0

玻璃制品出口怎么样(优秀20篇)

浏览

1349

范文

1000

关于进口贸易的合同

范文类型:合同协议,适用行业岗位:外贸,全文共 2746 字

+ 加入清单

合同号:_________

卖方:_________

地址:_________

电话:_________

传真:_________

电传:_________

买方:_________

地址:_________

电话:_________

传真:_________

电传:_________

双方同意按照下列条款由卖方出售,买方购进下列货物:

1.货物名称、规格:_________。

2.数量:_________。

3.单价:_________。

4.总值:_________。

5.交货条件:fob/cfr/cif,_________。除非另有规定,“cfr”和“cif”均应依照国际商会制定的《国际贸易术语解释通则(incotems)》办理。

6.原产地国别:_________。

7.包装及标准

货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。

8.唛头:_________。

9.装运期:_________。

10.装运港:_________。

11.目的港:_________。

12.保险:当交货条件为fob或cfr时,应由买方负责投保;当交货条件为cif时,应由卖方按发票金额110%投保_________险;附加险:_________。

13.支付条款

(1)信用证(l/c)支付买方应在装运期前_________日,向中国银行申请以电传/电信方式开立以卖方为受益人的不可撤销的议付信用证。信用证应在装船完毕后_________日内在受益人所在地到期。

(2)托收(d/p或d/a)支付货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(d/p)方式,通过卖方银行及_________银行向买方转交单证,换取货物。货物发运后,卖方出具以买方为付款人的承兑跟单汇票,汇付款期限为_________后_________日,按即期承兑交单(d/a_________日)方式,通过卖方银行及_________银行,经买方承兑后,向买方转交单证,买方按汇票期限到期支付货款。

(3)汇付(t/t或m/t)买方在收到卖方依本合同第14条规定提交的海运单据后七日内,以电汇/信汇方式支付货款。

14.单证

卖方应向议付银行提交下列单证:

(1)标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运提单。

(2)商业发票_________份;

(3)在cif条件下的保险单/保险凭证_________份;

(4)品质证明书;

(5)装箱单/重量单/数量一式_________份;

(6)原产地证明书;

(7)发货通知书。

15.装运条件

(1)在cif和cfr条件下,卖方应在装运前十天以电报或传真将船名、国籍和船龄通知买方。经买方确认后卖方才可装运,买方应在接到通知后五个工作日内予以确认,否则即视为已被确认。

(2)在fob条件下,由买方负责按照合同规定的交货日期洽定舱位。卖方应在合同规定的装船期前_________日将合同号、货物名称、数量、金额、箱数、总重量、总体积及货物在装运港备妥待运的日期以电传/传真通知买方。买方应在装船期前十日通知卖方船运船只或者到达日期,以便卖方安排装运。如果有必要改变装运船只或者其到达日期,买方或其运输代理应及时通知卖方。如果船只不能在买方通知的船期后_________日内到达装运港,买方应承担从第_________日起发生的货物仓储保管费用。如果买方船只按时到达装运港,而卖方不能按规定的时间备妥货物以待装船,则由此而产生的空舱费及滞期费应由卖方负担。

(3)在fob、cfr和cif条件下,卖方在货物装船完毕后应立即以电传/传真向买方及买方指定的代理人发出装船通知。装船通知应包括合同号、货物名称、数量、净重、毛重、包装尺码、发票金额、提单号码、启航期和预计到达的目的港的日期。如货物系危险品或易燃品,也应注明危规号。

(4)在运载船只启航之后_________个工作日内,卖方应将本合同第14条中列举的单证的副本(各一份)航空邮寄给买方。

(5)可以/不得转船。

(6)可以/不得分运。

(7)卖方有权在_________%数量内溢装或短装。

16.检验和索赔条款

(1)在货物运抵最终目的地的港后,买方有权向货物检验机构申请对货物进行检验。检验机构为中华人民共和国_________进出口商品检验局。

(2)买方在货物到达最终目的地目的港卸货完毕之日起90日内,如发现货物之质量、规格、数量、重量、包装、安全或卫生条件与合同规定的不符,应在上述期限内向卖方发出索赔通知,并凭借上款规定的检验机构所发具的检验证书向卖方索赔。除由保险公司或航运公司应承担的责任外,卖方须就该索赔要求进行赔偿。

(3)卖方应在收到于上述期限内由检验机构出具的检验证书以及索赔要求之后15日内回复买方。

(4)买方有权就第16条和第17条所述货物缺陷所造成的损失向卖方要求索赔。

17.品质保证

卖方保证其所提供的全部货物均符合本合同的规定,并且是全新和未使用过的。货物的质量保证期为自货物到达目的地之日目的港卸货完毕之日起12个月。在质量保证期内,凡因设计、制造工艺和所有材料而产生的缺陷,卖方应自负费用进行修理或更换货物或部件。

18.不可抗力

任何一方对由于下列原因而导致不能或暂时不能履行全部或部分合同义务的,不负责任:水灾、火灾、地震、干旱、战争或其他任何在签约时卖方不能预料、无法控制且不能避免和克服的事件。但受不可抗力影响的一方,应尽快地将所发生的事件通知对方,并应在事件发生后15天内将有关机构出具的不可抗力事件的证明寄交对方。如果不可抗力事件之影响超过120天,双方应协商合同继续履行或终止履行的事宜。

19.仲裁

因履行本合同所发生的一切争议,双方应友好协商解决。如协商仍不能解决争议,则应将争议提交中国国际经济贸易仲裁委员会(北京),依据其仲裁规则仲裁。仲裁裁决是终局的,对双方都有拘束力。仲裁费应由败诉一方承担,但仲裁委员会另有裁定的除外。在仲裁期间,除仲裁部分之外的其他合同条款应继续履行。

20.特殊条款:

本合同由双方代表签字后生效,一式_________份,双方各执_________份。

买方(盖章):_________ 卖方(盖章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

签订地点:_________ 签订地点:_________

展开阅读全文

更多相似范文

篇1:交通银行出口买方信贷贷款合同_合同范本

范文类型:合同协议,适用行业岗位:银行,外贸,信贷,全文共 3960 字

+ 加入清单

交通银行出口买方信贷贷款合同

借款方:_____________________

法定地址:___________________

贷款方:_____________________

法定地址:___________________ 应借款方_______年_______月_______日的借款申请,贷款方同意为其安排______________银行(下称“出口地银行”)的买方信贷。为此,借、贷双方根据《中华人民共和国民法通则》、《中华人民共和国经济合同法》、《借款合同条例》签订合同,以资遵守。 第一条 贷款用途和金额

1.1 本贷款用途是为出口商______________与进口商______________在_______年_______月_______日签订的商务合同(合同编号:________)融通资金,用于进口商为______________项目,购买______________设备。

1.2 贷款总金额为:_______(大写:______________),其中:____________________________

(1)用于商务合同项下支付的金额为_______(大写:_______),为商务合同金额的_______%。

(2)用于付给_______的本贷款保险费的金额为_______(大写:_______)

(3)

1.3________________________________ 第二条 提款条件

2.1 借款方根据商务合同的有关规定提款。

2.2 借款方满足了本合同第六条列明的各项陈述与保证。

2.3 借款方未发生本合同第七条列明的任何一种违约行为。

2.4 _______________________________ 第三条 提款

3.1 借款方在收到商务合同支付条款规定的有关文件和单据,并按规定时间审核无误以后指示出口地银行将贷款直接支付给出口商。

3.2 提款期从______________开始,至______________截止,过期______________

3.3 每次提款最小金额为_______(大写:______________)

3.4 提款的日期、金额及有关事项在每次提款发生后,由贷款方编制《提款通知书》(格式见样本1)通知借款方。《提款通知书》为本合同不可分割的部分,具有同等的法律约束力。

3.5______________________________ 第四条 利息和费用

4.1 借款方必须无条件的,没有任何扣除的按本合同规定向贷款方支付利息和下列条款费用。

4.2 贷款按_______利率计息。年利率为_______,一年按360天计算。

贷款金额的_______%即______________(大写:_______)按固定利率计息,年利率为_______,一年按360天计算。

还款期以前的利息每_______个月计收一次。每期利息支付的日期、金额及其有关事项由贷款方在《提款通知书》中通知借款方。

还款期的利息每_______个月计收一次。每期利息支付的日期、金额及有关事项由贷款方编制《还款通知书》(格式见样本2)通知借款方。《还款通知书》为本合同不可分割的部分,具有同等的法律约束力。

4.3 承诺费费率为_______%。承诺费自_______开始按末提贷款余额计算、支付,以后_______每_______个月计付一次。

4.4 管理费率为_______%。管理费自_______内按贷款总金额计算,一次付清。

4.5 本贷款保险费____________________________

4.6 每次支付利息和费用,借款方必须在支付日前的三个营业日将款项划入其开立在贷款方处的帐户上。

4.7___________________________ 第五条 还款

5.1 借款方必须无条件地按本合同规定偿还贷款,并且不受商务合同项下进、出口双方任何行为的影响。

5.2 本贷款还期为_______年,每_______个月等额偿还一次,分_______次还清。还款期从____________开始,其开始日最迟不超过_______每次还款的日期、金额及有关事项由贷款方在《还款通知书》中通知借款方。

5.3 借款方必须在还款前_______个月通知贷款方,并征得贷款方同意后可以不按《还款通知书》的规定提前归还贷款,并承担由此引起的贷款方的一切经济损失。

5.4 每次还款,借款方必须在还款日前的三个营业日将款项划入其开立在贷款方处的帐户上。

5.5___________________________ 第六条 陈述与保证

6.1 借款方在贷款方处开立结算帐户。借款方日常经营的资金通过该帐户结算。贷款方可以主动从该帐户划转资金用于偿还、支付本贷款项下到期的贷款、利息和各项费用。

借款方在贷款方处开立还款保证帐户。借款方将下列资金存入该帐户。在本贷款项下的所有债务和费用偿付清以前,未经贷款方同意不得挪作他用。存入该帐户的资金是:

1.__________________________________

2.__________________________________

3.__________________________________

6.2 借款方定期向贷款方提供项目进度报告;按月向贷款方报送资产负债表,损益表,财务收支表以及贷款方认为必要的其他文件和资料,借款方向贷款方提供的一切文件和资料是真实的。

6.3 借款方未隐瞒向第三方作出的任何信用担保,财产抵押以及其他影响借款方还款能力的行为。

在本合同有效期间,未经贷款方同意,借款方不得为第三方承担任何债务或对借款方的资产设定任何抵押以及作出其他影响还款能力的行为。

6.4 借款方在财务、经营方面的重大决定、重大变化须及时通知贷款方。当这些重大决定影响贷款方权益时,须事先征得贷款方的同意。

6.5 借款方在组织章程、管理制度和人事等方面的重大决定或重大变化须及时通知贷款方,当这些决定或变化影响到贷款方权益时,事先征得贷款方的同意。

6.6 _______________________________ 第七条 违约和处罚

7.1 下列任何事件发生,借款方必须承担由此引起的贷款方的一切经济损失,并且,贷款方有权提前收回贷款本息和处以下列注明的罚息以及采取其他一切处罚和补救措施,由此引起的贷款方的一切经济损失由借款方承担:

1.借款方未能按本合同规定的用途使用贷款。

贷款方对被挪用的贷款在原定利率的基础上加收50%的罚息。

2.借款方未能按本合同规定偿还贷款,支付利息和费用。

贷款方对逾期的本金、利息和费用加收_______%的罚息。

3.借款方未能满足本合同第六条陈述与保证的各项规定。

4.借款方改组、解散、终止其业务经营,资产负债及损益状况发生贷款方认为的重大不利变化。

5.借款方提供的抵押物已经失去其抵押价值,贷款方认为其权益受到损害。

6.担保人已经失去其担保能力或担保人提供的保函由于任何原因被取消,终止,以及更改后而产生相反效果,贷款方认为其权益受到损害。

7.借款方与第三方发生贷款方认为其权益受到损害的诉讼行为。

8.借款方发生贷款方认为其权益受到损害的借款方不按其与第三方签订的借贷合同偿还第三方债务的行为。

9._______________________________ 第八条 生效及其它

8.1 本合同经双方签署后生产,至本合同项下的全部债务、费用和借款方必须支付的一切赔偿、罚款被清偿后失效。

8.2 本合同有效期内,未经借贷双方同意,任何一方对本合同的修改无效。

8.3 本合同壹式肆份,借贷双方各执两份。 第九条 附则

___________________________________  附件1提款通知书 借款人:______________ 我行根据贷款合同(合同编号:______________)第三条和第四条规定,通知你方:你方已于__________年_____月_____日支付出口商第_____笔贷款,金额为__________(大写:__________)。 自本通知书发出时止,你方提款,计付息情况如下: 一、提款情况

币种:__________

提款序号提款日期提款金额累计提款金额第一次 年 月 日  第二次 年 月 日  第三次 年 月 日  第四次 年 月 日  第五次 年 月 日   二、还款期以前利息计付情况 年利率为:__________

币种:__________

付息序号 付息日期付息金额累计付息金额第一次   第二次   第三次   第四次   第五次   第六次    其他事项如下:

1.___________________________________

2.___________________________________

3.___________________________________

附件2还款通知书 借款方:__________ 我行根据贷款合同(合同编号:__________)第四条和第五条规定,现通知你方每次偿还贷款本金和支付还款期利息的日期、金额如下: 年利率为:_______________

币种:__________

序号还本付息日期本金利息本息合计1  2  3  4  5  6  7  8  9  10  11  12  13  合计   其他事项如下:

1.______________________________

2.______ _______________________

3.______________________________

展开阅读全文

篇2:2024年商务局外贸工作小结范文_商务工作总结_网

范文类型:工作总结,适用行业岗位:商务,外贸,全文共 2528 字

+ 加入清单

2020年商务外贸工作小结范文

一、继续大力推进开展“家电下乡”工作

为进一步贯彻落实财政部、商务部加强家电下乡监管,防止骗补的要求,认真开展家电下乡“监管年”活动,确保财政资金安全,确保惠民政策落实到位。今年我局联合财政局采取了定期检查和不定期抽查相结合的方式,加强对家电下乡网点的监管。全年累计检查20多次,共查处违规资金20万元,有效的保障了财政资金安全和防止骗补现象的发生。

截止到11月5日,销售家电下乡产品8636台(件),销售金额1788.61万元,兑付补贴资金232.52万元,销售摩托车460台,销售金额211.15万元,兑付补贴资金27.45万元,销售汽车35辆,销售金额104.92万元,补贴资金13.64万元。“家电下乡”销售额名列全州各县市前列,在全市5月底省商务厅、省财政厅“家电下乡”补贴资金检查中,获得省厅的好评。

二、积极开展做好“家电以旧换新”工作

“家电以旧换新”工作是继家电下乡后国家实施的又一项重大惠民利民政策。我局高度重视,认真做好企业备案及资料初审工作,全市共备案销售、回收企业105家。截止到11月份,我市家电以旧换新累计销售21900台,销售金额8104.2万元,补贴资金493.29万元,回收旧家电23772台。

三、全力推进开展“万村千乡”市场工程

为继续推动农村消费市场、打造农家店营销水平,今年州商务局分配我市建设“万村千乡”农家店15家的任务,为了完成该任务,我们对全市所在乡镇进行摸底调查,会同永顺家家乐超市一家一家上门改造装修,完成农家店15家,覆盖全市所有乡镇,圆满完成州分任务。

四、狠抓食品安全,加强生猪定点屠宰管理

为了让市民吃上“放心肉”,今年我们结合我市实际、牵头起草、市人民政府出台了《吉首城区生猪屠宰管理办法》。我们继续加强定点屠宰稽查,加强对超市、学校食堂、宾馆酒店等集体伙食的用肉管理,督促市定点屠宰场加强内部卫生及生猪来源、检疫检验的管理,打击私屠滥宰,防止了矮寨私宰死灰复燃。今年定点屠宰生猪目标管理10.3万头,已完成7.6万头,防止了税费流失,市民吃上了“放心肉”。

五、突出商贸物流中心建设

围绕市委、市政府打造吉首“旅游、商贸、工业、科教文化”四个中心的目标,今年四月我市成立了以市人大常委会主任吴文钊为组长,市人大市政府分管领导为副组长,发改、商务、规划、国土等部门主要领导为成员的吉首市发展商贸物流业领导小组,进一步发展现代商贸物流业,主要做好以下几项工作:

(一)完成了商贸物流中心建设可行性论证中心方案。我们结合吉首实际,于三月份制订了《吉首市商贸物流中心建设方案》,提出了发展总体思路和发展目标,到20xx年实现社会消费品零售总额200亿元,年均增长17%,明确了工作重点,建立保障措施。今年四月初,我们与湖南商学院签订协议,委托该院对我市建设商贸物流中心进行可行性论证。该院组织了以贺康庄教授、肖文金副教授的专家团队,到吉首进行了调研,先后考察了怀化、张家界及贵州铜仁,研究了浙江义乌、山东临昕、武汉汉正街、长沙高桥大市场、株州芦松市场等全国影响力的批发市场、物流中心后,编制了可行性研究报告,已形成文本。

(二)编制出吉首物流业发展规划。6月下旬,经过考察比较,我们委托处于全国物流业发展发达地区,位居国内商贸物流业研究前沿、曾经为国内多个地区编制过商贸物流规划、编制质量高的中山大学编制我市物流业发展规划,该课题组于8月份和11月上旬先后二次来我市和四省边区调研,现正在对初稿进行修改完善,预计11月底可完稿。

(三)加快物流园区建设。今年我们将发展物流业、加快物流园建设这一新型业态作为工作重点。目前已完成《吉首肉类加工冷藏保鲜》、《大湘西矿产品物流园建设工程》等三个项目可行性论证报告。二个物流园重点项目正在建设中:一是大湘西物流城建设项目,于今年2月成立了大湘西物流城开发有限公司,注册资本xx万元,由湖南中翔投资管理有限公司及彭任军两位自然人股东组成。

该项目内设矿产品物流园(项目总投资4983.8万元)、建材物流园(项目总投资4990.5万元)、仓储配送中心(项目总投资4993.8万元),目前该项目的矿产品物流园已在市发改委立项,建材物流园和仓储配送中心在立项申报,项目用地指标在省国土资源厅报批。

二是湘西农产品物流中心建设项目,该项目由国家、省、州、市四级共建,项目总投资5亿元,占地400亩,规划为两部分,第一部分为蔬菜水果交易中心项目区,即吉首市蔬菜果品批发大市场升级改造项目,占地100亩,由州、市共建,湘西五里牌蔬菜果品有限责任公司负责实施,已投资500万元,新征土地21亩,完成市场南大门的土建、电动门、电子地磅、电子显示屏建设,农产品全国联网报价系统等设备已安装调试完成并启用,二期24亩土地的三通一平建设正在实施。

第二部分为湖南新合作农产品物流配送展示中心项目区,占地300亩,由全国供销总社、湖南省供销联社与州投资贸易促进中心、闽辉房地产开发公司合作,组建湖南新合作农产品股份有限公司负责实施。目前湖南新合作商贸股份有限公司投入现金4500万元,州投资贸易促进中心投入实物折价1500万元(即土地52666平方米、仓库建筑物34793平方米),股本结构调整已完成。已投入资金660万元,对原八大仓库按照农产品加工,储藏的功能要求和进园道路及水、电、管线进行了维修和改造,大型仓储中心功能已基本具备。

(四)出台了支持酒店建设的意见。为了加快酒店建设步伐,优先发展州府吉首文化旅游集散中心,我局牵头,旅游、规划、国土等部门配合,规划xx期间我市建设五宾馆酒店6家、四宾馆酒店13家。目前已初步确定此19家宾馆酒店规划建设用地选址,市人民政府出台了“关于支持酒店建设的意见”,出台了酒店、物流业建设优惠政策,酒店招商引资来势强劲。

六、乾州“百味坊”招商来势较好

为了彰显湘西餐饮文化底蕴,引进湘西民族特色的名菜、名店,促进乾州古城旅游发展,我局加强招商引资力度,努力打造乾州古城“百味坊”。通过发传单、挂横幅、打广告、上门招商、专门召开坐谈会等形式,到目前为止,已引进盛莉苗疆菜坊、喜得园干菜馆、白河渔村等5家餐馆入驻开业,乾州“百味坊”初具雏形。

展开阅读全文

篇3:购买进口货物三方协议

范文类型:合同协议,适用行业岗位:外贸,全文共 685 字

+ 加入清单

签订时间:

签订地点:

甲方:

乙方:

(工厂)地址:地址:法定代表人:电话:法定代表人:电话:

丙方:(外商)地址:授权代表:电话:

鉴于:

1、乙丙双方经友好协商,同意由乙方向丙方购买本协议及本协议所涉及合同项下的货物;

2、乙方委托甲方向丙方进口上述货物,但出于某些技术上的原因,甲、乙双方于________年____月____日就该批货物签订了号《买卖合同》(以下称“销售合同”)而非代理进口合同;且

3、乙方授权甲方就上述货物以甲方名义(而非乙方名义)与丙方于________年____月____日签订了号《进口合同》(以下称“进口合同”);且

4、甲乙丙三方均知悉并同意上述情况及做法:甲乙丙三方就上述销售合同及进口合同中的某些问题,经友好协商,达成一致,兹签订本协议书。

甲、乙、丙三方同意:

1、如乙方未按照销售合同的规定将全部货款(分批交货、分批付款的,指每批货物的全部货款)付至甲方,甲方无义务按进口合同的规定向丙方支付任何货款,且免除任何有关延迟付款的违约责任,丙方无权依进口合同向甲方追索(究)任何货款(违约责任)。

2、甲方对有关货物的质量不承担任何责任。

如乙方对货物质量有任何异议,应自行与丙方协商处理,而无权依销售合同向甲方追究任何违约责任;如需退换货,乙方可委托甲方办理,手续费另计。

3、丙方保证交付所给甲方的货物在产地,规品、数量等方面与进口合同的规定严格一致;如有不符,丙方应承担所有法律责任并赔偿甲方因此而遭受的海关处罚。

4、如销售合同及进口合同的规定与本协议不符,以本协议的规定为准。

甲方:

授权人签字:盖章:

乙方:

授权人签字:盖章:

丙方:授权人签字:日期:

展开阅读全文

篇4:进口设备合同_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1213 字

+ 加入清单

进口设备合同

合同编号:_________

签字日期:_________年_________月_________日

签字地点:_________

中国_________公司(以下简称买方)为一方与_________国_________公司(以下简称卖方)为另一方,双方授权代表同意就下列条款签订本合同:

第一章 定义

1.1 “买方”--是指中国_________公司,或者该公司的法人代表、代理和财产继承者。

1.2 “卖方”--是指_________国_________公司,或者该公司的法人代表、代理和财产继承者。

1.3 “合同产品”--是指本合同附件一中所列的产品及其型号和规格。

1.4 “技术资料”--是指本合同附件二中所列的全部技术数据、图纸、设计、计算、操作、维修、产品检验资料。

1.5 “合同工厂”--是指买方使用卖方提供的技术和资料进行生产合同产品的场所,包括卖方提供的全套设备和备件,即_________省_________市_________工厂。

1.6 “净销售价”--是指合同产品的销售发票价格扣除包装费、运输费、保险费、佣金、商业折扣、税金和外购件等的费用后的余额。

1.7 “技术服务”--是指卖方根据本合同附件五和附件六中的规定,就合同产品的设计、制造、装配、检验、调试、操作等工作,向引进方提供的技术指导和技术培训。

1.8 “商业性生产”--是指合同工厂生产第_________台合同产品以后的生产。

1.9 “合同生效日期”--是指本合同的双方政府有关当局中的最后一方批准合同的日期。

第二章 合同范围

2.1 买方同意从卖方购买,卖方同意向买方出售_________成套设备项目(以下简称“合同工厂”),其中包括为保证合同工厂安全稳定地操作所需要的全部设备、材料和备件(以下简称“设备”),以及合同工厂装配、安装、试车、正常操作,生产和维修所需的全部技术和资料(以下简称“技术资料”)。

卖方供货的具体内容,详见本合同附件一。

卖方供应的“技术资料”,详见本合同附件三。

2.2 卖方所供应的全部设备的技术性能和卖方对合同工厂设备的技术保证详见本合同附件二。

2.3 卖方派遣有经验的、健康的和称职的技术人员到合同工厂现场对合同工厂的施工、安装、试车、投料试生产与考核进行技术指导。其人数、技术服务范围和待遇条件等见本合同附件五。

2.4 卖方负责培训买方派遣的人员,其人数、培训地点,培训范围见本合同附件六。

2.5 本合同签订后_________年内,根据买方的要求,卖方有义务以优惠价格提供买方的本“合同工厂”正常运行所需的全部备品备件。届时双方另签协议。

第三章 价格

3.1 卖方按本合同第二章规定提供合同工厂“设备”和“技术资料”的总价为_________(大写_________)。

3.2 上述合同总价的分项价格如下:

3.2.1 机械设备部分:

(1)设备和材料费

共12页,当前第1页123456789101112

展开阅读全文

篇5:纺织外贸实习心得

范文类型:心得体会,适用行业岗位:外贸,全文共 1584 字

+ 加入清单

以前的我对未知的事存在一些恐惧,做事有时不够大胆,放不开。就像刚开始那次打电话,本来我准备的很好,可一拿起电话就说话没主次了。那次以后我想了很久,总结了一下自己的问题,制定了一个改正的计划。那以后我主动和几个生产厂家打电话,将王总教的方法先记在本子上,慢慢得我发现自己可以很自由的和厂家讲价钱了。从这件事我认识到不是自己不可以,而是自己锻炼的少,以后我得主动争取机会,将自己的能力展示出来。通过这一个月我知道了要想把握住机会,除了自信以外,心里素质一定要好,还要积极主动地尽快去了解市场行情,了解产品,从而从容对待客户以及厂家的询问

还有就是自己有时干事不够仔细,通过这一个月的实习,我充分认识到自己需要尽快改正自己的粗心毛病,就像王总说是21天养成一个好习惯。我相信自己会逐步改正自己这方面的不足,将自己的失误降到最低。我觉得在这一个月的实习中,自己在这方面的进步就是办事有条理了很多,工作的效率进不了很多。

除了这些我还认识到自己的英语功底还不是很扎实,自己需要在空闲时多用功一些,将自己的英语能力赶上去。平时多注意一下各国说英语方式的不同,尽快将自己和客户融为一体,建立业务基础。

首先我明白要尽快做好自己角色的转变,使自己成长起来,成为公司的形象就像家训所说的那样,我会时刻提醒自己,自己的形象不仅代表我自己,更代表这我们柏思美科。要让自己做一个优秀的柏思美科职业人。

其次就是在学会做事之前我们得学会做人,这对于我们外贸人员是很重要的。对于自己的同事和客户,我们要以一个感恩的心去对待他们。因为每一件事都不是我们自己一个人可以完成的,我们需要团队的力量,团队的创造力,我觉得我们要把柏思美科当作自己的家,同事就是我们的兄弟姐妹,所以我要真心帮助每一个家人进步。对于客户我们要以一个朋友的身份去和他们交往,用自己的真诚去赢得客户的信任,这样才会有长期的合作关系。

然后就是我知道了要诚信做人,诚实做事。做事要讲求效率,学会把时间优化。争取用最短的时间完成任务。自己在这方面欠缺,要改正。还有作为一个业务员,我们的职责不仅仅是按时完成任务,我们要学会去思考,去总结,在慢慢的实践中培养起自己建设、管理、规范的领导能力。使自己在同事中成为姣姣者。不想做将军的士兵不是一个好士兵,所以我们要拥有一颗超越他人的决心。

另外自己明确了自己的位置。以前觉得自己是专科生,没有什么优势。可从王总的话中我明白了其实学历不代表什么,现在才是我们的起点。现在在这实习一个月了,我也意识到了这一点,所以我对自己更加有信心了,努力会成功的。

首先通过王总组织的一系列培训会,我逐渐理解了自己的责任以及一些工作上所需具备的知识,技巧。我觉得这一个月自己在这方面收获很多,我知道了如何去打电话,回复电话;怎么去和客户谈价钱,怎么在说话中占据优势;怎么去地道的回复一个客户的邮件;怎么去和客户建立较深厚的感情;怎么在网上将我们的产品发布出去;怎么去做一个单据;怎样整理资料,将资料系统化;以及一些信用证方面的单据问题等。

其次基本上了解了一些业务流程中应该注意的一些问题,这对于我们来说很有用处,以前在学校接触的都是一些理论的东西。可现在明白了有些东西理论和实践不是都一样的。有些是理论所没有提到的。通过这一个月的实习,我明白了自己还有很多要学的,自己所知道的那点是远远不够的,以后要多和学长学姐多交流,争取在短时间内让自己充实起来,成长起来。

然后就是知道我需要有危机意识,这样自己才会有动力。在公司中多思考,少抱怨。虽然我们的工作职位不一样,但我们应该明白我们对公司的责任都是一样的。所以我们都要不断的反省我们自己,找出我们工作的不足之处,从而推动公司不断向前发展、进步。

总的来说,我觉得自己在这一个月进步很大,从做人,做事以及自己的能力方面,不过自己需要提高的地方还是很多的,自己需要学习的地方也很多。

展开阅读全文

篇6:技术出口合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,外贸,全文共 49001 字

+ 加入清单

技术出口合同范本

Contract for Equipment Sales and Technology Licensing

Contract No. ____________________

This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

Article 1 Definitions

1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

1.5 “Destination Airport” refers to _____________Airport.

1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

Article 2 Scope of the Contract

2.1 The Seller’s Obligation

2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

2.2 The Buyer’s Obligation

2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

Article 3 Grant of License

3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

3.4 Territory

3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

Article 4 Price

4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

The breakdown price is as follows:

The price for Equipment is __________(say _______________________ only).

Fee for design is __________(say _______________________ only).

Fee for Technical Documentations is __________(say _______________________ only).

License fee is __________________(Say: _________________ only)

4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 2019, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

4.2.3 The above price is fixed and firm.

4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

Article 5 Payment

5.1 Down Payment

Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

5.2 [Option One: Payment by Sight L/C]

The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) Bill of Lading in one (1) original and ___ ( ) copies;

(b) Commercial Invoice in one (1) original and ___ ( ) copies;

(c) Packing list in one (1) original and ___ ( ) copies;

(d) Certificate of Origin in one (1) original and ___ ( ) copies;

(e) Insurance Policy in one (1) original and ___ ( ) copies;

5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

(b)One ( 1 ) copy of commercial invoice.

5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

b) One (1) copy of Commercial Invoice.

5.2 [Option Two: Payment under a L/G]

The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

Article 6 Delivery of Equipment and Technical Documentation

6.1 The Delivery of the Equipment

6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

6.1.3 The port of shipment is ____, while the port of destination is ____.

6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

(a) Contract number

(b) Name of the vessel and loading port

(c) Name of the Equipment shipped

(d) Number and date of Bill of Lading

(e) Total volume

(f) Total gross and net weight

(g) Total number of packages/cases

6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

(a) Bill of Lading

(b) Commercial Invoice

(c) Packing List

(d) Certificate of Origin

(e) Insurance Policy.

6.2 The Late Delivery of the Equipment

6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

(a) From the first week to the fourth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per

week

(b) From the fifth week to the eighth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per week

(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

the value of the delayed portion of the Equipment per week

6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

6.3 The Delivery of the Technical Documentation

6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

6.3.4 In case of shortage, loss of or damage to the Technical Documentation due to the Seller’s reason, the Seller shall make supplement to the Buyer within ____ ( ) days after receiving the Buyer’s written notification without any further charge.

Article 7 Packing and Marking

7.1 The Equipment shall be packed to withstand long distance transportation, multiple handling.

7.2 The Seller shall mark the following on two opposite sides of each package with indelible painted English words:

(a) Destination

(b) Consignee

(c) Contract number

(d) Shipping mark

(e) Gross/net weight (kg)

(f) Case/ bale number

(g) Dimensions: L x W x H (cm)

7.3 Each package shall contain one (1) copy of packing list.

7.4 The Seller shall mark on the package, if necessary, “Handle with Care", “Right Side Up", “Fragile" or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods.

7.5 If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facilitate loading, unloading and handing.

(a) Destination

(b) Consignee

(c) Contract number

(d) Gross/net weight (kg)

(e) Item number

(f) Dimensions: L x W x H (cm)

Article 8 Technical Service and Technical Training

8.1 The Seller shall dispatch technical personnel to Job Site to render Technical Service in accordance with Contract according to a time schedule agreed upon between both parties. The number, specialty, rank, treatment of the personnel, and payment as well as the contents, and requirements of Technical Service are specified in Appendix 6.

8.2 The Buyer shall have the right to send its technical personnel to the relevant factory selected by the Seller for training. The number, speciality, treatment of the personnel, and payment as well as the contents, time schedule, and requirement of training, are specified in Appendix 7.

8.3 Either party shall provide assistance to the other party’s technical personnel in their application for visa, working permit, and/or other necessary formalities for rendering Technical Service or training under the Contract in the other party’s factory.

8.4 Either Party’s technical personnel shall abide by the laws of the other party’s country and the regulations of the other party during their stay in the other party’s country.

Article 9 Standards and Inspection

9.1 The Seller shall carry out the design, manufacture, inspection and test of the Equipment according to the existing standards of the People’s Republic of China, namely GB.

9.2 The Seller or the manufacturer shall, at his own costs and expenses, inspect the Equipment and issue the ex-work quality certificate.

9.3 The open-case inspection of the Equipment shall be performed by the Buyer in the presence of the Seller’s representatives on the Job Site in days after the arrival of the Equipment at the Job Site. The open-case inspection fee shall be borne by the Buyer.

The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s representatives in their inspection work.

9.4 During the joint open-case inspection, a detailed inspection record shall be made and signed by the representatives of both parties.

In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. Any of such claims shall be lodged by the Buyer within month(s) after the arrival of the Equipment at the Job Site.

9.5 If any shortage, defect of or damage to the Equipment is found in open-case inspection not attributable to the Seller’s responsibility, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties.

9.6 The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent.

If there is no joint open case inspection due to the reasons not attributable to the Seller, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition.

Article 10 Design and Design Liaison

10.1 The Buyer shall provide to the Seller within ____ ( ) days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. The Seller shall not be liable to the Buyer for, and the Buyer shall indemnify the Seller and hold the Seller harmless from any damages or failure caused by the incompleteness, incorrectness and/or inaccuracy of any such information and data.

10.2 A design liaison meeting shall be held in the ____ ( ) month after receiving above mentioned design data, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details.

10.3 During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively.

Article 11 Erection, Test Run, Commissioning, Performance Test and Acceptance

11.1 The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer.

11.2 Chief Representatives

11.2.1 Each party shall nominate one (1) Chief Representative to deal with the technical matters during the period from the start of the Erection to Acceptance of the Equipment.

11.2.2 Detailed arrangements shall be made through friendly discussions by the Chief Representatives of both parties. The Chief Representatives of both parties shall fully cooperate to carry out their duties stipulated in the Contract, however they have no right to revise, alter or amend the Contract without the written authorization of both parties.

11.2.3 The Chief Representatives of both parties shall communicate through Linking Sheet for the matters relative to opinions, suggestions and information. The linking sheet shall be countersigned by the other party.

11.3 Erection and Test Run

11.3.1 The Erection shall be completed by the Buyer in ____ ( ) days from the effective date of the Contract. The Seller’s Chief Representative shall arrive at the Job Site ____ ( ) days prior to the beginning of the Erection.

11.3.2 When Erection is completed and in full conformity with requirements of the Technical Documentation, a Certificate of Completion for Erection of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing said Certificate shall be deemed as the date of completion of Erection.

11.3.3 As soon as the completion of Erection, Test Run for single machine and the whole system of the Equipment shall be started.

11.3.4 When Test Run has been successfully performed, a Certificate of Completion for Test Run of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing the said Certificates shall be deemed as the date of completion of Test Run of the Equipment.

11.4 Commissioning and Performance Test

11.4.1 Within ____ ( ) days after the completion of the Test Run, the Buyer shall make available qualified operation and maintenance personnel, raw materials, spare parts, utilities and other matters required for the Commissioning. Detailed procedures such as instrument calibrating, items of recording, sampling methods and analyzing methods, which are necessary for the Commissioning shall be discussed and agreed upon by the Chief Representatives of both parties.

If in the opinion of both parties, the Equipment is ready for the Commissioning, both parties shall confirm the readiness for the Commissioning in writing.

11.4.2 The Commissioning of the Equipment shall be started immediately after the confirmation of the readiness for the Commissioning. The Commissioning period shall ____ ( ) days after commencement of the Commissioning.

11.4.3 When the Seller and the Buyer consider that stable operation of the Equipment has been achieved, the date of Performance Test shall be fixed by Chief Representatives of both parties.

11.4.4 The Seller shall have the right to access to the laboratory and testing facilities in order to take samples and make analytical tests. The sample taking and analytical test during the Commissioning period will be done in the presence of the Chief Representatives of both parties.

11.4.5 During the period of Commissioning until Acceptance of the Equipment, the Seller may use the Buyer’s stored spare parts. Should the Buyer’s stored spare parts be used by the Seller due to the Seller’s responsibility, the Seller shall replenish the stores with the same in time at Job Site; otherwise the Seller shall provide the same at the Buyer’s costs upon the Buyer’s timely request.

11.4.6 If the result of Performance Test has reached the guarantee figures as per Appendix 1, the Acceptance Certificate of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days.

11.4.7 If the Performance Test cannot meet guarantee figures specified in Appendix 1, both parties shall jointly make investigations so as to find out the reason for clarifying the responsibility.

11.4.8 If the guarantee figures are not met due to the Seller’s reason, the Buyer shall agree to give an extension of ____ ( ) months so that the Seller can make improvement or adjustment to the Equipment and conduct further Performance Test. All the costs and expenses for making improvement or adjustment to the Equipment shall be borne by the Seller.

11.4.9 During the extension period, if the guarantee figures are still not met due to the Seller’s reason, the Seller shall pay the liquidated damages as per Appendix 1 to the Buyer against the Acceptance Certificate signed by both parties.

The Seller’s aggregate liability to pay liquidated damages for failure to attain the performance guarantees shall not exceed ____ ( ) percent of the Equipment price. The Seller shall have no further liability whatsoever to the Buyer in respect of such failure after payment of the liquidated damages.

11.4.10 If the non-achievement of the guarantee figures is due to the reasons not attributable to the Seller, the Seller shall agree to give an extension of ____ ( ) months. During the extension period all costs thereto incurred for the adjustment of the Equipment, as well as the costs and expenses for the Seller’s technical personnel shall be borne by the Buyer. In case the guarantee figures still can not be achieved due to the reasons not attributable to the Seller in the extension period, the Equipment shall be accepted by the Buyer. Both parties shall sign the Acceptance Certificate.

11.5 Acceptance

11.5.1 Acceptance shall occur in respect of the Equipment when :

(a) Performance Test has been successfully completed as per the Article 11.4.6.; or

(b) The Performance Test has not been completed due to the reasons not attributable to the Seller such as delayed civil construction, lack of and/or any other inconformity of raw materials, spare parts of the Buyer’s scope of supply under Appendix 2, and utilities with the requirements of the Contract in the ____ ( ) months from the date of Bill of Lading of the Last Shipment; or

(c) The Seller has paid the liquidated damages as per Article 11.4.9; or

(d) The guarantee figures still can not be reached due to reasons not attributable to the Seller’s reason in the extension period as specified in Article 11.4.10; or

(e) The Buyer takes the single machine and the whole system of the Equipment into use without the Seller’s approval.

11.5.2 At any time after any of the events set out in Article 11.5.1 has occurred, the Seller may give a notice to the Buyer requesting the issuance of the Acceptance Certificate.

11.5.3 The Buyer shall within seven (7) days after receipt of the Seller’s notice, issue such Acceptance Certificate.

11.5.4 If within seven (7) days after receipt of the Seller’s notice, the Buyer fails to issue the Acceptance Certificate or fails to inform the Seller in writing, with convincing evidence, of the reason why the Buyer has not issued the Acceptance Certificate, the Equipment shall be deemed having been accepted on the seventh day of the Seller’s said notice.

11.5.5 After the Acceptance, the Seller’s responsibilities and obligations under the Contract shall be deemed having been fulfilled except those as stipulated in Article 12 and 14.

Article 12 Guarantee and Warranty

12.1 The Seller guarantees that:

(a) The Equipment supplied by the Seller shall be new and made of adequate materials, and in conformity with the technical requirements of the Contract;

(b) The Technical Documentation shall be complete, clear and correct.

12.2 The period of warranty given by the Seller under Article 12.1 shall be ____ ( ) months from the date of Acceptance or ____ ( ) months from the date of Last Shipment, whichever comes earlier.

12.3 Defect of the Equipment

12.3.1 During the Warranty Period, should any defect due to inferior materials or bad workmanship of the Equipment be found under normal operation, the Buyer shall give the Seller a notice stating the details, together with all available evidence.

The Seller shall take immediate action to eliminate the defect at the Seller’s expenses within the period agreed by both parties.

12.3.2 If certain defect can not be eliminated despite of several attempts, the Seller shall replace the defective parts with non-defective parts at the Seller’s costs and expenses.

12.3.3 If the defect is eliminated by the Buyer himself, subject to the Seller’s prior written consent, all the direct costs and expenses thus incurred shall be borne by the Seller.

12.3.4 The Seller may reduce the price of the defective Equipment according to the degree of inferiority or extent of damage as agreed by both parties. After the reduction the Seller shall be released from its obligations and liabilities.

12.3.5 During the Warranty Period, should any defect due to the Buyer’s improper operation or maintenance be found, the Seller will provide technical assistance to eliminate the defect or replace the defected parts upon Buyer’s requests. All the costs and expenses thus occurred shall be borne by the Buyer.

12.3.6 Subject to Article 12.3.1, The Seller shall not be responsible for any defect or damage to the Equipment arising out of any circumstances including but not limited to the following causes:

(a) Combination of the Equipment with any machinery, and/or component other than those supplied by the Seller; or

(b) Alteration, modification or repair without the Seller’s prior written consent; or

(c) Failure of the Buyer to follow the Technical Documentation and instructions of the Seller, including the Buyer’s improper operation and maintenance; or

(d) Normal wear and tear.

12.4 During the Warranty Period, should the Technical Documentation supplied by the Seller be found incomplete, unclear or incorrect due to the Seller’s reason, the Seller shall be liable to supplement, replace or correct the Technical Documentation free of charge.

12.5 The Seller shall in no respect be understood or interpreted as liable for the commercial development of the Contract Products. The Buyer shall undertake the risk of the commercial development of the Contract Products.

12.6 In no circumstances, whether as a result of breach of contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, shall the Seller or its subcontractors or suppliers be liable for loss of profit or revenues, loss of production, loss of use, loss of information or data, cost of capital, cost of substitute equipment, facilities, services or replacement power, downtime costs, claims of the Buyer’s customers for such damages, or for any special, consequential, incidental, indirect or exemplary damages.

12.7 Notwithstanding anything to the contrary provided in the Contract, the aggregate liability of the Seller to the Buyer , on all claims of any kind, whether in contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, arising out of the performance or breach of the Contract or use of any Equipment or exploration of the Patent and/or Know-how shall not exceed ____ ( ) percent of the total Contract price.

12.8 All Contractual obligations of the Seller shall be deemed as having been fulfilled upon the expiry date of the Warranty Period.

Article 13 Intellectual Property Right

13.1 The Seller represents that it is entitled or authorized to grant the license to the Buyer to use the Patent and/or Know-how for the purpose as specified in Article 3.

13.2 The Buyer shall not use such Patent and/or know-how received from the Seller for any purpose other than that as specified in this Contract.

13.3 Any intellectual property right or other technical information granted by the Seller to the Buyer shall remain the property of the Seller. In no circumstances shall any terms and conditions in this Contract be construed, deemed, or interpreted as transfer of title to the Buyer of any information which may be delivered to or accessed by the Buyer.

13.4 Registration of the Contract and Maintenance of Patent

13.4.1 The Buyer shall, after the Contract is signed between both parties, make sure that the Contract is registered with or filed to the competent authorities in the Buyer’s country if it is required by law.

13.4.2 The Seller shall, during the validity period of the Contract, make all reasonable efforts to maintain Patent in force in the territory as stipulated in Article 3.4.1 and bear the costs thus incurred. The Buyer shall not make any action or inaction which may lead to invalidation or compulsory licensing of the Patent.

13.5 Improvement and Grant-back

13.5.1 Should any Improvement be made by the Seller on Patent and/or Know-how within the validity period of the Contract, which shall be the exclusive property of the Seller, the Seller shall grant the Buyer a non-exclusive license to exploit such Improvement at latest __________months from its improving, provided that the license fee is agreed upon between both parties.

13.5.2 The Buyer shall be entitled to make Improvement on Patent and/or Know-how within the validity period of the Contract. The Seller shall have the right to obtain and make use of the Improvement. The license fee shall be discussed between both parties in due time.

13.5.3 Both parties shall keep Improvement confidential. Neither party shall be entitled to grant any third party a sub-license on Improvement made and provided by the other party without previous written consent of the other party.

Article 14 Confidentiality

14.1 After signing of the Contract, both parties shall keep secret all the contents, terms, conditions of the Contract.

14.2 The Buyer shall take proper measures to keep strictly confidential of Know-how, Technical Documentation, Improvement and any other secret information obtained or accessible to from the Seller. The Buyer shall not disclose any of them to any third party, and shall not make use of them without prior written consent of the Seller except otherwise stipulated in the Contract.

14.3 The Buyer may disclose the secret information as described in Article 14.2 to the personnel of its own, or of any related parties engaged in the performance of the Contract subject to Article 14.2, strictly to the extent as essential for the implementation of the Contract, provided that the individuals and/or parties accessing or may access such secret information are engaged to undertake in written form the same confidential liability of the Buyer to the Seller. Any breach of confidentiality obligations by any personnel from the Buyer or the Buyer’s related parties shall be deemed as breach of the Contract by the Buyer.

14.4 Notwithstanding this Article 14, the Seller may furnish to its sub-contractor such documents, data, and other information received from the Buyer to the extent required for performing the Contract, in which event the Seller shall obtain from such sub-contractor an undertaking of confidentiality similar to that imposed on the Seller under the Article 14.

14.5 This Article 14 shall survive the expiration or termination of the Contract.

14.6 The confidential obligation shall not apply to the information which:

A. now or hereafter enters the public domain; or

B. can be proved to have been in the possession of the Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto; or

C. otherwise lawfully becomes available to either party from a third party under no obligation of confidentiality.

Article 15 Taxes and Duties

15.1 All taxes and duties in connection with the signing and performance of the Contract, levied by Governments of the People’s Republic of China, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Seller.

15.2. All taxes and duties in connection with the signing and performance of the Contract levied on the Buyer and Seller by the Buyer’s Governments, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Buyer. The Buyer shall pay in due time and full amount and hold the Seller harmless from any taxes and duties in case incurred to the Seller in the signing and performance of the Contract.

15.3 All import taxes and duties for tools and/or instruments, which the Seller or the Seller’s personnel may bring to the Buyer’s country for the execution of the Contract, shall be borne and paid by the Buyer.

15.4 Any and all taxes and duties in connection with the signing and performance of the Contract levied in any place except the cases as specified in Article 15.1 are not included in the Contract price. Should the Seller make the relevant payment directly as the case may be, both Parties agree to amend the Contract price to fully compensate the Seller for the payment, and the Buyer shall fully refund the Seller for the relevant amount within_______( ) days from the Seller’s payment.

Article 16 Force Majeure

16.1 If either of the Contract parties is prevented from executing the Contract due to the event of Force Majeure such as war, riot, coup, embargo, flood, typhoon, tornado, snowstorm, earthquake and other events which could not be foreseen, avoided and overcome, the affected party shall notify the other party by fax within the shortest possible time of occurrences of the Force Majeure and send a certificate issued by competent authorities or agency certifying the event of the Force Majeure by registered or express mail within fourteen (14) days following its occurrence.

16.2 The affected party shall not be liable for any delay or failure in performing any of its obligations due to the event of Force Majeure. However the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure as soon as possible.

16.3 Both parties shall proceed with their obligations immediately upon the cease of the event of Force Majeure or the removal of the effects and the term of the Contract shall be extended correspondingly. Should the effect of the event of Force Majeure last for more than one hundred and twenty (120) days, either party shall have the right to terminate the Contract by a written notice.

Article 17 Applicable Law and Settlement of Disputes

17.1 The applicable law of the Contract shall be the laws of the People’s Republic of China.

17.2 All disputes arising from or in connection with the Contract shall be settled through friendly consultation between both parties. In case no agreement can be reached, the dispute shall be submitted for arbitration.

17.3 The arbitration shall be conducted by China International Economic and Trade Arbitration Commission (CIETAC) in Beijing in accordance with Arbitration Rules of the Commission in effect at the time of applying for arbitration. The tribunal shall be composed of three arbitrators.

17.4 The arbitral award shall be final and binding upon both parties.

17.5 During proceedings of arbitration, the undisputed part of the Contract shall be performed continuously by both parties regardless of such arbitration proceedings.

Article 18 Effectiveness, Term and Termination of the Contract

(a) The Seller and the Buyer sign the Contract;

(b) The Contract shall be approved by the competent authorities and/or banks of both parties (if applicable);

(c) The Seller receives the Down Payment;

(d) The Seller duly receives the L/C (or L/G ) issued by the Buyers Bank.

18.2 Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.

18.3 If the Contract has not become effective pursuant to Article 18.1 within ____ ( ) months after the date of signing this Contract, the Seller has the right to make an equitable adjustment to the total Contract price and the time for delivery and/or other relevant conditions of the Contract. Should no agreement is reached for the above mentioned adjustment within ____ ( ) days from the Seller’s request of adjustment, the Seller shall be entitled to cancel the Contract.

18.4 The Contract shall be valid and remain in force for_____ (_____) years from the Date of Effectiveness, during which period the Buyer shall be entitled to manufacture the Contract Products with Patent and/or Know-how and sell the Contract Products within the licensed territory as specified in Article 3.4.

(Option 1) The Buyer shall not be entitled to manufacture with patent and/or know-how or sell the contract products after the aforesaid period unless the Buyer agrees to pay additional license fees in the amount and with the payment schedules and methods as agreed upon between both Parties in due time.

(Option 2) The Buyer shall be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after expiration of the Contract term specified above, provided that the Buyer shall not be released from its confidential obligations under the Contract.

(Option 3) The Buyer shall not be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after the expiration of the Contract term specified above, and shall return to the Seller all the Technical Documentations specified in Appendix 4 without remaining any duplicate copies. Nevertheless the confidential obligations of the Buyer under Article 14 shall survive the Contract term.

18.5 Either party may, without prejudice to any other remedy for the other party’s following breach of the Contract, terminate the Contract in whole or in part by a written notice send to the other party, if the other party

A. fails to perform its payment obligation under the Contract and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

B. fails to perform its confidentiality obligation under the Contract; or

C. fails to perform any other obligations under the Contract except minor parts thereof, and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

D. becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or dissolves, or ceases to do business, or be ordered to close down / to cease to do business / to dissolve, or has its business license revoked, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events.

18.6 Either party may, without prejudice to any other remedy, terminate the Contract in whole or in part by a written notice send to the other party, if

A. The other party is prevented by the laws, statutes, rules or regulations of either country from performing its obligations under the Contract; or

B. The Seller is prevented by the relevant authority of the Buyer’s country from being paid in accordance with the Contract; or

C. The other party is prevented from performing its contractual obligations by any event of Force Majeure for more than one hundred and twenty (120) days.

18.7 In the event of termination of the Contract, without prejudice to any other remedies available according to the Contract and/or applicable laws,

The Buyer shall cease all its further exploitation of the Patent and/or Know-how and any acceptance of further orders from third parties for the Contract Products.

All the delivered literatures, drawings, samples, instruments, equipment, and other documents including the interpretations related to Patent and/or Know-how shall be returned to the Seller as the Seller’s requests.

All the contracts on sales of the Contract Products signed between the Buyer and third parties shall be terminated by the Buyer, otherwise the Seller shall be paid accordingly.

In case the termination is due to the Seller’s default, the Buyer shall be entitled to complete the performance of the contracts on sales of the Contract Products already signed between the Buyer and third parties before the termination.

The Seller shall be paid by the Buyer for all the contractual obligations performed by the Seller till the date of termination within _______days from receipt of the termination notice.

E. Termination of the Contract shall not release either party from its confidential obligations under the Contract

Article 19 Miscellaneous

19.1 The Contract is signed by the authorized representatives of both parties in ____ ( ) originals. Each party shall keep ____ ( ).

19.2 The Contract supersedes all communications, negotiations and agreements between the parties prior to the signing date of this Contract.

19.3 All amendments, supplements and alternations to terms of the Contract shall be made in written form and signed by the authorized representatives of both parties. These amendments, supplements and alternations shall form integral parts of the Contract.

If any costs occur or delivery delay due to amendment or explanation of the new law or statute or regulations enacted by the Buyer’s country after the effectiveness of the Contract,the Seller shall have the right to ask for necessary adjustment in relation to the Contract price and the delivery schedule.

19.4 No assignment, cession, novation, or transfer of any right or obligation under this Contract shall be made by either party to a third party without the prior written consent of the other party.

19.5 All communications between both parties in the course of implementation of the Contract should be in English language in written form at the address set forth below. The faxes concerning the important matters shall be confirmed in due time by registered or express mail or letter delivered by hand.

The Buyer:

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

The Seller :

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be duly executed.

The Buyer:

The Seller:

By:______________________[Signature]

Name: [printed name]

By:_______________________ [Signature]

Name: [printed name]

Title:

Title:

Appendices

Appendix 1 Specifications and Guarantee Indices (Omitted)

展开阅读全文

篇7:2024年外贸公司实习工作总结_公司企业工作总结_网

范文类型:工作总结,适用行业岗位:外贸,企业,全文共 928 字

+ 加入清单

2021年外贸公司实习工作总结

时间飞逝,还有一年就要告别大学生活了,即将踏入社会。我们知道随着中国在国际贸易中地位的不断上升,以及在我国加入世界贸易组织和全球化进一步发展的新形势下,对于我们国贸专业的学生们来说,或对于作为将来从事国际贸易方面业务的我们来说,去外贸公司实习对我们来说非常重要。这次学校给了我们一个很好的实习锻炼机会,就是让我们在暑假期间去外贸公司进行实习。

短短的实习期已经结束,静下心来回想这次实习真是感受颇深。我们知道实习是大学教育中一个极为重要的实践性环节,通过实习,可以使我们在实践中接触与本专业相关的一些实际工作,培养和锻炼我们综合运用所学的基础理论、基本技能和专业知识,去独立分析和解决实际问题的能力,把理论和实践结合起来,提高我们的实际动手能力,为将来我们毕业后走上工作岗位打下一定的基础。通过这段时间的学习,从无知到认知,到深入了解,渐渐地我喜欢上这个专业,让我深刻的体会到学习的过程是最美的,在整个实习过程中,我每天都有很多的新的体会,新的想法。

回顾我的实习生活,感触是很深的,收获也是丰硕的。这次的实习,主要是跟有外贸公司有工作经验的师傅们学习,通过看各种外贸定单、商业邮件、各种原始合同,让我对于实际的外贸工作有了一个感性的认识,针对不懂的问题我会及时在网上查找,并将自己在书上所学的知识,与当天了解到、所学到的结合在一起,使我对外贸这个专业有了更加理性的认识和更深刻的体会。

通过这次的实习,我由第一天的拘谨,对什么事情都充满着好奇,转而逐渐适应了这样的生活,做事情按部就班,循序渐进。这次的实习,让我懂得了许多,知道了许多,大学文凭其实只是一块敲门砖。进入工作单位后,大家都是从头开始,凡事都要自己去摸索,没有人会手把手教你。所以,我们有必要培养主动学习能力和创新能力,必须努力提高自身的综合素质,适应时代的需要。虽说大学文凭只是一块敲门砖,但是个人的综合素质却仍是你就业时的重要筹码。首先是学习成绩,用人单位认为成绩的好坏从一定程度上说明了你学习能力的强弱,所以,学习成绩是他们非常看重的一点。因此,我们首先要学好自己的专业知识。其次,他们看重的就是就是我们的社会实践能力。这一点就要看我们平时的实际动手及操作能力。

展开阅读全文

篇8:大学生外贸公司实习心得

范文类型:心得体会,适用行业岗位:大学,学生,外贸,企业,全文共 590 字

+ 加入清单

实习小结

为期两个月的实习期结束了,回想起这两个月的生活,一个人在新的环境里,应对新的人际关系,面对新的生活,苦当然是有的,但是乐在其中。因为任何知识都源于实践,所以需要这段时间的实习将学校所学理论知识付诸实践,让其来检验所学。然而,并不能仅仅将实践的意义定义于此,我们还要从实践中总结经验教训,为以后如何更好的工作打下坚实的基础。

现将这两个月的所见所闻所感所想总结如下:

1.基础的理论知识要掌握扎实,才能灵活变通,以不变应万变。工作要认真对待,积极完成自己的任务,不能把自己的事情一拖再拖,但是切忌浮躁,脚踏实地才能学到东西,一步一个脚印才能成功。

2.工作中如果有耐心教自己的同事是一种福气,当然也会同样的有不乐意对我们施舍经验的人,遇到这种情况,不必抱怨,因为他们并没有这个义务,所以一定要沉住气。如果问他们问题他们只是敷衍了事,那么仍要笑着说谢谢,但是心里要记住以后不要再犯同样的错误了。另外如果同事让自己帮忙一定要很乐意去做,而且要尽量做好,因为更多时候需要帮助的是我们。

3.要眼观六路,耳听八方。从其他同事之间的交谈以及同事如何接电话打电话中学习怎么和工厂联系,制单结汇中应注意什么问题,怎么拒绝不必要的电话广告……有时从他们的谈话语气、举止中可以了解到自己在办公室中的处境,因此也就明白了对哪个人该说什么样的话,什么时候该说话,什么时候该沉默,什么话该说,什么话不该说。

展开阅读全文

篇9:出口业务合作协议书

范文类型:合同协议,适用行业岗位:外贸,全文共 1513 字

+ 加入清单

甲方:________________

乙方:________________

上述甲乙双方方因为拓展市场,充分调动乙方的积极性、主动性,实现企业增效、个人增收的目标,现双方在平等自愿、协商一致的基础上,达成如下协议:

一、本协议是平等主体的甲、乙双方之间的业务合作关系,甲、乙双方不存在劳动关系及其他任何人事隶属关系。

二、双方商定,合作为期限为年,自_____年____月____日起至_____年____月____日止,期满双方可协商续订。

三、合作合作方式:

乙方以甲方名义对外开展销售业务,甲方提供所需的法律文件。必要时,甲方以其掌握的商业信息与乙方共享。

四、利益分配:

乙方取得的销售收入,扣除税收、等企业必要开支后的净利润,按甲方65%、乙方35%的比例分配。

上述利益分配的具体时间、方式,双方可另行协商,但每一协议年度应对双方各自收益结算一次,乙方对其拓展的销售业务,应进行后续跟踪,包括安排生产、监督生产、监督发货以及货款全额回收等。

五、乙方在开展业务的过程中支出的差旅费、招待费、交通费、通讯费等由乙方承担。

六、乙方在承接业务前,应对客户的资信情况进行认真、详细的调查,在确定对方有履行能力和诚意的情况下,方可与其发生业务往来。乙方承接的所有业务,拟签订的合同或协议(特别是有关质量要求、价格、交期、付款方式、期限进度等条款)均须经甲方审核同意后,方可正式与客户签约。合同应由甲方与客户签订。

七、售后服务由甲方指定的部门或人员负责,乙方应按甲方的要求积极配合,货物(定作物)发出后,客户就质量、数量、交期等方面提出异议的,乙方按甲方的指示进行处理,乙方不能自行与客户签订赔偿协议或任何类似的合同、承诺、声明等,否则,甲方由此遭受的.损失均由乙方承担。

乙方应及时将客户的意见向甲方反映,由甲方进行调查核实,如确需退货、换货或赔偿损失的,由甲方书面委托的人员与客户谈妥解决方案后签订处理协议。处理上述争议过程中所需的差旅费、招待费、赔偿金等,作为经营成本。

八、凡乙方拓展的业务,乙方应负责按甲方与客户签订的合同所约定的收款期限及时把业务款收回并交至甲方。逾期未收回,该款暂列为亏损,在结算双方受益分配时从纯利润中扣除,待收回后另行按约定进行分配。

在收款过程中,应请客户一律以银行汇票、支票、电汇等方式把款项直接打入甲方银行帐户,不得收取现金。如遇特殊情况确需收取现金的,必须在收款后三日内交(汇)给甲方。聘期届满,若双方未达成续聘协议的,乙方仍应按前述约定将其经手的业务款全部收回甲方。严禁以任何形式、理由挪用或侵占业务款,否则,一经发现,甲方除可依法追回该款项外,还有权解除与乙方签订的协议,情节严重的,还可请求公安机关追究其刑事责任。

九、甲方或乙方如提前解除本协议,应提前30天向对方递交书面通知。甲方或乙方提前解除本协议或本协议期限届满而终止的,乙方必须将自己所经办的业务款全部收回,并将自己经办的其他事宜向甲方办妥移交手续。乙方向甲方付款后,该业务应收款债权转让给乙方,并通知有关债务人。

十、乙方在与甲方合作期间以及解除合作关系后两年内,必须严格保守甲方的商业秘密(包括但不限于客户名单、销售渠道、销售策略等经营秘密和技术秘密);不得泄露、非法使用、转让或许可其他单位、个人使用。具体事宜,由双方签订的保密协议确定。

十一、双方在履行本协议的过程中如发生争议,友好协商解决未成的,任何一方均可向张家港市人民法院起诉。

十二、本协议一式________份,甲方和乙方各执________份,经双方签字或盖章后生效。

甲方:________________

乙方:________________

_____年____月____日

展开阅读全文

篇10:外贸工作自我评价

范文类型:自我评介,适用行业岗位:外贸,全文共 1278 字

+ 加入清单

本人这一学年继续担任本校教导主任,并承担六年级语文教学。工作中,我时刻以“爱心献给学生,放心留给家长,热心送给同事。”作为座右铭,工作认真踏实,任劳任怨,现将个人工作评价如下:

一、政治思想方面:

本人忠诚党的教育事业,爱岗敬业,能自觉遵守社会公德和教师的行为规范。牢固树立教育是一种服务的意识,为学生服务、为教师服务、为学校服务。真诚、热情、公正的对待每一个人、每一件事。严格遵守学校的各项规章制度,要求教师做到的,自我先做到。努力使自我成为校长的好助手,教师的好榜样。

二、个人教学工作:

我认为:一个好领导首先必须要做一个好教师。作为一名语文教师,我始终抓好“阅读与写作”这两件大事,经过多种方法,培养学生阅读兴趣,提高学生的写作本事。为激发学生的阅读兴趣,我组织学生开展了丰富多彩的活动,为学生写作供给了素材。为了提高学生作文的本事,我重视了作后评讲,经过不断的尝试,本班学生的阅读写作兴趣增强了,写作本事也有了明显的提高。有效的读写训练提高了孩子们的语文素养,也激发了他们学习语文的兴趣。教学中,我一向努力以教学“六认真”来严格要求自我。我充分利用网络资源,查阅有关资料,和青年教师商榷,力求使课堂教学更具实效。

三、教导处工作:

作为一名中层领导,我以身作则做好教学工作同时,任劳任怨,尽力完成教学管理工作。在校长室的指导下,协助主管校长抓好教育教学管理,提高服务意识。教导处的工作是琐碎而繁杂的,协调好教导处成员,做好以下几方面的工作:

1、每学期期初,严格按《新课程设置方案》开齐、开足每一门课程,排好课程表。和教导处其他成员研讨分管教学工作,期初进行合理计划。结合学校工作计划,每周合理安排并组织实施,使学校教育教学工作更有针对性、实效性。

2、狠抓教学常规检查与落实。在校长室的领导下,为了增强教研活动的实效性,提高了教师的课堂教学水平,安排了观摩课和随堂课,并组织教师认真评价反思。为了落实有效教学,组织实施常规检查,对备课、作业、批改、辅导、

政治、业务学习做到逐项检查,认真评价、及时反馈,推出典型和找出不足。注重了检查与指导相结合,及时和有关教师交换意见,提出改善意见,且做到每次检查都有记录,每次检查都有评价。

3、做好每学期的期中及期末检测考务安排等工作,组织进行了期中考试质量分析,经过分析查找教学中存在的不足,使教师在分析中反思,在反思中成长,在成长中提高。

4、带头做好教研工作,以身作则,率先垂范。一学年中进取组织开展教研活动,深入课堂,认真听课评课。

5、课题研究:本人申报的《小学语文感悟式教学法的实践研究》课题,已被列为沧州市教育科研所20__年度立项课题。参与的市级《小学语文教学中童话作品的拓展与延伸研究》课题已结题。

四、存在不足如下:

1、对新课程理论学习有待深入,仍有应试教育的思想倾向。

2、对多媒体等新的教学手段有待进一步学习使用。

3、如何建立一种新型的师生的关系,对我来说仍是一个挑战。

总之,一学年来,本人尽职恪守,在工作岗位中尽量克服缺点,完善自我,努力向前。当然自我尚未发现的缺点定然不少,还望广大师生、领导的批评指正。

展开阅读全文

篇11:外贸专业跟单员实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,跟单,全文共 2181 字

+ 加入清单

外贸专业跟单实习报告范文

外贸专业跟单员实习报告

x年前的一个七月,一个莘莘学子从大学的校门踏出来了,怀着一股新鲜,一股憧憬,当年血气正旺的我毅然放弃了去银行工作的机会(财经类学校毕业,又有关系),也放弃了去考公务员的想法,可能是受父亲的遗传(父亲一直以来就是一个商人,做过很多生意,只因时运不济,没能发达),不过也幸亏父亲不是很发达,不然可能我连读大学的机会都没了,有可能早就坠落了,现在至少还算是个人吧!

大学毕业后的工作基本都是我自己找的,家里托的关系我都没要,可能是毕业的时候想法太纯的关系吧,想靠自己的手来打造自己的一片天,现在想想还是有点后悔,就连读书的学校都离家有个好几千公里。我学的是贸易专业,所以后来找的工作基本都跟外贸有关。

进的第一家公司是家中国台湾公司的办事处,通过其代理公司在人才市场上招的我。当时的想法就是想把户口挂到人才市场去,所以当时问他们的其中一个条件就是是否可以将户口挂到他们单位,他们居然说可以。于是我的第一份工作就这样定下来了。工作的性质是跟单验货,那个时候可小心了,工作也认真,一点点事情一个电话,一个传真,老板还给我配了个砖头大的那种手机,当时在大家还用bp机的时代,还是挺高兴的,还时不时的拿手机出来炫耀一下,虽然不是自己的,想想现在连初中生,小学生都有手机了,再好的手机拿在手中也没有这种感觉了!

三个月的试用期结束后,老板还是没办法解决我的户口问题,所以毅然决定辞职了,而后的工作生涯我的户口一直就挂在我们县上的人才中心,不过现在想想也无所谓了,户口已经不重要了,最好有机会还是挂到农村去,有机会拆迁的时候还有一笔不错的收入呢!

后来零星又换了好几份工作,工作时间都不长,有次面试的时候我去应聘业务员助理,然后女老板问我是怎么想的,我说先从最基本的干起,然后再作业务员!她突然很轻蔑的问我(那种神态,而在还不能忘记):做业务员啊。fob是什么?……当时没能一下子答出来,汗颜啊!可能是当时被她那种神态气的吧。

还有份工作现在想想还可以的,做服装的外销员,只是公司这方面的业务才刚起步,需要我们几个新人去开发,老板还特意花了两个月时间来安排我们去工厂实习(从织布--染布……成衣的整个过程)。现在想想也浪费了一个很好的机会,只因跟我一起实习的另外一位同事对于实习不重视,经常不去,所以后来我一个人也懒得去了。

大概一年的时间,找了好多工作,期间的辛酸艰苦只有自己明白了,第一年刚好收支平衡,总算没有从父母腰包掏钱,不然脸可丢大了!1年后找了一个自己比较喜欢的业务员岗位,然后一干就是好几年,直到有一天自己成了soho一族!

自己的弯路走多了,就不希望大家走同样的弯路,或许对于很多高手来说,下面写的也许只是多余的,不过哪怕只有一个人觉得从中受益,这一个人也可以少走几次弯路,那我也会觉得很开心!捧鲜花的砸鸡蛋的尽管来吧,本人在此恭候大驾光临!

概念篇

首先,本文的适用对象:刚学做外贸又不喜欢看教科书,或者觉得教科书太枯燥学了跟没学一样,又不愿意自己积累经验,力求速成的朋友们!

其次,写本文的目的:为了使大家能在最短的时间内学习到一些最基本的外贸知识,在以后的外贸生涯少走点弯路!

然后,谈谈本文的一些特点,这些特点将始终贯穿于整篇文章:

1.娱乐性---力求跟我们的周星星大侠媲美。(独白)是你茶余饭后,开心一笑,学习知识的必备良药。

2.通俗性(不求艺术性)---想到什么就说什么,不矫揉造作,力求浅显易懂,简洁明了。

3.实用性---书上有的尽量不讲,说文论道俺可比不过外经贸出版社的众多前辈们!

最后一点呢就是本文的学习方法:因为本文所涉及到的一些案例题材均取自于现实生活,而外贸由于客人和产品的巨大差别,处理方法则更不相同,所以本文仅供参考,请不要照抄照搬,免得误人子弟,怡笑大方!

特别强调的一点是,无论本人写的是好是坏,如果没经同意,请不要转摘,最起码的一点对人的劳动成果珍重请保留,否则后果自负!

现在一切ok,进入正题:

究竟什么是外贸呢?似乎听起来总是那么神圣和高不可及。其实假如你去菜市场买(卖)过菜,你就会比较容易懂的。外贸,顾名思义就是对外贸易,就是跟外国人做生意,再简单的说就是把菜卖到外国或者把菜从外国买进来。

到这里不禁有朋友要问了,既然是买菜卖菜,在中国买卖和同老外买卖究竟有什么区别啊?先用几个比较专业的行话来对买菜卖菜行为下个定义,在中国的买卖菜叫做内贸,把菜卖到国外去叫出口,把菜从国外买进来叫进口,(备注:因为本人长期从事的是出口,所以以后本系列中所有的外贸指的都是出口)这样这个区别就是内贸和外贸的区别。

那么外贸和内贸究竟有多大区别呢?本人认为最大的区别有两点:

一、既然叫外贸,就一定要是对外的,也就是一定要出中国的关境,这里要特别强调的是关境而不是国境,中国的国境大于关境,所以这成了如果英语不懂也可以做外贸的一个重大理由,那就是将产品卖给我们的港澳台同胞们,我们将产品卖给他们只是出了中国的海关而没出中国的边境!

二、所支付的币种一定要不是rmb(不要告诉我不知道这是什么符号啊),如果支付的是rmb的一律不叫外贸,不然我们国家天天喊创收创收的不就白喊了嘛!还不如拿自己的印刷机多印几次来的快。

现在对外贸有点感觉了吧,就是把菜卖给外国人,然后叫他们付钱给我们,只要不是rmb的都可以,最好嘛当然是usd了,

展开阅读全文

篇12:外贸采购员的职责有什么

范文类型:制度与职责,适用行业岗位:外贸,采购,全文共 233 字

+ 加入清单

工作职责:

1、协助采购经理进行采购方面的工作;

2、管理采购合同及供应商文件资料,建立供应商信息资源库;

3、协助采购经理进行供应商的联络、接待工作,

2、与供应商有关交货期、交量、货款等方面沟通协调;

5、填写有关采购表格,提交采购分析和总结报告;

6、完成采购主管安排的其它工作;

7、需适应短期出差。

任职资格:

1、熟悉采购流程,良好的沟通能力、谈判能力和成本意识;

2、工作细致认真,责任心强,思维敏捷,具有较强的团队合作精神;

3、有良好的职业道德和素养,懂一定的商务礼仪。

展开阅读全文

篇13:2024外贸实习工作总结

范文类型:工作总结,适用行业岗位:外贸,全文共 1775 字

+ 加入清单

暑假结束了,带着不一样的心情将要迈向我的大三生活。回顾刚刚过去的暑假,收获颇多,感触多多……

首先我要做一下自我“检讨”,不得不承认自己缺乏一定“韧”性、耐力。起先在一家食品加工厂车间实习,每天工作十二多个小时,食宿条件都远非想象,再加从未接触过这么多的工作量,工作了两天,我退却了。我可以为自己找到一些很好的理由,但这不能掩盖暴露出来的缺点,不过,即便仅体验了两天,我也从中领悟到一些以前不曾体会到的东西。枯燥无味的机械工作把我弄得身心疲惫,每天工作结束躺在床上,连思考的精力都快没了,进一步体会到生活的艰辛。看到比自己年龄小的小妹妹们为了生计坚持工作,我感激自己拥有的一切,更加怀念在学校学习的生活,真正意识得到那是一种幸福。我告诫自己,要利用好学习的机会,努力发展自己,为将来的腾飞积聚力量。

还好,接着我有幸找到一家机械制造公司,并在商贸部得到一个实习职位,与我的专业很相符,因此,我倍加珍惜这个机会,理论联系实际,想在这里多学习点东西。起先我负责协助管理公司网站、发布产品信息,对产品稍作了解后,开始熟悉外贸流程。由于实习时间较短,不能充分了解产品,只能学习一下外贸方面的大概知识。不过,这与只学习理论知识是完全不一样的体会,毕竟很多东西是无法从书本中学到的,亲身体验,感受是不一样的。从寻找客户到洽谈,到合同以及备货、后续工作,每一个过程都有细节,都有技巧。像寻找客户,也是贸易的基础,不能漫无目的地寻找、大海捞针地碰运气,而要找有意向购求自己产品的客户。这里,我学会了用网络商务平台与客户接触,只有这样,才能更快、更有成效地找到自己的客户;再者,开发客户需要有耐心,这是我从老职工那里学到的,用他的话说要“厚脸皮”、“穷追不舍”,遗憾的是,时间太短,没法进车间细致了解产品,也就不好向客户介绍,尤其是涉及到机械的专业知识,我更是一窍不通。从这一点也可看出,以后对从事的工作要先进行了解,最好进入自己略知一二的行业。现在的外贸与以往略有不同,互联网的普遍应用和发展,便捷了对外贸易活动,电子商务已成为一种普遍的趋势,进而催生一股在家工作的新潮流。但是我觉得最重要的还是对产品的充分了解,唯有如此,回复客户询盘时才能得心应手,不至于让对方感觉自己是行外人,因为大多客户都愿意与专业人士做生意。因此,这也可看作是做外贸的基础。还有就是当国外客户到本部参观时,很多中小企业不另聘翻译人员,这时,外贸业务员就要做好两者的沟通桥梁,既要把本公司的产品优势推荐给外国客户,又要把客户的建设性、改善性意见传播给本部,特别是技术人员,以便日后对产品的改进。时间较短,对单据方面接触的不是太多,日后的课程学习中我会更加用心。

其实,不管从事什么行业,就职于那个公司,最基础的都相同。在这里,我学到的一些业务之外的知识将使我受益匪浅,对于以后的工作大有裨益。在一个办公室里工作,工作环境很重要,这就要求尽力营造和谐的氛围,学会沟通、交流,这确实是一门学问。其次,工作中要勤快一些,特别是作为后生,要多做一些事情,诸如打扫卫生、打水等杂务。既养成好习惯,也赢得了别人的好评,这让我想起一句俗语“吃亏是福”。我们一直强调活到老、学到老,经过这段时间的实习,我发现自己需要学习的东西确实太多了,刚进公司我就提醒自己,要利用好这个机会多学习学习,不懂就要问。其实,好问多问并不丢人,相反不懂装懂才是真傻,当然,问问题也并不是什么都问,一些能自己解决的最好还是靠自己,还有一点就是很重要的问题要记下来,不要下次遇到再反复问,那不是好问而是不用心学习。总之,在社会、在公司不要把自己太“当回事”,要低调做人、高调做事。只有俯下身子、贴身实际,才能看得更清、学得更多、做得更好。因为每一个人都有值得学习的地方,每一方面都值得学习,更何况涉世未深的我们。以后的工作、生活,光凭书本上的知识是万万不够的,生活处处皆学问,用心工作、用心生活,才能做得更好。

还有一点就是对待工作、生活要有激情,做外贸可能还好些,工作有时就是枯燥无味,并且这种情绪很容易感染。其实关键还是在于心态,改变不了工作环境,可以改善自己心境。努力为自己的生活增添点乐趣,所以,工作之余听听音乐、散散步也是有道理的。

这次社会实践的体会就先写这么多,相信:用心做事才能把事情做好。“输入”越多,“输出”的才更有分量!

展开阅读全文

篇14:补偿贸易设备进口合同

范文类型:合同协议,适用行业岗位:外贸,全文共 1010 字

+ 加入清单

范本

随着时间的推移,关于合同的利益纠纷越来越多,签订合同可以使我们的合法权益得到法律的保障。知道吗,写合同可是有方法的哦,下面是小编帮大家整理的补偿贸易设备进口合同范本,希望对大家有所帮助。 本合同由下列双方于________年____月____日签订 卖方:_________ 买方:_________ 买方向卖方订购下列商品,条件如下:

1、商品的规格:_________

2、数量:_________

3、价格:_________

4、支付条件:_________

5、包装:_________

6、保险:_________

7、交货:

(1)交货时间:_________

(2)目的港:_________

8、单证:_________

9、检验:_________

10、技术规格说明:_________ 1

1、本合同服从后面所附的一般条款。该条款为本合同不可分割的一部分。 一般条款

1、财产权转移 货物的财产权以交货为转移。

2、保证

(1)如果货物发现缺陷,买方必须在到货后三十天内以书面形式通知卖方。

(2)卖方保证货物品质规格符合卖方的.规格说明。

3、不可抗力 由于不可抗力及其他超过买卖双方控制能力范围的原因造成不能完成合同义务,买方和卖方均不予负责。

4、赔偿 如果卖方不能履行由于向买方出售上述货物而承担的义务,买方因此造成的损失或损害,卖方均应向买方赔偿。

5、合同的取消 如果卖方没有或不能遵守合同,没有或不能履行义务,买方有下列权利:

(1)有关货物,包括已运抵买方的货物,不论财产权是否转移,均可退回卖方,费用由卖方负担;或者撤销全部或部分订单,不论撤销时货物是否运出或财产权是否已转移。在上述情况下,卖方应立即退还已付款项。买方对此概不负责。

(2)买方行使本合同第五条所赋予的权力并不损害或影响其他行动权利和获得由此产生的应得的赔偿金的权利。

6、专利权的侵犯 如果买方因使用或售出上述商品侵犯或被认为是侵犯他人专利权、注册的设计权、商标、牌号而受到牵连,一切费用和损失,卖方应负责赔偿。

7、仲裁 任何时候,双方对本条款或由本条款组成的合同发生任何争议,应由_________仲裁庭并按其仲裁规则进行仲裁。仲裁地点在_________。

8、本合同一式二份,双方各执一份为证。 卖方(签字):_________买方(签字):_________ 签订地点:_________签订地点:_________

展开阅读全文

篇15:外贸业务助理工作职责范围

范文类型:制度与职责,适用行业岗位:外贸,助理,全文共 214 字

+ 加入清单

1.安排订单给生产部门,与采购,生产,财务部等协调确认订单交期,跟进并确保按照预定交期交货;

2.联系物流公司安排货物出口物流,单证和发票等单证制作,负责一达通平台订单操作(安排出口订单,发票安排,相关单证后台上传等);

3.负责阿里巴巴主账号后台信保订单/在线批发订单的发货,付款等事宜;

4.官网,阿里巴巴后台资料更新以及产品资料的制作;

5.部分外购产品的样品测试,返修产品的维修以及物流等;

6.及时统计相对应客户收款和发货数据。

展开阅读全文

篇16:出口销售合同

范文类型:合同协议,适用行业岗位:外贸,销售,全文共 1597 字

+ 加入清单

编 号(No.) :________________

签约地点(Signed at) :________________

日 期(Date) :________________

卖方(Seller) :________________

地址(Address) :________________

电话(Tel) :________________传真(Fa__) :________________

电子邮箱(E-mail) :________________

买方(Buyer) :________________

地址(Address) :________________

电话(Tel) :________________传真(Fa__) :________________

电子邮箱(E-mail) :________________

买卖双方经协商同意按下列条款成交:

1. 货物名称、规格和质量 (Name, Specifications and Quality of Commodity):

2. 数量(Quantity):________________

3. 单价及价格条款 (Unit Price and Terms of Delivery) :

(除非另有规定,“FOB”、“CFR”和“ CIF”均应依照国际商会制定的《________________年国际贸易术语解释通则》(INCOTERMS 20__)办理,出口销售合同。)

4. 总价(Total Amount):________________

5. 允许溢短装(More or Less):__________________%.

6. 装运期限(Time of Shipment):________________

收到可以转船及分批装运之信用证___天内装运。

7. 付款条件(Terms of Payment):

买方须于____ 前将保兑的、不可撤销的、可转让的、可分割的即期付款信用证开到卖方,该信用证的有效期延至装运期后_____天在中国到期,并必 须注明允许分批装运和转船。

买方未在规定的时间内开出信用证,卖方有权发出通知取消本合同,或接受 买方对本合同未执行的全部或部份,或对因此遭受的损失提出索赔。

8. 包装(Packing):

9. 保险(Insurance):________________

按发票金额的___%投保_____险,由____负责投保。

10. 品质/数量异议 (Quality/Quantity discrepancy):

如买方提出索赔,凡属品质异议须于货到目的口岸之日起30天内提出,凡属数量异议须于货到目的口岸之日起15天内提出,对所装货物所提任何异议于保险 公司、轮船公司、其他有关运输机构或邮递机构所负责者,卖方不负任何责任,

11. 由于发生人力不可抗拒的原因,致使本合约不能履行,部分或全部商品延误交货,卖方概不负责。本合同所指的不可抗力系指不可干预、不能避免且不能克服的客观情况。

12. 仲裁(Arbitration):

因凡本合同引起的或与本合同有关的任何争议,如果协商不能解决,应提交中国国际经济贸易仲裁委员会深圳分会。按照申请仲裁时该会当时施行的仲裁 规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。

13. 通知(Notices):

所有通知用___文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后___日内书面通知另一方。

14. 本合同为中英文两种文本,两种文本具有同等效力。本合同一式 _____ 份。自双方签字(盖X)之日起生效。

The Seller:________________ The Buyer:________________

卖方签字:________________ 买方签字:________________

_______年___月___日

展开阅读全文

篇17:进口合同样式一[页15]_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1292 字

+ 加入清单

进口合同(样式一)

15.8 双方任何一方未能取得另一方事先同意前,不得将本合同项下的任何权利或义务转让给第三者。

15.9 除本合同规定的义务和责任外,双方中的任何一方都不承担任何其他义务和责任。

第十六章 法定地址

买 方:中国技术进出口总公司

地 址:中国北京西郊二里沟

电报挂号:techimport beijing

电传号:22244 tic

传真号:

卖 方:

地 址:

电报挂号:

电传号:

传真号:

买方:____

(签字)

卖方:____

(签字)

附件五

卖方技术人员的服务范围和待遇条件

1.卖方技术人员的派遣

为了使合同现场的建设顺利进行,卖方应向买方派遣技术熟练的、身体健康的、称职的技术人员到合同现场进行技术服务。卖方技术人员的专业、职务、人数、在华工作期限详见附表一。

上述卖方技术人员的确切专业、人数、在华工作期限、到达和离开本合同工厂的日期,将根据本合同现场的建设任务的实际进展情况,由买卖双方协商确定。需要调整附表一规定的人/月数时,双方届时另议。

2.卖方技术人员的职责和义务

(1)卖方应从所派遣的技术人员中指定一名为卖方在合同现场的总代表,负责本合同范围内总的技术服务,并与买方合同现场总代表合作协商,解决有关工作和技术问题,但双方总代表未经双方授权无权修改合同。

(2)代表卖方执行本合同规定范围内的施工、安装、调试、投料试车(包括功能试验和考核试验)、生产操作、生产工艺和维修方面的技术服务并应执行合同规定的卖方应承担的职责和义务。

(3)详细讲解技术资料、图纸、工艺流程、设备性能、分析方法以及有关注意事项等,解答并解决买方提出的有关本合同范围内的技术问题。

(4)为确保上述二2条和二3条的正确进行,卖方技术人员应在本合同服务范围内予以全面的、正确的技术服务和必要的示范操作。

(5)协助买方在本合同现场培训安装、调试、生产、设备维修和分析检验人员,提高他们的技术水平。

(6)卖方人员的技术指导应正确无误。如因指导错误所造成“设备”的损失,应由卖方负责更换、修理或补齐,费用均由卖方负担。对于卖方技术人员的技术指导,买方有关人员应予以尊重。

3.卖方技术人员的技术服务费和支付办法

(1)买方应支付给卖方技术人员如下技术服务费(按每人每天计算):

每人每天 美元

总代理(或主任工程师)

工程师

技术员

操作工

(2)卖方技术人员的技术服务费(每天)自抵达合同工厂现场之日起计算至离开合同工厂现场之日止。

(3)星期天,中华人民共和国的法定节日为卖方技术人员在合同现场的有薪休息日。

(4)对于卖方技术人员未经双方现场总代表同意的缺勤以及经双方总代表同意的事假,买方不支付其技术服务费,但经医生证明的病假除外。如果病假连续超过15天,买方不再支付其技术服务费。

(5)卖方技术人员的技术服务费按月结算,买方收到卖方每月开出的帐单一式四份和双方总代表签署的卖方技术人员记时卡,经审核无误后,于30天内通过中国银行将卖方技术人员的月技术服务费汇到卖方指定的银行帐户上。如卖方开出的帐单有误,买方有权拒付有误的部分,但按时支付无误部分。

共17页,当前第15页1234567891011121314151617

展开阅读全文

篇18:对外贸易合作协议

范文类型:合同协议,适用行业岗位:外贸,全文共 3458 字

+ 加入清单

甲方:____________________________

住所地:____________________________

法定代表人:____________________________

乙方:____________________________

住所地:____________________________

法定代表人:____________________________

鉴于:____________________________

甲方在本合同约定的项目范围内系贸易商,乙方系本合同约定的生产商。甲方自愿介绍甲方的 固定客户“ ”(以下简称“客户”)至乙方购买货物,乙方承诺在此过程中为保障甲方的商业利益,乙方将按照本合同的约定向甲方支付佣金。现甲乙双方根据《中华人民共和国民法典》等相关法律法规的规定,在平等协商一致的基础上达成以下协议,以资共同遵守。

第一条 主体资格

甲乙双方分别系独立主体,均具备独立的民事行为能力和民事责任能力;甲乙双方之间不存在劳动关系、雇佣关系、承揽关系等法律上的任何具有隶属性质的关系;甲乙双方亦非存在关联关系的总分公司、母子公司。

第二条 合作项目定义

本合同所述的合作项目是指:甲方将甲方的客户介绍至乙方作为购货方,乙方作为该客户的供货方。乙方根据该合同的约定向甲方支付佣金以保障甲方的商业利益。

第三条 项目合作运营

1.本合同签订后甲方有权自主选择将客户介绍至乙方;本合同签订后,乙方不得委托除甲方以外的任何第三人代理其与本合同所涉客户签订国际货物买卖合同,乙方能且只能委托甲方代理其与该客户签订相关国际货物买卖合同,该期限为5年。

2.乙方与甲方介绍的客户签订国际货物买卖合同,乙方作为国际货物买卖合同的供货方,该客户作为国际货物买卖合同的购货方,甲方不是乙方与该客户签订的国际货物买卖合同的主体。

3.在乙方同该客户磋商、订立合同前,乙方应当向甲方出具书面的货物成本预算书,该预算书的结算按照人民币结算。乙方制作预算的相关费用由乙方自行承担,乙方不得就此向甲方主张任何费用,

4.在同客户磋商、订立国际货物买卖合同的过程中,无论客户与甲方或乙方签订合同,均由甲方定价。乙方与客户之间的货物买卖合同由甲方根据乙方向其提供的书面的货物成本预算书向该客户报价。

5.乙方及其关联企业在与该客户签订国际货物买卖合同时,合同约定的货物单价不得低于甲方向该客户的报价。

6.在乙方与该客户履行国际货物买卖合同的过程中,甲乙双方均有权接收客户支付的国际货物买卖合同对应的货物价款。无论乙方收到该款项的对手方是甲方还是该客户,乙方均应当在收到货物价款的70%之日起开始进行相关货物生产,该价款剩余的30%由甲方或该客户向乙方支付。

第四条 佣金

1.甲乙双方就甲方或乙方每次与客户签订的国际货物买卖合同,应当协商确定一个甲乙之间佣金结算的外币与人民币之间的汇率。具体结算汇率由甲乙双方根据国际货物买卖合同的签订、履行的具体时间等另行签订书面函件确定。

2. 本合同所涉客户按照国际货物买卖合同向甲方或乙方支付的总价款中超过乙方向甲方出具的相应的预算书总金额的部分系乙方应当向甲方支付的佣金。

3.若客户将国际货物买卖合同的价款支付至甲方,甲方有权于自收到价款之日起 工作日内按照本合同的约定对佣金予以扣除后按指定方式交付乙方;若甲方或客户将国际货物买卖合同的价款支付至乙方,乙方应当自收到价款之日起 工作日内将本合同约定的佣金按指定方式支付至甲方。

4.支付方式:____________________________

甲方账户信息:____________________________

开户行:____________________________

开户名称:____________________________

账号:____________________________

乙方账户信息:____________________________

开户行:____________________________

开户名称:____________________________

账号:____________________________

第五条 项目运营监督

1.乙方在与该客户磋商、签订货物买卖合同时应当向甲方书面告知。

2.乙方在与该客户签订合同后应当向甲方交付一份买卖合同原件。

3.乙方应当在每次向该客户运送货物之前15个工作日以书面方式通知甲方。

4.乙方在履行国际货物买卖合同的过程中,应当向甲方提交所有的与货物买卖相关的书面单据的副本。

5.以上义务并不具备强制性,乙方未及时履行,并不构成乙方违约,甲方无权要求乙方赔偿和增加相应的佣金。但在甲方声明下,乙方应积极予以配合。

第六条 风险负担

1.甲方承诺介绍其客户与乙方签订国际货物买卖合同,不保证乙方与该客户一定能够签订买卖合同,甲方不承担乙方不能签订相应国际货物买卖合同的风险。但甲方因对其推荐的客户资信承担相应的保证责任。

2.乙方在履行其与该客户签订的国际货物买卖合同过程中的生产风险由乙方承担,甲方不承担乙方货物生产的风险。

3.乙方在与该客户履行买卖合同过程中的风险由乙方承担,该风险包括:货物运输风险、货物灭失风险、该合作伙伴的违约风险等。

4.乙方在履行其与该客户履行买卖合同过程中的风险不影响乙方按照本合同约定向甲方支付相关佣金报酬。

第六条 违约责任

1.乙方违反甲乙双方本合同第三条的约定私自向该客户报价的,乙方应当向甲方承担相当于乙方私自报价签订的国际货物买卖合同的标的额的 20 %的损害赔偿金。

2.乙方应当严格按照本合同的约定向甲方支付佣金报酬 ,否则,乙方除应当向甲方支付该笔报酬,还应当按照该笔报酬的 50 %向甲方承担违约金,该违约金兼具补偿性和惩罚性。

3.乙方违反其与该客户签订的国际货物买卖合同的,由乙方向该客户承担相应的违约责任,甲方不向其承担违约责任。针对该种情形,乙方仍应当按照本合同的约定向甲方支付相应的报酬。

4.甲乙双方应当对本合同的相关信息尽保密义务。乙方在本合同有效期内不得向本合同以外的任何第三方(包括本合同所述客户)透露本合同的相关信息。即使甲乙双方终止本合同,乙方自本合同终止之日起十二个月内亦不得向本合同以外的第三人透露本合同的相关信息。否则,乙方应当向甲方支付 元(人民币)的违约金,该违约金兼具赔偿性和惩罚性。

乙方的关联企业,董事及其他高管等人士有涉及上述行为的,认定为乙方所为。甲方有权要求乙方承担上述违约责任。

5.在本合同履行过程中,若客户向甲方反馈乙方产品质量或服务等问题的,甲方应立即书面告知乙方其所了解的相关情况,并协助乙方与客户进行交流,乙方在自收到甲方告知书 工作日内未予以改善的,或者上述客户反馈情形出 现次数超过 次的,甲方有权终止本合同,且无需向乙方承担任何违约责任。

6.因甲方未审慎选择客户,导致乙方损失的,甲方应承担乙方因此遭受的损失。

第七条 管辖

在履行本合同的过程中如发生甲乙双方不能协商解决的纠纷,甲乙双方均应当将其提交 仲裁委员会管辖。

第八条 其他

1.甲乙双方承诺对该合同书的文字及表达意思表示已经清楚,并愿意严格按照本合同的内容行使权利和履行义务,在本合同的签订过程中不存在欺诈、胁迫、显示公平、重大误解事宜。

2.本协议有效期5年,自双方签字捺印之日起计算,自 年 月 日起至 年 月 日止。在本协议履行过程中,若甲乙双方之间未就合同履行发生重大争议,本合同期满后其有效期自动延长 年。双方协商一致可提前终止本合同。

3.在本合同的履行过程中如有争议甲乙双方应当协商,甲乙双方协商另行签订的补充协议与本合同具有同等的法律效力。

4.本合同未尽事宜,甲乙双方可以签订补充协议,补充协议与本合同具有同等的法律效力。

5.本合同一式两份,双方各执一份,具有相同的法律效力

6. 本合同之订立、生效、解释、履行及争议之解决等适用《中华人民共和国民法典》 、《中华人民共和国公司法》等法律法规,本协议之任何内容如与法律、法规冲突,则应以法律、法规的规定为准。

甲方(盖章):____________________________ 乙方(盖章):____________________________

授权人(签字捺印):____________________________ 授权人(签字捺印):____________________________

年 月 日 年 月 日

展开阅读全文

篇19:外贸业务员实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,销售,全文共 1730 字

+ 加入清单

外贸业务员实习报告范文

在*年全市副县级领导干部竞争上岗中,我被组织上安排任外经贸局副局长。以下将我在*年工作、思想、学习方面做出总结,向上级组织部门做出汇报,请考核。

任职后,我得到局领导的关心和全局同志们的工作支持。按照市委组织部的要求,努力学习,扎实工作,认真履行岗位职责,积极加强实践锻炼,多方面学习提高。根据局党组安排分工,我具体分管外经贸发展科、对外贸易管理科、国外经济合作管理科和贸促会。

一、加强邓小平理论和“三个代表”重要思想的学习,不断提高思想理论水平和综合素质,牢固树立全心全意为人民服务的宗旨,争取做好人民公仆。

学习是前进的动力,做好工作的保证。为了适应中国加入wto和中西部发展的新形势和对外开放工作要求,我继续加强邓小平理论的学习,注重在实践工作中去体会和运用理论的精神实质。在中国共产党第十六次全国代表大会上所做的“全面建设小康社会,开创中国特色社会主义事业新局面”的报告,再次深刻阐述了“三个代表”重要思想的科学内涵,总结了xx大以来的伟大成就和十三届四中全会以来的基本经验,明确把“三个代表”确立为党的指导思想,指明了全面建设小康社会的奋斗目标,并从政治、经济、文化、社会发展、国际外交和党建方面阐述了具体的行政纲领。

通过学习、研讨和自己深入细致的领悟,我的思想认识和理论水平有了明显提高,我理解为这是坚持邓小平理论,联系国内外形势和我国社会的深刻变革,对党成立以来的历史经验和党带领人民建设中国特色社会主义事业新鲜经验的科学总结,坚持了解放思想、实事求是的思想路线,展望未来,提出任务,体现了与时俱进、进行理论创新的勇气与品格。我充分认识到“三个代表”是党的立党之本,执政之基,力量之源。

此外,我学习的另一项重要内容是新《党章》和党员廉洁自律以及领导干部廉洁从政的各项规定。认识到当前复杂的国际形势下,加强与改进党的作风建设的重要性和紧迫性,联系自己的工作实际,不断思考在工作中如何贯彻政策和各项规定。特别作为一名党员,要从自身做起,做到“八个坚持,八个反对”,工作中坚持原则,廉洁自律。除理论和政策学习外,我今年不断补充和学习新的知识,适应工作需要,业余时间培训学习计算机与外语,效果明显,基本能够在工作中使用。目前,我还在进修北京大学工商管理方面的研究生课程,努力提高自身的综合素质。今年我还参加了自治区党委组织部举办的少数民族地区干部赴深圳考察学习班,开阔视野,更新观念,提高对外工作能力。

工作中,我坚持行政机关工作就是服务的观点,改进工作作风,提高服务水平,学习掌握怎样通过自己的工作去体现全心全意为人民服务的宗旨,外经贸工作是通过对外经济交流,吸引外资,扩大出口,发展我市的经济,为全市人民服务。为此,我在工作中兢兢业业,努力认真,全面为企业,为项目单位多服务,服好务,树立了公仆意识,增加了服务观念,我认为这是与工作能力与水平提高同等重要的立场观点问题。

二、加强工作实践锻炼,团结同事,树立全局观念,在单位做好领导的助手。

任副局长后,我按照局党组明确的工作分工,认真履行岗位职责,不务虚,不回避困难,在局主要领导的带领下,为完成全局的工作任务,切实做好实际工作,在进出口业务管理、扩大我市产品出口、对外经济技术合作、贸易发展促进等方面做好自己的分管工作。与局领导班子成员搞好团结,共同为xx年全市外经贸任务的完成群策群力。

我也能够摆正自己的位置,作为副职,当好一把手的参谋与助手,服从组织安排,除分管工作外,随时做好领导交办的临时工作,对于局里的工作困难、问题,主动想办法、出主意,创造性的发挥作用。由于是上任不久的副县级干部,我认为自己更加应该严于律己,克己奉公,要具备党对年轻干部的新要求、新条件,就是除了要有新的知识结构、高的专业素质外,在工作中更要发挥先锋模范带头作用,表现出新的工作面貌,不能辜负上级组织和群众对自己的期望,扎扎实实的工作,认认真真的做人做事。因此,这段时间里,我也经常深入到基层,到企业,到旗县区,到项目单位做好外经贸方面的指导与服务,帮助企业解决实际困难。在单位里遵守各项纪律与规章制度,表里如一,勤于职守,关心同志,使自己的工作得到干部群众的认可。

三、几项主要工作

共2页,当前第1页12

展开阅读全文

篇20:进口货物委托代理合同

范文类型:委托书,合同协议,适用行业岗位:外贸,全文共 616 字

+ 加入清单

甲方:乙方:

地址:地址:

法定代表人:电话:法定代表人:电话:

丙方:

地址:

授权代表:电话:

鉴于:

1、乙丙双方经友好协商,同意由乙方向丙方购买本协议及本协议所涉及合同项下的货物;

2、乙方委托甲方向丙方进口上述货物,但出于某些技术上的原因,甲、乙双方于______年____月____日就该批货物签订了号《买卖合同》而非代理进口合同;

3、乙方授权甲方就上述货物以甲方名义与丙方于______年____月____日签订了号《进口合同》;

4、甲乙丙三方均知悉并同意上述情况及做法:

甲乙丙三方就上述销售合同及进口合同中的某些问题,经友好协商,达成一致,兹签订本协议书。

甲、乙、丙三方同意:

1、如乙方未按照销售合同的规定将全部货款付至甲方,甲方无义务按进口合同的规定向丙方支付任何货款,且免除任何有关延迟付款的违约责任,丙方无权依进口合同向甲方追索任何货款。

2、甲方对有关货物的质量不承担任何责任。如乙方对货物质量有任何异议,应自行与丙方协商处理,而无权依销售合同向甲方追究任何违约责任;如需退换货,乙方可委托甲方办理,手续费另计。

3、丙方保证交付所给甲方的货物在产地,规品、数量等方面与进口合同的规定严格一致;如有不符,丙方应承担所有法律责任并赔偿甲方因此而遭受的海关处罚。

4、如销售合同及进口合同的规定与本协议不符,以本协议的规定为准。

甲方:

授权人签字:

盖章:

乙方:

授权人签字:

盖章:

丙方:

授权人签字:

盖章:

______年____月____日

展开阅读全文