0

外贸流程全步骤---外贸篇(推荐20篇)

浏览

5216

范文

1000

补偿贸易设备进口合同

范文类型:合同协议,适用行业岗位:外贸,全文共 1051 字

+ 加入清单

补偿贸易设备进口合同

编号:_________

本合同由下列双方于_________年_________月_________日签订

_________(以下称卖方)

_________(以下称买方)

买方向卖方订购下列商品,条件如下:

1、商品的规格:_________

2、数量:_________

3、价格:_________

4、支付条件:_________

5、包装:_________

6、保险:_________

7、交货:

(1)交货时间:_________

(2)目的港:_________

8、单证:_________

9、检验:_________

10、技术规格说明:_________

11、本合同服从后面所附的一般条款。该条款为本合同不可分割的一部分。

卖方(签字):_________ 买方(签字):_________

附件

一般条款

1、财产权转移货物的财产权以交货为转移。

2、保证

(1)如果货物发现缺陷,买方必须在到货后三十天内以书面形式通知卖方。

(2)卖方保证货物品质规格符合卖方的规格说明。

3、不可抗力由于不可抗力及其他超过买卖双方控制能力范围的原因造成不能完成合同义务,买方和卖方均不予负责。

4、赔偿如果卖方不能履行由于向买方出售上述货物而承担的义务,买方因此造成的损失或损害,卖方均应向买方赔偿。

5、合同的取消如果卖方没有或不能遵守合同,没有或不能履行义务,买方有下列权利:

(1)有关货物,包括已运抵买方的货物,不论财产权是否转移,均可退回卖方,费用由卖方负担;或者撤销全部或部分订单,不论撤销时货物是否运出或财产权是否已转移。在上述情况下,卖方应立即退还已付款项。买方对此概不负责。

(2)买方行使本合同第五条所赋予的权力并不损害或影响其他行动权利和获得由此产生的应得的赔偿金的权利。

6、专利权的侵犯如果买方因使用或售出上述商品侵犯或被认为是侵犯他人专利权、注册的设计权、商标、牌号而受到牵连,一切费用和损失,卖方应负责赔偿。

7、仲裁任何时候,双方对本条款或由本条款组成的合同发生任何争议,应由_________仲裁庭并按其仲裁规则进行仲裁。仲裁地点在_________。

8、本合同一式二份,双方各执一份为证。

甲方(公章):____________ 乙方(公章):___________

法定代表人 :_____________ 法定代表人 :____________

(或委托代理人) (或委托代理人)

_______年 ______月______日 _______年______月______日

展开阅读全文

更多相似范文

篇1:外贸实习手册范文

范文类型:员工手册,适用行业岗位:外贸,全文共 3171 字

+ 加入清单

一 :理论经验:

为了加强我们实践能力,学校为我们英语专业的学生安装了网上模拟实习教学软件,在网络上建立几近真实的国际贸易模拟环境,在其中亲身实践,熟悉外贸业务的流程和惯例,熟练运用交易磋商的各种基本技巧,体会国际贸易中不同当事人的不同业务伙伴建立合作关系,面临的具体工作和互动关系。

具体包括同业务伙伴建立合作关系,进出口成本核算,交易磋商的过程,外销合同的签订,进出口货物的运输和险,进出口报检、报关,缮制单据,议付结汇,办理出口核销退税等内容。基本上涵盖了国际贸易实务可能遇到的各个环节。通过实习,对国际贸易实务各个过程有了具体的印象,知道各种信函的写作格式,语言表达习惯,对成本进行核算及怎样作出合理的报价,还有进出口各个环节的的单据的制作。从书本上的东西重新输理一遍,在头脑中有一个印象,对待外贸业务出现的问题怎么解决有了底。

在这次模拟实习中感触最大的是成本核算和报价,它需要认真的学习课本上的公式,非常细心的进行核算,因为外贸业务讲究单证相符,这个一错,接下来的各种单据的制作就跟着错了。外贸业务是一环套一环的,所以很考验耐心跟细心。

二 :实践经验:

二月初,我离开家,来到了深圳这个人才济济的大城市,开始了我的求职生涯,对一个还没有出校门,没有任何经验的应届大学生来说,这就是一种考验,找怎样的工作,怎么去应聘,这些都只是在课堂上听老师讲过,却从来就没有亲身体验过,来到了这里才知道, 原来,其中还有很大的学问呢。还有很多东西需要学习,书本上和老师所讲的只是其中一部分。

不知在人才市场投递了多少分简历之后,才会有一个面试机会,这样的面试机会又多么的具有竞争啊。在现在这个社会, 这样的竞争是可想而知的。

在不知经历了多少次面试之后,终于有公司愿意给我机会让我去工作, 想想当时是多么的激动,高兴的不知所措,终于找到了工作了,那种感觉很奇妙,无法形容,可马上又想到,自己什么都不懂,又担心自己做不好,很矛盾。 就这样,带着矛盾的心情,我开始了我的实习工作。

时间飞快,我的实习将要结束,最先,我抱着学习和锻炼的精神来到这里,实习充实了我的学习生活,我学到了许多书本上无法体验的知识。通过实习,我感触颇多,得到许多新的认识,对许多问题多了深一层次的思考。经过两个多月的实习,使我对工作,生活都有了一个全新的体验。以后就是社会上的一份子了,责任也将越来越重。我是在一家外贸公司实习,我在公司主要工作是熟悉外贸流程以及做业务,对一些新客户的发展和老客户的维护。首先我介绍一下我在公司所要做的事情:

1. 客户询盘:一般在客户下订单之前,都会有相关的order inquiry给我们业务部,做一些细节上的了解。

2. 报价:我们业务部及时回复客人查询,确定货物品名,型号,生产厂家,数量,交货期,付款方式,包装规格及柜型等,并做好performa invoice 给客户做正式报价。

3. 得到订单:经过洽谈,收到客户正式的订单purchase order。

4. 下生产订单:得到客人的订单确认后,把订单转做成内部订单给采购部让她给工厂下订单,安排生产计划。

5. 业务审批:业务部收到订单后,首先做出业务审核表。按"出口合同审核表"的项目如实填写,尽可能将各种预计费用都列明。合同审批需附上客人订单传真件,与工厂的收购合同。审核表要由业务员签名,部门经理审批,再交管理部人员审核后才能执行。如金额较大的,或有预付款和佣金等条款的,要经公司总经理审批才行。合同审批之后,制成销售订单,交给部门进程员跟进。

6. 下达生产通知:业务部在确定交货期后,满足下列情况可下达生产通知, 通知工厂按时生产: 如果是t/t付款的客户,要确认定金已经到账。 如果是西联付款的客户,要先确定付款是否已经到达本地的西联。

7. 验货 : 在工厂把货物生产好,并发货到公司之后, 要对所定货物进行查验,是否能用,质量是否过关,这些是必须要进行验证的,是基本原则,因为要想稳定客户资源,这一部分就一定要做好的。

8. 制备基本文件。工厂提供的装箱资料,制作出口合同,出口商业发票,装箱单等文件。

9. 发货:通知货代来公司收货。并且把所以必备的单据叫给货代。

10. 确认收货:在发货后要通知客户已发货,并且一个星期左右要询问客户是否收到货物。

选择进入公司自然少不了要办公,办公相对来说是比较程序化和正式化的。首先,要遵守的就是时间,准时上下班,对于在大学比较自由的我们来说要锻炼“坐”功。我们每天都是坐在电脑前面,一坐就是好几个小时。其次,要适应办公的氛围,基本上办公的时候还是很严肃的,在紧张的工作重要懂得调节。第三,就涉及到现代办公工具的使用,复印,打印,传真没有想象的容易。对于我们外贸业务员还要能够通过电话和邮件中跟外国客户沟通好。熟悉 sales confirmation,commercial invoice 等各种单据是基本的。通过对商务文件的翻译发现也没有想象的难,只要将中文意思能够用简单的文字表达清楚就行。

信念,坚持到底是获得成功的最主要条件。

成功的业务员是先和客户当朋友再谈生意。开始的一段时间我都主动在电话里以及网上和客户打招呼问好,后来慢慢的我的客户都会开始主动跟我打招呼。有时还会有客户主动打电话过来问候聊天,这样就增进了我与客户之间的交谈及友谊,让客户对我有个好的印象,对业务员来说,这些客户资源是日后最大的潜在力。

棘手的客户是业务员最好的老师。客户的抱怨应当被视为神圣的语言,任何批评意见都应当乐于接受。正确处理客户的抱怨 :一、提高客户的满意度,二、增加客户认牌购买倾向,三、丰厚的利润。成交并非是销售工作的结束,而是下次销售活动的开始。销售工作不会有完结篇,它只会一再“从 头开始”。成功的人是那些从失败上汲取教训,而不为失败所吓倒的人,有一点业务员不可忘记,那就是从失败中获得的教训,远比从成功中获得的经验更容易牢记在心。不能命中靶子决不归咎于靶子。买卖不成也决不是客户的过错。问一问任何一个专业业务员成功的秘诀,他一定回答:坚持到底。世界上什么也不能代替执着。天分不能——有天分但一事无成的人到处都是:聪明不能——人们对一贫如洗的聪明人司空见惯,教育不能——世界上有教养但到处碰壁的人多的是。唯有执着和决心才是最重要的。记住:最先亮的灯最先灭。不要做一日之星。执着才能长久。一个人到了年老的时候,又穷又苦,那并不是那个人以前做错了什么,而是他什么都没有做。

业务员一定要有强硬的心理承受能力。被客户无理轰骂,无理挂掉电话是常有的事情。有次和一客户明明一直谈的好好的,突然就来一句,那就不要谈了,挂掉了电话。但是下次再打电话给他时,一样要记住保持满脸笑容,声音愉快,好像上次不愉快的事情根本没发生。

在学校的象牙塔里待了十几年,一夕之间身份由学生变成了社会人,刚开始真的很难适应,所有的角色和职责都转变了,出来工作,不再有人告诉你,什么你该做什么不该做,也没有老师在旁教你错误如何改正,一旦犯了,就要去承担,这就是社会人的责任.但与此同时,我觉得纵然有再多的无奈,也要学着去适应去克服。

两个多月的实习很快就过去,加上在学校实习的一个星期,让我能够对外贸业务有初步的了解,很庆幸有机会可以接触到客户,这对于我以后的工作和继续深造都是一个很好的平台。外贸看中的还是经验,经验的累积对以后是一笔丰富的财富。虽然开始很辛苦,但是前景很好。实习中同事和老总的对我的帮助很大,告诉我做人做事。以后的路还很长,要学的还很多,我希望能够走好每一步。

在我的实习期中,有开心也有难过的时候,有难忘的事情,也有碰到困难问题的时候,这一切我都一直努力地去克服,并尽自己最大的努力去做好!我相信,事在人为,有志者事竟成。而我在未来的人生和工作道路上了,我会更加努力用心的走下去!

展开阅读全文

篇2:技术出口合同范本_合同范本

范文类型:合同协议,适用行业岗位:技术,外贸,全文共 49001 字

+ 加入清单

技术出口合同范本

Contract for Equipment Sales and Technology Licensing

Contract No. ____________________

This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­_________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

Article 1 Definitions

1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

1.5 “Destination Airport” refers to _____________Airport.

1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

Article 2 Scope of the Contract

2.1 The Seller’s Obligation

2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

2.2 The Buyer’s Obligation

2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

Article 3 Grant of License

3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

3.4 Territory

3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

Article 4 Price

4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

The breakdown price is as follows:

The price for Equipment is __________(say _______________________ only).

Fee for design is __________(say _______________________ only).

Fee for Technical Documentations is __________(say _______________________ only).

License fee is __________________(Say: _________________ only)

4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 2019, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

4.2.3 The above price is fixed and firm.

4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

Article 5 Payment

5.1 Down Payment

Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

5.2 [Option One: Payment by Sight L/C]

The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) Bill of Lading in one (1) original and ___ ( ) copies;

(b) Commercial Invoice in one (1) original and ___ ( ) copies;

(c) Packing list in one (1) original and ___ ( ) copies;

(d) Certificate of Origin in one (1) original and ___ ( ) copies;

(e) Insurance Policy in one (1) original and ___ ( ) copies;

5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

(b)One ( 1 ) copy of commercial invoice.

5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

b) One (1) copy of Commercial Invoice.

5.2 [Option Two: Payment under a L/G]

The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

Article 6 Delivery of Equipment and Technical Documentation

6.1 The Delivery of the Equipment

6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

6.1.3 The port of shipment is ____, while the port of destination is ____.

6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

(a) Contract number

(b) Name of the vessel and loading port

(c) Name of the Equipment shipped

(d) Number and date of Bill of Lading

(e) Total volume

(f) Total gross and net weight

(g) Total number of packages/cases

6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

(a) Bill of Lading

(b) Commercial Invoice

(c) Packing List

(d) Certificate of Origin

(e) Insurance Policy.

6.2 The Late Delivery of the Equipment

6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

(a) From the first week to the fourth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per

week

(b) From the fifth week to the eighth week, the liquidated damages shall be

____ ( ) percent of the value of the delayed portion of the Equipment per week

(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

the value of the delayed portion of the Equipment per week

6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

6.3 The Delivery of the Technical Documentation

6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

6.3.4 In case of shortage, loss of or damage to the Technical Documentation due to the Seller’s reason, the Seller shall make supplement to the Buyer within ____ ( ) days after receiving the Buyer’s written notification without any further charge.

Article 7 Packing and Marking

7.1 The Equipment shall be packed to withstand long distance transportation, multiple handling.

7.2 The Seller shall mark the following on two opposite sides of each package with indelible painted English words:

(a) Destination

(b) Consignee

(c) Contract number

(d) Shipping mark

(e) Gross/net weight (kg)

(f) Case/ bale number

(g) Dimensions: L x W x H (cm)

7.3 Each package shall contain one (1) copy of packing list.

7.4 The Seller shall mark on the package, if necessary, “Handle with Care", “Right Side Up", “Fragile" or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods.

7.5 If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facilitate loading, unloading and handing.

(a) Destination

(b) Consignee

(c) Contract number

(d) Gross/net weight (kg)

(e) Item number

(f) Dimensions: L x W x H (cm)

Article 8 Technical Service and Technical Training

8.1 The Seller shall dispatch technical personnel to Job Site to render Technical Service in accordance with Contract according to a time schedule agreed upon between both parties. The number, specialty, rank, treatment of the personnel, and payment as well as the contents, and requirements of Technical Service are specified in Appendix 6.

8.2 The Buyer shall have the right to send its technical personnel to the relevant factory selected by the Seller for training. The number, speciality, treatment of the personnel, and payment as well as the contents, time schedule, and requirement of training, are specified in Appendix 7.

8.3 Either party shall provide assistance to the other party’s technical personnel in their application for visa, working permit, and/or other necessary formalities for rendering Technical Service or training under the Contract in the other party’s factory.

8.4 Either Party’s technical personnel shall abide by the laws of the other party’s country and the regulations of the other party during their stay in the other party’s country.

Article 9 Standards and Inspection

9.1 The Seller shall carry out the design, manufacture, inspection and test of the Equipment according to the existing standards of the People’s Republic of China, namely GB.

9.2 The Seller or the manufacturer shall, at his own costs and expenses, inspect the Equipment and issue the ex-work quality certificate.

9.3 The open-case inspection of the Equipment shall be performed by the Buyer in the presence of the Seller’s representatives on the Job Site in days after the arrival of the Equipment at the Job Site. The open-case inspection fee shall be borne by the Buyer.

The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s representatives in their inspection work.

9.4 During the joint open-case inspection, a detailed inspection record shall be made and signed by the representatives of both parties.

In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. Any of such claims shall be lodged by the Buyer within month(s) after the arrival of the Equipment at the Job Site.

9.5 If any shortage, defect of or damage to the Equipment is found in open-case inspection not attributable to the Seller’s responsibility, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties.

9.6 The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent.

If there is no joint open case inspection due to the reasons not attributable to the Seller, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition.

Article 10 Design and Design Liaison

10.1 The Buyer shall provide to the Seller within ____ ( ) days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. The Seller shall not be liable to the Buyer for, and the Buyer shall indemnify the Seller and hold the Seller harmless from any damages or failure caused by the incompleteness, incorrectness and/or inaccuracy of any such information and data.

10.2 A design liaison meeting shall be held in the ____ ( ) month after receiving above mentioned design data, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details.

10.3 During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively.

Article 11 Erection, Test Run, Commissioning, Performance Test and Acceptance

11.1 The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer.

11.2 Chief Representatives

11.2.1 Each party shall nominate one (1) Chief Representative to deal with the technical matters during the period from the start of the Erection to Acceptance of the Equipment.

11.2.2 Detailed arrangements shall be made through friendly discussions by the Chief Representatives of both parties. The Chief Representatives of both parties shall fully cooperate to carry out their duties stipulated in the Contract, however they have no right to revise, alter or amend the Contract without the written authorization of both parties.

11.2.3 The Chief Representatives of both parties shall communicate through Linking Sheet for the matters relative to opinions, suggestions and information. The linking sheet shall be countersigned by the other party.

11.3 Erection and Test Run

11.3.1 The Erection shall be completed by the Buyer in ____ ( ) days from the effective date of the Contract. The Seller’s Chief Representative shall arrive at the Job Site ____ ( ) days prior to the beginning of the Erection.

11.3.2 When Erection is completed and in full conformity with requirements of the Technical Documentation, a Certificate of Completion for Erection of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing said Certificate shall be deemed as the date of completion of Erection.

11.3.3 As soon as the completion of Erection, Test Run for single machine and the whole system of the Equipment shall be started.

11.3.4 When Test Run has been successfully performed, a Certificate of Completion for Test Run of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days. The date of signing the said Certificates shall be deemed as the date of completion of Test Run of the Equipment.

11.4 Commissioning and Performance Test

11.4.1 Within ____ ( ) days after the completion of the Test Run, the Buyer shall make available qualified operation and maintenance personnel, raw materials, spare parts, utilities and other matters required for the Commissioning. Detailed procedures such as instrument calibrating, items of recording, sampling methods and analyzing methods, which are necessary for the Commissioning shall be discussed and agreed upon by the Chief Representatives of both parties.

If in the opinion of both parties, the Equipment is ready for the Commissioning, both parties shall confirm the readiness for the Commissioning in writing.

11.4.2 The Commissioning of the Equipment shall be started immediately after the confirmation of the readiness for the Commissioning. The Commissioning period shall ____ ( ) days after commencement of the Commissioning.

11.4.3 When the Seller and the Buyer consider that stable operation of the Equipment has been achieved, the date of Performance Test shall be fixed by Chief Representatives of both parties.

11.4.4 The Seller shall have the right to access to the laboratory and testing facilities in order to take samples and make analytical tests. The sample taking and analytical test during the Commissioning period will be done in the presence of the Chief Representatives of both parties.

11.4.5 During the period of Commissioning until Acceptance of the Equipment, the Seller may use the Buyer’s stored spare parts. Should the Buyer’s stored spare parts be used by the Seller due to the Seller’s responsibility, the Seller shall replenish the stores with the same in time at Job Site; otherwise the Seller shall provide the same at the Buyer’s costs upon the Buyer’s timely request.

11.4.6 If the result of Performance Test has reached the guarantee figures as per Appendix 1, the Acceptance Certificate of the Equipment shall be signed by the Chief Representatives of both parties in two (2) originals, one for each party, within three (3) days.

11.4.7 If the Performance Test cannot meet guarantee figures specified in Appendix 1, both parties shall jointly make investigations so as to find out the reason for clarifying the responsibility.

11.4.8 If the guarantee figures are not met due to the Seller’s reason, the Buyer shall agree to give an extension of ____ ( ) months so that the Seller can make improvement or adjustment to the Equipment and conduct further Performance Test. All the costs and expenses for making improvement or adjustment to the Equipment shall be borne by the Seller.

11.4.9 During the extension period, if the guarantee figures are still not met due to the Seller’s reason, the Seller shall pay the liquidated damages as per Appendix 1 to the Buyer against the Acceptance Certificate signed by both parties.

The Seller’s aggregate liability to pay liquidated damages for failure to attain the performance guarantees shall not exceed ____ ( ) percent of the Equipment price. The Seller shall have no further liability whatsoever to the Buyer in respect of such failure after payment of the liquidated damages.

11.4.10 If the non-achievement of the guarantee figures is due to the reasons not attributable to the Seller, the Seller shall agree to give an extension of ____ ( ) months. During the extension period all costs thereto incurred for the adjustment of the Equipment, as well as the costs and expenses for the Seller’s technical personnel shall be borne by the Buyer. In case the guarantee figures still can not be achieved due to the reasons not attributable to the Seller in the extension period, the Equipment shall be accepted by the Buyer. Both parties shall sign the Acceptance Certificate.

11.5 Acceptance

11.5.1 Acceptance shall occur in respect of the Equipment when :

(a) Performance Test has been successfully completed as per the Article 11.4.6.; or

(b) The Performance Test has not been completed due to the reasons not attributable to the Seller such as delayed civil construction, lack of and/or any other inconformity of raw materials, spare parts of the Buyer’s scope of supply under Appendix 2, and utilities with the requirements of the Contract in the ____ ( ) months from the date of Bill of Lading of the Last Shipment; or

(c) The Seller has paid the liquidated damages as per Article 11.4.9; or

(d) The guarantee figures still can not be reached due to reasons not attributable to the Seller’s reason in the extension period as specified in Article 11.4.10; or

(e) The Buyer takes the single machine and the whole system of the Equipment into use without the Seller’s approval.

11.5.2 At any time after any of the events set out in Article 11.5.1 has occurred, the Seller may give a notice to the Buyer requesting the issuance of the Acceptance Certificate.

11.5.3 The Buyer shall within seven (7) days after receipt of the Seller’s notice, issue such Acceptance Certificate.

11.5.4 If within seven (7) days after receipt of the Seller’s notice, the Buyer fails to issue the Acceptance Certificate or fails to inform the Seller in writing, with convincing evidence, of the reason why the Buyer has not issued the Acceptance Certificate, the Equipment shall be deemed having been accepted on the seventh day of the Seller’s said notice.

11.5.5 After the Acceptance, the Seller’s responsibilities and obligations under the Contract shall be deemed having been fulfilled except those as stipulated in Article 12 and 14.

Article 12 Guarantee and Warranty

12.1 The Seller guarantees that:

(a) The Equipment supplied by the Seller shall be new and made of adequate materials, and in conformity with the technical requirements of the Contract;

(b) The Technical Documentation shall be complete, clear and correct.

12.2 The period of warranty given by the Seller under Article 12.1 shall be ____ ( ) months from the date of Acceptance or ____ ( ) months from the date of Last Shipment, whichever comes earlier.

12.3 Defect of the Equipment

12.3.1 During the Warranty Period, should any defect due to inferior materials or bad workmanship of the Equipment be found under normal operation, the Buyer shall give the Seller a notice stating the details, together with all available evidence.

The Seller shall take immediate action to eliminate the defect at the Seller’s expenses within the period agreed by both parties.

12.3.2 If certain defect can not be eliminated despite of several attempts, the Seller shall replace the defective parts with non-defective parts at the Seller’s costs and expenses.

12.3.3 If the defect is eliminated by the Buyer himself, subject to the Seller’s prior written consent, all the direct costs and expenses thus incurred shall be borne by the Seller.

12.3.4 The Seller may reduce the price of the defective Equipment according to the degree of inferiority or extent of damage as agreed by both parties. After the reduction the Seller shall be released from its obligations and liabilities.

12.3.5 During the Warranty Period, should any defect due to the Buyer’s improper operation or maintenance be found, the Seller will provide technical assistance to eliminate the defect or replace the defected parts upon Buyer’s requests. All the costs and expenses thus occurred shall be borne by the Buyer.

12.3.6 Subject to Article 12.3.1, The Seller shall not be responsible for any defect or damage to the Equipment arising out of any circumstances including but not limited to the following causes:

(a) Combination of the Equipment with any machinery, and/or component other than those supplied by the Seller; or

(b) Alteration, modification or repair without the Seller’s prior written consent; or

(c) Failure of the Buyer to follow the Technical Documentation and instructions of the Seller, including the Buyer’s improper operation and maintenance; or

(d) Normal wear and tear.

12.4 During the Warranty Period, should the Technical Documentation supplied by the Seller be found incomplete, unclear or incorrect due to the Seller’s reason, the Seller shall be liable to supplement, replace or correct the Technical Documentation free of charge.

12.5 The Seller shall in no respect be understood or interpreted as liable for the commercial development of the Contract Products. The Buyer shall undertake the risk of the commercial development of the Contract Products.

12.6 In no circumstances, whether as a result of breach of contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, shall the Seller or its subcontractors or suppliers be liable for loss of profit or revenues, loss of production, loss of use, loss of information or data, cost of capital, cost of substitute equipment, facilities, services or replacement power, downtime costs, claims of the Buyer’s customers for such damages, or for any special, consequential, incidental, indirect or exemplary damages.

12.7 Notwithstanding anything to the contrary provided in the Contract, the aggregate liability of the Seller to the Buyer , on all claims of any kind, whether in contract, warranty, indemnity, tort (including negligence), strict liability, or otherwise, arising out of the performance or breach of the Contract or use of any Equipment or exploration of the Patent and/or Know-how shall not exceed ____ ( ) percent of the total Contract price.

12.8 All Contractual obligations of the Seller shall be deemed as having been fulfilled upon the expiry date of the Warranty Period.

Article 13 Intellectual Property Right

13.1 The Seller represents that it is entitled or authorized to grant the license to the Buyer to use the Patent and/or Know-how for the purpose as specified in Article 3.

13.2 The Buyer shall not use such Patent and/or know-how received from the Seller for any purpose other than that as specified in this Contract.

13.3 Any intellectual property right or other technical information granted by the Seller to the Buyer shall remain the property of the Seller. In no circumstances shall any terms and conditions in this Contract be construed, deemed, or interpreted as transfer of title to the Buyer of any information which may be delivered to or accessed by the Buyer.

13.4 Registration of the Contract and Maintenance of Patent

13.4.1 The Buyer shall, after the Contract is signed between both parties, make sure that the Contract is registered with or filed to the competent authorities in the Buyer’s country if it is required by law.

13.4.2 The Seller shall, during the validity period of the Contract, make all reasonable efforts to maintain Patent in force in the territory as stipulated in Article 3.4.1 and bear the costs thus incurred. The Buyer shall not make any action or inaction which may lead to invalidation or compulsory licensing of the Patent.

13.5 Improvement and Grant-back

13.5.1 Should any Improvement be made by the Seller on Patent and/or Know-how within the validity period of the Contract, which shall be the exclusive property of the Seller, the Seller shall grant the Buyer a non-exclusive license to exploit such Improvement at latest __________months from its improving, provided that the license fee is agreed upon between both parties.

13.5.2 The Buyer shall be entitled to make Improvement on Patent and/or Know-how within the validity period of the Contract. The Seller shall have the right to obtain and make use of the Improvement. The license fee shall be discussed between both parties in due time.

13.5.3 Both parties shall keep Improvement confidential. Neither party shall be entitled to grant any third party a sub-license on Improvement made and provided by the other party without previous written consent of the other party.

Article 14 Confidentiality

14.1 After signing of the Contract, both parties shall keep secret all the contents, terms, conditions of the Contract.

14.2 The Buyer shall take proper measures to keep strictly confidential of Know-how, Technical Documentation, Improvement and any other secret information obtained or accessible to from the Seller. The Buyer shall not disclose any of them to any third party, and shall not make use of them without prior written consent of the Seller except otherwise stipulated in the Contract.

14.3 The Buyer may disclose the secret information as described in Article 14.2 to the personnel of its own, or of any related parties engaged in the performance of the Contract subject to Article 14.2, strictly to the extent as essential for the implementation of the Contract, provided that the individuals and/or parties accessing or may access such secret information are engaged to undertake in written form the same confidential liability of the Buyer to the Seller. Any breach of confidentiality obligations by any personnel from the Buyer or the Buyer’s related parties shall be deemed as breach of the Contract by the Buyer.

14.4 Notwithstanding this Article 14, the Seller may furnish to its sub-contractor such documents, data, and other information received from the Buyer to the extent required for performing the Contract, in which event the Seller shall obtain from such sub-contractor an undertaking of confidentiality similar to that imposed on the Seller under the Article 14.

14.5 This Article 14 shall survive the expiration or termination of the Contract.

14.6 The confidential obligation shall not apply to the information which:

A. now or hereafter enters the public domain; or

B. can be proved to have been in the possession of the Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto; or

C. otherwise lawfully becomes available to either party from a third party under no obligation of confidentiality.

Article 15 Taxes and Duties

15.1 All taxes and duties in connection with the signing and performance of the Contract, levied by Governments of the People’s Republic of China, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Seller.

15.2. All taxes and duties in connection with the signing and performance of the Contract levied on the Buyer and Seller by the Buyer’s Governments, including but not limited to customs duties, income tax, sales tax, value-added tax etc., shall be borne and paid by the Buyer. The Buyer shall pay in due time and full amount and hold the Seller harmless from any taxes and duties in case incurred to the Seller in the signing and performance of the Contract.

15.3 All import taxes and duties for tools and/or instruments, which the Seller or the Seller’s personnel may bring to the Buyer’s country for the execution of the Contract, shall be borne and paid by the Buyer.

15.4 Any and all taxes and duties in connection with the signing and performance of the Contract levied in any place except the cases as specified in Article 15.1 are not included in the Contract price. Should the Seller make the relevant payment directly as the case may be, both Parties agree to amend the Contract price to fully compensate the Seller for the payment, and the Buyer shall fully refund the Seller for the relevant amount within_______( ) days from the Seller’s payment.

Article 16 Force Majeure

16.1 If either of the Contract parties is prevented from executing the Contract due to the event of Force Majeure such as war, riot, coup, embargo, flood, typhoon, tornado, snowstorm, earthquake and other events which could not be foreseen, avoided and overcome, the affected party shall notify the other party by fax within the shortest possible time of occurrences of the Force Majeure and send a certificate issued by competent authorities or agency certifying the event of the Force Majeure by registered or express mail within fourteen (14) days following its occurrence.

16.2 The affected party shall not be liable for any delay or failure in performing any of its obligations due to the event of Force Majeure. However the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure as soon as possible.

16.3 Both parties shall proceed with their obligations immediately upon the cease of the event of Force Majeure or the removal of the effects and the term of the Contract shall be extended correspondingly. Should the effect of the event of Force Majeure last for more than one hundred and twenty (120) days, either party shall have the right to terminate the Contract by a written notice.

Article 17 Applicable Law and Settlement of Disputes

17.1 The applicable law of the Contract shall be the laws of the People’s Republic of China.

17.2 All disputes arising from or in connection with the Contract shall be settled through friendly consultation between both parties. In case no agreement can be reached, the dispute shall be submitted for arbitration.

17.3 The arbitration shall be conducted by China International Economic and Trade Arbitration Commission (CIETAC) in Beijing in accordance with Arbitration Rules of the Commission in effect at the time of applying for arbitration. The tribunal shall be composed of three arbitrators.

17.4 The arbitral award shall be final and binding upon both parties.

17.5 During proceedings of arbitration, the undisputed part of the Contract shall be performed continuously by both parties regardless of such arbitration proceedings.

Article 18 Effectiveness, Term and Termination of the Contract

(a) The Seller and the Buyer sign the Contract;

(b) The Contract shall be approved by the competent authorities and/or banks of both parties (if applicable);

(c) The Seller receives the Down Payment;

(d) The Seller duly receives the L/C (or L/G ) issued by the Buyers Bank.

18.2 Each party shall use its best efforts to fulfill the above conditions for which it is responsible as soon as practicable.

18.3 If the Contract has not become effective pursuant to Article 18.1 within ____ ( ) months after the date of signing this Contract, the Seller has the right to make an equitable adjustment to the total Contract price and the time for delivery and/or other relevant conditions of the Contract. Should no agreement is reached for the above mentioned adjustment within ____ ( ) days from the Seller’s request of adjustment, the Seller shall be entitled to cancel the Contract.

18.4 The Contract shall be valid and remain in force for_____ (_____) years from the Date of Effectiveness, during which period the Buyer shall be entitled to manufacture the Contract Products with Patent and/or Know-how and sell the Contract Products within the licensed territory as specified in Article 3.4.

(Option 1) The Buyer shall not be entitled to manufacture with patent and/or know-how or sell the contract products after the aforesaid period unless the Buyer agrees to pay additional license fees in the amount and with the payment schedules and methods as agreed upon between both Parties in due time.

(Option 2) The Buyer shall be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after expiration of the Contract term specified above, provided that the Buyer shall not be released from its confidential obligations under the Contract.

(Option 3) The Buyer shall not be entitled to manufacture with Patent and/or Know-how or sell the Contract Products after the expiration of the Contract term specified above, and shall return to the Seller all the Technical Documentations specified in Appendix 4 without remaining any duplicate copies. Nevertheless the confidential obligations of the Buyer under Article 14 shall survive the Contract term.

18.5 Either party may, without prejudice to any other remedy for the other party’s following breach of the Contract, terminate the Contract in whole or in part by a written notice send to the other party, if the other party

A. fails to perform its payment obligation under the Contract and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

B. fails to perform its confidentiality obligation under the Contract; or

C. fails to perform any other obligations under the Contract except minor parts thereof, and does not remedy for its failure within a period of ______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

D. becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made against him, compounds with his creditors, or carries on business under a receiver, trustee or manager for the benefit of his creditors, or dissolves, or ceases to do business, or be ordered to close down / to cease to do business / to dissolve, or has its business license revoked, or if any act is done or event occurs which (under applicable Laws) has a similar effect to any of these acts or events.

18.6 Either party may, without prejudice to any other remedy, terminate the Contract in whole or in part by a written notice send to the other party, if

A. The other party is prevented by the laws, statutes, rules or regulations of either country from performing its obligations under the Contract; or

B. The Seller is prevented by the relevant authority of the Buyer’s country from being paid in accordance with the Contract; or

C. The other party is prevented from performing its contractual obligations by any event of Force Majeure for more than one hundred and twenty (120) days.

18.7 In the event of termination of the Contract, without prejudice to any other remedies available according to the Contract and/or applicable laws,

The Buyer shall cease all its further exploitation of the Patent and/or Know-how and any acceptance of further orders from third parties for the Contract Products.

All the delivered literatures, drawings, samples, instruments, equipment, and other documents including the interpretations related to Patent and/or Know-how shall be returned to the Seller as the Seller’s requests.

All the contracts on sales of the Contract Products signed between the Buyer and third parties shall be terminated by the Buyer, otherwise the Seller shall be paid accordingly.

In case the termination is due to the Seller’s default, the Buyer shall be entitled to complete the performance of the contracts on sales of the Contract Products already signed between the Buyer and third parties before the termination.

The Seller shall be paid by the Buyer for all the contractual obligations performed by the Seller till the date of termination within _______days from receipt of the termination notice.

E. Termination of the Contract shall not release either party from its confidential obligations under the Contract

Article 19 Miscellaneous

19.1 The Contract is signed by the authorized representatives of both parties in ____ ( ) originals. Each party shall keep ____ ( ).

19.2 The Contract supersedes all communications, negotiations and agreements between the parties prior to the signing date of this Contract.

19.3 All amendments, supplements and alternations to terms of the Contract shall be made in written form and signed by the authorized representatives of both parties. These amendments, supplements and alternations shall form integral parts of the Contract.

If any costs occur or delivery delay due to amendment or explanation of the new law or statute or regulations enacted by the Buyer’s country after the effectiveness of the Contract,the Seller shall have the right to ask for necessary adjustment in relation to the Contract price and the delivery schedule.

19.4 No assignment, cession, novation, or transfer of any right or obligation under this Contract shall be made by either party to a third party without the prior written consent of the other party.

19.5 All communications between both parties in the course of implementation of the Contract should be in English language in written form at the address set forth below. The faxes concerning the important matters shall be confirmed in due time by registered or express mail or letter delivered by hand.

The Buyer:

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

The Seller :

Address:

Post Code:

Fax: __________________________

Tel.: __________________________

Email:__________________________

Attention: ______________________

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be duly executed.

The Buyer:

The Seller:

By:______________________[Signature]

Name: [printed name]

By:_______________________ [Signature]

Name: [printed name]

Title:

Title:

Appendices

Appendix 1 Specifications and Guarantee Indices (Omitted)

展开阅读全文

篇3:空运货物出口运输协议

范文类型:合同协议,适用行业岗位:外贸,运输,全文共 836 字

+ 加入清单

空运货物出口运输协议

甲方:

地址:

编码:

电话:

传真:

乙方:

地址:

编码:

电话:

传真:

经过平等、友好协商,甲、乙双方就空运货物出口运输事宜,于年月日签订如下协议:

(一)?委托事项

甲方接受乙方委托,承接乙方委托的空运出口运输业务。乙方指定甲方作为其代理人,代为安排提货、办理出口报关和出口商品检验检疫等事务。

(二)?乙方应在每票货物出运之前五个工作日以书面形式(包括信函、传真、电报、电传)向甲方提交《出口运输委托书》(简称“委托书”或“托单”)。

“委托书”应包括但不限于以下内容:

托运人(shipper)名称、姓名、地址、联系方式;

收货人(consignee)名称、姓名、地址、联系方式;

通知方名称、姓名、地址、联系方式;

航班号、日期、始发港、目的港;

货物品名、件数、重量、体积、声明价值;

运费及其它费用的标准和支付方式;

托运人的签名、盖章、日期。

(四)?乙方在向甲方发出委托后要求撤消或变更委托事项、委托内容的,应采用书面形式并得到甲方的认可,乙方应补偿甲方由此付出的额外费用。

(五)?接收货物?如果甲方在收货时发现乙方的货物表面状况(包括外包装)不良,甲方有权拒绝接收货物。如果乙方不能在甲方要求的时间内对货物及其包装进行改良,甲方有权停止为乙方出运货物。由于甲方原因未能在乙方指定时间内将货物按排出港,乙方有授向甲方提出损失索赔。

(六)?对货物的要求

(七)?乙方应向甲方支付与货物运输有关的所有运杂费用。

乙方应在货物起飞后30天内将相应款项支付给甲方。

(八)?本协议有关的任何事务,适用中华人民共和国法律、法规及相关国际公约的规定。

(九)?协议的修改和补充

对本协议的修改和补充应采用书面形式,并得到双方的书面确认。修改和补充从双方书面确认之日起生效。

(十)?本协议自双方盖章之日起生效。本协议的有效期至年月日止。

(十一)?本协议以传真形式签订确认,同具法律效力。

(十二)?签约地:

甲方:

日期:?年月?日

乙方:

日期:?年月?日

展开阅读全文

篇4:进口设备采购合同

范文类型:合同协议,适用行业岗位:外贸,采购,全文共 1752 字

+ 加入清单

买方(以下简称甲方):

联系方式:

地址:

卖方(以下简称乙方):

联系方式:

地址:

经甲、乙双方充分友好协商,就购买_________项目特订立本合同,以便共同遵守。

一、设备的名称、规格型号、数量

名称:_______________________________________。

规格型号:___________________________________。

数量:________________________________________。

二、合同价格

1、设备总价为______________元人民币,(大写):_______________。

2、总价中包括设备金额、包装、运输保险费、装卸费、安装及相关材料费、调试费、软件费、检验费及培训所需费用及税金。

3、本合同总金额不得做任何变更与调整。

三、合同生效

本合同经双方签字后生效。

四、付款方式

货物验收合格,设备安装、调试运转正常,乙方为甲方培训结束、甲方无疑问后,甲方向乙方支付合同总价_______%货款。

五、交货、包装与验收

1、交货地点:按甲方指定的地点。

2、交货时间:合同生效后_________日内。

3、乙方将货物一次运至交货地点。并于到货前_______小时将到货名称、型号、数量、外形尺寸、单重及注意事项等,以书面形式通知甲方。

4、设备包装应符合国家标准,以保证设备在运输过程中不受损伤,由于包装不当造成设备在运输过程中有任何损坏或丢失,由乙方负责。

5、设备由乙方负责送到施工现场,由乙方负责运输、卸车。

6、设备到达现场,甲乙双方均须在场并确认包装的完好性后,由甲方验货。乙方应按甲方安排的时间派人到现场,对货物进行清点验收,并签字确认。若发现货物与装箱单不符,乙方负责补齐或收回,如乙方不能按时到达,甲方有权开箱检验,并对缺件,损坏做出记录,乙方应认可并负责解决。

7、乙方负责设备安装及调试,直至设备正常运行。最终验收在此之后进行。如设备不能通过验收,乙方应退货,退还甲方所有金额。

8、乙方应自带用以安装、调试过程中所需的各种工具、仪器仪表及易损件。

六、产品质量保证与售后服务

1、乙方应严格按照国家有关标准和规定进行制造和检验,材料及零部件均为全新未用过的。以确保产品质量,设备须经技术检验,符合国家相关标准才能出厂。

2、乙方负责免费为甲方培训操作及维修人员。包括:基本原理,操作使用和维修保养。

3、设备投入正常运行后,乙方应定期回访使用方。

4、乙方应在附件中明确售后服务内容、响应时间、范围、方式、收费标准等,并进行其他售后服务工作。

七、责任与义务

1、在设备安装调试时,如乙方提出,甲方应为乙方人员的饮食提供方便,其费用由乙方自理。

八、违约责任

1、乙方不能按期交货,除不可抗拒因素外,乙方应向甲方支付延期违约金,每日按合同总价的_______%,金额计¥_________元计算。

2、甲方延期付款时(正当拒付除外)。应向乙方支付延付款数额的延期违约金,每日按延期付款额的_______%金额计算,支付款办理期为_______个工作日。

3、双方必须严格执行《中华人民共和国合同法》的有关违约责任规定。

九、合同的解除和变更

1、当合同一方要求变更或解除合同时,在新协议未达成前,原合同仍然有效。要求变更的一方应及时通知对方,对方在接到通知15日内给与答复,逾期未答复则视为已同意。

2、如乙方要求变更或解除合同,所造成的损失由乙方负责。

十、合同纠纷的解决

1、甲乙双方若发生合同纠纷,应本着互谅互让、互相尊重、和平友好的原则协商解决。

2、本合同履约地为_________,若双方不能通过协商达成协议,可依据《中华人民共和国民事诉讼法》和《中华人民共和国合同法》的有关规定,向_________仲裁机构申请仲裁。

十一、免责条款

本合同因不可抗力而无法履行时,双方按国家有关法律规定处理。

十二、其它约定事项

1、本合同未尽事宜,可由甲乙双方商定,并签署书面补充协议。

2、本合同一式_________份,甲执_______份,乙执_______份,都具有同等法律效力。

甲方(盖章):

委托代表人(签字):

签约日期:_______年_______月_______日

乙方(盖章):

委托代表人(签字):

签约日期:_______年_______月_______日

展开阅读全文

篇5:货物进口合同_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 2059 字

+ 加入清单

货物进口合同(一)

货物进口合同(一)

__________________市 ________年____月____日

俄罗斯________市______外贸公司(下称外贸公司)与中国______市________公司(下称公司)签订本合同如下:

1.合同的标的;价格和总价

外贸公司在俄中国界车上交货条件下按本合同附件1向公司提供商品。商品以美元计价,系俄中国界车上交货价,包括包皮、包装和标记的费用。

根据附件1由俄罗斯向中国供货的总值为____美元。

公司相应地在中国俄国界车上交货条件下按本合同附件2向外贸公司提供商品。商品以美元计价,系中俄国界车上交货价,包括包皮、包装和标记的费用。

根据附件2由中国向俄罗斯供货的总值为________美元。

2.供货期

售方应在本合同附件规定的期限内交货。售方有权按双方商定的数量和金额提前供货。购方有义务按合同规定接收货物。

3.结算

本合同所供货物之价款,在易货基础以上美元计价,不通过银行记帐。货物交接后,由售方商务代表到购方结算,或将结算凭证寄给购方进行结算,并凭下列单据办理:

(1)发货帐单2份;

(2)盖有发货站戳记的铁路运单副本1份

(3)明细单2份

(4)品质证明书1份

购方接到上述单据核对无误后给售方出以等值易货贸易结算凭证予以确认。

4.包装

卖方应在包装货物时采取所有预防措施以保证货物在储存、海运、陆运、吊装时完好无损。

5.商品的品质和保证

所供商品的品质应由品质证明书加以确认,该证书确认商品品质符合生产国的技术条件和国家标准。

所供商品的品质性能应与标准样品相一致,标准样品在签订合同时交给买方,在保证期内留存买方并在对供货品质发生争议的情况下供双方使用。

保证期为供货后九个月。

6.索赔

购方可按1990年3月13日“由中国向苏联和苏联向中国交货的共同条件”所规定的期限和程度在下列方面提出索赔。

(1)货物的数量

如货物数量与明细单注明的数量不符,在包装完整和没有外部损伤(内部短缺)的情况下,购方有权凭检验证书提出索赔。

如果货物的发运系按发货人确定的重量发出,而国境交接站双方铁路交接中发现不足,并从实际情况看来,不是铁路方面的过失。可根据双方铁路方面编制的商务记录提出索赔。

(2)货物的质量

如货物品质与合同规定不符时,可根据商品检证或无利害关系的权威机关的代表参与制成的记录提出异议。

如售方所供货物的品质,不符合合同规定的技术条件或与双方确认的样品不符时,购方有权要求售方或者削价、或者更换货物。如果售方自收到异议之日起60天内不作最后决定,或不同意检验证书中确定的削价百分之比时,则购方有权将品质不合格的货物按售方提供的地址退给售方。售方应在本合同规定的异议审理期限内将返回地址通知购方。

如果在每批货物中发现残次品占____%以上,收货人则将退回全部货物。由于质量原因退回货物时所产生的全部费用由售方承担。

在这种情况下,售方没有免除向购方补发数量相同并符合合同规定的货物的责任。

在终点检验货物的数量和/或质量所需要的一切费用由购方承担。

7.不可抗力条款

由于发生不可抗力情况(如:火灾、水灾、地震等),而直接影响本合同的履行时,售方对本合同的部分义务或全部义务无法履行的责任不予承担。经双方协商,履行本合同义务的期限也可相应推迟。发生不可抗力情况一方应自灾情结束之日起,十日内将有关发生不可抗力情况的性质、毁坏程度及影响合同履行的情况书面通知对方。如对方有异议,发生不可抗力情况一方凭其国家有关机关的认证书豁免责任,中方为中国贸促会,俄方为俄罗斯工商会。

8.仲裁

由本合同所产生或与本合同有关的一切纠纷,应尽可能通过双方谈判解决。如双方不能达成协议,可通过被告国对外贸易仲裁机关审理。

9.其他条件

本合同未尽事宜,均按1990年3月13日“由中国向苏联和由苏联向中国交货件”办理。

对合同的一切修改与补充意见只有以书面形式形成并经双方鉴定后才生效。经双方确认的往来信函、传真、电子邮件等,将作为本合同的组成部分,具有合同的效力。

本合同一式两份,以中、俄两种文字书就,两种文字具有同等效力。

双方法定地址:

售方:__________ 购方:________________

地址:__________ 地址:________________

电传:__________ 电传:________________

传真:__________ 传真:________________

电话:__________ 电话:________________

国际电报:______ 国际电报:____________

10.运输地址

发货人:____________ 收货人:______________

发站:______________ 到站:________________

售方签字:__________ 购方签字:____________

展开阅读全文

篇6:新版农行面试自我介绍流程

范文类型:自我评介,全文共 301 字

+ 加入清单

尊敬的各位评委好:

首先做一下简单自我介绍,我叫,今年**岁,毕业与**学校,学习的财会专业,取得了会计证等等,在校期间多次获得奖学金,荣获*名誉称号之类。

很荣幸有这次机会能够参加农行的招聘面试,我出生在农村,对农村有着深厚的感情,提起农业银行自然有一份亲切的感觉;也正因为我是农村的孩子,所以我养成了踏实肯干的良好习惯,无论做什么事情,我都会不辞辛苦、踏踏实实的去做,做到最好;我所学习的财会专业,期望能有一个让我发挥所学知识的工作,如果我有幸被录取,我将珍惜和把握各位领导给我的机会,快速的适应农行的新环境,努力学习各项业务,尽快进入工作主角,使自我成为一名合格的农行人。

多谢各位评委,自我介绍完毕。

展开阅读全文

篇7:精选外贸业务员实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,销售,全文共 3077 字

+ 加入清单

精选外贸业务员实习报告范文

转眼大三就结束了,是该我们实习的时候了,考虑到本专业就业要求较严格,学校里要求我们每个同学都必须在机房里面实习。通过在学校机房里五天的实习,我学到了很多在书本上学不到的东西。在机房里面实习虽然不如在外面实体单位里面实习来得那么实在,但是,也是按照实际生活中正常国际贸易交易的步骤和程序来进行的,所以,我们学到的东西仍然是不能忽视的。在学校实习期间,我们就像正常上班一样,每天准时刷卡上班,刷卡下班,秩序井然,老师、同学和自己相互约束,认认真真完成每一项工作,过得忙碌而充实。针对几天来的实习,我对自己的实习分三个部分作如下报告:

一、对实习软件的认识和评价

首先,毫无疑问,这个实习软件是非常不错的。其包含了很多的公司且公司信息详细,我们可以亲身体验到那种身处公司氖围,完全没有那种被排外的感觉,每个人都能掌握住公司的基本信息,做起交易来,是非常方便的;软件也集中体现了培养我们动手实践的功能,在很多操作中,都是需要我们自己去查找一定的数据和资料才能够完成的,这就要求我们必须要有扎实的理论基础;软件的功能非常齐全,基本上囊括了我们在国际贸易操作中的各个方面,从建立贸易关系、询盘、发盘、还盘、接受到签订合同、计算成交价格、各种成本、利润、制造各种单据、审核各种单据,再最后到善后处理等都是非常详尽的,既将实习都置身为卖家,又将其假设为买主,使我们更能够很好地妥善办好自己在国际贸易中的角色;软件的应用也较简单,只要稍微熟悉一下,就知道该怎么做了,操作起来简单,不需要死记一些操作,进入界面,就可以根据提示操作,非常地省时省神。但是,任何事情都有两面性,这个实习软件也有它的不好之处,我认为最主要的缺点就是缺乏灵活性,基本上同学们实习的步骤都是一样的,且需要操作的要求也是一样的,所要求上交的作业也是一样的,且数据死板,有些数据、资料很难查到,不得不花费大量的时间去搜集和整理;其次,没有完全体现真正公司的情形,像在一些信函的处理上,需要一些自动回复信函,在一些计算方面,也需要一些计算模板,这样就能够节省大量的时间,工作人员可以去做其他的更重要的事情。

总体来讲,这个实习软件优点是非常明显的,充分体现了实习的本质,大大地提高了我们的实践操作能力,也提高了我们的对国际贸易的认识,让我们发现自己的缺点和不足,有利于我们在以后的学习和生活、工作中注意加强这些方面的训练,提高自己的能力。

二、实习的收获

我是在国际贸易公司( international trade corp)实习的,在刚开始实习的时候,我是不知所措的,经过同学和老师的指导,我慢慢地步上了正轨,但是在操作的过程中还是有点畏首畏尾,怕出错,但是又想,只要认真地做好每一步,就不会有什么大的问题。然后,同学们也互相鼓励,终于我沉下了心,认真地做,当遇到不懂的地方就主动地请教老师和同学,就这样,一步一步地把每个步骤都做好了。

国际贸易的中间环节多,涉及面方,除交易双方当事人外,还涉及商检、运输、保险、金融、车站、港口和海关等部门以及各种中间商和代理商。如果哪个环节出了问题,就会影响整笔交易的正常进行,并有可能引起法律上的纠纷。

实习是从与外国公司建立贸易关系开始的,然后就是根据自己的业务(进口或是出口)与客户进行询盘、发盘、还盘、接受,再就是订立合同,合同订好后,就是单据、发货、审单等,经过多个步骤一项业务才能有完成。在各个步骤中,都不能有任何的错误和偏差,否则,会给自己公司带来很大的损失。在建交时,一定要诚心诚意,让对方相信我方是他最好的合作伙伴,在询盘、发盘、还盘、接受等各项业务时,一定要认真核算成本、利润、利润率,以保证我方的利益,在制造各种单据、审核单据时一定要做到与合同以及信用证相符,以免到时候出现银行拒付货款的事情。在每一个步骤进行时,当出现差错时,一定要及时改正且与对方取得联系,与对方商议,取得一致协商同意,这样才能保证交易的公平与顺利进行。

我在实习过程中,在计算成本核算时,由于对方要订购的商品种类有四种且每一种商品都得报两个价,每一种商品都要自己去查询相关的资料,比如商品的质量、包装、体积、购货成本、汇率、增值税率、各种商品所适用的货物等级、海洋运价、海关税则等)由于平时对这些东西不够熟练且不太在意,我花去了太多的时间在这个上面,且在计算时,经常出错,这说明自己的业务水平还很差,需要不断地加强;在制单的时候,,也是这样,需要填写的东西没填,不需要填的却填了,结果是,一张好好地单据被我弄得乱七八糟;在审单的时候,是我最困难的时候,因为是对对方的相关单据审核,我只是注意一些货物方面的东西,比如订货的数量、包装等,却没有注意审核一些看起来很正常实际上却有着很大隐患的东西,像公司的名称、地址、付款条件等,这些也是非常重要的,一旦出错,会对公司产生很大的影响;当一切敲定时,我却忘了善后工作,对方银行开来了拒付通知,我一时手足无措,心想前面的工作都做得很顺利,为什么银行还是拒付款呢,然后我仔细看了拒付的理由,心里才有了底,跟对方通过信函联系,双方取得了一致意见,最后总算是一笔交易成功了。在最后,我还写了一封感谢对方的合作且希望下次再继续合作的善后信。

此次实习,让我意识到,掌握理论知识是做好实践的基本前提。国际贸易术语的掌握要“与时俱进”,且要掌据透彻,不能似懂非懂且不能守旧,牢牢熟记《国际贸易术语通则》各种术语所适用的交货条件、运输条件、付款条件、保险条件等,这样有利于快速清楚地计算成交价格、成本和还盘利润及利润率等;熟悉各种货物的运输等级、运费率等;汇率也是非常重要的,这对付款是非常重要的,按何时何种汇率计算,都关系到交易双方的切身利益。其次是要懂得一些国际商法方面的知识,这样当在遇到纠纷时,可以随时用来维护自身利益和说服对方,使交易顺利进行。最重要的是学好英语,外贸中语言的沟通非常普遍和实用,一定要学好外语,这是和外商沟通的必备的桥梁。此次实习中,也使我确实感受到了团队精神的作用。每个人,生活在这个社会中,都必须随时处于一个团队中,不可能孤立存在,我们能够顺利完成此次实习,与大家的努力与协作是分不开的。虽然在实习期间,我们没有真正接触到实际的外贸业务,但是老师告诉我们,每一笔买卖都不是个人能够完成的,都是大家各司其职,齐心协力的结果。所以一定要重视团队协作精神。只有这样我们才更好地解决我们与老师在教学的过程中的冲突。更好地解决我们对知识的理解。

三、对实习的意见和建议

前面已经提到过,实习的软件需要更一步提升,能够更切实际;其次,加强实习纪律管理,虽然是在机房里面实习,但也要像是在真正工作了一样,要制定一下出勤和业绩考核标准,虽然我们都是自觉地遵守,但仍不免让人感觉到群龙无首;最后,就是建立一个鼓励大家提出问题和解决问题制度,这样才能让大家在实习过程中更好地交流,遇到的问题能更好更快地解决。

总之,此次实习是非常圆满地完成了。我也深深地感受到了,作为一门从事国际贸易业务方面的工作人员来说,对自己的业务熟悉、理论知识扎实、语言基础好这些都是基本的要求,同时我也深深地认识到国际贸易实务是一门综合性的学科,与其他课程内容紧密相联,应该将各门知识综合运用,比如讲到商品的品质、数量和包装内容时就应去了解商品学科的知识;讲到商品的价格时,就应去了解价格学、国际金融及货币银行学的内容;讲到国际货物运输、保险内容时,就应去了解运输学、保险学科的内容;讲到争议、违约、索赔、不可抗力等内容时,就应去了解有关法律的知识等等。

展开阅读全文

篇8:纺织外贸实习心得

范文类型:心得体会,适用行业岗位:外贸,全文共 532 字

+ 加入清单

通过本次的实习,我还发现自己以前学习中所出现的一些薄弱环节,并为今后的学习指明了方向,同时也会为将来的工作打下一个良好的基础。之前,每次填单总是填不完整,而且会出现很多的小错误,经过这次的训练,我已经可以比较正确的填制一些必要的单据。虽然我们还未真正参与到业务中,只是做一些简单的工作,如填单,但这次的实习为我们提供了一个很好的锻炼机会,使我们及早了解一些相关知识以便以后运用到以后的业务中去。

通过这次的实习,我们可以熟练掌握实务的基本流程,同时让我懂得只有通过刻苦的学习,加强对业务知识的熟练掌握程度,在现实的工作中才会得心应手,应对自如。

总体来说,这次实习不仅仅是锻炼了我在贸易操作方面的一些技能,同时,经过这次实习,我还从中学到了很多课本上所没有提及的知识,还有就是在就业心态上我也有很大的改变,以前我总想找一份适合自己爱好,并且专业对口的工作。

可现在我们都知道找工作很难,要专业对口更难,很多东西我们初到社会才接触、才学习。所以我现在要建立起先就业再择业的就业观。应尽快学会在社会上独立,敢于参加与社会竞争,敢于承受社会压力,使自己能够在社会上快速成长。总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,实习都将成为我人生中一笔重要的资本。

展开阅读全文

篇9:出口贸易合同范本_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 570 字

+ 加入清单

出口贸易合同范本

卖方:____

合同号码:____

买方:____

双方同意按下列条款由卖方出售,买方购进下列货物:

───────────────┬────────┬─────┬─────

(1)货物名称、规格、包装及唛头 │ (2)数量 │ (3)单价 │(4)总值

───────────────┼────────┼─────┴─────

包装:小捆70~120千克及/或大 │卖方有权在3%以内│上述价格内包括给买方佣

捆500~1000千克 │多装或少装 │金 %按fob值计算

───────────────┴────────┴───────────

(5)装运期限:

(6)装运口岸:

(7)目的口岸:

(8)保险:由卖方按发票金额110%投保

(9)付款条件:买方应通过买卖双方同意的银行,开立以卖方为受益的人,不可撤销的、可转让和可分割的、允许分批装运和转船的信用证。该信用证凭装运单据在中国的中国银行见单即付。

该信用证必须在__前开出。信用证有效期为装船后十五天在中国到期。

(10)单据:卖方应向议付银行提供已装船清洁提单、发票,装箱单/重量单:如果本合同按cif条件,应再提供可转让的保险单或保险凭证。

(11)装运条件:

1)载运船只由卖方安排,允许分批装运并允许转船。

2)卖方于货物装船后,应将合同号码、品名、数量、船名、装船日期以电报通知买方。

展开阅读全文

篇10:大班艺术领域活动流程设计方案

范文类型:方案措施,适用行业岗位:设计,全文共 1558 字

+ 加入清单

活动目标:

1.通过多通道的参与,激发幼儿感谢自然的情感。

2.乐意用绘画的形式表现自己的想法。

3.体验与同伴合作的快乐。

活动准备:自然风光图片幻灯;雨伞3把;颜料、画笔若干。

活动过程:

一、听音乐、看图片,感受大自然的美,激发幼儿对自然的感恩之心。

1.听音乐入场:让我们听着这美妙的音乐,一起去欣赏大自然美丽的风景吧。

2.看图片,提问:你看到了大自然中的哪些美景?(温暖的阳光、晶莹的露珠、五彩缤纷五颜六色的鲜花、绿油油柔软的草地、茂密的森林、潺潺的流水、广阔的大海、可爱勤劳的动物们……学一学小朋友好听的词语)它们会给我们带来什么?

3.教师小结:我们每个人都应该感谢大自然,感谢阳光给予我们温暖,感谢雨露滋养生命,感谢森林给予我们清新的空气;感谢河流给予我们生命的源泉;感谢小鸟给我们带来动听的歌声;感谢花朵为我们装扮生活……生活在这么和谐的自然中,你觉得幸福吗?我们应该用什么样的行动来感谢、保护大自然呢?

4.幼儿相互讨论,个别回答。

5.教师启发幼儿用宣传画的方式记录幼儿的想法。

师:如果我们把这些好的想法画下来并展示给大家看,相信一定会有更多的人乐意用自己的行动来感谢大自然。

评析:在本环节的活动中,教师用了大量内容丰富的风景图片,让幼儿通过视觉的美的享受来激发了幼儿内心对美的向往,同时通过教师的引导,让幼儿充分认识到了自然赋予了人类及一切生物的生存根本,从细微处入手,激发幼儿内心对自然的感恩的情感。

二、出示操作材料,幼儿合作完成伞面宣传画。

1.出示材料,提出活动要求。

师:看看老师带来了什么?(伞)今天我们用请小朋友相互合作在伞面上画出我们感谢大自然的行动。

(1)数一数每把伞都有几个伞面,可以邀请几位小朋友来合作绘画。

(2)邀请同伴并围成圆圈坐下。

(3)和同伴讨论决定你们小组绘画的主题。

(4)需要和同伴沟通自己的想法,作品要完整,每个小朋友分配任务完成画的一部分。

2.幼儿邀请同伴并相互商量合作内容,确定合作主题,合理分工。

评析:幼儿在平时的绘画活动中,总是从与同伴的相互启发、讨论、学习中来完成自己的作品。因此在这个环节中,教师就从幼儿自身的兴趣与特点出发,以合作在伞面画宣传画的集中绘画方式,通过商量绘画主题、确定分工,来达到培养幼儿的合作精神和交往能力的目标,同时,邀请同伴并与同伴沟通自己的想法又从隐性的层面,让幼儿学习了一种新的交往方式。

3.幼儿合作完成宣传画,教师指导个别幼儿合理布局。

评析:在本环节的活动中,兼顾了情感、知识、技能等方面的内容,教师善于发现孩子的兴趣点,鼓励他们大胆说、大胆想、大胆做,使幼儿在整个活动中都处于主体地位,充分体现了幼儿的主体性、积极性和创造性。

三、展示幼儿成果,并请小组代表介绍作品内容。

1.将幼儿完成的作品集中展示。

2.请每个小组推荐一位代表来介绍你们画的主题是什么?想要宣传什么?

评析:在本环节的活动中,教师让幼儿通过民主推荐的方法决定了介绍的代表,让幼儿在平等和谐的氛围中学习了合作、交往的技能。

四、向周围的同伴宣传感谢自然的行动,愉快结束活动。

师:让我们撑起这把特殊的感谢自然宣传伞,把我们的行动宣传给其他的小朋友听吧,让我们一起出发!

评析:美术是幼儿表达自己的认识和情感的重要方式,艺术表达是自由的表达是创造性的表达。正是这样的教育理念促使了幼儿在绘画活动中大胆地表达自己的情感,发展了幼儿的社会适应能力,包括幼儿的交往能力和行为习惯。在本次活动中,孩子用绘画的方式,感恩自然,告知同伴这些都是与自然、同伴交往的方法,体现出良好的情感态度和社会适应能力。从幼儿的画面与讲述可以看出,幼儿都有着积极乐观的情感态度,真切自然的表达方式,童真美好的心灵愿望。

活动延伸:在日常生活中注重从小事做起,珍惜自然资源,关爱自然生物,努力用行动创造和谐的自然环境。

展开阅读全文

篇11:2024年外贸总结开头_工作总结开头_网

范文类型:工作总结,适用行业岗位:外贸,全文共 529 字

+ 加入清单

2020年外贸总结开头

伴随着新年钟声的临近,我们依依惜别了20xx年,满怀热情的迎来了充满希望的20xx年。在这年终之际,现对来公司九个月的时间里所作的工作汇报如下:

20xx年即将画上圆满的句号,这一年是我人生的一个转折点。由一名学生转型为社会人士,在机遇与挑战共存的竞争时代,我开始了自己的追梦生涯。回顾这三个月与新起点同行的点滴,颇有感触,现将工作以来的感受和工作体会总结如下。

时间飞逝,不知不觉来到公司已经半年了,就快到过年的时候了。记得刚来的时候,由于经验的缺乏,是即兴奋又担心。最初是抱着学习和锻炼的态度来到这里的。。半年下来,觉得自己学到了很多,也进步了很多,在生活和工作上都有了一个全新的体验。虽然没有什么大的贡献,但也算经历了一段不平凡的考验。在此,当然首先非常感谢公司给我这个机会,让我在工作中不断地学习,不断地进步,慢慢提升自身的素质,同时也非常感谢大家在这段时间对我的帮助。

工作已经有两个月了,渐渐地由对外贸行业的新奇转入到琐碎的细节中。2。刚进公司的时候,我是有些忐忑的,一方面来自其他外贸业务员的描述:耐力,压力,还要考验反应力。另一方面来自对这个行业的陌生,虽然在学校系统的学过,但那也只能作为实战的参考借鉴。我知道挑战已经开始。

展开阅读全文

篇12:进出口租赁合同书

范文类型:合同协议,适用行业岗位:外贸,全文共 2375 字

+ 加入清单

合同编号:_________

委托方:_________(以下简称“甲方”)

法定代表人:_________

地址:_________

邮编:_________

经办人:_________

电话:_________

传真:_________

受托方:_________(以下简称“乙方”)

法定代表人:_________

地址:_________

邮编:_________

经办人:_________

电话:_________

传真:_________

甲乙双方本着自愿平等、公平合理的原则,经友好协商,就甲方委托乙方办理进出口货物报关事宜,双方一致同意订立以下合同条款,以供双方共同遵照执行:

一、甲方委托乙方办理的进出口货物的具体明细,由甲方另以书面的方式提供给乙方,并应在货物装船前_________日、装飞机前_________日、船舶抵港前_________日或飞机抵港前_________日前将以下材料或信息提供给

乙方:

1.合同;

2.发票;

3.装箱单;

4.提单、空运单或其他运输单证;

5.提货单;

6.货物的hs编码;

7.贸易性质;

8.手册,批件,如进出口许可证,配额证,免税表,证明等;

9.报关要求及注意事项;

10.报关所需的其他资料。

二、乙方作为甲方的报关代理人,应在甲方的授权范围内进行活动,认真履行职责,维护甲方的合法权益。

乙方在代理权限内的任何责任和费用都应由甲方承担。

乙方只对因自身的过失与疏忽给甲方造成的直接损失负有责任。

三、甲方需要变更有关报关等事项的,应在报关前提出,并应出具书面的变更通知书。

报关后有正当理由需要更改的,甲方应书面委托乙方协助办理。

由于变更引起的一切费用和后果由甲方承担。

四、甲方必须保证报关货物不属于国家禁止或者限制进出境的物品。

否则,甲方应对由此产生的一切后果承担责任和费用,并对由此给乙方造成的损失负赔偿责任。

五、甲方应保证申报的内容均真实、准确、无欺诈,且与报关单上的内容一致。

如委托的内容与报关单有出入,以报关单为准,甲方应承担由于委托内容与报关单不一致而产生的一切责任,并对由此给乙方造成的损失负赔偿责任。

六、甲方有权对乙方的报关行为进行监督,有权要求乙方对于报关进展情况及时汇报。

乙方应及时向甲方报告货物的报关、报检及报验等信息。

七、对于进口货物,甲方是进口货物的海关关税、海关监管手续费.代征增值税的义务缴纳人。

如甲方书面委托乙方代付,甲方应在乙方报关前根据乙方估算的数额将上述款项汇至乙方账户,以便乙方代甲方在纳税期限内向海关缴纳。

否则,乙方无义务为甲方垫付前述费用。

八、甲方如对海关开征的税额款有异议,应按《海关法》的规定办理,先缴纳后申请减免,手续费自负。

乙方应积极协助甲方办理退税手续,手续费由甲方承担。

九、乙方应收取的具体每票业务的报关、报检和报验等费用标准和结算方式,详见《报价及结算单》,《报价及结算单》为本合同的附件,是本合同不可分割的一部分。

《报价及结算单》中的内容甲、乙双方可根据情况进行变更,变更经双方书面确认后方可生效。

变更生效前所发生的业务,仍按原《报价及结算单》的标准执行。

若单票业务的委托书中的费用标准与《报价及结算单》不一致的,按该票委托书中的标准处理本票业务。

对于《报价及结算单》和委托书中均没有约定的乙方应收费项目,双方另行协商处理。

十、甲方应按合同的约定履行付款义务,每逾期一天,应向乙方支付未付部分万分之五的违约金。

若甲方指定第三方付款的,如第三方拒付、少付、延期付款的,甲方仍有付款义务并承担违约责任。

一、对于甲方委托乙方代付海关关税、海关监管手续费、代征增值税的业务,甲方应在乙方指定的期限内将该税费付至乙方指定的账户,最后据实结算,多退少补。

其他费用如报关滞报金、船公司、航空公司及货代调单费等按实际发生额收取,甲、乙双方另行结算。

十二、在甲方未按照合同约定支付乙方费用时,乙方有权滞留相应的运输单据或货物,由此产生的所有损失和责任由甲方承担。

十三、由于海关、卫生检疫、动植检部门的审核、查验等原因造成乙方报关、报检、报验等延误的,所产生的疏港费、集装箱超期使用费及其他额外费用均由甲方承担,与乙方无关。

十四、由于海关的原因致使货物被扣押或者报关滞后的,乙方应积极协助甲方同海关进行交涉,由此产生的损失和费用由甲方承担。

十五、如因甲乙双方的过失致使合同不能履行,给双方造成了实际损失,应根据实际情况,由双方分别承担各自的责任。

十六、由于地震、台风、水灾、战争、政府政策的改变以及其他不能预见并且对其发生和后果不能防止或者避免的不可抗力事故,致使货物被扣、不能报关或者报关滞后,遇有上述不可抗力事故的一方应立即将事故情况通知对方,并应在日内,提供事故详情及合同不能履行的有效证明文件。

按照事故对履行合同影响的程度,由双方协商决定是否解除合同,或者部分免除履行合同的责任,或者延期履行合同。

十七、本合同项下发生的任何纠纷或者争议,双方首先就友好协商解决。

协商不成的,提交上海仲裁委员会根据该会的仲裁规则进行仲裁。

仲裁裁决是终局的,对双方都有约束力。

十八、本合同的订立、效力、解释、履行、争议的解决均适用中华人民共和国法律。

十九、本合同经甲.乙双方签字盖章之日起生效,合同有效期为一年。

本合同期满之日前,甲、乙双方如无异议,则自动延长一年。

任何一方均可在期满前提出终止合同,但应以书面方式通知另一方。

二十、经甲、乙双方协商一致,可对本合同进行修改和补充,修改及补充的内容经双方签字盖章后作为本合同的组成部分。

二十一、本合同一式两份,甲、乙双方各执一份,两份具有同等法律效力。

甲方:_________(盖章)

乙方:_________(盖章)

代表:_________(签字) 代表:_________(签字)

_____年____月____日 _________年____月____日

展开阅读全文

篇13:中国深圳对外贸易货物出口合同_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 7852 字

+ 加入清单

中国深圳外贸货物出口合同

合同编号:_________

签订日期:_________

签订地点:_________

卖方:_________

买方:_________

经买双方确认根据下列条款订立本合同:

1、

┌────┬────────┬────┬────┬─────┬──────┐

│货号 │ 名称及规格 │ 单位 │ 数量 │ 单价 │ 金额 │

│ │ │ │ │ │ │

├────┼────────┼────┼────┼─────┼──────┤

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │合计: │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

├────┴────────┴────┴────┴─────┴──────┤

│总值(大写): │

│ │

└────────────────────────────────────┘

允许溢短_________%

2、成交价格术语:_________(fob cfrcif ddu_________)

3、包装:_________

4、装运唛头:_________

5、运输起讫:由_________经_________到

6、转运:允许 不允许;分批装运:允许不允许

7、装运期:_________

8、保险:由_________按发票金额110%投保_________险,另加保_________险至_________为止。

9、付款条件:

买方不迟于_________年_________月_________日前将100%的货款用即期汇票/电汇送抵卖方。

买方须于_________年_________月_________日前通过_________银行开出以卖方为受益人的不可撤销_________天期信用证,并注明在上述装运日期后_________天在中国议讨有效,信用证须注明合同编号。

付款交单:买方应对卖方开具的以买方为付款人的见票后_________天付款跟单汇票,付款时交单。

承兑交单:买方应对卖方开具的以买方为付款人的见票后_________天承兑跟单汇票,承兑时交单。

10、单据:卖给方应将下列单据提交银行议付/托收。

整套正本清洁提单。

商业发票一式_________份。

装箱单或重量单一式_________份。

由_________签发的质量与数量证明书一式_________份。

保险单一式_________份。

由_________签发的产地证一式_________份。

11、装运通知:装运完毕,卖方应即电告买方合同号、品名、已装载数量,发票总金额,毛重,运输工具名称及启运日期等。

12、检验与索赔:

卖方在发货前由_________检验机构对货物的品质、规格和数量进行检验,并出具检验证明书。

货物到达目的的口岸后,买方可委托当地的商品检验机构对货物进行复检。如果发现货物有损坏、残缺或规格、数量与合同规定不符,买方须于货到目的口岸的_________天内凭_________检验机构出具的检验证明书向卖方索赔。

如买方提供索赔,凡属品质异议须于货到目的的口岸之日起_________天提出;凡属数量异议须于货到目的口岸之日起_________天提出。对所装货物所提任何异议应由保险公司、运输公司或邮递机构负责的,卖方不负任何责任。

13、人力不可抗拒:如因人力不可抗拒的原因造成本合同全部或部分不能履约,卖方概不负责,但卖方应将上述发生的情况及时通知买方。

14、争议之解决方式:任何因本合同而发生或与本合同有关的争议,应提交中国国际经济贸易仲裁委员会,按该会的仲裁规则进行仲裁。仲裁地点在中国深圳。仲裁裁决是终局的,对双方均有约束力。

15、法律适用:本合同之签订地、或发生争议时货物所在地在中华人民共和国境内或被诉人为中国法人的,适用中华人民共和国法律,除此规定外,适用《联合国国际货物销售公约》。

16、文字:本合同中、英两种文字具有同等法律效力,在文字解释上,若有异议,以中文解释为准。

17、附加条款(本合同上述条款与本附加条款有抵触时,以本附加条款为准):_________

18、本合同共_________份,自双方代表签字(盖章)之日起生效。

卖方(盖章):_________ 买方(盖章):_________

代表人(签字):_________ 代表人(签字):_________

附件:china shenzhen foreign trade sales contractdate:_________signed at :_________the sellers:_________the buyers:_________the undersigned sellers and buyers have confirmed this contract in accordance with the terms and conditions stipulated below :

1、

┌────┬────────┬────┬────┬─────┬──────┐

│art no. │ descriptions │ unit │quantity│unit price│ amount │

├────┼────────┼────┼────┼─────┼──────┤

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │ │

│ │ │ │ │ │totally: │

│ │ │ │ │ │ │

├────┴────────┴────┴────┴─────┴──────┤

│ │

│total value:(in words) │

└────────────────────────────────────┘

_________% more or less in quantity and value allowed.

2、terms: _________(fob cfrcif ddu_________)

3、packing:_________

4、shipping marks:_________

5、shipment from _________to _________

6、tran shipment:allowednot allowed;partial shipments: allowed not allowed

7、shipment date:_________

8、insurance : to be covered by the _________ for 110% of the invoice value covering _________ additional _________ form _________ to _________

9、terms of payment:

he buyers shall pay 100% of the sales proceeds through sight(demand)draft/by t/t remittance to the sellers not later than _________

the buyers shall issue an irrevocable l/c at_________ sight through _________ in favour of the sellers prior to _________ indicating l/c shall be valid in china through negotiation within_________day after the shipment effected , the l/c must mention the contract number.

documents against payment: (d/p)the buyers shall duly make the payment against documentary draft made out to the buyers at _________days by the sellers.

documents against acceptance(d/a)the buyers shall duly accept the documentary draft made out to the buyers at _________days by the sells.

10、documents require:the sellers shall present the following documents required for negotiation/collection to the banks.

full set of clean on board ocean bills of lading.

signed commercial invoice in _________ copies.

packing list/weight memo in_________copies.

certificate of quantity and quality in_________copies issued by

insurance policy in_________copies.

certificate of origin in _________copies issued by

11、shipping advice : the sellers shall immediately , upon the completion of the loading of the goods , advise the buyers of the contract no , names of commodity , loaded quantity , invoice values , gross weight , names of vessel and shipment date by tlx/fax.

12、the buyers shall have the qualities , specifications , quantities of the goods carefully inspected by the _________inspection authority , which shall issue inspection certificate before shipment.

the buyers have right to have the goods inspected by the local commodity inspection authority after the arrival of the goods at the port of destination. if the goods are found damaged / short / their specifications and quantities not in compliance with that specified in the contract, the buyers shall lodge claims against the sellers based on the inspection certificate issued by the commodity inspection authority within _________ days after the goods arrival at the destination.

the claims , if any regarding to the quality of the goods shall be lodged within _________ days after arrival of the goods at the destination , if any regarding to the quantities of the goods , shall be lodged within _________days after arrival of the goods at the destination . the sellers shall not take any responsibility if any claims concerning the shipping goods is up to the responsibility of insurance company / transportation company /post office.

13、force majeure : the sellers shall not hold any responsibility for partial or total non-performance of this contract due to force majeure . but the sellers shall advise the buyers on times of such occurrence.

14、disputes settlement : all disputes arising out of the contract or in connection with the contract , shall be submitted to the china international economic and trade arbitration commission for arbitration in accordance with its rules of arbitration in shenzhen , china . the arbitral award is final and binding upon both parties.

15、law application :it will be governed by the law of the peoples republic of china under the circumstances that the contract is singed or the goods while the disputes arising are in the peoples republic of china or the deffendant is chinese legal person , otherwise it is governed by united nations convention on contract for the international sale of goods.

16、versions : this contract is made out in both chinese and english of which version is equally effective .conflicts between these two language arising therefrom . if any , shall be subject to chinese version .

17、additional clauses : _________(conflicts between contract clause here above and this additional clause , if any , it is subject to this additional clause)

18、this contract is in _________ copies , effective since being signed/sealed by both parties.the sellers(seal):_________ the buyers(seal):_________representative(signature):_________ representative(signature):_________

展开阅读全文

篇14:进口合同样式一[页3]_合同范本

范文类型:合同协议,适用行业岗位:外贸,全文共 1132 字

+ 加入清单

进口合同(样式一)

(14)不可抗力:由于人力不可抗拒事故,使卖方不能在合同规定期限内交货或者不能交货,卖方不负责任。但卖方必须立即以电报通知买方,并以挂号函向买方提出有关政府机关或者商会所出具的证明,以证明事故的存在。由于人力不可抗拒事故致使交货延期一个月以上时,买方有权撤销合同。卖方不能取得出口许可证,不得作为不可抗力。

(15)延期交货及罚款:除本合同第(14)条人力不可抗拒原因外,如卖方不能如期交货,买方有权撤销该部分的合同,或经买方同意在卖方缴纳罚款的条件下延期交货。买方可同意给予卖方15天的优惠期。罚款率为每10天按货款总额的1%。不足10天者按10天计算。罚款自第16天起计算,最多不超过延期货款总额的5%。

(16)仲裁:一切因执行本合同或与本合同有关的争执,应由双方通过友好方式协商解决。如经协商不能得到解决时,应提交北京中国国际贸易促进委员会对外贸易仲裁委员会,按照中国国际贸易促进委员会对外贸易仲裁委员会仲裁程序暂行规则进行仲裁。仲裁委员会的裁决为终局裁决,对双方均有约束力。仲裁费用除非仲裁委员会另有决定外,由败诉一方负担。

(17)附加条款:以上任何条款如与以下附加条款相抵触时,以以下附加条款为准。

买方:__(盖章)

代表人:__(签字)

卖方:__(盖章)

代表人:__(签字)

__年__月__日订立

成套设备进口合同样本

目录

第一章 定义

第二章 合同范围

第三章 价格

第四章 支付

第五章 交货与交货条件

第六章 包装与标记

第七章 设计与设计联络

第八章 标准与检验

第九章 安装、试车和验收

第十章 保证、索赔和罚款

第十一章 侵权和保密

第十二章 不可抗力

第十三章 税费

第十四章 仲裁

第十五章 合同生效、终止及其他

第十六章 法定地址

附件

附件一 合同的供货范围和合同产品的内容(略)

附件二 “合同工厂”的规范及技术条件(略)

附件三 技术资料的内容及交付日期(略)

附件四 合同的分项价格(略)

附件五 卖方技术人员的服务范围和待遇条件

附件六 买方技术人员的培训范围和待遇条件

附件七 卖方银行不可撤销的保证函(略)

附件八 买方银行不可撤销的保证函(略)

成套设备公司 合同编号:____

签字日期:____

签字地点:____

中国,北京,中国技术进出口总公司(以下简称买方)为一方与__国,__市,__公司(以下简称卖方)为另一方,双方授权代表同意就下列条款签订本合同:

第一章 定义

1.1 “买方”--是指中国技术进出口总公司,或者该公司的法人代表、代理和财产继承者。

1.2 “卖方”--是指__国__公司,或者该公司的法人代表、代理和财产继承者。

共17页,当前第3页1234567891011121314151617

展开阅读全文

篇15:商务局外贸工作总结范文_商务工作总结_网

范文类型:工作总结,适用行业岗位:商务,外贸,全文共 1972 字

+ 加入清单

商务外贸工作总结范文

一、继续大力推进开展“家电下乡”工作

为进一步贯彻落实财政部、商务部加强家电下乡监管,防止骗补的要求,认真开展家电下乡“监管年”活动,确保财政资金安全,确保惠民政策落实到位。今年我局联合财政局采取了定期检查和不定期抽查相结合的方式,加强对家电下乡网点的监管。全年累计检查20多次,共查处违规资金20万元,有效的保障了财政资金安全和防止骗补现象的发生。

截止到11月5日,销售家电下乡产品8636台(件),销售金额1788.61万元,兑付补贴资金232.52万元,销售摩托车460台,销售金额211.15万元,兑付补贴资金27.45万元,销售汽车35辆,销售金额104.92万元,补贴资金13.64万元。“家电下乡”销售额名列全州各县市前列,在全市5月底省商务厅、省财政厅“家电下乡”补贴资金检查中,获得省厅的好评。

二、积极开展做好“家电以旧换新”工作

“家电以旧换新”工作是继家电下乡后国家实施的又一项重大惠民利民政策。我局高度重视,认真做好企业备案及资料初审工作,全市共备案销售、回收企业105家。截止到11月份,我市家电以旧换新累计销售21900台,销售金额8104.2万元,补贴资金493.29万元,回收旧家电23772台。

三、全力推进开展“万村千乡”市场工程

为继续推动农村消费市场、打造农家店营销水平,今年州商务局分配我市建设“万村千乡”农家店15家的任务,为了完成该任务,我们对全市所在乡镇进行摸底调查,会同永顺家家乐超市一家一家上门改造装修,完成农家店15家,覆盖全市所有乡镇,圆满完成州分任务。

四、狠抓食品安全,加强生猪定点屠宰管理

为了让市民吃上“放心肉”,今年我们结合我市实际、牵头起草、市人民政府出台了《吉首城区生猪屠宰管理办法》。我们继续加强定点屠宰稽查,加强对超市、学校食堂、宾馆酒店等集体伙食的用肉管理,督促市定点屠宰场加强内部卫生及生猪来源、检疫检验的管理,打击私屠滥宰,防止了矮寨私宰死灰复燃。今年定点屠宰生猪目标管理10.3万头,已完成7.6万头,防止了税费流失,市民吃上了“放心肉”。

五、突出商贸物流中心建设

围绕市委、市政府打造吉首“旅游、商贸、工业、科教文化”四个中心的目标,今年四月我市成立了以市人大常委会主任吴文钊为组长,市人大市政府分管领导为副组长,发改、商务、规划、国土等部门主要领导为成员的吉首市发展商贸物流业领导小组,进一步发展现代商贸物流业,主要做好以下几项工作:

(一)完成了商贸物流中心建设可行性论证中心方案。我们结合吉首实际,于三月份制订了《吉首市商贸物流中心建设方案》,提出了发展总体思路和发展目标,到2020年实现社会消费品零售总额200亿元,年均增长17%,明确了工作重点,建立保障措施。今年四月初,我们与湖南商学院签订协议,委托该院对我市建设商贸物流中心进行可行性论证。该院组织了以贺康庄教授、肖文金副教授的专家团队,到吉首进行了调研,先后考察了怀化、张家界及贵州铜仁,研究了浙江义乌、山东临昕、武汉汉正街、长沙高桥大市场、株州芦松市场等全国最具影响力的批发市场、物流中心后,编制了可行性研究报告,已形成文本。

(二)编制出吉首物流业发展规划。6月下旬,经过考察比较,我们委托处于全国物流业发展发达地区,位居国内商贸物流业研究前沿、曾经为国内多个地区编制过商贸物流规划、编制质量高的中山大学编制我市物流业发展规划,该课题组于8月份和11月上旬先后二次来我市和四省边区调研,现正在对初稿进行修改完善,预计11月底可完稿。

(三)加快物流园区建设。今年我们将发展物流业、加快物流园建设这一新型业态作为工作重点。目前已完成《吉首肉类加工冷藏保鲜》、《大湘西矿产品物流园建设工程》等三个项目可行性论证报告。二个物流园重点项目正在建设中:一是大湘西物流城建设项目,于今年2月成立了大湘西物流城开发有限公司,注册资本xx万元,由湖南中翔投资管理有限公司及彭任军两位自然人股东组成。

该项目内设矿产品物流园(项目总投资4983.8万元)、建材物流园(项目总投资4990.5万元)、仓储配送中心(项目总投资4993.8万元),目前该项目的矿产品物流园已在市发改委立项,建材物流园和仓储配送中心在立项申报,项目用地指标在省国土资源厅报批。

二是湘西农产品物流中心建设项目,该项目由国家、省、州、市四级共建,项目总投资5亿元,占地400亩,规划为两部分,第一部分为蔬菜水果交易中心项目区,即吉首市蔬菜果品批发大市场升级改造项目,占地100亩,由州、市共建,湘西五里牌蔬菜果品有限责任公司负责实施,已投资500万元,新征土地21亩,完成市场南大门的土建、电动门、电子地磅、电子显示屏建设,农产品全国联网报价系统等设备已安装调试完成并启用,二期24亩土地的三通一平建设正在实施。

共2页,当前第1页12

展开阅读全文

篇16:外贸实习小结

范文类型:工作总结,适用行业岗位:外贸,全文共 1284 字

+ 加入清单

(1)坚持理论联系实际 将《商务英语谈判》〈国际贸易单证〉《英语口语》等课程中所学到的基础理论和基本政策加以具体运用。力求做到理论与实践、政策与业务有效地结合起来,不断提高分析与解决实际问题的能力。认真观察业务流程,积极和同事交流 虚心请教学习,学习与客户沟通,开发市场。

(2)加强英语的学习 对于外贸专业人员而言,不仅要掌握一定的专业知识,而且还必须会用英语与外商沟通、谈判及函电等。如果专业英语知识掌握不好,就无法开展工作,甚至会影响业务的顺利进行。因此,在实习中大胆与客户交流,边巩固所学知识,边学习工作中遇到的外贸英语知识,掌握外贸专业术语基础。

(3)注意本课程同其他相关课程的联系 外贸英语是一门综合性的学科,与其他课程内容紧密相联。应该将各们知识综合运用。比如法律,比如商品学 比如营销学,在实习期间发现这些对开展工作的用处很大,这就要求我们广泛博览其他相关学科的书籍,多和同事、上级沟通 关注外贸当面的新发展,不断提高业务能力。

(4)坚持学以致用 外贸英语是一门实践性很强的应用学科。实习中深有体会,许多书本中学的东西想要发发挥其作用 需要广泛积极的应用于外贸交流中,处理工作事务中学习到很多书本没有讲的知识 ,可见 学以致用在这门学科里的重要性。基本的业务 流程 就得从找客户开始。寻找客户是一门颇深的学问,要下一番苦功夫才行,运气好的另当别论。当然要回答客户的问题,给客户报价等应该要具备一些基本的 国际贸易 知识。我上个学期学的 国际贸易 实务让我对 国际贸易 方面的 术语 并不陌生。目前为止,虽然自我感觉有些客户稍有眉目,但是稍一不慎就前功尽弃。只有找到了客户,下了订单,签订了合同,才有后面一系列制单结汇等 流程 。由于本人才疏学浅,目前尚属初级阶段――找客户阶段。

实习总结

我通过一段时间的摸索摸索,总结出摆正心态的重要性 ,冷静分析,从自身查找原因,采取有效措施。树立一个辩证的挫折观,保持自信和乐观的态度,正是失败本身才最终造就了成功。学会自我宽慰,能容忍挫折,要心怀坦荡,情绪乐观,善于化压力为动力,改变内心的压抑状态,以求身心的轻松,重新争取成功。 接待客户,收发处理邮件 制发文件等工作要做到积极主动,认真 负责。 还有与领导谈话要注意言语场合 ,正确理解领导意图。

通过实习,加深了我对外贸英语知识的理解,提高了我的实践能力,掌握了更为实际的外贸知识,锻炼了办事能力,了解了社会。 通过实习,发现了自己的不足,我会在以后的工作学习中更加努力,取长补短,需心求教。相信自己会在以后的工作中更加用心,表现更加出色!不管从事什么工作都会努力! 对于公司的不足,暂时还没什么想法,可能是自己观察不够。以后我会在这方面有所留心,争取多发现问题,解决问题,有好的想法会及时和大家交流。

工作中也会遇到一些问题的,遇到的问题及建议解决方案与上司沟通不好;版权归属原作者上司给的某份工作感觉无从下手;谢谢合作。对琐碎重复的工作感到厌倦。

在XX年,我希望自己能掌握更多业务能力,当我们能独挡一面的时候,相信也会是公司壮大的时候。来年的我们都会越来越好!

展开阅读全文

篇17:2024年外贸公司实习报告

范文类型:汇报报告,适用行业岗位:外贸,企业,全文共 5720 字

+ 加入清单

一、国际贸易

(一)国际贸易(InternationalTrade)国际贸易亦称"世界贸易",泛指国际间的商品和劳务(或货物、知识和服务)的交换。它由各国(地区)的对外贸易构成,是世界各国对外贸易的总和。国际贸易在奴隶社会和封建社会就已发生,并随生产的发展而逐渐扩大。到资本主义社会,其规模空前扩大,具有世界性。

(二)对外贸易(ForeignTrade)对外贸易亦称"国外贸易"或"进出口贸易",是指一个国家(地区)与另一个国家(地区)之间的商品和劳务的交换。这种贸易由进口和出口两个部分组成。对运进商品或劳务的国家(地区)来说,就是进口;对运出商品或劳务的国家(地区)来说,就是出口。这在奴隶社会和封建社会就开始产生和发展,到资本主义社会,发展更加迅速。其性质和作用由不同的社会制度所决定。

二、国际贸易和对外贸易

(一)、国际贸易(InternationalTrade)国际贸易亦称“世界贸易”,泛指国际间的商品和劳务(或货物、知识和服务)的交换。它由各国(地区)的对外贸易构成,是世界各国对外贸易的总和。国际贸易在奴隶社会和封建社会就已发生,并随生产的发展而逐渐扩大。到资本主义社会,其规模空前扩大,具有世界性。

(二)、对外贸易(ForeignTrade)对外贸易亦称“国外贸易”或“进出口贸易”,是指一个国家(地区)与另一个国家(地区)之间的商品和劳务的交换。这种贸易由进口和出口两个部分组成。对运进商品或劳务的国家(地区)来说,就是进口;对运出商品或劳务的国家(地区)来说,就是出口。这在奴隶社会和封建社会就开始产生和发展,到资本主义社会,发展更加迅速。其性质和作用由不同的社会制度所决定。

毕业生外贸跟单员实习报告范文

时间飞逝,三年的大学生活已经接近尾声了,我即将踏入社会。在大学的三年时间里我无论是在理论知识方面,还是人文素质方面都有全面的提高,我要在社会实践中充分运用所学的知识,争取更大的进步。

我们明白实习是大学教育中一个极为重要的实践性环节,透过实习,能够使我们在实践中接触与本专业相关的一些实际工作,培养和锻炼我们综合运用所学的基础理论、基本技能和专业知识,去独立分析和解决实际问题的潜力,把理论和实践结合起来,提高我们的实际动手潜力,为将来我们毕业后走上工作岗位打下必须的基础。我在校园学习的专业是会计,本想找一份与专业相关的会计工作,但经过20多天的应聘都没有结果,无奈之下选取了外贸跟单员。但经过这次外贸的学习,我从无知到认知,到深入了解,渐渐地喜欢上这份实习工作,它让我深刻的体会到学习的过程是最美的,在整个实习过程中,我每一天都有很多的新的体会,新的想法。

一、实习单位简介

工艺品有限公司系中国澳门商人曾国伟先生投资兴建的外商独资企业,成立于20__年10月,于20__年07月正式投产。它坐落于素有“鱼米之乡”的江汉平原、武汉经济圈的汉川经济开发区人民大道53号,总投资人民币3000万元,其中注册资本人民币2100万元,是湖北省目前唯一一家专业从事工艺品设计、开发、生产、外销的大型外商独资企业。

公司占地100亩,拥有2万平方米的大型现代化厂房,员工600余人,其中各类专业技术人员100多名,各种国内外先进生产设备100余台(套)。主要生产“满天星”(“starry”)牌玻璃餐具、GT像框等工艺品(相框、镜框、果盘、烛台及文具、礼品系列)、工艺艺术时钟,精雕板画、水晶、石雕及卫浴面镜等系列产品,并承接玻璃产品深加工业务,产品主要外销欧美、中东及国内经济发达城市。公司在阿联酋迪拜设销售分公司,在武汉、北京、浙江、上海、深圳等地设营销办事处,全国其它各地的销售网络日臻完善。国外销售市场前景看好,公司被孝感市商务局确认为“产品出口型企业”。

二、实习岗位及过程

我从20__年2月15号正式到工艺品有限公司上岗,到此刻以快二个多月了,我此刻的职位是公司销售部外贸跟单员。上班时间早上8:00到晚上6:00,周六仍然要上班。还记得刚来公司的几天,当时的我对这方面没有接触过,再加上我不是这个专业的,所以刚开始做的时候很吃力,有很多专业术语不明白也不懂,为了能尽快的上手工作,我每一天晚上都会学习外贸知识,并加强对英语的训练。此刻我介绍一下我在公司所要做的事情:

1.客户询盘:一般在客户下订单之前,都会有相关的OrderInquiry给我们业务部,做一些细节上的了解。

2.报价:我们业务部及时回复客人查询,确定货物品名,型号,生产厂家,数量,交货期,付款方式,包装规格及柜型等,并做好PerformaInvoice给客户做正式报价。3.得到订单:经过洽谈,收到客户正式的订单purchaseOrder。

4.下生产订单:得到客人的订单确认后,把订单转做成内部订单给采购部让她给工厂下订单,安排工作计划。

5.业务审批:业务部收到订单后,首先做出业务审核表。按出口合同审核表的项目如实填写,尽可能将各种预计费用都列明。合同审批需附上客人订单传真件,与工厂的收购合同。审核表要由业务员签名,部门经理审批,再交管理部人员审核后才能执行。如金额较大的,或有预付款和佣金等条款的,要经公司总经理审批才行。合同审批之后,制成销售订单,交给部门进程员跟进。

6.下达生产通知:业务部在确定交货期后,满足下列状况可下达生产通知,通知工厂按时生产:如果是T/T付款的客户,要确认定金已经到账。如果是西联付款的客户,要先确定付款是否已经到达本地的西联。

7.商检:拿着相关产品资料到商检局去出单证明你的货物经检验贴合怎样的品质和数量。买家凭借你出具的商检单能够了解到货物的品质是否与其需求的一致。

8.验货:在工厂把货物生产好,并发货到公司之后,要对所定货物进行查验,是否能用,质量是否过关,这些是务必要进行验证的,是基本原则,因为要想稳定客户资源,这一部分就必须要做好的。

9.制备基本文件。工厂带给的装箱资料,制作出口合同,出口商业发票,装箱单等文件。

10.发货:通知货代来公司收货。并且把所以必备的单据叫给货代。

11.确认收货:在发货后要通知客户已发货,并且一个星期左右要询问客户是否收到货物。

每一天我都会登录公司邮箱接收英文邮件,然后对有意向购买我公司产品的邮件进行回复及确定产客户所需货物的规格及型号,以及其他要求。

选取进入公司自然少不了要办公,办公相对来说是比较程序化和正式化的。首先,要遵守的就是时间,准时上下班,对于在大学比较自由的我们来说要锻炼“坐”功。我们每一天都是坐在电脑前面,一坐就是好几个小时。其次,要适应办公的氛围,基本上办公的时候还是很严肃的,在紧张的工作重要懂得调节。第三,就涉及到现代办公工具的使用,复印,打印,传真没有想象的容易。对于我们外贸业务员还要能够透过电话和邮件中跟外国客户沟通好。熟悉SalesConfirmation,CommercialInvoice等各种单据是基本的。透过对商务文件的翻译发现也没有想象的难,只要将中文意思能够用简单的文字表达清楚就行。

三、实习心得及体会

透过这次的实习,我由第一天的拘谨,对什么事情都充满着好奇,转而逐渐适应了这样的生活,做事情按部就班,循序渐进。这次的实习,让我懂得了许多,明白了许多,大学文凭其实只是一块敲门砖。进入工作单位后,大家都是从头开始,凡事都要自己去摸索,没有人会手把手教你。所以,我们有必要培养主动学习潜力和创新潜力,务必努力提高自身的综合素质,适应时代的需要。虽说大学文凭只是一块敲门砖,但是个人的综合素质却仍是你就业时的重要筹码。

在实习中我觉得工作中就应做好以下几点:

(一)细心,学习也好,工作也好,必须要做到细心,细心是成功的基石。

(二)耐心,刚刚跨出校门,步入社会这个大家庭,我们一时摆脱不了学生的气息,做事往往缺乏耐心,沉不住气,受不住委屈,但同样要认识到,没有耐心怎能做大事。

(三)职责心,这似乎是一个亘古不变的话题,从小学到大学,父母及老师都教导我们做人要有职责心,做工作也应如此,我们就应充分的认识到我们的背后除了自己的利益外还有公司的利益,也许几十万,几百万,甚至更多。所以无论什么时候,不要忘了职责心!

(四)勤学,熟话说,学无止境。无论在什么样的环境,什么样的场合,我们都就应用心主动的学习,我们刚刚出来,没有社会经验,不懂得人际交往,更不说怎样与斡旋,就连间单的礼仪也要一步步的学。所以学习是任何状况下都不能够少的!

总体来说,这次实习不仅仅仅是锻炼了我在贸易操作方面的一些技能,同时,经过这次实习,我还从中学到了很多课本上所没有提及的知识,还有就是在就业心态上我也有很大的改变,以前我总想找一份适合自己爱好,并且专业对口的工作。可此刻我们都明白找工作很难,要专业对口更难,很多东西我们初到社会才接触、才学习。所以我此刻要建立起先就业再择业的就业观。应尽快学会在社会上独立,敢于参加与社会竞争,敢于承受社会压力,使自己能够在社会上快速成长。总的来说,作为一个快要毕业的大学生,无论是在今后的工作或是生活中,实习都将成为我人生中一笔重要的资本。

四、实习单位存在的问题及对策

到公司做外贸,从刚开始的一无所知到慢慢熟悉。经过快两个月的工作,慢慢地对公司业务也了解了很多,从工作中我觉得公司存在着如下几个问题:

1、在市场推广和产品推介上渠道过于集中和单一,大概所有的业务都是透过广交会才得到的,通常在网站上得到的客户几乎很少。随着这一渠道内部竞争程度的不断加强,企业产品推广和市场开拓将面临极大困难。

2、在产品定价和贸易方式选取上缺乏主动权和话语权,定价主动权的缺乏主要是我国出口企业产品的可替代性强,国内同业竞争过于激烈造成的。

3、由于职员不专业,知识水平不高,职业操守不高,没有经过专业的培训,导致在客户询问相关产品信息时,每个部门同事的回答不能令客户满意。

4客户变的更保守,订单变少,客户倾向与选取更廉价的产品,企业资金周转困难。5、产品的损坏率高,工艺品的产品特性,内含超多玻璃制品和手工制品。货物在生产、搬运、存放等等过程中,会破会部分产品。手工制作的过程中,不合格率也很高,返工率高,从而大大增加了生产成本。

解决的办法:首先,展开客户来源的渠道,不能只盯着广交会着单一的渠道,应舍得花钱和人力、经历在互联网上用发广告(在贸易平台网站上发效果会比较好)和搜寻买家信息的方式寻找客户,或者透过电子邮件的方式上门推销。广交会虽成交率高,但费用贵。而互联网无需成本,就能搜集超多信息,覆盖面广,节约成本。其次,公司应对外贸岗位上的人做一次系统的培训,让他们完善自己在岗位上的不足,在管理上也应作出相应的调整,制定一些奖励惩罚机制来约束一下职员的行为,开除一些成天混时间不为公司做事的人,树立公司形象。最后,公司应多多开发新产品,学会创新,不能因市场的可替代品而丧失市场,导致业绩的下降。应打造公司自己的特有不可替代的产品。加强产品在生产过程中工序的质量检验,以及在搬运,存放工艺品的安全检验,减少不必要的损失。

五、实习总结或体会

透过两个月的实习,我收获了很多东西,发现了自己身上存在的不足。我的工作敏感度有所提高,能够较用心地向领导汇报工作进度与结果;工作适应力逐步增强,对后期安排的工作,现已得心应手。工作中存在的不足主要有,工作细心度仍有所欠缺;在日常工作中,时常有些工作因为不够细心,从而浪费时间或是再做一遍;外来客人的接待和服务不够热情大方,而作为办公室文员,做好接待工作是自己的本份工作,由于本人在这方面没有足够的经验,每次接待都不能做得很好,在以后的接待工作中,力求能做到热情周到,耐心细致。

下面,我总结一下在实习期间的体会和心得。

(1)要拥有用心进取的工作态度。在工作中,你不只为公司创造了效益,同时也提高了自己,象我这样没有工作经验的新人,更需要透过多做事情来积累经验。个性是此刻实习工作并不象正式员工那样有明确的工作范围,如果工作态度不够用心就可能没有事情做,所以平时就更需要主动争取多做事,这样才能多积累多提高。

(2)要拥有团队精神。工作往往不是一个人的事情,是一个团队在完成一个项目,在工作的过程中如何去持续和团队中其他同事的交流和沟通也是相当重要的。一位资深人力资源专家曾对团队精神的潜力要求有这样的观点:要有与别人沟通、交流的潜力以及与人合作的潜力。合理的分工能够使大家在工作中各尽所长,团结合作,配合默契,共赴成功。个人要想成功及获得好的业绩,务必牢记一个规则:我们永久不能将个人利益凌驾于团队利益之上,在团队工作中,会出此刻自己的协助下同时也从中受益的状况,反过来看,自己本身受益其中,这是保证自己成功的最重要的因素之一。

(3)要懂得基本礼仪。步入社会就需要了解基本礼仪,而这往往是原先作为学生不大重视的,无论是着装还是待人接物,都就应合乎礼仪,才不会影响工作的正常进行。这就需要平时多学习,比如注意其他人的做法或向专家请教。这一点,在我接待来宾时,体会个性深刻。

(4)要学会为人处事。作为学生应对的无非是同学、老师、家长,而工作后就要应对更为复杂的关系。无论是和领导、同事还是客户接触,都要做到妥善处理,要多沟通,并要设身处地从对方角度换位思考,而不是只是思考自己的事。(5)要对自己有信心。相信别人能做的,自己经过努力也能做得到,要勇敢。我们每个人,或多或少都有过自卑的心理,觉得自己不行。这时候,我们需要自己给自己一点信心,如果自己都不能相信自己,我们又怎样能期望别人相信自己呢只要我们够努力,别人能做到,我们也能够做得到,甚至可能会做得更好。因为,我们并不比任何人差!在工作中,必须不要失去信心,尽管我们的潜力还很弱,但是,我们还能够做更多的事,所以,在争取一份工作机会的时候,要勇敢一点,给自己机会证明自己做得到。

我坚信透过这一段时间的实习,从中获得的实践经验使我终身受益,并会在我毕业后的实际工作中不断地得到印证,我会持续地理解和体会实习中所学到的知识,期望在未来的工作中把学到的理论知识和实践经验不断的应用到实际工作中来,充分展示我的个人价值和人生价值,为实现自我的理想和光明的前程而努力。

展开阅读全文

篇18:外贸公司报关实习报告范文_实习报告_网

范文类型:汇报报告,适用行业岗位:外贸,企业,全文共 1657 字

+ 加入清单

外贸公司报关实习报告范文

截止到今天我已经实习将近两个月了,几经波折,我被学校安排到一家叫“利通国际货运有限公司”报关行实习。虽然没报关证,但从总体上感觉做报关工作还挺有趣味的,做报关工作既锻炼了自己的能力又充实了自己的知识面。

首先,你面对的是海关和往来的客户,做为桥梁作用的报关员就要充分发挥两者之间的协调和沟通作用了,这从另一个侧面来看报关工作锻炼你的交际和沟通能力;其次,随时间的推移,海关的法规和海关通关作业的程序也在不断的改变,很多东西要靠自己在工作中去学习,积累,和实践,从而不断更新自己的知识面。

从大学校园生活直接步入社会,需要你去接触的不再是那些熟悉的面孔,换之而来的是各行个业的人。对他们的了解要从头开始,如何去了解一个人的内心世界,如何去和一个人沟通,这一系列的问题都要你去探索和解答。处理好发生在自己身边的每一件事,同时搞好自己的人际关系网,与同事,与客户,与海关,树立良好的自我形象。

实习的第一天我当然是先熟悉工作环境了。在办公室看同事如何的工作,跟他们一起办手续,就比如:去cosco船代,marsk盖申报,在国际货柜盖进场,去码头验货,货物放行后要去码头送配载等等。

在对环境基本上熟悉后就是实际的业务操作了首先是做进口了。有带我的同事的指点,我很快就掌握了。在随后的几天里我相继对有关的进口的单据,诸如提运单,发票,箱单等各类型的都做了学习,因为我们这里海运和陆运都做的。

对进口做的相对熟练后,我开始学做出口和转关了。有了进口的基础,出口和转关就相对简单了,我也很快就掌握了。

其实我觉得在工作的一开始,我是从复印资料开始做的,帮我的同事复印一些资料。其实看起来很简单的,但是里面有好多需要你去掌握的。至少你要记得哪些资料是有用的,哪些是没用的,还有需要的份数。随后在看了几次如何装订和盖章后我就开始尝试着自己来装订了,以后就和同事一起做单递单了,在递单环节也是一个很好的学习机会。因为这个时候你是和海关直接的接触,可以及时了解海关最新的政策和通关的要求;同时,接单的时候也是报关员云集的时候,利用这个机会和他们交流经验或倾听他们讨论工作中的问题,对以后的工作也是十分有用的。

在实习当中通过对业务的操作,从中也发现很多的不足。以前在学校里学的只是理论上的东西,和实际的操作有很大的差别的。就报关单的填制就可以知道的。海关总署只是制定了统一的标准,而具体到每个海关,就有不同的规范了。进出口商品如何规范申报,是我们在办理通关事务时经常遇到的难题,虽然报关单填制规范对报关单中各项的内容的填报作了具体的规定。但对于不同的商品来讲,海关在归类,审价和监管方面的要求是不同的,因此相应的商品申报规范也是不同的,而某项商品的名称,规格型号具体应该如何申报,海关总署并无相应的规定,各地海关目前也无统一做法。因此,我们如何对海关提供具体的商品的申报规范,这就要求我们在平时的工作当中不断的学习和积累了,要把这些已经掌握的东西变成自己的。

在工作中最好的办法就是多学多问。

在实习中我总结了一点小小的经验,这一点对我的作用很大。那就是在实习期间一定要记得实习期间辛苦一点,多做些琐碎的小事,多和同事帮忙,去掌握工作中的每一个细节,每一个细节都掌握了,那么以后你就会轻松一点。把最基本的都掌握了,该做的都会做了,那你就算是真正学到手了。

综上报告,对我院我系物流与报关专业提出如下建议,希望在以后的教学过程中逐步完善:

(一)从工作的内容上,有重点地完善对毕业在校生的实际操作动手能力。在各个环节上容易出现什么问题,应注意哪些事项,有何具体的操作技巧。如模拟报关的实际业务流程:从接受客户的报关资料到填写预录入凭单,从预录入到复核发送,从订单到递单,从查验到海关放行。

(二)从工作的技术支持上,加强对新的应用软件如edi报关系统及中国电子口岸的学习和掌握,以适应现代化的大通关。

(三)从工作涉及的人际关系方面,提高对在校生的素质教育,既包括心理素质,又包括职业道德素质。逐步加强人际关系学的方法和技巧的学习和掌握。

展开阅读全文

篇19:中外贸易合同

范文类型:合同协议,适用行业岗位:外贸,全文共 2166 字

+ 加入清单

________公司(以下简称卖方) ________公司(以下简称买方)

订立合同如下:

第一条 合同标的

卖方卖出、买方购入商品。商品应符合下文第四条中所确定的清单no1。该清单为本合同的附件,是本合同不可分割的组成部分。

第二条 价格和合同总金额

在清单no1中所载明的商品价格,以美元计价。本合同总金额为__________ 。

商品价格包括抵____的一切费用,同时包括在买方国境外预付的包装、标记、保管、装运、保险的费用。

第三条 供货期限和日期

商品应在卖方银行通知保兑的、与第二条所列金额相符的有效信用证时起60天内从公司运往________。

卖方有权提前供货,也有权视情况一次或几次供货。

第四条 商品品质

商品品质和数量由买卖双方以书面协议确定,在本合同附件清单no1中载明。清单no1附在本合同上(见第一条)。

第五条 包装和标记

商品包装应符合规定的标准和技术条件,保证货物在运输中完好无损。

每件货物上应有以下标记:

________到达站名称;

________卖方名称;

________买方名称;

________货件号;

________毛重;

________净重:体积(用立方米表示)。

第六条 支付

买方应在本合同签订后20个工作日内开立以卖方为受益人、不可撤销的、可分割的、可转让的跟单信用证。该信用证的总金额在合同第二条中载明,其有效期至少80天。

信用证由卖方选择的、法律上承认的________银行开立并确认。以信用证付款凭卖方向银行提交以下单据进行:

________发票一式三份;

________全套买方名义下的运输单;

________包装单一式三份;

________本合同副本;

________在买方国境内的一切银行费用由买方负担,在买方国境外的一切费用由卖方负担。

第七条 商品的交接

所有商品应由检查人员进行必要的数量和品质检查。

检查人员的结论是最终结论,买卖双方不得对此有争议。

余下部分买方可以拒收和退还,买方应单独保管其拒收的商品,并对此承担责任,便于卖方、供货人和检查人员进行可能的检查。如果确定拒收成立,对商品的责任自动转移给卖方,由卖方自行决定商品的处理,商品的保管费由供货人支付。

第八条 保险

根据上文第二条由________对商品在运抵________港之前进行保险。

第九条 品质保证

商品品质应符合清单no1。买方没有义务接收不符合清单no1的商品。

买方可以不加解释和不出示证据退还未被接收的商品(见下文第十条)。

根据下文第十条,卖方应在收到买方理由充分的索赔时起30天内如数更换未被接收的商品,以保证完全按照本合同规定运送货物。

第十条 索赔

商品运到时,买方有权就商品的数量向卖方提出索赔(见第七条),反之,买方接收共同指定的检查员确定的数量的商品。买方可以就商品品质不合格向卖方提出索赔。所有运抵的商品如果没有以适当的方式拒收或退回,都被认为买方已经接收。

有充分理由退还的拒收商品都被认为卖方供货不足,同时免除对买方就拒收商品的支付或赔偿提出任何异议。检查员最终确定有充分理由拒收和退回商品的数量。

在商品原封不动或无损坏退还卖方的情况下,未超出检查员确定的界限的商品的拒收,无需经商品不合格证明,在规定的期限内,根据必需的手续,应由卖方无条件承认。

买方索赔函用挂号信寄给卖方。

就某一批商品提出索赔,不能成为双方拒收和拒付根据本合同所规定的其他供应商品的理由。

第十一条 不可抗力

出现不可抗力,即火灾、自然灾害、封锁、禁止进出口和其他合同双方人力不可抗拒的情况造成合同某一方不能完全或部分履行合同义务时,按不可抗力与其后果存在的时间推迟履行合同义务。

如果上述情况与其后果持续达三个月以上,任何一方都有权拒绝履行本合同项下的义务。在此情况下,任何一方都无权要求补偿可能的损失。

由不可抗力造成不能履行合同义务的一方应尽快将妨碍履行义务的不可抗力的出现和终止情况通知另一方。由卖方或买方国有关商会出具的证明是上述不可抗力情况出现的必需证明。

第十二条 罚则

如违反本合同规定的货物抵达期限,卖方应向买方支付罚金。罚金数额规定如下:

1.在最初三周内每过期一个日历周支付未交商品总金额的1%;

2.以后每过期一个日历周支付未交商品总金额的2%,但罚金总额不能超过未交商品总金额的15%。

第十三条 其他条件

任何一方在没有征得另一方书面同意的情况下不得将自己对本合同的权利和义务转让给第三者。

对合同的一切修改和补充意见只有以书面形式形成并经双方签字后才有效。

在买方国境内的一切费用和规费,包括海关规费和关税,与订立、履行本合同有关的费用,由买方承担,在买方国境外,则由卖方承担。

本合同用________两种文字书就,两种文本具有同等法律效力。

第十四条 仲裁

由本合同派生或与本合同有关的一切争议和分歧由国际仲裁机构审理。

第十五条 双方法定地址

卖方:________________________________地址:____________邮码______ 电话_____

买方:________________________________地址:____________邮码______ 电话_____

日期::_________________________日期::________________________________

展开阅读全文

篇20:关于进口贸易的合同

范文类型:合同协议,适用行业岗位:外贸,全文共 2055 字

+ 加入清单

合同号码:____

日期:____

地点:____

买方:____

卖方:____

兹经买卖双方同意,由买方购进,卖方出售下列货物,并按下列条款签订本合同:

(6)装运口岸;

(7)目的口岸;

(8)付款条件:买方在收到卖方关于预计装船日期及准备装船的数量的通知后,应于装运前20天通过北京中国银行开立以卖方为受益人的不可撤销的信用证。该信用证凭即期汇款票及本合同第(9)条规定的单据在开证行付款。

(9)单据:各项单据均须使用与本合同相一致的文字,以便买方审核查对:

a.填写通知目的口岸对外贸易运输公司的空白抬头、空白背书的全套已装船的清洁提单(始本合同为fob价格条件时,提单应注明“运费到付”或“运费按租船合同办理”字样;如本合同为c&f价格条件时,提单应注明“运费已付”字样)。

b.发票:注明合同号、唛头、载货船名及信用证号;如果分批装运,须注明分批号。

c.装箱单及/或重量单:注明合同号及唛头,并逐件列明毛重、净重和炉号。

d.制造工厂的品质及数量/重量证明书。

品质证明书内应列入根据合同规定的标准按炉号进行化学成分、机械性能及其它各种试验的实际试验结果。数量/重量证明书应按炉号列明重量。

e.按本合同第(11)条规定的装运通知电报抄本。

f.按本合同第(10)条规定的航行证明书(如本合同为c&f价格条件时,需要此项证明书;如本合同为fob价格条件时,则不需此项证明书)。

(10)装运条件:

a.离岸价条款:

a)装本合同货物的船只,由买方或买方运输代理人中国租船公司(地址:北京,二里沟。电报挂号zhong zu peking)租订舱位。卖方负责货物的一切费用风险到货物装到船面为止。

b)卖方必须在合同规定的交货期限30天前,将合同号码、货物名称、数量、装运口岸及预计货物运达装运口岸日期,以电报通知买方以便买方安排舱位。并同时通知买方在装港的船代理。若在规定期限内买方未接到前述通知,即作为卖方同意在合同规定期内任何日期交货,并由买方主动租订舱位。

c)买方应在船只受载期12天前将船名,预计受载日期、装载数量、合同号码、船舶代理人,以电报通知卖方。卖方应联系船舶代理人配合,船期备货装船。如买方因故需要变更船只或更改船期时,买方或船舶代理人应及时通知卖方。

d)买方所租船只按期到达装运口岸后,如卖方不能按时备货装船,买方因而遭受的一切损失包括空舱费、延期费及/或罚款等由卖方负担。如船只不能于船舶代理人所确定的受载期内到达,在港口免费堆存期满后第16天起发生的仓库租费、保险费由买方负担,但卖方仍负有载货船只到达装运口岸后立即将货物装船之义务并负担费用及风险。前述各种损失均凭原始单据核实支付。

b.成本加运费价条款:

卖方负责将本合同所列货物由装运口岸装达班轮到目的口岸,中途不得转船。货物不得用悬挂买方不能接受的国家的旗帜的船只装运。载货船只在驶抵本合同第(7)条规定的口岸前不得停靠中国台湾及/或中国台湾附近地区。

(11)装运通知:卖方在货物装船后,立即将合同号、品名、件数、毛重、净重、发票金额、载货船名及装船日期以电报通知买方。

(12)保险:自装船起由买方自理,但卖方应按本合同第(11)条规定通知买方。如卖方未能按此办理,买方因而遭受的一切损失全由卖方负担。

(13)检验和索赔:货卸目的口岸,买方有权申请中国商品检验局进行检验。如发现货物的品质及/或数量/重量与合同或发票不符,除属于保险公司及/或船公司的责任外,买方有权在货卸目的口岸后90天内,根据中国商品检验局出具的证明书向卖方提出索赔,因索赔所发生的一切费用(包括检验费用)均由卖方负担。fob价格条件时,如重量短缺,买方有权同时索赔短重部分的运费。

(14)不可抗力:由于人力不可抗拒事故,使卖方不能在合同规定期限内交货或者不能交货,卖方不负责任。但卖方必须立即以电报通知买方,并以挂号函向买方提出有关政府机关或者商会所出具的证明,以证明事故的存在。由于人力不可抗拒事故致使交货延期一个月以上时,买方有权撤销合同。卖方不能取得出口许可证,不得作为不可抗力。

(15)延期交货及罚款:除本合同第(14)条人力不可抗拒原因外,如卖方不能如期交货,买方有权撤销该部分的合同,或经买方同意在卖方缴纳罚款的条件下延期交货。买方可同意给予卖方15天的优惠期。罚款率为每10天按货款总额的1%。不足10天者按10天计算。罚款自第16天起计算,最多不超过延期货款总额的5%。

(16)仲裁:一切因执行本合同或与本合同有关的争执,应由双方通过友好方式协商解决。如经协商不能得到解决时,应提交北京中国国际贸易促进委员会对外贸易仲裁委员会,按照中国国际贸易促进委员会对外贸易仲裁委员会仲裁程序暂行规则进行仲裁。仲裁委员会的裁决为终局裁决,对双方均有约束力。仲裁费用除非仲裁委员会另有决定外,由败诉一方负担。

(17)附加条款:以上任何条款如与以下附加条款相抵触时,以以下附加条款为准。

买方:__(盖章)

代表人:__(签字)

卖方:__(盖章)

代表人:__(签字)

__年__月__日订立

展开阅读全文
搜索发现
404
404

Can not connect to database!

error: ͨÿ׽ֵַ(Э/ַ/˿)ֻʹһΡ