或与本合同有关的一切争议,双方应通过友好协商解决。

11.2如双方通过协商不能达成协议时,则应提交中国国际经济贸易仲裁委员会_____分会,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。

仲裁裁决是终局的,对双方均有约束力。

第十二条合同的生效及其他

12.1本合同由双方授权代表于____年____月____日在________签字。并自签字之日起生效。

12.2本合同的有效期从合同生效日起算共__________年。

12.3本合同的执行中,对其条款的任何变更、修改和增减,都须经双方协商同意并签署书面文件,作为合同的组成部分,与合同具有同等效力。

12.4本合同一式两份。

合同双方的法定住址如下:

a.接受方:_____________ b.许可方:_____________

地址:_________________ 地址:_________________

电话:_________________ 电话:_________________

传真:_________________ 传真:_________________

接受方授权代表:(签字)_________________ 许可方授权代表:(签字) _________________

展开阅读全文